HomeMy WebLinkAboutItem B: Next Steps on Police Facility/City Hall
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Work Session: Next Steps on Police Facility/City Hall
Meeting Date: July 29, 2009 Agenda Item Number: B
Department: Central Services Staff Contact: Mike Penwell
www.eugene-or.gov Contact Telephone Number: 682-5547
ISSUE STATEMENT
The purpose of this work session is to request council direction for using a portion of the Facility
Reserve to implement a proposed plan for City Hall including acquiring the property at 300
Country Club Road for use as a Police Facility and addressing the deficiencies of the City Hall
building.
BACKGROUND
At work sessions on April 22 and May 11, 2009, the council was presented with information
regarding the Country Club Road property, and the life safety, space, functional, and condition
deficiencies of City Hall. In addition, elements of the City Manager’s recommendation for
resolving these issues was presented and discussed. A complete summary of this background
information is contained in a council memo dated July 20, 2009, and included with this AIS as
an attachment.
In short, the recommended plan consists of a series of separate but related actions to support
specific outcomes. The first step is to move all police functions currently located in City Hall to
the 300 Country Club Road site in order to house the Police Department in a safe, adequate, and
cost-effective facility from which it can better serve the community. Coupled with this step
would be the establishment of a Downtown Public Safety Station to maintain a strong and visible
police presence downtown including front counter services.
The next step is to move the remaining City functions out of City Hall and into leased space in
the Beam and/or WG development projects in order to create a civic campus for City services
downtown. This allows the City to avoid the significant capital costs that would otherwise be
required to stay in City Hall, helps assure the viability of one or both development projects in
which the City is already invested both economically and politically, and accomplishes greater
consolidation of City services for improved efficiency and customer service. Specific details of
this plan, including the financing plan, would be developed and brought back to the council for
further action as discussions with project partners progress.
The final step is to develop a plan for the appropriate use of the existing City Hall site after City
functions have moved out. This will require additional community conversations to take place
together with policy and financial analysis of options in order to produce the best solution for the
community and the City organization. Additional information would be brought back to the
council for further action as this planning process unfolds.
Z:\CMO\2009 Council Agendas\M090729\S090729B.doc
As directed by the council at the May 11 work session, a limited public involvement process was
conducted to seek community input on the options for City Hall and police facilities. This
included a presentation to a combined meeting of the Government Affairs Committee of the
Chamber of Commerce and the Downtown Eugene, Inc. (DEI) board on June 19, discussions and
Q&A at the Downtown Neighborhood Association (DNA) meetings in May and July, and two
public forums held on June 23 and 25. The Chamber of Commerce subsequently issued a
“statement of support” for moving Police to Country Club Road provided the City “makes a
long-term commitment to maintain a visible, accessible police sub-station in Eugene’s downtown
core.” A show of hands at the July 16 DNA meeting resulted in near unanimous support for the
same.
About 40-45 people attended each of the two public forums, both of which produced good,
spirited discussions about the issues with most of the comments focused on the potential Police
move to Country Club Road. The June 23 forum at the Atrium Building ended with an estimated
60 percent of participants generally opposed to the idea and approximately 40 percent in favor.
The June 25 forum at Sheldon Community Center produced a strong majority in favor of the
move. A summary of the public forums is included as Attachment C.
Also, the citizen members of the Budget Committee will meet on July 27 to hear information
about, and discuss the proposed use of, Facility Reserve funds to move Police to Country Club
Road and implement the Civic Campus concept to address the remaining functions in City Hall.
The Mayor and council are invited to attend and themes that emerge from the meeting will be
summarized for the July 29 work session.
RELATED CITY POLICIES
Addressing the deficiencies of the existing City Hall and providing safe, adequate space for the
Police Department relates to the council values of effective, accountable municipal government,
a safe community, and sustainable development. The council has maintained a continuing goal
to adopt an implementation plan for resolving the issues related to City Hall and a police facility.
The City Hall Complex Action Plan identified key issues that must be addressed as work toward
the goal progresses.
COUNCIL OPTIONS
1.The council can choose to move forward with all three elements of the City Manager’s
recommended plan.
2.The council can choose to move forward with any single element of the plan and request
additional information on the other plan elements before deciding whether to move forward
with those elements.
3.The council can choose to request additional information on the entire plan before moving
forward with any elements.
Z:\CMO\2009 Council Agendas\M090729\S090729B.doc
CITY MANAGER’S RECOMMENDATION
The City Manager recommends option 1.
SUGGESTED MOTIONS
1.Move to authorize the City Manager to negotiate and sign a purchase and sale agreement for
the acquisition of the property at 300 Country Club Road for use as a Police Facility and
r
equest on a Supplemental Budget an appropriation of up to $16,000,000 from the Facility Reserve
for costs related to acquisition, design, construction, furnishing, and move-in.
2.Move to direct the City Manager to return to the council at a future work session with an
implementation plan—including a detailed financing plan—for moving the remaining non-
police services out of City Hall.
3.Move to direct the City Manager to return to the council at a future work session with options
and recommendations for the future use of the existing City Hall site.
