HomeMy WebLinkAboutOrd. 20704ORDINANCE NO. 20704
AN ORDINANCE AMENDING THE EUGENE-SPRINGFIELD METROPOLITAN
AREA GENERAL PLAN DIAGRAM AND THE WILLOW CREEK SPECIAL
AREA STUDY FUTURE LAND-USE MAP TO REDESIGNATE THE PROPERTY
IDENTIFIED AS ASSESSOR'S MAP 18-04-04-20, TAX LOT 00100 TO LIGHT
MEDIUM INDUSTRIAL AND REZONING THE PROPERTY FROM E-1 CAMPUS
EMPLOYMENT TO E-2 MIXED USE EMPLOYMENT.
The City Council of the City of Eugene finds as follows:
A. On June 7, 2023, the applicant, Musgrove Family Land Holdings, submitted an
application for a Type I amendment to the Eugene-Springfield Metropolitan Area General Plan
(Metro Plan) Plan Diagram and a concurrent zone change to redesignate the property identified
as Assessor's Map 18-04-04-20, Tax Lot 00100 (the subject property) from Campus Industrial to
Light Medium Industrial and to rezone the subject property from E-1 Campus Employment with
/CAS Commercial Airport Safety Zone Overlay Zone to E-2 Mixed Use Employment with /CAS
Commercial Airport Safety Zone Overlay Zone. On November 6, 2023, the applicant, Musgrove
Family Land Holdings, submitted an application for a concurrent refinement plan amendment to
the Willow Creek Special Area Study Future Land-Use Map to redesignate the subject property
from Special Light Industrial to Light-Medium Industrial.
B. On January 9, 2023, the Eugene Planning Commission held a public hearing on
the application. The Eugene Planning Commission recommended that the Eugene City Council
approve the proposed Metro Plan amendment, refinement plan amendment and zone change.
NOW, THEREFORE,
THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS:
Section 1. The plan diagram for the Eugene-Springfield Metropolitan Area General Plan
is amended to redesignate the subject property from Campus Industrial to Light Medium
Industrial, as depicted on Exhibit A attached hereto and incorporated herein by reference.
Section 2. The Future Land-Use Map (Map E) for the Willow Creek Special Area Study
is amended to redesignate the subject property from Special Light Industrial to Light-Medium
Industrial, as depicted on Exhibit B attached hereto and incorporated herein by reference.
Section 3. The subject property is rezoned from E-1 Campus Employment with /CAS
Commercial Airport Safety Zone Overlay Zone to E-2 Mixed Use Employment with /CAS
Commercial Airport Safety Zone Overlay Zone, as depicted on Exhibit C attached hereto and
incorporated herein by this reference.
Section 3. The findings set forth in the attached Exhibit D are adopted in support of this
Ordinance.
Section 4. If any section, subsection, sentence, clause, phrase, or portion of this
Ordinance is for any reason held invalid or unconstitutional by any court of competent jurisdiction,
Ordinance --Page 1 of 2
that portion shall be deemed a separate , distinct, and independent provision and that holding shall
not affect the validity of the remaining portions of th is Ordinance .
Passed by the City Council this
11 th day of March, 2024
Ordinance --Page 2 of 2
Approved by the Mayor this
--1.2_ day of March, 2024.
Mayor
Proposed Metro Plan Designation
Pitchford -City Files: MA 23-3, RA 23-2. & Z 23-5
Exhibit A
Metro Plan Amendment, Refinement Plan Amendment, & Zone Change
I
i---------,•V. w
I-'
.~· 1-,w . ~--------r---1
l==:=:==i· w
~------I...--~~
w ::.=: 0::: w
w
0::: u
___ ___, r----,----,...------13:
0
'-----I ::I
t----+----1§ t--------.1
~ r-r-
i--------------0---1 ~ CREEK
Property to be redesignated from Campus Industrial to Light Medium Industrial
on the Eugene-Springfield Metropolitan Area General Plan (Metro Plan) Plan Diagram
Assessor's Map 18-04-04-20, Tax Lot 00100 •
Proposed Refinement Plan Designation
Pitchford -City Files: MA 23-3, RA 23-2. & Z 23-5
Exhibit B
Metro Plan Amendment, Refinement Plan Amendment, & Zone Change
I ____ .v. w
I-'
,V)' 1-
_w, v,------.----1
r::::====i· w z ____ ---1.. __ ---10 z 0::
w ~ 0:: w
w
0:: u
-----I r-------r----,,------13:
0
'-----1::j
l----+----1§ t-------.1
r-r-
r--------------0---1
:ii: CREEK
Property to be redesignated from Special Light Industrial to Light-Medium Industrial
on the Willow Creek Special Area Study Future Land-Use Map (Map E).
