HomeMy WebLinkAboutResolution No. 5403CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
1
CITY OF EUGENE
PARKS AND RECREATION
SDC
PROJECT PLAN
June 2020
Resolution
Exhibit A
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
2
TABLE OF CONTENTS
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
SDC PROJECT LIST OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Parks and Recreation Priorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Project Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
PARKS AND RECREATION SDC TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
City-Wide SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Bethel Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
City Central Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
River Road/ Santa Clara Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Southeast Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Southwest Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Willakenzie Planning District SDC Project List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
PARKS AND RECREATION SDC PROJECT MAPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
Bethel Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
City Central Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
River Road/ Santa Clara Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Southeast Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Southwest Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Willakenzie Planning District SDC Project Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Parks and Recreation SDC Incentive Areas Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
3
INTRODUCTION
In July of 2018, City Council unanimously adopted Picture. Plan. Play.
A Vision and Implementation Plan for Eugene’s Parks and Recreation
System, commonly referred to as the Parks and Recreation System
Plan . This plan was built on the input of over 12,000 individuals who
participated in a multi-year, award-winning public engagement
process . The plan outlines a vision to be implemented over the next
30 years:
The vision for parks and recreation in Eugene is a system of beautiful,
inspiring places that foster personal, community and environmental
health while upholding four core principles:
•Care for and make the most of what we have
•Serve the entire community
•Create more connections
•Build better partnerships
These principles respond to current challenges and look forward in
anticipation of a growing population whose reliance on parks and
recreation will become even more central to preserving Eugene’s
exceptional quality of life .
Implementation of the Parks and Recreation System Plan will require multiple capital funding sources, including
System Development Charges (SDCs), bond measures, grants, donations and partnerships . SDC improvement fees
are specifically targeted towards funding portions of the system improvements that are required to support an
expanding population .
To address the requirement of ORS223 .309, this Project Plan includes a list of the capital improvements that the City
intends to fund, in whole or in part, with revenues from improvement fees collected through Parks and Recreation
SDCs .
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
4
SDC PROJECT LIST OVERVIEW
The adoption of the Parks and Recreation System Plan in July of 2018 established a new project list and prioritized
project implementation . That project list was used as the basis for the SDC project list included in this plan . The
subset of projects and project costs included in this plan are those needed to increase the capacity of the parks
and recreation system to serve the next twenty years of population growth .
PARKS AND RECREATION PRIORITIES
The Parks and Recreation System Plan identified four core principles:
•Care for and make the most of what we have
•Serve the entire community
•Create more connections
•Build better partnerships
With these principles as a foundation, a set of criteria was developed to prioritize parks and recreation capital
projects . The criteria were applied to each project, taking into account the unique needs of each planning district
and triple bottom line considerations of social equity, environmental health, and economic prosperity .
The resulting priority ranking is an indication of the time-frame for project completion . A priority 1 rating is
proposed for completion in the 1-10 year time frame and a priority 2 rating for the 11-20 year time frame . The 20-
year planning horizon is based on data from 2015–2035 . Projects with multiple ratings (i .e . 1/ 2) are proposed for
completion in phases due to either high dollar costs or projects that are more practically implemented over a
number of years, such as trails and property acquisition .
PROJECT COSTS
Costs for each of the SDC eligible projects are shown in the project list tables with a break down that shows the
estimated costs and percentage of costs eligible to be funded from SDC improvement fees in the “Growth % of
Total Project Cost” column . The costs shown on the project list tables were included in the Parks and Recreation
System Plan and reflect planning-level estimates. All costs are rounded and provided in 2016 dollars.
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
5
The SDC project list is organized into a common city-wide list and six neighborhood planning districts .
Geographical-based planning facilitates analysis of the unique characteristics, needs, and opportunities
of each area .
•City-wide
•Bethel
•City Central
•River Road/ Santa Clara
•Southeast
•Southwest
•Willakenzie
Each project is assigned a project number that correlates to the accompanying maps and to the Parks and
Recreation System Plan Project List .
The project list includes both improvements to existing parks, and acquisition and development of new parks, trails
and facilities . New capacity costs include improvements that increase the level of performance of existing parks
(to serve additional users), and new parks and facilities . For more information on how growth costs for each type
of project were determined, see the Parks SDC Methodology, Appendix E .
Note: Calculations were produced by computer spreadsheets where numbers extend beyond the decimal places
shown in the tables presented. These slight variations exist due to rounding and are not material.