ATTACHMENTS
A.Council Memo Dated July 20, 2009
B.Facility Reserve History
C.Public Forum Summaries
FOR MORE INFORMATION
Staff Contact: Mike Penwell, Facility Management Division Manager (AIC)
Telephone: 682-5547
Staff E-Mail: michael.j.penwell@ci.eugene.or.us
Z:\CMO\2009 Council Agendas\M090729\S090729B.doc
ATTACHMENT A
Central Services
Facility Management
City of Eugene
210 Cheshire
M
Eugene, Oregon 97401
EMORANDUM
(541) 682-2690
(541) 682-6222 FAX
www.eugene-or.gov
Date:
July 20, 2009
To:
Mayor Piercy and City Council
From:
Mike Penwell, 682-5547
Facility Management Division Manager (AIC)
Cc:
Eugene Budget Committee Citizen Members
Subject:
Next Steps on Police Building and City Hall Planning
Over the past weeks and months, there has been a lot of information circulated and discussions
conducted about how to proceed with decisions on a proposed Police Facility and what to do
with City Hall. The purpose of this memo is to summarize relevant information pertaining to
this subject and outline the City Manager’s recommendation well ahead of the July 29 council
work session. This memo will also serve as background information for the Budget Committee’s
discussion of these issues relative to the use of the Facility Reserve on July 27.
Facility Reserve/Project Funding
As the Facility Reserve is the primary funding source for most of the initial costs related to the
proposed space moves, a brief history of the reserve fund is included as Attachment [B]. As
noted in the attachment, the Facility Reserve was initially created in 2001 as a way for the
organization to save for the repair or replacement of City Hall and a new Police Facility. The
intention was that the organization could reduce the amount asked from voters to pay for City
Hall and Police Facility projects by saving money in the Facility Reserve.
Over the past year or two, changing priorities and a worsening economy have eliminated consid-
eration of a bond measure as a realistic funding source for the foreseeable future. As a result,
any solutions to the City Hall/Police Facility problem must be funded with existing internal
resources supplemented by any grants or stimulus funds that may become available as projects
are implemented.
Existing City Hall
The space and condition issues related to City Hall have been well documented over the years.
There have been at least five different seismic studies/reports dating back to 1995 that have
included some level of assessment of the city hall building’s ability to withstand the lateral
forces associated with earthquakes. All reports have consistently concluded that City Hall would
likely suffer major structural damage and possible collapse in the types of earthquakes associated
15
Page of
with western Oregon. In March of this year, a cost estimate was developed by kpff Consulting
Engineers under the direction of Berry Architects for a life-safety level seismic upgrade to City
Hall. The total project cost for the most appropriate seismic upgrade scheme was estimated to be
approximately $6 million. An “essential facility” seismic upgrade (the current code standard for
police and fire stations) that would allow Police to safely remain in the building would cost at
least 25% more, if it is even technically achievable.
There are numerous other condition deficiencies at City Hall including mechanical and electrical
systems that have outlived their useful life-span and the rotting wood “fins” on the exterior of the
building. Because of its age, the heating, ventilating, and air conditioning (HVAC) system is
very inefficient by today’s standards, a situation that is exacerbated by the lack of insulation at
the walls, roofs, and floors of the building and the presence of single-glazed windows. In
addition, the building’s primary source of heat—steam from the EWEB steam system—is slated
to be shut off within 3-5 years. A complete replacement of the HVAC system and a complete
upgrade of the exterior envelope would need to be accomplished in the next several years in
order to continue use of the building.
Even if all the condition deficiencies in the building were addressed, City Hall is much too small
to accommodate even the existing functions within the building, to say nothing of consolidating
additional general office functions located in multiple other locations downtown. Police have
been more and more squeezed over the years as they have anticipated moving all or part of their
functions to safer, more appropriate space elsewhere. Municipal Court has long needed a larger,
dedicated third courtroom along with jury orientation space and meeting space for attorneys and
their clients. The City Manager’s Office has been split among multiple locations for several
years and both City staff and community members would benefit from consolidation of CMO
functions.
During the City Hall Complex Master Plan process, the consultant team estimated that a retrofit
of City Hall to LEED Silver standards, a life-safety level seismic upgrade, and a moderate
amount of internal remodeling for better functional use of the spaces after Police moves out,
would have a total project cost of $40-50 million without any increase in building area.
Police Facility on Country Club Road
The City Manager’s recommendation for addressing the life safety, space, functional, and
condition deficiencies of City Hall starts with acquiring the 300 Country Club Road facility as
the new home for all Police functions currently located in City Hall. The property consists of a
66,000 square foot two-story building with 70-75 secure covered parking spaces below and more
than 250 on-grade parking spaces, situated on a four-acre site. The property meets current space
and parking requirements for all Police functions presently housed at City Hall and has ample
future expansion capabilities if needed.
The building was constructed in 1982 to house Pacific Northwest Bell, the precursor to what is now
Qwest. Because the building was designed to accommodate an emergency call center, it was built to a
higher seismic standard than was required by code at the time. A recent seismic analysis performed by a
licensed structural engineer determined that the building can be upgraded to meet essential facility
. In addition, the building has a
seismic requirements for approximately $500,000 in total project costs
largely open floor plan making it relatively easy to remodel for use as a police facility.
25
Page of
Acquisition of the property plus remodeling and seismic upgrades to meet police requirements is
estimated to not exceed $16 million in total costs, and the Facility Reserve is the presumed
source of funding for these costs.