Assessor's Map 18-04-04-20, Tax Lot 00100 0
Proposed Zone Change Exhibit C
Pitchford -City Files: MA 23-3, RA 23-2. & Z 23-5
Metro Plan Amendment, Refinement Plan Amendment, & Zone Change
0:::
'C
I i---------t ,___ ___ .u. i---------JL....-----1 w 1-·
,VI' 1-
_w, vi--------.----1
l====is~z
z--------1....---1~
w ~
0::: w
w
0::: u
----r----r--.-----is
0 -----1::f
t---+-----1§: t--------.l
r-r-
r---------------0-~
:1: CREEi<
Property to be rezoned from E-1 Campus Employment with the /CAS Overlay Zone to E-2 Mixed
Use Employment with the /CAS Overlay Zone
Assessor's Map 18-04-04-20, Tax Lot 00100 •
Exhibit D
FINDINGS IN SUPPORT OF AN ORDINANCE AMENDING THE EUGENE-
SPRINGFIELD METROPOLITAN AREA GENERAL PLAN DIAGRAM AND THE
WILLOW CREEK SPECIAL AREA STUDY FUTURE LAND-USE MAP TO
REDESIGNATE THE PROPERTY IDENTIFIED AS ASSESSOR'S MAP 18-04-04-20,
TAX LOT 00100 TO LIGHT MEDIUM INDUSTRIAL AND REZONING THE
PROPERTY FROM E-1 CAMPUS EMPLOYMENT TO E-2 MIXED USE
EMPLOYEMENT.
APPLICATION OVERVIEW
Name (File Numbers): Pitchford (MA 23-3 / RA 23-2 / Z 23-5)
Map No. / Tax Lot: 18-04-04-20 / 00100
The applicant has requested a Eugene-Springfield Metropolitan Area General Plan (Metro Plan)
amendment to change the designation of the subject property from Campus Industrial to Light-
Medium Industrial, an amendment of the Future Land-Use Map for the Willow Creek Special
Area Study to change the designation of the subject property from Special Light Industrial to
Light-Medium Industrial, and a change in the base zone of the subject property from E-1
Campus Employment with the /CAS Commercial Airport Safety Zone Overlay Zone to E-2 Mixed
Use Employment with the /CAS Commercial Airport Safety Zone Overlay Zone. The requested
changes are outlined in Table 1, below.
Pitchford Metro Plan Amendment, Refinement Plan Amendment, and Zone Change
Application Current Proposed
Metro Plan Amendment Campus Industrial Light Medium Industrial
Refinement Plan Special Light Industrial Light-Medium Industrial Amendment
Zone Change* E-1 Campus E-2 Mixed Use Employment Employment
*The applicant is only proposing to change the base zoning of the property. The existing /CAS
Commercial Airport Safety Overlay Zone is proposed to remain on the subject property.
Acres
3.68
The subject property consists of a vacant tax lot located on the north side of Pitchford Avenue,
west of Willow Creek Road (Assessor's Map/ Tax Lot: 18-04-04-20 / 00100). The subject
property is located within the boundary of the Willow Creek Special Area Study (WCSAS), which
is an adopted refinement plan of the Metro Plan.
FINDINGS
Based on substantial evidence in the record, the Eugene City Council finds as follows:
Findings Page 1 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
This request for a Metro Plan Amendment (Type I) is subject to the land use application procedures
in the Eugene Code (EC) 9.7700-9.7735. The proposed Metro Plan Amendment also triggers the
need for an amendment to the Willow Creek Special Area Study (WCSAS), which is the adopted
refinement plan for this area. The applicant has also requested a zone change. Per EC 9.8005, the
requested refinement plan amendment and zone change are being processed concurrently. The
following findings address the details of the proposal in the context of compliance with the
applicable approval criteria at EC 9.7735, EC 9.8424, and EC 9.8865. Those criteria are provided
below (in bolded text), including findings addressing compliance with each.