TABLES
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
6
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth
Cost
Growth % of
Total Project
Cost
City-Wide
E2 Systemwide Implement comprehensive signage improvements 1/2 $150,000 $105,000 $45,000 $8,435 6%
E5 Systemwide Develop and implement a comprehensive ap-
proach to locating inclusive play
1/2 $800,000 $240,000 $560,000 $104,963 13%
E6 School Update school playground usage agreements and
partner to provide renovations as needed
1/2 $1,000,000 $500,000 $500,000 $93,717 9%
E8 Systemwide Develop and implement a comprehensive
approach to locating multi-generational play-
grounds/exercise equipment
1/2 $1,000,000 0 $1,000,000 $187,433 19%
E9 Systemwide Continue to make ADA accessibility improvements
throughout system
1 $300,000 0 $300,000 $56,230 19%
E11 Other P’etanque Court Improvements 2 $30,000 0 $30,000 $30,000 100%
E14 Metro River visioning project implementation to improve
safe access to the Willamette River for swimming,
fishing, paddling and nature viewing while main-
taining or improving habitat for fish and wildlife
1/2 $6,000,000 0 $6,000,000 $859,928 14%
E15 Natural Area Amazon Creek water trail feasibility study 2 $75,000 0 $75,000 $37,886 51%
E16 Natural Area Trail Plan Special Studies 1/2 $50,000 0 $50,000 $25,257 51%
E18 Other Bicycle related facilities including mountain bike
skills park, pump track and educational traffic
garden
2 $100,000 0 $100,000 $50,514 51%
E19 Natural Area Feasibility study of bike/ped bridge over Willamette
River to connect to Springfield
2 $100,000 0 $100,000 $50,514 51%
E22 Natural Area Access and parking improvements at high-use
trailheads
1 $1,000,000 0 $1,000,000 $752,571 75%
PARKS AND RECREATION SDC PROJECT LIST
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
7
BETHEL PLANNING DISTRICT
B1 Nhood Acquire new neighborhood park sites in under-served areas (Bc; Be)2 $1,800,000 0 $1,800,000 $1,800,000 100%
B2 Community Golden Gardens Park general park development to serve Ba 1 $1,000,000 0 $1,000,000 $885,307 89%
B5 Rec Facility Multi-field sports complex 1/2 $25,100,000 0 $25,100,000 $17,642,178 70%
B7 Nhood Andrea Ortiz Park development and access im-provements 1 $800,000 0 $800,000 $800,000 100%
B8 Nhood Build playground at Echo Hollow Pool to serve Bd 1 $200,000 0 $200,000 $194,081 97%
B13 Community Bethel Community Park spray play 1 $400,000 0 $400,000 $174,938 44%
B14 Community Bethel Community Park running trail (Trail Plan #44)2 $75,000 0 $75,000 $40,182 54%
B15 Natural Area Enhance and provide interpretation for Bethel Community Park wetland 2 $20,000 $14,000 $6,000 $341 2%
B17 Community Petersen Park community garden 2 $200,000 0 $200,000 $168,690 84%
B25 Natural Area Fir Butte habitat restoration (BLM)2 $40,000 $26,000 $14,000 $797 2%
B26 Natural Area Willamette Daisy Meadow and Green Hill to Fern
Ridge habitat restoration
2 $50,000 $25,000 $25,000 $1,423 3%
B28 Natural Area A2 Channel to Meadowlark Prairie Trail acquisition (Trail Plan #C9)1/2 $1,280,000 0 $1,280,000 $685,778 54%
B29 Other Farm Belt Trail connection from Hwy 99 to A2 Channel trail acquisition (Trail Plan #C10)1/2 $700,000 0 $700,000 $375,035 54%
B30 Natural Area Kalapuya High School to Dragonfly Bend trail ac-quisition (Trail Plan #38)2 $500,000 0 $500,000 $267,882 54%
B33 Natural Area West Eugene Wetlands at Greenhill to Fern Ridge Reservoir/ Fir Butte Road trail development (Trail
Plan #29)
2 $100,000 0 $100,000 $50,514 51%
B35 Nhood Improve access to Irwin Park from Bb 1 $75,000 0 $75,000 $6,317 8%
B36 Nhood Improve access to Malabon Elementary play-ground to serve Bd 1 $75,000 0 $75,000 $6,317 8%
B37 Nhood Improve access to Petersen Park to serve Bf 1 $50,000 0 $50,000 $9,372 19%
B41 Systemwide Eugene Recreational Walking Routes Planning/ Neighborhood Greenways: Bethel 1 $150,000 0 $150,000 $28,115 19%
B42 Rec Facility Echo Hollow Pool expansion/ remodel 1 $10,500,000 $3,967,000 $6,533,000 $3,741,388 36%
B43 Rec Facility Petersen Barn expansion/ remodel 2 $6,771,527 $1,196,000 $5,575,527 $1,857,533 27%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth
Cost
Growth % of
Total Project
Cost