Based on current costs at City Hall, ongoing annual operations, maintenance, and utility costs for
a Police Facility in this larger building would be approximately $876,000 in 2009 dollars, an
increase of $368,000 over current police O&M costs at City Hall. However, the remodel of the
Country Club Road building is assumed to be to LEED Silver standards—making it much more
energy-efficient than the current City Hall building—so utility costs on a per-square-foot basis
should be reduced significantly. We are also in the process of evaluating more cost-effective
custodial approaches that may reduce the O&M costs even more. Regardless, there will be some
increase in the overall O&M costs associated with this building because of the increase in
building area as compared to Police’s current space in City Hall.
One potential concern that has been raised about the Country Club Road site is that it is on the
edge of the 100-year flood plain of the Willamette River. In keeping with past and current code
requirements, the building was designed so the first floor level is one foot above the flood plain.
The only area that would be affected as a result of a 100 year flood event is parking. As there is
typically several days warning before a river reaches flood stage, a contingency plan would be
developed to assure the continuation of police services in such an event. Since construction of
the building in 1982, the Country Club Road site has never flooded including in 1996 when area
rivers experienced some of their worst flooding in decades.
Another concern raised relative to the Country Club Road site is that, although the building
would be upgraded to withstand a major earthquake, the bridges that span the Willamette River
might not survive because none of the vehicular bridges currently spanning the river are built to
current seismic code. The first point to make on this issue is that, at any given time, patrol
officers are out in various parts of the City and responding from their area of patrol, not from the
facility. Secondly, ODOT is in the process of replacing the I-5 bridge across the Willamette with
one designed to current seismic code, providing a safe “back door” into Eugene via Glenwood.
It should also be noted that all the bike/ pedestrian bridges crossing the river in Eugene are
designed to carry emergency vehicles, including the DeFazio Bike Bridge that was designed to
current code requirements. If all else fails, the National Guard has a plan to erect a floating
bridge to provide an emergency connection across the Willamette within a few days of a major
earthquake.
One final concern expressed about the Country Club Road site is traffic congestion on and
around Country Club Road during certain parts of the day and during U of O football games.
Again, it is important to remember that police officers respond to emergencies from their patrol
areas and not from the facility. Patrols go out from the building in overlapping shifts seven times
a day, and can be planned around the modest “rush hour” we experience here in Eugene. Like-
wise, U of O football games are scheduled and can be planned around. Finally, because the site
backs up to the on-ramp from Country Club Road to I-105, it may be possible to create an
emergency egress onto I-105 in case of an incident that completely blocks Country Club Road.
It’s an involved process to obtain ODOT approval for an emergency connection to a limited
access highway, but we’ve been told there is precedent elsewhere in the state.
35
Page of
Police Presence Downtown
If the police headquarters moves to Country Club Road, it will be important to maintain a strong
and visible police presence downtown. Regular vehicle and bike patrols would continue to be
the primary response presence downtown as they are now. In addition, a Downtown Public
Safety Station would be added in a prominent and visible storefront location providing front
counter services and some mix of uniformed patrol officers and Community Service Officers.
This would also be the likely base for downtown bike patrols and possibly the Downtown Guides
as well. Ideally, the Downtown Public Safety Station would be collocated with other City
functions in the Beam and/or WG Developments to reinforce the “Civic Campus” concept for
downtown City offices.
Downtown “Civic Campus”
If all police functions currently in City Hall were to move to a consolidated Police Facility,
relocating the remaining City Hall functions and planning for the future use of the City Hall site
becomes a viable option. The recommended option for accomplishing this is for the City to
leverage its interests in the Beam and/or WG Developments to move the remaining functions in
City Hall—as well as selected functions currently in leased space elsewhere—to leased space in
one or both of these development projects. In the Purchase and Sale Agreement between Beam
Development and the Urban Renewal Agency, the City committed to lease up to 50,000 square
feet in the building to be constructed on the vacant parcel adjacent to the Centre Court building.
With Lane Community College entering the picture and both developers talking to other
prospective tenants, the City could choose to transfer a portion of this commitment to the WG
Development.
The remaining $6 million in the Facility Reserve could be used to “buy down” the City’s cost of
occupancy. This could allow the City to control the ongoing costs of occupancy while avoiding
the tens of millions of dollars in capital costs that would be needed over the next 5-10 years to
refurbish and update City Hall for continued use. The addition of these funds for capital costs on
the front end might also help one or both projects to secure additional capital in the tight credit
market that currently exists for these types of projects.
In this option, we would want to assure that any buildings occupied by City functions have a
civic presence appropriate to municipal government buildings. As noted above, the Downtown
Public Safety Station could also be included in order to maintain a police presence in close
proximity to other City offices. Relocating City Hall functions to these developments would
help create a municipal government district focused between the Beam Development at Broad-
th
way and Willamette and the Library at 10 and Charnelton. This would be an improvement over
the current dispersion of City offices that stretches from the Library to City Hall. At the same
time, ground floor uses in these development projects could be largely dedicated to retail uses
creating a livelier streetscape and a more engaging pedestrian experience.
Future Options for a Consolidated City Hall
The Civic Campus concept may be an interim solution, and it allows the City to avoid large
capital expenditures in the existing city hall building and jump-start one or both important
development projects currently being considered on neglected sites downtown. But “interim” in
this case may be as long as 10-15 years. Eventually, the City will want to look again toward a
consolidated City Hall. The Civic Campus concept buys us time while we explore future options
45
Page of
for a consolidated City Hall including building on the existing City Hall site, acquiring the
EWEB Administration Building, acquiring the Federal Building if the GSA decides to surplus it
at some future date, or moving forward with an option that hasn’t yet been conceived. During
this interim period, the Facility Reserve will need to be replenished in order to help fund future
City Hall projects.