METRO PLAN AMENDMENT
The applicant's requested Metro Plan Amendment proposes to change the land use designation
of the subject property from Campus Industrial to Light Medium Industrial. The amendment is
a Type I Metro Plan Diagram amendment as it only involves property located wholly within the
City of Eugene. The following findings address the applicable approval criteria for the Metro
Plan Amendment:
EC 9.7735 (1): The proposed amendment is consistent with the relevant Statewide Planning
Goals.
Goal 1: Citizen Involvement -To develop a citizen involvement program that ensures
the opportunity for citizens to be involved in all phases of the planning process.
The City's provisions for citizen involvement ensure the opportunity for citizens to be involved
in all phases of the planning process and set out requirements for such involvement. The
proposal does not include any changes to the City's citizen involvement program.
The City's land use code implements Statewide Planning Goal 1 through its noticing
requirements, which include:
• A neighborhood/applicant meeting (9/21/2023)
• Notice to the Oregon Department of Land Conservation and Development (12/5/2023)
• Referrals and notice sent to Lane County and the City of Springfield (11/28/2023)
• Public notice for the Planning Commission public hearing to consider the applications,
which includes: mailing notice to interested parties and adjacent property owners
(12/8/2023); posting of the notice on-site (12/15/2023); and, publishing the notice in a
local newspaper (12/20/2023).
All noticing was conducted in accordance with Eugene Code requirements. Consideration of the
amendments began with a Planning Commission public hearing on January 9, 2024. Following
action by the Planning Commission, the Eugene City Council held a public hearing to consider
the plan amendment and zone change, which was duly noticed. Any written testimony received
by the City discussing this application was made available to the Planning Commission and City
Council for their consideration.
Findings Page 2 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
Based on these findings, the proposed Metro Plan Amendment is consistent with Statewide
Planning Goal 1.
Goal 2: Land Use Planning -To establish a land use planning process and policy
framework as a basis for all decisions and actions related to use of land and to assure
an adequate factual base for such decisions and actions.
Consistent with Statewide Planning Goal 2, the requested Metro Plan Amendment is being
processed according to Eugene's land use code, which specifies the procedure and criteria for
consideration of the request. The requested Metro Plan amendment qualifies as a Type I
amendment as defined in EC 9.7705 because the only requested change is to the Metro Plan's
Diagram, for lands located wholly within the City of Eugene. Consistent with EC 9.7715(1), the
request for an amendment was initiated by a representative for the property owners. Per EC
9.7705(1), this Type I amendment requires approval by City of Eugene only. The subject
property is entirely within Eugene City limits and there is no regional impact associated with
this request to amend the Metro Plan land use designation for the subject property.
As the application follows the procedural requirements established by Eugene's land use code,
the amendment is consistent with Statewide Planning Goal 2.
The Statewide Planning Goal 2 coordination requirement is met when the City engages in an
exchange, or invites such an exchange, between the City and any affected governmental unit
and when the City uses the information obtained in the exchange to balance the needs of its
citizens. To comply with the Goal 2 coordination requirement, the City provided notice of the
proposal and opportunity to comment to Lane County, Lane Council of Governments, City of
Springfield, the Oregon Department of Transportation and the Oregon Department of Land
Conservation and Development.
There are no exceptions to Statewide Planning Goal 2 required for this amendment. Therefore,
the amendments are consistent with Statewide Planning Goal 2.
Goal 3: Agricultural Lands -To preserve agricultural lands.
The amendment is for property located within the Eugene city limits and does not affect any
land designated for agricultural use. Based on this finding, Statewide Planning Goal 3 does not
apply.
Goal 4: Forest Lands -To preserve forest lands.
The amendment is for property located within the Eugene city limits and does not affect any
land designated for forest use. Based on this finding, Statewide Planning Goal 4 does not apply.
Goal 5: Natural Resources, Scenic and Historic Areas, and Open Spaces -To protect
natural resources and conserve scenic and historic areas and open spaces.
There are no Goal 5 resources located on the subject property. This amendment does not
create or amend the City's list of Goal 5 resources, does not amend a code provision adopted in
Findings Page 3 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
order to protect a significant Goal 5 resource or to address specific requirements of Goal 5, nor
does it allow new uses that could be conflicting with a significant Goal 5 resource site.
Therefore, the amendment is consistent with Statewide Planning Goal 5.
Goal 6: Air, Water and Land Resources Quality -To maintain and improve the quality
of the air, water and land resources of the state.