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
8
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity Cost Growth Cost Growth % of
Total Project
Cost
CITY CENTRAL PLANNING DISTRICT
C1 Metro Riverfront Park and Plaza at former EWEB site
to serve CCa
1 $4,500,000 0 $4,500,000 $4,500,000 100%
C2 Metro Acquire land or easement in front of SMJ
house
2 $750,000 0 $750,000 $750,000 100%
C3 Metro Acquire land at 4j admin site 2 $1,000,000 0 $1,000,000 $1,000,000 100%
C4 Community City Central dog park (location TBD)2 $250,000 0 $250,000 $109,336 44%
C5 Metro Downtown play area to serve CCa 1 $1,000,000 0 $1,000,000 $970,405 97%
C13 Metro Washington/Jefferson Park master plan and
renovation
2 $500,000 $100,000 $400,000 $57,329 11%
C14 Metro Washington/Jefferson Park basketball court
rehabilitation
1 $150,000 $30,000 $120,000 $22,492 15%
C17 Metro Skinner Butte Park habitat restoration 1/2 $80,000 $20,000 $60,000 $8,599 11%
C18 Metro Skinner Butte Park pedestrian trails (Trail Plan
#43)
1/2 $142,000 0 $142,000 $71,730 51%
C24 Metro Owen Rose Garden Management Plan &
Renovation
2 $25,000 $12,500 $12,500 $2,343 9%
C27 Metro South Bank running trail (Trail Plan #32)1 $250,000 0 $250,000 $126,286 51%
C31 Nhood Eugene Recreational Walking Routes Plan-
ning / N’hood Greenways: City Central
2 $150,000 0 $150,000 $150,000 100%
C32 Rec Facility Campbell Community Center expansion/
remodel
1 $5,000,000 $1,667,178 $3,332,822 $1,118,269 22%
C33 Rec Facility River House Outdoor Center expansion/
remodel
2 $2,979,000 $45,000 $2,934,000 $977,486 33%
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
9
RIVER ROAD/ SANTA CLARA PLANNING DISTRICT
RS1 Nhood Acquire new neighborhood park sites in
underserved areas (RSc; RSd; RSg; RSh)
1/2 $2,800,000 0 $2,800,000 $2,800,000 100%
RS2 Metro Acquire and build urban plaza to serve RSc 1/2 $2,000,000 0 $2,000,000 $1,469,479 73%
RS3 Community Santa Clara Community Park acquisition 1/2 $2,500,000 0 $2,500,000 $2,500,000 100%
RS4 Community Santa Clara Community Park development 1/2 $5,000,000 0 $5,000,000 $4,426,537 89%
RS5 Community Santa Clara Community Park running trail
(Trail Plan #37)
2 $150,000 0 $150,000 $80,365 54%
RS7 Nhood Ferndale Park development 1 $1,000,000 0 $1,000,000 $970,405 97%
RS8 Nhood Lone Oak Park development 2 $1,000,000 0 $1,000,000 $970,405 97%
RS9 Nhood Ruby Park development 1 $750,000 0 $750,000 $727,804 97%
RS10 Nhood Terra Linda Park development 2 $1,000,000 0 $1,000,000 $970,405 97%
RS12 Nhood West Bank/ Hillcrest Site 2 $750,000 0 $750,000 $727,804 97%
RS14 Nhood West Bank Park playground(s) to serve RSe
and RSh
1 $700,000 0 $700,000 $679,283 97%
RS15 Community RR/SC community garden (location TBD)1 $200,000 0 $200,000 $168,690 84%
RS16 Community RR/SC dog park (location TBD)1 $250,000 0 $250,000 $109,336 44%
RS17 Community RR/SC spray play at Santa Clara Community
Park
2 $350,000 0 $350,000 $153,071 44%
RS27 Natural Area Acquire riverfront property between be-
tween Beltline and Hileman Landing to
provide access to natural areas and con-
nectivity
1/2 $2,000,000 0 $2,000,000 $1,628,611 81%
RS30 Other Farm Belt Trail connection from Hileman
Landing to Hwy 99 trail acquisition (Trail Plan
#C10)
1/2 $1,000,000 0 $1,000,000 $535,764 54%
RS31 Linear West Bank Path running trail (Trail Plan #31)2 $252,000 0 $252,000 $127,296 51%
RS32 Nhood Improved crossing of Irvington, at
Arrowhead
1 $75,000 0 $75,000 $6,317 8%
RS39 Nhood Eugene Recreational Walking Routes Plan-
ning / N’hood Greenways: RR/SC
1 $150,000 0 $150,000 $150,000 100%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth Cost Growth % of
Total Project
Cost
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
10
SOUTHEAST PLANNING DISTRICT
SE1 Nhood Acquire new neighborhood park sites in
underserved areas (SEb; SEf)
2 $1,250,000 0 $1,250,000 $1,250,000 100%
SE2 Community Acquire Amazon Park inholdings 1 $500,000 0 $500,000 $500,000 100%
SE4 Natural Area Tugman Park habitat restoration 2 $50,000 $30,000 $20,000 $1,138 2%
SE12 Community Westmoreland Park tennis court renovation 2 $650,000 $260,000 $390,000 $73,099 11%
SE17 Natural Area Habitat renovation in Amazon ash forest
and wet prairie sites