Summary of Potential Moves and Use of Facility Reserve
The following table lists functions currently located in City Hall with the approximate building
area needed, where they would be relocated and how the Facility Reserve would be utilized to
pay for or assist with up-front capital costs.
Service Area Square Footage Project Cost Recommended Location
Police Headquarters 66,000 s.f. $16 million 300 Country Club Road
Downtown Public
Safety Station 3,000 s.f.
Mayor, City Council &
Civic Campus Area including
Council Chamber 5,000 s.f.
$6 million
Beam and/or WG Development
CMO/Human Resources 12,000 s.f.
Municipal Court 15,000 s.f.
Other potential functions that may be considered for inclusion in the Beam/WG developments
are Risk Services (3,300 s.f.), the City Prosecutor (1,700 s.f.), a combined training/conference
room (1,500 s.f.), Police Auditor (1,400 s.f.), and City Recorder Archives (4,000 s.f.). More
detailed information on the preferred location of specific functions, relationships to other public
and private functions, and the financing plan will be developed and brought back to council as
discussions with potential project partners progress.
Options for Existing City Hall Site
The last piece of the puzzle that needs to come together in order to complete the plan is deciding
what to do with the existing City Hall site. Ideas for reuse have included letting the building live
on as an arts center or home for non-profits. Others have suggested it be sold for market value
with the proceeds used to begin replenishing the Facility Reserve. Still others have suggested the
site be retained by the City as the future home for City Hall, but the building be demolished and
replaced in the interim by a park, a parking lot (to generate revenue), or a combination of the
two. Clearly additional conversations with the community need to take place and criteria
developed in order to achieve a successful future use of the site. We propose additional public
input opportunities on this topic be scheduled for late summer and early fall, if the council
chooses to move forward with the option of vacating City Hall, with results and a recommenda-
tion brought back to council in the fall.
Please contact me at 682-5547 or by email at michael.j.penwell@ci.eugene.or.us if you have
questions or need additional information.
55
Page of
ATTACHMENT B
FACILITY RESERVE HISTORY
The Facility Reserve was created in FY01 as a way for the organization to save for the repair or
replacement of City Hall and a new Police Facility. The intention was that the organization
could reduce the amount asked from voters to pay for the City Hall projects by saving money in
the Facility Reserve.
Overall, the amount in the Facility Reserve in FY10 is estimated to be $23 million, with $1
million of that total dedicated towards the second year of pothole patching. Below are brief
descriptions of some of the major revenues and expenditures transactions that have occurred in
the Facility Reserve since its creation in FY01.
Major Deposits into the Facility Reserve
Excess EWEB Wholesale CILT:
During FY01, $7.3 million was earned from one-time CILT
payments on wholesale electric sales to California. These funds were deposited into the Facility
Reserve during FY01and FY02.
Settlement of Telecommunications Lawsuits:
In FY05, the City deposited $15.4 million into
the Facility Reserve from the General Fund and the Telecommunications Fund. The revenues
were a result of additional licenses and permits from Qwest and other telecom providers.
Assessment Bond Fund Residual Assets:
In FY03, council reviewed the residual assets
contained in the assessment bond fund reserves and determined how to use the excess funds. At
that time, $2.3 million of the residual assets were deposited into the Facility Reserve to be used
for City Hall complex master plan projects.
Capitalization Component of Facilities Charge:
During FY02, a new component was added to
the Facilities Charge for certain downtown facilities. This charge was developed as a way to
systematically set aside funds for a new City Hall. Both General Fund and Non-General Fund
services have contributed to the Facility Reserve through Facility Capitalization Charges. In
FY09, the charge for all funds is about $900,000.
Other Miscellaneous Revenues:
The City deposited other one-time funds into the Facility
Reserve from time to time. Examples are proceeds from sale of the Olive Street parking lot
($350,000), the library asbestos settlement ($227,000), and return of excess budget for Library
construction project ($100,000).
Major Expenditures from the Facility Reserve
Roosevelt Police Building:
In FY02 and FY03, $3.9 million was transferred from the Facility Reserve to
pay for construction of the Forensic Evidence Unit/Property Control Unit facility at Roosevelt, which
allowed police to discontinue using the basement space at City Hall as regular working areas.
City Hall Master Plan:
Council dedicated approximately $3 million to the City Hall Master Plan from
the Facility Reserve in fiscal years 2006 through 2009.
Lane County Revenue Swap:
In FY09, $4.5 million was transferred to Lane County, so that the funds
could be used to pay for jail beds, prosecution services and other high-priority services. In return, the
County sent $4.5 million from their Road Fund to the City to pay for road maintenance, repair and
construction.
Transportation Utility Fund Transfer:
In FY09, the City transferred $1 million from the Facility
Reserve to the Transportation Utility Fund to pay for street maintenance, including pothole patching. The
City also expects to make a similar transfer in the FY10 budget.