The proposed change to the Metro Plan Diagram does not impact the existing regulations that
implement the City's protections for the quality of air, water, and land resources. Any future
development will be subject to City regulations and other state and federal requirements,
ensuring that future developments will be consistent with this Goal. Based on these findings,
the Metro Plan amendment is consistent with Statewide Planning Goal 6.
Goal 7: Areas Subject to Natural Hazards -To protect people and property from
natural hazards.
Statewide Planning Goal 7 requires that local government planning programs include provisions
to protect people and property from the following natural hazards: floods, landslides,
earthquakes and related hazards, tsunamis, coastal erosion and wildfires. Goal 7 prohibits
development in natural hazard areas without appropriate safeguards. The subject property is
not located within known areas of natural disasters or hazards. The subject property is outside
the flood zone and is not subject to hazards normally associated with wildfires or tsunamis.
Other hazards can be mitigated at the time of development based on applicable land use code
provisions, building codes and building techniques. The amendment to the Metro Plan Diagram
does not affect the City's restrictions on development in areas subject to natural disasters and
hazards. Based on these findings, the amendment is consistent with Statewide Planning Goal 7.
Goal 8: Recreational Needs -To satisfy the recreational needs of the citizens of the
state and visitors and, where appropriate, to provide for the siting of necessary
recreational facilities including destination resorts.
Statewide Planning Goal 8 ensures the provision of recreational facilities for Oregon citizens
and is primarily concerned with the provision of those facilities in non-urban areas of the state.
The Metro Plan Diagram amendment does not affect the City's provisions for, or individuals'
access to, recreation areas, facilities, or recreational opportunities. Therefore, the amendment
is consistent with Statewide Planning Goal 8.
Goal 9: Economic Development -To provide adequate opportunities throughout the
state for a variety of economic activities vital to the health, welfare, and prosperity of
Oregon's citizens.
Statewide Planning Goal 9 requires cities to evaluate the supply and demand of commercial and
industrial land relative to community economic objectives. This amendment to the Metro Plan
Diagram is only related to lands designated as industrial. The Oregon Administrative Rule for
Statewide Planning Goal 9 (OAR 660 Division 9} requires that the City provide for at least an
Findings Page 4 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
adequate supply of sites of suitable sizes, types, location, and service levels for a variety of
industrial and commercial uses consistent with plan policies. The Employment Lands Supply
Study 2012-2032 (ELSS} is included as appendix Bin the City's comprehensive plan, Envision
Eugene, and complies with the requirements of Goal 9 and the corresponding Administrative
Rule. The amendment to the Metro Plan Diagram does not add or subtract any industrial land
from the adopted inventories.
The proposed change to the Metro Plan designation for the subject property does not have an
impact on the City's availability of employment or industrial lands because all industrial land
use land designations (Campus, Light Medium, and Heavy) are grouped together for the
purposes of the City's ELSS. Therefore, properties within the broad category of industrial can be
re-designated to another type of industrial without changing the amount of industrial land in
the City's inventory. In this case, a re-designation from Campus Industrial to Light Medium
Industrial results in no net change to the City's overall supply of industrially designated land.
OAR 660-009-010(4) includes specific requirements for changes in plan designation that involve
land in excess of two acres within an existing urban growth boundary from an industrial use
designation to a non-industrial use designation, or another employment use designation to any
other use designation. While the subject property is in excess of two acres, the proposed
change is from one industrial designation (Campus) to another industrial designation (Light
Medium). Therefore, this administrative rule requirement does not apply.
Given these facts, the requested Metro Plan Amendment will not adversely impact the City's
ability to provide opportunities for a variety of economic activities. In the application materials,
the applicant addresses the economic benefits of the proposed change. The applicant asserts
that the proposed change will "provide the following economic benefits: 1. Substantial increase
in tax revenue. The current Campus Industrial plan designation and zoning has not attracted
development. 2. Increase in the diversity of uses allowed including some of Eugene's 'target
industries. 3. Future development of the site will create jobs and result in direct and indirect
benefits to the local economy."
Based on these findings, the amendment is consistent with Statewide Planning Goal 9.
Goal 10: Housing -To provide for the housing needs of citizens of the state.
The subject property does not include any lands designated for residential use in the City's
Buildable Lands Inventory (BLI}; therefore, the proposal does not include any changes that
would impact the availability of residential lands for housing, nor does it impact the City's
ability to provide for housing needs in the future. Based on these findings, the amendment is
consistent with Statewide Planning Goal 10.