1/2 $50,000 $17,500 $32,500 $1,850 4%
SE18 Metro Hendricks Park rehabilitation 2 $500,000 $200,000 $300,000 $42,996 9%
SE19 Metro Hendricks Park Rhododendron Garden man-
agement plan and rehabilitation
1/2 $150,000 $60,000 $90,000 $16,869 11%
SE22 Metro Hendricks Park Forest Management Plan
implementation and habitat restoration
2 $250,000 $125,000 $125,000 $17,915 7%
SE24 Metro Wayne Morse Family Farm nature play to
serve SEb
2 $100,000 0 $100,000 $14,332 14%
SE25 Natural Area Wayne Morse habitat restoration 2 $50,000 $25,000 $25,000 $1,423 3%
SE36 Natural Area Amazon Creek habitat restoration 1/2 $1,400,000 $700,000 $700,000 $39,838 3%
SE39 Natural Area Moon Mountain habitat restoration 2 $50,000 $30,000 $20,000 $1,138 2%
SE42 Natural Area Implement Mariposa Woodlands (Spencer
Butte) habitat restoration management plan
1 $75,000 $37,500 $37,500 $2,134 3%
SE44 Natural Area Spur and neighborhood connector trails in
various locations acquisition (Priority 2) (Trail
Plan #5, 7, 8, 9, 10, 13, 15, 16)
2 $250,000 0 $250,000 $133,941 54%
SE45 Natural Area Moon Mountain to 30th Avenue trail con-
nector loop acquisition (Trail Plan #21)
2 $945,000 0 $945,000 $506,297 54%
SE46 Natural Area Ribbon Trail to Bloomberg Park trail acquisi-
tion (Trail Plan #22)
2 $250,000 0 $250,000 $133,941 54%
SE47 Natural Area Suzanne Arlie Park to 30th Avenue trail ac-
quisition (Trail Plan #C7)
1/2 $900,000 0 $900,000 $482,188 54%
SE48 Natural Area 30th Avenue to Moon Mountain Park trail
acquisition (Trail Plan #C8)
2 $200,000 0 $200,000 $107,153 54%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth Cost Growth % of
Total Project
Cost
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
11
SOUTHEAST PLANNING DISTRICT (continued)
SE49 Natural Area Moon Mountain to Willamette River basin
trail acquisition (Trail Plan #C12)
2 $200,000 0 $200,000 $107,153 54%
SE50 Natural Area South Eugene Meadows pedestrian trail
(Trail Plan #3)
2 $65,000 0 $65,000 $32,834 51%
SE51 Natural Area South Eugene Meadows to Ridgeline Trail at
Willamette Street (Trail Plan #4)
1 $275,000 0 $275,000 $138,914 51%
SE52 Natural Area Spur and neighborhood connector trails in
various locations (Priority 1) (Trail Plan #11,
14, 17)
1 $175,000 0 $175,000 $88,400 51%
SE54 Natural Area Spencer Butte restroom improvements 1 $250,000 0 $250,000 $14,228 6%
SE55 Natural Area Spencer Butte Park west side pedestrian trail
(Trail Plan #12a)
1 $100,000 0 $100,000 $50,514 51%
SE56 Natural Area Spencer Butte Park barrier-free trail (Trail
Plan #39)
1 $30,000 0 $30,000 $15,154 51%
SE57 Metro Suzanne Arlie Park master plan
implementation
2 $500,000 $150,000 $350,000 $50,162 10%
SE58 Natural Area Suzanne Arlie Park Ridgeline Trail extension
(Trail Plan #18)
1 $260,000 0 $260,000 $131,337 51%
SE59 Natural Area Suzanne Arlie Park connector trails and
trailhead (Trail Plan #19)
2 $625,000 0 $625,000 $315,714 51%
SE61 Natural Area Moon Mountain Park shared-use trail and
trailhead (Trail Plan #20)
2 $350,000 0 $350,000 $176,800 51%
SE65 Nhood Eugene Recreational Walking Routes
Planning / N’hood Greenways: Southeast
Eugene
2 $150,000 0 $150,000 $150,000 100%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity Cost Growth Cost Growth % of
Total Project
Cost
* Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
** Project added by City Council in March 2024. Project costs are not included in Total SDC Project Costs on page 13.
**SE73 Other Regional Pickleball Facility 1 $2,885,000 0 $2,885,000 $750,000 26%
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
12
SOUTHWEST PLANNING DISTRICT
SW1 Nhood Acquire new neighborhood parks in
underserved areas (Swa; SWc/f; SWg)
2 $2,100,000 0 $2,100,000 $2,100,000 100%
SW3 Nhood Mattie Reynolds Park development 1 $1,000,000 0 $1,000,000 $970,405 97%
SW4 Nhood Warbling Creek Park development 2 $1,000,000 0 $1,000,000 $970,405 97%
SW5 Community Southwest spray play (location TBD)2 $350,000 0 $350,000 $153,071 44%
SW6 Community Southwest dog park (location TBD)2 $250,000 0 $250,000 $109,336 44%
SW7 Nhood Amazon channel playground to serve SWd 1 $250,000 0 $250,000 $242,601 97%
SW8 Natural Area Melvin Miller nature play to serve SWg 1 $100,000 0 $100,000 $97,040 97%