Fire Station #1 Costs:
As part of the financing plan for construction of a new Fire Station #1, $270,000
was transferred out of the Facility Reserve in FY03 to pay for furnishings, fixtures and equipment
(FF&E). The bulk of the fire station was built with General Obligation bond funds approved by voters,
but the FF&E costs are not eligible for General Obligation Bond funding.
General Fund Budget Gap:
In FY04, $900,000 was transferred from the Facility Reserve to fill a
budget gap in the General Fund.
Other Miscellaneous Expenditures
: Facility Reserve contributions were also used to pay for the LRCS
Master Plan ($130,000), the EPD PERF Study ($35,000), and homeless prevention services ($150,000).
ATTACHMENT C
CONSOLIDATED COMMENTS FROM PUBLIC FORUMS
June 23, 2009 & June 25, 2009
Discussion: Moving Police out of City Hall to site on Country Club Road
LEGEND
Hollow bullets indicate specific responses from City staff to questions posed by the public during the
o
forum.
Clarifying Questions – following Mike Penwell’s presentation
?
Can we trade the Country Club Road building for the Veteran’s Administration [who occupy
space in the federal building]?
The GSA has specific guidelines, and is not in the practice of trading buildings that they
o
own.
?
Could we trade City Hall for the Country Club Road site?
The Country Club Road site is more desirable and worth a lot more
o
?
What are the seismic standards of the Country Club Road facility?
Original construction was higher than the standards at the time
o
The owners have done a lot of updating so far
o
Engineering analysis/plan is to bring up to current “essential facility” seismic levels
o
?
What is the condition of the Country Club Road building?
Because the building was originally a Pacific Bell call center, it had higher standards than
o
normal, at the time
The owners completely renovated the building in 1997/98 and made structural
o
improvements
If the City acquires the building, they would bring it up to LEED (energy efficiency)
o
standards, including equipment replacement
It has an open floor plan and is easy to remodel
o
It was built in 1982, but is more like a 1997 building
o
?
What would happen to the Country Club Road site in the event of a subduction zone
earthquake?
The City has planned for flooding and earthquake scenarios, many of which include events
o
that only happen every 100 or 500 years. In the event of a subduction zone earthquake
(possibly resulting in a 9 or higher on the Richter scale for several minutes) not many
buildings in Eugene would be suitable to withstand it without damage. Also, regarding
floods, even with the Country Club building close to the river, it was built higher than the
flood plain. In the event of a flood – to the level of the 500 year flood – we would likely
have 2-3 days warning to prepare as the river rises. it is possible that the parking garage
would be impacted/damaged. We need to be flexible and open to opportunities, and this
is the first building in 10 years that is this compliant.
Emergency access issues have been discussed, including creating an egress from the
o
parking lot onto the freeway
Bridge collapse scenario
o
Scenarios have been discussed
o
Hopefully not every single bridge would be out
o
Page 1 of 11
Consolidated Comments from June 09 Public Forums.docx
The DeFazio bridge was built to current seismic standards, and even though it is a
o
bike/pedestrian bridge, it was designed to carry emergency vehicles.
The National Guard has a plan to set up a floating bridge if all the existing bridges
o
collapse
2 different studies indicated that the cost to bring City Hall up to current standards would
o
cost $40-$50M.
?
What is meant by “police presence” and “hours of operation”?
If we go to the Country Club Road building, we will still need to have a Full Time
o
downtown presence in the form of counter service during regular business hours (8-5, M-
F). We envision having a sub-station with an “obvious” police presence.
In any case, police presence will be there [downtown]
o
?
What do the Police think?
Police command staff support moving to the Country Club Rd. building
o
The union [EPEA] supports it, though one officer wrote an editorial against it
o
?
How is the City going to handle traffic flow during home games at Autzen Stadium?
There will be planning on that issue
o
Luckily, the police generally do not respond from the “hub” (like at a fire station)
o
?
Has the City considered leasing instead of buying?
It is generally more cost-effective for the City to buy rather than lease because the City
o
usually keeps its buildings for a long time
?
How about EWEB?
We are continuing to look at the Administration building. It is about the same square
o
footage as the current City Hall. However, there is more site area around it.
Country Club Road Site – Comments in Favor
Condition of Current City Hall
?
Safety
?
Safety of officers and assured response only if in “seismic-proof” building – URGENT need
?
Safety – cost effective
?
There is a big difference between how the community treats fire and how they treat police
?
Morale is bad for people who must work in an unsafe building
?
First responders need to be where they can do the job
?
Get Police out of City Hall ASAP
?
Get Police out of building ASAP – earthquake risk
?
We owe it to police to give them something that is safe
?
The need is today. 10 years ago, we promised the Police we would do something about their
building and we haven’t done it!
?
10 yrs ago – should have moved
?
City Hall is too small and inefficient
?
There is a broad sense that it [City Hall] is not safe for anyone
Page 2 of 11
Consolidated Comments from June 09 Public Forums.docx
Financial
?
Appreciate cost savings
?
Good move, great time to buy, fire sale, City is exercising due diligence in trying to buy property in
this economy
?
Don’t want to miss opportunity
?
$40-$50M to upgrade City Hall
?
We have the money now – no new taxes or bond measures needed!
?
Country Club Road building is uniquely appropriate for Police use, and the money is there
?
Fiscally responsible
?
Affordability
?
“Fire sale” purchase – great price, perfect timing; trust in City’s due diligence
?
Fiscally responsible
Location
?
Not concerned about location compared to downtown
?