Goal 11: Public Facilities and Services -To plan and develop a timely, orderly and
efficient arrangement of public facilities and services to serve as a framework for
urban and rural development.
Findings Page 5 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
The Metro Plan Diagram amendment does not affect the City's provision of public facilities and
services. Based on this finding, the amendment is consistent with Statewide Planning Goal 11.
The City has an acknowledged Public Facilities and Services Plan, which is the Eugene-
Springfield Metropolitan Area Public Facilities and Services Plan: a refinement plan of the
Eugene-Springfield Metropolitan Area General Plan. As a note, all necessary public services
exist or are readily available in close proximity to the subject site.
Goal 12: Transportation -To provide and encourage a safe, convenient and economic
transportation system.
Goal 12 requires a determination of whether the proposed Metro Plan Amendment will
significantly impact an existing or planned transportation facility. OAR 660-012-0060, the
Transportation Planning Rule (TPR), implements Goal 12 for proposed amendments to the
Metro Plan Diagram, such as this application. The TPR contains the following requirement:
OAR 660-012-0060{1} If an amendment to a functional plan, an acknowledged
comprehensive plan, or a land use regulation (including a zoning map) would significantly
affect an existing or planned transportation facility, then the local government must put in
place measures as provided in section (2) of this rule, unless the amendment is allowed
under section {3}, (9) or {10} of this rule.
The applicant requests a Metro Plan Amendment from Campus Industrial to Light Medium
Industrial, as well as a zone change from E-1 Campus Employment to E-2 Mixed Use
Employment.
The applicant's consultant, Sandow Engineering, prepared a scoped transportation analysis that
references projected trip generation from a reasonable worst-case development scenario. The
consultant compared allowed uses and buildout scenarios consistent with the existing E-1 zone
and the allowed uses of the E-2 Zone. The applicant has provided an analysis consistent within
the parameters of the agreed scope of work and using industry best practices.
Public Works staff concurs with the consultant's methodology, traffic study, and findings to
determine that this proposal has no significant effect on existing or planned transportation
facilities. A detailed discussion of the study and conformance with the TPR is addressed below.
A plan or land use regulation amendment significantly affects a transportation facility if it
would:
(a) Change the functional classification of an existing or planned transportation facility
(exclusive of correction of map errors in an adopted plan);
The applicant has provided a transportation technical memo consistent with the requirements
for TPR Analysis as coordinated between the City of Eugene and the applicant. The analysis is
written to uphold industry best standards. The applicant's traffic study identified an increase in
Findings Page 6 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
the average daily traffic. The increase in average daily trips is not expected to require a change
in the functional classification of any street within the study area. The applicant has not
proposed any changes to the functional classification of any roadway within the study area.
(b) Change standards implementing a functional classification system; or
The zone change does not propose to change the standards implementing the current
functional classification system adopted in the City of Eugene 2035 TSP. The current TSP (City of
Eugene 2035 Transportation System Plan) and street classification map were developed and
adopted assuming City wide transportation impacts based upon the policy, designations,
planning horizons and growth assumptions identified in the Metro Plan at the time of its
adoption. The proposed zone change does not change the standards implementing the current
functional classification system adopted in the City of Eugene 2035 TSP.
(c) Result in any of the effects listed in paragraphs {A} through {C} of this subsection based
on projected conditions measured at the end of the planning period identified in the
adopted TSP. As part of evaluating projected conditions, the amount of traffic projected
to be generated within the area of the amendment may be reduced if the amendment
includes an enforceable, ongoing requirement that would demonstrably limit traffic
generation, including, but not limited to, transportation demand management. This
reduction may diminish or completely eliminate the significant effect of the amendment.
(A) Types or levels of travel or access that are inconsistent with the functional
classification of an existing or planned transportation facility;
{B} Degrade the performance of an existing or planned transportation facility such
that it would not meet the performance standards identified in the TSP or
comprehensive plan; or
(C) Degrade the performance of an existing or planned transportation facility that is
otherwise projected to not meet the performance standards identified in the TSP or
comprehensive plan.
The applicant's engineer has provided an analysis based upon the projected impacts of the
proposed zone change. The study provides trip generation estimates for reasonable worst-case
scenarios of the proposed zone as compared to trip generation estimate of the existing zone.