SW11 Community Churchill Sports Park renovation 2 $1,250,000 $625,000 $625,000 $553,317 44%
SW13 School Churchill HS tennis court renovation (4J)1 $650,000 $195,000 $455,000 $85,282 13%
SW18 Linear Fern Ridge Path linear park enhancements 1 $500,000 $250,000 $250,000 $46,858 9%
SW21 Natural Area Murray Hill habitat restoration 2 $60,000 $39,000 $21,000 $1,195 2%
SW22 Natural Area Wild Iris Ridge habitat restoration 1/2 $75,000 $37,500 $37,500 $2,134 3%
SW25 Natural Area Willow Creek Rd to West 11th Ave trail
acquisition (Trail Plan #C2)
2 $525,000 0 $525,000 $281,276 54%
SW26 Natural Area Murray Hill to Wild Iris Ridge trail acquisition
(Trail Plan #C3)
2 $805,000 0 $805,000 $431,290 54%
SW27 Natural Area Wild Iris Ridge to Fern Ridge Path trail
acquisition (Trails Plan #C4)
1 $276,000 0 $276,000 $147,871 54%
SW28 Natural Area Wild Iris Ridge to Blanton Road and South
Eugene Meadows trail acquisition (Trail Plan
#C5)
1/2 $4,000,000 0 $4,000,000 $2,143,057 54%
SW31 Natural Area Wild Iris Ridge (south end) shared-use trail
(Trail Plan #2)
2 $150,000 0 $150,000 $75,771 51%
SW33 Natural Area Murray Hill shared-use trail (Trail Plan #41)2 $145,000 0 $145,000 $73,246 51%
SW34 Nhood Eugene Recreational Walking Routes
Planning / N’hood Greenways: Southwest
Eugene
1 $150,000 0 $150,000 $150,000 100%
SW35 Rec Facility New multipurpose community center and
pool facility
1/2 $18,200,000 0 $18,200,000 $6,063,480 33%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth Cost Growth % of
Total Project
cost
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
13
WILLAKENZIE PLANNING DISTRICT
W1 Nhood Acquire new neighborhood park sites in
underserved areas (Wb; Wc; Wf; Wh)
2 $2,500,000 0 $2,500,000 $2,500,000 100%
W2 Nhood Striker Field development 1 $3,200,000 0 $3,200,000 $3,105,296 97%
W3 Nhood Chase Commons development 1 $1,000,000 0 $1,000,000 $970,405 97%
W20 School Sheldon HS tennis court renovation (4J)2 $150,000 $75,000 $75,000 $14,058 9%
W23 Metro Alton Baker Park (west) master plan update
and renovation
1/2 $7,500,000 $2,250,000 $5,250,000 $752,437 10%
W24 Metro Alton Baker lighting improvements 1/2 $1,750,000 $437,500 $1,312,500 $238,727 14%
W26 Metro Alton Baker Park Canoe Canal feasibility
study and restoration
1/2 $6,000,000 $2,400,000 $3,600,000 $515,957 9%
W27 Metro Whilamut Natural Area of Alton Baker Park
master plan update and implementation
1/2 $200,000 $100,000 $100,000 $18,189 9%
W28 Natural Area East Bank Path near Beltline to Armitage
Park feasibility study
2 $125,000 0 $125,000 $63,143 51%
W29 Natural Area Acquire natural areas along the Willamette
River, north of Beltline
2 $1,000,000 0 $1,000,000 $1,000,000 100%
W30 Natural Area Delta Ponds bridge and Debrick Slough trail
(Trail Plan #34)
1 $1,000,000 0 $1,000,000 $505,143 51%
W37 Nhood Increase access to Sheldon Sports Park from
We
1 $148,000 0 $148,000 $12,465 8%
W38 Nhood Increase access to Bond Lane Park from Wg 1 $75,000 0 $75,000 $6,317 8%
W39 Systemwide Eugene Recreational Walking Routes
Planning/ Neighborhood Greenways:
Willakenzie
1 $150,000 0 $150,000 $28,115 19%
W40 Rec Facility Sheldon Community Center Expansion/
remodel
1/2 $10,585,611 $3,002,000 $7,583,611 $2,526,542 24%
W40 Rec Facility Sheldon Pool Expansion/ remodel 1 $5,968,170 0 $5,968,170 $3,472,058 58%
Project
Number
Facility Type Project Name Timeframe
(Priority)*
Total Cost Rehabilitation
Cost
New Capacity
Cost
Growth Cost Growth % of
Total Project
Cost
*Priority 1 rating =1-10 years; Priority 2 = 11-20 years; Priority 1/ 2 = phased implementation over 20 years
TOTAL SDC Project Costs $213,677,308 $36,742,178 $176,935,130 $95,083,435
SDC Balance Available (end of FY19) $7,805,174
Calibrated SDC Project Costs $87,278,261
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2018CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
14
The SDC project list is organized into a common city-wide list and six neighborhood planning districts . Each list
and the accompanying project numbers correlate to the following maps:
•Bethel
•City Central
•River Road/ Santa Clara
•Southeast
•Southwest
•Willakenzie
•Parks and Recreation SDC Incentive Areas Map