Not concerned about moving across the river
?
Parking good/some concern about traffic
?
Traffic impact – do study
?
Don’t have a problem with police being on the other side of the bridge / connectivity
?
In favor, but concerned with access to police by public: concern that public needs 24/7 access –
Country Club would present more difficult pedestrian access
Note: Bus stop/parking/bike bridge
?
NEEDS TO BE ACCESSIBLE TO PEOPLE
?
?
Separate Police from other City staff
Allows City to focus on Police now, then other City Hall functions next
?
?
Free parking
?
Public transportation to new facility, Breeze? [LTD] Funding cuts?
Suggestions for Country Club Site Use
?
Allows for expansion on site
?
Expand the Courts on the site
?
Turn it into a justice center of police, courts and social services, and have council and staff
relocate into the downtown vacant spaces like Beam Development
?
City Jail in new building
?
Use the Country Club Road facility only as an interim solution until a state-of-the-art facility can
be built
Misc
?
Gives police presence on north side of river
st
?
Allows flexibility in doing remodel of City Hall – the required 1 step
?
Good idea
?
Seems like a viable option
?
Win Win
?
Favors Country Club move
Page 3 of 11
Consolidated Comments from June 09 Public Forums.docx
?
Recruitment (helpful)
?
Yes! Do it now!
?
Don’t let the perfect be the enemy of the good [Voltaire]. We can’t find perfect, but this is a
really good solution.
?
One who has been involved in the process since 2003 (and works for Symantec), it has been too
long, and it’s time to make a decision. “Let’s do this thing!”
Country Club Road Site – Comments Against
Commitment to Downtown
?
Against moving a major facility away from downtown
?
The City has no faith in downtown
?
Blow to reinforcing downtown
?
Reinforce downtown, don’t move a major part of it out
?
Absence of police presence (see additional comments under “Police Presence” heading)
?
Moving to Country Club sends a mixed message regarding downtown development
Financial
?
True cost accounting – upgrade – downtown station
?
With municipal costs going up 6% a year and revenues limited to 3% a year how are we going to
pay for more police?
?
$15 million would put 10 police officers on the street for 10 years!
?
Navy and Marine Reserve Center is a cheaper short term solution
?
The cost represents too large a part of the building reserve fund. $6 million will not build a City
Hall.
?
With most of the money in the Facility Reserve Fund going to the police station, with what money
will we pay for a new City Hall?
?
Why is the facility reserve the only or best option for this?
?
Can’t build City Hall with the remaining $6M
?
Cost of new facility not just $16M, it will cost extra for the sub-station(s) and freeway egress
?
What’s the rush? More places will come on the market – the economy is still going down
?
We don’t have to jump into this building right now
?
Cost of travel from Police facility to City Hall and court
?
Don’t think $16 M is total cost
?
Cost of emergency ramp to freeway
?
Reserve dollars – what’s left for City Hall?
Location
?
Real estate saying “Location, Location, Location” – this site fails
?
Traffic concerns
?
People on other side of the river can’t access City services
?
A little concerned about traffic
Page 4 of 11
Consolidated Comments from June 09 Public Forums.docx
Structural/Safety Issues
?
Immediate needs in a dam break
?
If the collapse of City Hall is a concern, the new building again has parking underneath (and is in a
flood plain)
?
How can the City Council force a public safety facility? When the hospital was needed and it was
not in our best interest, it [the new hospital] had to be built in Springfield.
?
Ferry Street Bridge failure – what is contingency?
?
Should study impact of Ferry Street Bridge outage
?
Earthquake
Misc
?
The question is putting the cart before the horse – we need a new City Hall before we need to
figure out what to do with the current site.
?
The decision has been made – this is a sales pitch, not a discussion
?
Not a good idea
?
100 calls from citizens who don’t want it but City Council has made up its mind
?
Residents in the area are concerned about noise
?
Access to Country Club Road
?
Adaptive Reuse – good approach, Country Club bad test subject
Comments Regarding Police Presence Downtown
?
Important to retain a strong downtown presence
?
The move will reduce some presence downtown with less police even if they are only coming and
going
?
Substation in Beam property
?
Satellite facilities – police
?
We need precinct station in North and West Eugene
?
The downtown substation shutdown – we are offered it back, in exchange for support for this
proposal, making this buy a precondition for opening the substation will only alienate certain
potential supporters
?
We need to go to the precinct model first then figure where the Police HQ would go
?
Many smaller stations instead of a larger one – more dispersed
?
Downtown Station important to keep police presence
?
The significant volume of police presence [downtown] serves as a deterrent to bad behavior
?
The benefit of it being downtown is that people can see it
?
Master Plan in the 60’s was a coordinated effort for the Federal, County and City government to
all be centrally located. We should have 3 major precincts (North, West…). Start thinking
dispersal
?
Feels like downtown sub-station is being held hostage
?
Police as part of process – campus substation, real community policing
?
West University neighborhood
Student riots recur here
?
Page 5 of 11
Consolidated Comments from June 09 Public Forums.docx
Most dense neighborhood in town
?
Eugene Clinic site more appropriate for these reasons
?
?
More eyes [police] on the streets
?
Having more distributed police infrastructure would address the redundancy issue
?
Highest crime rates are Campus, Downtown and Whiteaker
Is substitution enough?
?
?
Police precincts in Fire houses - What happened to 911 Willakenzie [fire station]?