A "significant effect" on existing or planned transportation facilities is defined by the criteria
identified in subsections (A) through (C). The proposed zone change results in none of the
effects identified in subsections (A) through (C). The proposal does not include, and the
proposal does not require, an enforceable, ongoing requirement that would demonstrably limit
traffic generation.
Findings Page 7 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
The City Council finds that this proposal has no significant effect on existing or planned
transportation facilities as defined within OAR 660-012-0060(1). Therefore, the proposed zone
change satisfies the Transportation Planning Rule.
Based on these findings, the proposal is consistent with Statewide Planning Goal 12.
Goal 13: Energy Conservation -To conserve energy.
The proposed change to the Metro Plan's Diagram will not amend or otherwise involve any land
use regulations that implement this Goal. Therefore, the amendment is consistent with
Statewide Planning Goal 13.
Goal 14: Urbanization -To provide for an orderly and efficient transition from rural to
urban land use, to accommodate urban population and urban employment inside
urban growth boundaries, to ensure efficient use of land, and to provide for livable
communities.
The Metro Plan Diagram amendment does not affect the City's provisions regarding the
transition of land from rural to urban uses. Based on this finding, the amendment is consistent
with Statewide Planning Goal 14.
Goal 15: Willamette River Greenway -To protect, conserve, enhance and maintain the
natural, scenic, historical, agricultural, economic and recreational qualities of lands
along the Willamette River as the Willamette River Greenway.
The Metro Plan Diagram Amendment does not contain any changes that affect the Willamette
River Greenway regulations, nor is the subject property located within the adopted Willamette
Greenway boundary. Based on this finding, Statewide Planning Goal 15 does not apply.
Goals 16 -19: Estuarine Resources; Coastal Shorelands; Beaches and Dunes; and
Ocean Resources
There are no estuarine, beach and dune, coastal, or ocean resources related to subject
property. Based on this finding, Statewide Planning Goals 16 through 19 do not apply.
Conclusion
Based on the findings above, the Metro Plan Amendment complies with the Statewide Planning
Goals and the approval criterion at EC 9. 7735(1) is met.
EC 9.7735{2}: The proposed amendment does not make the Metro Plan internally
inconsistent.
No policies within the Metro Plan appear to serve as mandatory approval criteria for this
application, nor do any Metro Plan policies appear to be directly relevant to this site-specific
Metro Plan Diagram amendment. Therefore, the proposed amendment does not present any
Findings Page 8 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
conflict with other Metro Plan policies nor does it make the Metro Plan internally inconsistent.
Based on these findings, this criterion is met.
EC 9.7735(3}: When the city-specific local comprehensive plan also applies, the proposed
amendment is consistent with the city-specific local comprehensive plan.
The city-specific local comprehensive plan for the City of Eugene is the Envision Eugene
Comprehensive Plan. The following policy from the Envision Eugene (EE) Comprehensive Plan
provides relevant support for the amendment to the Metro Plan Diagram:
EE Policy 3.23: Flexible campus employment areas. Recognize changing market demands
and accommodate land needs through flexible zoning for light industrial/campus
employment areas, including Greenhill Technology Park, Willow Creek Circle and Chad
Drive.
This policy specifically recognizes the challenges presented by existing zoning restrictions in the
area of the subject property. The applicant contends that the existing E-1 zoning has not
responded well to market conditions and has not provided opportunities to meet market
demand. The subject property has been designated Campus Industrial and zoned E-1 Campus
Employment since 2013 and has remained vacant for the seven years since that time. While the
policy specifically related to flexible zoning, the proposed Metro Plan Diagram change is
necessary to facilitate the zone change.
The Transportation chapter of Envision Eugene states that the Eugene 2035 Transportation
System Plan (TSP) serves as the transportation element for the comprehensive plan. As noted in
the findings related to Statewide Planning Goal 12, the Metro Plan Diagram amendment is
consistent with the City's TSP, and therefore consistent with the transportation element of
Envision Eugene. No transportation policies appear to be directly relevant to this site-specific
Metro Plan Amendment, nor do they serve as mandatory approval criteria for the amendment.
Based on these findings, the proposed Metro Plan Amendment is consistent with Envision
Eugene, the City's local comprehensive plan.
REFINEMENT PLAN AMENDMENT
The proposed Metro Plan Amendment also triggers the need for an amendment to the Future
Land-Use Map (Map E} of the Willow Creek Special Area Study (WCSAS}, which is the adopted
refinement plan for this area. The WCSAS Future Land-Use Map designates the property as
Special Light Industrial. The following findings address the applicable approval criteria for the
related refinement plan amendment:
EC 9.8424(1): The refinement plan amendment is consistent with all of the following:
(a) Statewide planning goals.