MAPS
March 2024
CITY OF EUGENE PARKS AND RECREATION SDC PROJECT PLAN, 2020
10
W 11TH AVE
BAILEY HILL GREEN HILL RDBARGER DR
CLEAR LAKE RD
ROOSEVELT BLVD
IRVING RD
N TERRY STN
O
R
T
H
W
E
S
T
E
X
P
R
E
S
S
W
A
YFIR BUTTE RDB
E
T
H
E
L
D
R
MAXWELL RD
FISHER RDW 1ST AVE
BELTLINE RDELMIRA RD
SENECABODENHAMER RD
AVALON ST
HUNSAKER
L
N
ECHO HOLLOW RDDANEBO AVEROYAL AVE
BERTELSEN RDMCKINLEY STTERRY STEB BELTLINE
O
N
R
P
WB BELTLINE O N R P
W 7TH AVE
W 5TH AVEBELTLINE RDH
IGHW
A
Y
9
9HIGHW
A
Y
9
9
HIGH
W
A
Y
1
2
6
ANDREA
ORTIZ Peterson Community Center
Kalapuya
HS
Shasta
MS
Churchill
High School
Cascade
MS
Education Options
West
Willamette
HS
Danebo
ES
Meadow View
School (K-8)
Malabon
ES
Corridor
Elementary School
Fairfield
ES
Clear Lake ES
Prairie
Mountain
School
(K-8)
Yujin Gakuen
Japanese Immersion
Elementary School
OAK HILL
(BLM,ODOT)
MEADOWLARK
PRAIRIE
(BLM, EUGENE)
GOLDEN
GARDENS
SEE-SIL
SAVANNA
(BLM)
WILLAMETTE DAISY MEADOW
(BLM,EUGENE,ODOT)
TSAL LUK-WAH
(BLM,EUGENE)
DRAGONFLY BEND
GREEN HILL
TO FERN RIDGE
FIR
BUTTE
(BLM)
BETHEL
COMMUNITY
PARK
DANEBO POND
(EUGENE,LANE COUNTY,ODOT)
PETERSEN
SHASTA
BALLFIELDS
A-3 CHANNEL
IRWIN
CANDLELIGHT
ROOSEVELT
CHANNEL
MANGAN
GARFIELD
TRAINSONG
FERNDALE
STATE
STREET
A-2
CHANNEL
Echo Hollow Pool
LARK
RUBY
GRASSHOPPER
MEADOW
GILBERT
Am
a
z
o
n
Cree
k
Amazon
CREEK
A
-
2
C
h
a
n
n
e
l
A3 Channel
Legend
Bethel-Danebo Sub-Area
City of Eugene Parks
Other Conserved Lands
Park Facility on School Property
Public School
Recrea�on Facility
Exis�ng Hard-Surface Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene Urban Growth Boundary
Proposed Projects
New or Improved Recrea�onal Facility
Improvement of Exis�ng Park or Natural Area
New Park or Park Amenity
New Park Site Acquisi�on
New Trails, Paths, and Access Improvements
New So�-Surface Trail Conceptual Alignment
0
Scale
1/2 Mile1/4 SDC Projects: Bethel Planning District
Eugene Parks and Recreation System
October 2019
Index
RR/SC
SE
W
SW
B
CC
FernRidgeReservoir
Amazon
Dive
r
s
i
o
n
Channel
BERTELSEN NATURE PARK
(BLM, EUGENE, ODOT)
B1
B2
B7
B1
B15
B25
B26
B13 B8
B35
B36
B37
B17
B5
B28
B29
B30
B14
B33
B42
B43
Other Sub-Area ProjectLoca�on to be Determined
B41
ToSpencerBu�e
To Willame�eRiver
15 March 2024
16
I-5
I-5
Lamb Cottage
Campbell CommunityCenter
Hilyard CC
Trude Kaufman Senior Center( Leased )
Washington Park
Community Ctr
Shelton-McMurpheyJohnson House( Leased )
UO Student Recreation Center
YMCA(Semi-Public)
Lane Events Center( Lane County )
Roosevelt MS
Adams
ES Edison ES
Willagillespie
ES
Chávez ES
Condon ES
South Eugene HSATA
Eugene Country
Club Golf Course
(Private)
Oakway
Golf Course
ALTON BAKER
AMAZON
SKINNER
BUTTE
HENDRICKS
Laurelwood Golf Course Clubhouse
WESTMORELAND
MAURIE
JACOBS
RASOR
GUDU-KUT
MELVIN
MILLER
OAK PATCH EAST
SORREL
POND
OAKMONT
FRANKLIN
WASHINGTON
OAK PATCH
WEST
HAWKINS
HEIGHTS
GARFIELD
GILLESPIE
BUTTE
SLADDEN
COLLEGE HILL
RESERVOIR
(EWEB)
JEFFERSON
MONROE
ED
SMITH
LAUREL HILL
ACORN
UNIVERSITY
CHASE COMMONS
BERKELEY
MISSION
Amazon Pool
(WILLAMALANE PRD)
FRIENDLY
TANDY
TURN
SCOBERT GARDENS
PARK
BLOCKS
CHARNEL MULLIGAN PREFONTAINE
MEMORIAL
FAIRMOUNT
LINCOLN
SCHOOL
Amazon CC
MLK JR.
River House
WEST
UNIVERSITY
McNail-Riley House
BROADWAY PLAZA
Willa
m
e
t
t
e
RiverPOLK STHILYARD STCHAMBERS STWILLAMETTE STW 7TH AVE
W 6TH AVE
HARLOW RD
HIGH STOAK STE 19TH AVE
W 28TH AVE PEARL STHARRIS STE 18TH AVE
LINCOLN STE 24TH AVECITY VIEW STAGATE STW 7TH PL GARFIELD STOAKWAY RDE 11TH AVE
W 24TH AVE ALDER STPATTERSON STFRIENDLY STAUGUSTA STWASHINGTON STMLK JR BLVD
W 2ND AVE
B
L
A
I
R
B
L
V
D
COUNTRY CLUB RD
OAK PATCH RDRAI
LRO
A
D B
LV
D SATRE STN GARDEN WAYW 27TH AVE
I-105
M E N L O LP
JEFFERSON STKINSROW AVE
W 5TH AVE
W 1ST AVE COBURG RDL
E
O
HARR
I
S
PKWY
FRAN
K
L
I
N
B
L
V
D
E 13TH AVE
SDC Projects: City Central Planning District
Eugene Parks and Recreation SystemOctober 2019
Index
RR/SC
SE
W
SW
B
CC
Legend
City Central Sub-Area
City
Public School
Recrea�on Facility
Exis�ng Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene UGB
Proposed Projects
New or Improved Recrea�onal Facility
Improvement of Exis�ng Park or NA
New Park or Park Amenity
New Park Site Acquisi�on
New Trails, Paths, and Access Improve.