?
Atrium for downtown station
?
Police aren’t terribly visible downtown now
No one knows where it is
?
Parking is a problem
?
?
Studies show less accountability with distance
?
Accountability – studies show that the physically closer the police are to their administrative
body, the greater their interest is in being more accountable
?
Top brass of station will get more out of touch with citizens and community if they are removed
from the area
?
Police need day-to-day contact with civilians, and have civilian oversight; it is the most civil way to
go
?
We need more police officers not more police offices!
?
Belief that the more police that are out in the community and not behind a desk, the better
Suggestions regarding what to do with the existing City Hall
Misc
?
What do we do with the existing facility and the rest of City Hall?
?
Whatever the use, it should be dedicated to service, preferably public service
?
Dedicated to serve – public
?
City Hall was built for other [civic] purposes, but is a blessing for the current need [to use the
building for something else]
?
Higher, better use
?
City Hall Master Plan – what to do with existing City Hall
?
Not a park – crime issues
?
Not a park
?
Consider re-use
st
?
1 step - have to move police
?
First step is to determine what to do with City Hall
?
Incrementalism
?
Is it [City Hall] habitable?
?
Make it part of larger park blocks
?
Use part of site to help connect with Federal Building
?
It was originally an award winning design
?
Coordinate with Atrium
?
If Police go to Country Club Road, then:
Page 6 of 11
Consolidated Comments from June 09 Public Forums.docx
Relocate everyone out of existing City Hall and into other safe space
?
If WG/Beam don’t happen, build on it for City
?
Vacant City Hall site ideas:
?
Central Park idea with businesses around
?
Use Urban Renewal funds to build new City Hall / sell other City owned buildings
?
downtown
Financial
?
Put it on the market
?
Offer property on free market
?
$4 million just for property
?
The City Hall property without the building is worth about $4M
?
Value of land versus improvement
?
We need a new City Hall before we can decide what to do with the existing City Hall and $6M
won’t buy it.
?
More important, don’t want to spend for improvements
?
What developer is going to buy something that’s occupied?
?
Only 80,000 square feet
?
However much money we have, it [City Hall] won’t have a satisfactory upgrade
Move Services Out of Existing Building
?
All agree City Hall functions can move out of existing buildings
?
Pull remaining functions out of City Hall
?
What do we do with City Hall if we get the rest of the folks out?
?
Consensus that existing functions could be moved out of City Hall – not good condition. Don’t
spend money on building, create a marketplace.
?
City Hall where it is – lot across street developed first, move while retrofitting. Tremendous arch
bridge with shops and concessions/working bridge
?
No City Hall pit – retrofit – reject $ they talk about – wonderfully flexible building – on roof, steam
system. Excellent exposure for solar, don’t buy the current $ projection
?
Consider other development options for the rest of City Hall
?
Rent other office space downtown while building a new, safer space for City Hall
?
There are plenty of vacancies downtown, occupy them
Keep & Use Existing Building
?
Remodel City Hall – let it be “ceremonial” space
Fill parking
?
?
Respect the architectural history of old City Hall, but can’t remodel while occupied
?
We in the West tear down buildings that are 50 years old. The current one is imposing, but would
like to treat it as a civic monument, use arts and crafts, very “Eugene.”
?
City Hall as public market?
?
Farmers’ Market
?
Saturday Market
?
Metro-Retro Art Museum
Page 7 of 11
Consolidated Comments from June 09 Public Forums.docx
?
Art center
?
Teen Center (open until midnight)
?
Use City Hall for Farmer’s Market and a Teen Center, where City Councilors and others can
participate in mentor programs.
?
Small options: pool, park, grocery store
?
Grocery store
?
Combination – part building, part green space, part parking
?
Maybe parking lot on interim basis
?
Put a parking lot there and get revenue
?
Hotel / Convention Center – private with City support
Helps bring property on tax base
?
?
Home for non-profits
?
Civic Center – non-profit center
?
Homeless people
?
Low income apartments
?
Offer to developer for new [non-governmental] use, Marketplace
?
Sell to developer to turn into a hotel and convention center
?
Attempt to make the City Hall building a mixed use development – some things can’t be done, like
condos
?
Civic meeting center
?
Continue use of City Hall for Council Chambers, etc…award winning design.
?
Continue use of Council Chamber
?
City Councilor’s offices in the basement
Tear Down Existing Building
?
Tear it down and build a new City Hall on the same site – as the City Hall Public Process
recommended?
?
Tear down City Hall – build state-of-the-art building for government function
?
Take the building [City Hall] down and hold the property
?
Level it
?
Raze City Hall
?
Level it – it’s not worth much
?
Tear down building, relocate everyone into vacant spots downtown
Suggestions for the site and design for a new City Hall
Proximity to Library
?
Keep site centralized, also City offices close to Library with a park
?
City Hall across from Library is a good idea
?
Land swap with property owners near Library and build/relocate there
?
Property swap with property owners of land by Library
?
Retrofit for police – City office closer to Library
Page 8 of 11
Consolidated Comments from June 09 Public Forums.docx
EWEB
?
Can City Hall move to EWEB HQ?
?
EWEB reservoirs
?
Take over EWEB building by eminent domain by declaring as blighted and fix it!
Existing Site
th
?
8 & High – the “triangle” by Federal Courthouse are the worst sites to build new
?