Findings Page 9 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
The findings addressing consistency with the Statewide Planning Goals included above under
Metro Plan Amendment approval criterion EC 9.7735(1), are incorporated herein by reference.
Based on those findings, the amendment to the Future Land-Use Map for the Willow Creek
Special Area Study is consistent with the Statewide Planning Goals.
(b) Applicable provisions of the comprehensive plan.
The findings above under Metro Plan Amendment approval criteria EC 9.7735(2) and EC
9.7735(3) are incorporated herein by reference and the amendment to the Future Land-Use
Map for the Willow Creek Special Area Study is consistent with the provisions of the Metro Plan
and Envision Eugene.
(c) Remaining portions of the refinement plan.
Only the Future Land-Use Map (Map E) for the Willow Creek Special Area Study will be
amended. No other amendments to the WCSAS are proposed or required. No polices listed in
the WCSAS appear to serve as mandatory approval criteria for this amendment, nor do any
refinement plan policies require further analysis beyond that provided above for the Metro
Plan Amendment.
EC 9.8424(2): The refinement plan amendment addresses one or more of the following:
(a) An error in the publication of the refinement plan.
(b) New inventory material which relates to a statewide planning goal.
(c) New or amended community policies.
(d) New or amended provisions in a federal law or regulation, state statute, state
regulation, statewide planning goal, or state agency land use plan.
(e) A change of circumstances in a substantial manner that was not anticipated at the
time the refinement plan was adopted.
An amendment to the plan designation on the Metro Plan Diagram constitutes a "new or
amended community policy." Per the findings pertaining to the Metro Plan Diagram
amendment at EC 9.7735, incorporated herein by reference, the designation change is
consistent with all Statewide Planning Goals and the existing Metro Plan policies. Therefore, the
refinement plan land use diagram must be amended to remain consistent with the amended
Metro Plan Diagram. Based on these findings, this criterion is met.
ZONE CHANGE
The applicant's request includes a concurrent change in the base zone of the subject property
from E-1 Campus Employment to E-2 Mixed Use Employment, to bring the zoning into
conformance with the proposed Light Medium Industrial plan designation. The following
findings address the applicable approval criteria for the zone change request:
Findings Page 10 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
EC 9.8865(1): The proposed change is consistent with applicable provisions of the Metro
Plan. The written text of the Metro Plan shall take precedence over the Metro Plan Diagram
where apparent conflicts or inconsistencies exist.
According to EC 9.2405, the requested E-2 zone implements the Metro Plan's Light Medium
Industrial land use designation. Therefore, the zone change is consistent with a change to the
Metro Plan Diagram to designate the subject property as Light Medium Industrial. There are no
Metro Plan policies that serve as mandatory approval criteria for this zone change or require
further analysis beyond that provided above for the requested Metro Plan Amendment.
Based on these findings, and with approval of the Metro Plan Diagram Amendment, this
criterion is met.
EC 9.8865(2): The proposed zone change is consistent with applicable adopted refinement
plans. In the event of inconsistencies between these plans and the Metro Plan, the Metro
Plan controls.
The subject property is within the boundaries of the Willow Creek Special Area Study (WCSAS),
which is the adopted refinement plan for the area of this request.
The WCSAS identifies the subject property as being designated for Special Light Industrial.
However, the requested Refinement Plan Amendment would result in the designation being
amended to Light-Medium Industrial. Amendment of the WCSAS Future Land-Use Map to
designate the subject property as Light-Medium Industrial is consistent with the requested E-2
Mixed Use Employment zoning. No policies listed in the WCSAS appear to serve as mandatory
approval criteria for this zone change or to require further analysis beyond that provided above
for the requested Metro Plan Amendment and Refinement Plan Amendment.
Based on these findings, and with approval of the amendment to Future Land-Use Map for the
WCSAS, this criterion is met.
EC 9.8865(3): The uses and density that will be allowed by the proposed zoning in the
location of the proposed change can be served through the orderly extension of key urban
facilities and services.
Key urban facilities and services are defined in the Metro Plan as: wastewater service,
stormwater service, transportation, water service, fire and emergency medical services, police
protection, City-wide parks and recreation programs, electric service, land use controls,
communication facilities, and public schools on a district-wide basis (see Metro Plan, page V-3).