New So�-Surface Trail - Conceptual
0
Scale
1/2 Mile1/4
C1
C4
C27
C31
Other Sub-Area Project
Loca�on to be Determined
C17C13
C5
C24
C14
C18
C33
C32
C3
C2
of Eugene Parks
Other Conserved Lands
Park Facility on School Property
March 2024
17
Westmoreland
Comunity Ctr
Coyote Creek South
n
GOLDEN
GARDENS
DELTA
PONDS
WEST
BANK
HILEMAN LANDING
(LANE COUNY)
WALNUT
GROVE
RASOR
EMERALD(RRPD)
SANTA CLARA
COMMUNITY PARK
ARROWHEAD
AWBREY
WENDOVER
FERNDALE
TERRA
LINDA
LONE OAK
BRAMBLEWOOD
FILBERT
MEADOWS
WHITELY LANDING
(OPRD)
RUBY
ROSETTAHIGHW
A
Y
9
9 RIVER
RD
BELTLINE RDPRAIR
IE
RD
CLEAR LAKE RD IRVING RD
N
O
R
T
H
W
E
S
T
E
X
P
R
E
S
S
W
A
Y
BEACON DR
DELTA HWYAWBREY LN
MAXWELL RD
AIRPORT RD
IRVINGTON DR
RIVER AVE
E ENID RD
HORN LNN PARK AVEWILKES DR
PARK AVE
HOWARD AVESCENIC DRRIVER LP 2
DIVISION AVECROCKER RDHUNSAKER LN
BLACKFOOT AVE
R I VER LOOPPRAIRIE RDPRAIRIE RDBELTLINE RDRS8
RS1
RS1
RS1
RS1
RS3
RS10
RS9
RS4
RS7
RS2
RS12
Other Sub-Area Projects
Loca�ons to be Determined
0
Scale
1/2 Mile1/4
SDC Projects: River Road/Santa Clara Planning District
Eugene Parks and Recreation System
October
2019
Legend
River Road/ Santa Clara Sub-Area
City of Eugene Parks
Other Conserved Lands
Park Facility on School Property
Public School
Recrea�on Facility
Exis�ng Hard-Surface Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene Urban Growth Boundary
Proposed Projects
New or Improved Recrea�onal Facility
Improvement of Exis�ng Park or Natural Area
New Park or Park Amenity
New Park Site Acquisi�on
New Trails, Paths, and Access Improvements
New So�-Surface Trail Conceptual Alignment*
Index
RR/SC
SE
W
SW
B
CC
Rive
rWil
l
ametteEmerald Park
Community Center
and Pool (RRPRD)
Kelly
MS
Madison
MS
Howard
ES
North
Eugene
HS
Irving
ES
Corridor
ES
Awbrey
Park
ES
Spring Creek ES
River Road/
El Camino del Río
Elementary School
Yujin Gakuen
Japanese Immersion ES
GREEN ISLAND
(MCKENZIE RIVER TRUST)
BOBOLINK
RS32
RS15 RS16
RS17
RS30
RS27
RS5
RS31
RS39RS14
March 2024
13
Tamarack Center(Semi-Public)
Hilyard CC
Washington Park CC
Morse Ranch Museum
YMCA
(Semi-
Public)
ColemanCC
WillardBldg.
Churchill
High School
Roosevelt MS
Adams
ES Edison
ES
Spencer
Butte
MS
McCornack
Elementary School
Camas
Ridge
ES
Edgewood ES
Crest Drive
Building
South
Eugene
HS
Arts & Techno
l
o
g
y
A
c
a
d
e
m
y
(
K
-
8
)
Charlemagne ES
E 30TH AVECHAMBERS STWILLAMETTE STDONALD STOAK STE 19TH AVE
W 28TH AVE HARRIS STE 18TH AVE
LINCOLN STE 24TH AVE VIEW STAGATE STW AMAZON DRE AMAZON
DR
W 24TH AVE AUGUSTA STE 40TH
E 33RD AVE
E 4 3 R D A V E SPR IN GBLVDW 39TH AVE
E 29TH AVEJEFFERSON STCOLUMBIAFOXHOLLO
W
R
D AGATE STCREST DR
BRAE BURNE 46th
WILLAMETTE STDI
LL
A
R
D
R
D
I-5
I-5HIGH STSUZANNE
ARLIE
DORRIS
RANCH
(WILLAMALANE)
SPENCER
BUTTE
AMAZON
HEADWATERS
MT. BALDY
SOUTH EUGENE
MEADOWS
BLANTON RIDGE
AMAZON
HENDRICKS
Laurelwood
Clubhouse
WESTMORELAND
MOON
MOUNTAIN
RIBBON
TRAIL
BLOOMBERG
TUGMAN
WAYNE MORSE
FAMILY FARM
AMAZON
PARKWAY
FRANK
KINNEY
WASHINGTON
KINCAID
LORANE
CONNECTOR
COLLEGE HILL
RESERVOIR(EWEB)
LAUREL
HILL
UNIVERSITY
CREST
HEIGHTS LAFFERTY
MISSION
Amazon Pool
EDGEWOOD
FRIENDLY
SHADOW
WOOD
MILTON
PREFONTAINE
MEMORIAL
Amazon CC