The best site is the current site, the most logical option would be to build over the existing
parking lot
?
Build in same location
?
Pristine, respect connection to County
Financial
?
Federal money – Homeland Security. Suggestion to involve Rep Peter DeFazio, because he chairs
a committee that oversees over $600M dollars, some of which could go to a new building
?
Seek federal money
?
$1.2 M study
?
Use Urban Renewal funds
Misc
?
The architect has taken one particular view. [Instead] how about a flexible building design,
building and mounting things on top of the roof. Build incrementally, in components.
?
There is value in consolidating a “home” for City government
?
South Hills – safety – bedrock
?
Cooperate with developer to create something positive downtown
?
Recruiting for businesses in Eugene (and the Eugene area) is very difficult when City Hall looks like
it does
?
Don’t like how City Hall looks
?
Expand court
?
Courthouses
?
There is a special nature to the issue in that talking about it for ten years has failed. The bigger
issue is City Hall. They change the nature of City Hall, parking spaces, having it on a great street.
Need to share with the street.
th
?
“Great Street” concept, expanding 8 Avenue, considering proximity to County and Federal
?
If we are going to have a great street, it will need more vibrant activities
?
Not a supporter of downtown great street concept
?
Central Park idea
General Comments and Questions
Financial
?
Don’t want Facilities Reserve spent on pot holes
?
Do want money spent on City facilities
Page 9 of 11
Consolidated Comments from June 09 Public Forums.docx
?
Cheapness now does not mean we will save money in the long run
?
How much does the building put on the property tax rolls? What are we doing to do with the
savings?
?
What happened to the $1.2M?
?
15% cut salary
?
Building from tax roll?
?
What is the savings?
?
In the interest of realtors, property value and the value of the surrounding property, both
downtown and around Country Club Road
Public Involvement
?
Have a public hearing, up or down. Yes/no invitation, more transparent
?
Perception of thorough involvement = support for additional needed funds
?
Fix process somewhat – public hearing in 1 week – save staff time to determine political viability
(overcome journalists as issue framers’ problem)
?
What happened to the City Hall Public Process?
?
Why this question?
?
Put this issue to the voters
?
Consider asking voters (i.e. site)
?
Don’t send to the voters, we elected people to figure this out
?
$1,000 contest for school kids to design City Hall, what would happen is that people would be
involved at a grass roots level to cultivate support and best ideas
Police Involvement in Process
?
It is unfortunate that police is not part of this process. [Interactions] with the University sub-
station, considers them to be incredibly involved with the public. Element missing from process.
?
Why is EPD not here?
?
What does the Police Advisory Board think?
Misc
?
What’s the rush?
?
What about court?
?
Can courts move with Police to Country Club Road? [If so] That would be worth exploring
?
What is cost of travel between City Hall and County Courthouse?
?
More eyes on the street. Public buildings not used at night. Active uses [downtown] needed.
[More] details.
?
EPD is like a spare tire; keep in the trunk until you need it. We’ll never get a City Hall as long as
police is there
?
If the space at Country Club Road is double what is currently used, are [non-police] City services
going to be combined there? At the current rate, it doesn’t seem that more police are really
going to happen.
?
If Mike Penwell has not been able to “sell” this after so many years [11] working on it, maybe
another spokesperson would help; perhaps a “changing of the guard.” Another participant
commended Mike for bringing people together.
Page 10 of 11
Consolidated Comments from June 09 Public Forums.docx
?
More building details needed
?
Will you combine policing functions?
?
What do we do with City Hall if we get the rest of the folks out?
?
Value of police station
?
What happens to existing Police facility?
?
Why ask?
?
8 years of missed opportunities!?
?
How many leases does the City have?
Written statement read aloud by Paul Spain, e-mailed to Krisitie Hammitt & Mike Clark, and quoted
below:
“My name is Paul Spain, I reside at 1112 Valley Butte Drive, Eugene, Oregon.
I am here this evening to speak out in favor of moving the police department to the building being
considered on Country Club Road.
It is time for the elected officials of this city to stop pandering to the populist ideas of the few and
extreme, and embrace the responsibilities of their offices for the many and the moderate.
This city has eviscerated the police department and bombarded them with administrative oversight
to the point that they have destroyed the morale of our men and women in uniform who put
themselves at risk everyday for the citizens of our community. To continue to require them to work
in a cramped, unsafe work environment is morally irresponsible and borders on fiscal malfeasance.
They have been forced to work in the very same cramped, unsafe work environment vacated by our
fire department several years ago. Why you would want to deny our police force the same respect
and courtesy shown to our firefighters is beyond comprehension.
If this were a private employer making the same decision, this city’s elected officials would be moving
mountain and mole hill, day and night, to force them to move to a facility that would be better for its
employees, such as the matter before us. Give our officers the respect and courtesy they so well
deserve by at the very least, providing them, and us as citizens, a safe and efficient work
environment. Do not squander this opportunity to acquire a facility that is fundamentally move in
ready which I would expect could be readied for their occupancy within a year. Attempting to retrofit
the existing structure that is seismically unsafe and likely riddled with hazardous environmental
conditions such as asbestos and lead paint, which would be released in the air during a retrofitting
process, would add additional expense to such an endeavor, no doubt increasing costs well beyond
current estimates.”
Page 11 of 11
Consolidated Comments from June 09 Public Forums.docx