The following summary addresses the availability of these key urban services and facilities as
required under this criterion.
Wastewater: Public wastewater service is currently available for the subject property from a
wastewater line located in Pitchford Avenue. Wastewater standards will be reviewed at the
time of future development for any extension of service to the subject property.
Findings Page 11 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
Stormwater: Existing stormwater conveyance lines are located in Pitchford Avenue.
Stormwater standards will be reviewed at the time of future development for any extension of
service to the subject property.
Streets: The subject property has frontage on Pitchford Avenue, which is classified as a local
street, per Figure 60 of the Eugene 2035 Transportation System Plan (2035 TSP). Compliance
with applicable street standards will be addressed at the time of future development.
Solid Waste: Collection service is provided by private entities. Regional disposal sites and the
Short Mountain Landfill are operated by Lane County.
Water and Electric: Water and electrical services, operated by Eugene Water and Electric Board
(EWEB) are available for extension to the property. Any future development will require
coordination with EWEB staff to ensure that water and electric services comply with City
standards and EWEB requirements.
Public Safety: Police protection for the subject property is consistent with service provision
throughout the City. Fire protection will be provided by Eugene Springfield Fire. Emergency
medical services are currently provided on a regional basis by the cities of Eugene and
Springfield.
Transportation: The subject property is accessible to pedestrians, bicycles, and vehicles via the
surrounding street network. Transit stops are located north of the subject property on West
11 th Avenue. Sidewalks are present along all street frontages of the subject property.
Parks and Recreation: Parks and recreation programs are provided on a City-wide basis. The
inclusion of the subject property in the City is sufficient evidence to demonstrate the minimum
level of this key urban service is met.
Planning and Development Services: Planning and building permit services are provided for all
properties located within the urban growth boundary by the City of Eugene. The Eugene Code,
Chapter 9, will provide the required land use controls for future development of the subject
property.
Communication: A variety of telecommunication providers offer communications services
throughout the Eugene/Springfield area; therefore, these services are available, and this key
urban service requirement is met.
Public Schools: The subject property is within Eugene School District 4J. As access to schools is
evaluated on a district wide basis, the property's location within the school district is sufficient
evidence to demonstrate the minimum level of this key urban service is met.
Findings Page 12 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)
Based on these findings, this criterion is satisfied.
EC 9.8865(4): The proposed zone change is consistent with the applicable siting
requirements set out for the specific zone in:
(b) EC 9.2430 Employment and Industrial Zone Siting Requirements.
The specific siting standards for the E-2 Mixed Use Employment zone are listed under EC
9.2430(2) and provided for ease of reference below.
EC 9.2430(2): E-2 Mixed Use Employment. This zone is limited to areas designated Light
Medium Industrial in the comprehensive plan and those that meet either (a) or (b) of the
following minimum siting requirements:
(a) Property has frontage on an arterial street.
(b) Contiguous to parcels currently zoned E-2 or C-2 Community Commercial.
E-2 zoning is limited to areas designated Light Medium Industrial and the subject property is
designated Light Medium Industrial by the Metro Plan Diagram amendment approved as part of
this application package. The subject property is also contiguous to parcels zoned C-2
Community Commercial. Based on these findings, with approval of the proposed Metro Plan
Diagram amendment, the siting requirements of EC 9.2430 are satisfied, and this criterion is
met.
EC 9.8865(5): In cases where the NR zone is applied based on EC 9.2510(1)(b), the property
owner shall enter into a contractual arrangement with the city to ensure the area is
maintained as a natural resource area for a minimum of SO years.
This criterion does not apply because the proposed zone change does not include the NR zone.
OAR 660-012-0060 -Transportation Planning Rule
While not an approval criterion included in Eugene Code, zone change applications are required to
demonstrate compliance with the State's Transportation Planning Rule under OAR 660-012-0060.
Consistent with the findings under the Statewide Planning Goal 12 regarding the Metro Plan
Amendment, which are incorporated herein by reference, the proposed zone change is consistent
with the Transportation Planning Rule.
CONCLUSION
Based on the available information and evidence, and the preceding findings of compliance
with the applicable approval criteria, the proposed Metro Plan Amendment, Refinement Plan
Amendment, and Zone Change comply with the applicable approval criteria.
Findings Page 13 of 13
Pitchford (MA 23-3/RA 23-2/ Z 23-5)