WILLIS
GLEN
OAK
CORYELL RIDGE
LAURELWOOD Wi
l
lamette
Am
a
z
o
n
CreekWASHBURNE
To BufordPark andSpringfield
Other Sub-Area Projects
Loca�ons to be Determined
0
Scale
1/2 Mile1/4 SDC Projects: Southeast Planning District
Eugene Parks and Recreation SystemOctober 2019
Legend
Southeast Sub-Area
City of Eugene Parks
Other Conserved Lands
Park Facility on School Pr
CITY operty
Public School
Recrea�on Facility
Exis�ng Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene UGB
Proposed Projects
New or Improved Rec. Facility
Imp. of Exis�ng Park or NA
New Park or Park Amenity
New Park Site Acquisi�on
New Trails, Paths, and Access
New So�-Surface Trails
Index
RR/SC
SE
W
SW
B
CC
SE1
SE1
SE12
SE17
SE36
SE22
SE39
SE4
SE24
SE19
SE18
SE44
SE45
SE46
SE47
SE48
SE49
SE50
SE51
SE52
SE56
SE58
SE59
SE61
SE25
SE65
SE55
SE2
SE54
SE57
SE42
To Wild Iris Ridge and Fern RidgePath
18
SE73
March 2024
19
n
COYOTE CREEK NORTHEAST
(ODFW)
WARBLING CREEK
GIMPL
RIDGE
W 11TH AVE
BAILEY HILL RDCROW RDGIMPL HILL RDCHAMBERS STS BERTELSEN RDW 1ST AVE
HAWKINS LNCITY VIEW STBELTLINE RDW 7TH PL
PINE GROVE RDGARFIELD STSENECA RDS DANEBO AVETI
M
B
E
R
LI
N
E
DRMCKINLEY STOAK PATCHW 25TH AVE
W 13TH AVETERRY STWILLOW CREEK RDW 5TH AVE
W 11TH AVE
GREEN HILL RD.CREST DR.
Highway 126
BAILEY HILL RDH
I
G
HW
A
Y
9
9
LORANEHWY.
Kennedy
MS
Churchill HS
McCornack
ES
César E. Chávez
Elementary SchoolArts & Tech
n
o
l
o
g
y
A
c
a
d
e
m
y
(
K
-
8
)
WILLOW CREEK
PRESERVE
(TNC)
COYOTE
PRAIRIE
WILD
IRIS
RIDGE
WILLAMETTE DAISY MEADOW
(BLM,EUGENE,ODOT)
BERTELSEN NATURE PARK
TSAL LUK-WAH
SOUTH
EUGENE
MEADOWS
MURRAY
HILL
LUK-WAH
PRAIRIE
(TNC, BLM)
CHURCHILL SPORTS PARK
AMAZON
CORRIDOR
BAILEY HILL
A-3 Channel
GIMPL
RIDGE
GUDU-KUT
NOLAN
MITIGATION SITE
MELVIN
MILLER
OAK PATCH
EAST
VIDERA
WILLOW
CORNER
OAK PATCH
WEST
HAWKINS
HEIGHTS
GARFIELD
MATTIE
REYNOLDS
SKYVIEW
LORANE
CONNECTOR
ACORN
RICHARDSON
BRIDGE
BERKELEY
MLK JR.
Amazon Creek
WILD
IRIS
RIDGE
TOWNSEND
WOODS
0
Scale
1/2 Mile1/4 SDC Projects: Southwest Planning District
Eugene Parks and Recreation System
October 2019
Legend
Southwest Sub-Area
City of Eugene Parks
Other Conserved Lands
Park Facility on School Property
Public School
Exis�ng Hard-Surface Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene Urban Growth Boundary Index
RR/SC
SE
W
SW
B
CC
Proposed Projects
New or Improved Recrea�onal Facility
Improvement of Exis�ng Park or Natural Area
New Park or Park Amenity
New Park Site Acquisi�on
New Trails, Paths, and Access Improvements
New So�-Surface Trails (conceptual alignment)
SW1
SW1
SW1
SW3
SW4
SW11
SW21
SW22
SW13
Other Sub-Area ProjectsLoca�ons to be Determined
SW5 SW6
SW25
SW26
SW28
SW27
SW31
SW33
SW7
SW8
SW34 SW35
SW18
To FernRidgePath
To Blanton Road andSpencer Bu�e
To Blanton Road andSpencer Bu�e
SW26
March 2024
20
Sheldon
HS
Monroe
MS
Cal
Young MS
Gilham
ES
Bertha Holt
ES
Willagillespie
ES
Buena
Vista ES
Sheldon Community Center/Pool
The Rink Exchange Ice Center
( Lane County )
I-5
I-5ALTON BAKER
DELTA
PONDS
SKINNER
BUTTE
ARMITAGE
(LANE CO)
EASTGATE
WOODLANDS
ASCOT
MAURIE
JACOBS
EAST
BANK
RASOR
STRIKER
FIELD
WEST D STREET
GREENWAY
CAL YOUNG
SPORTS PARK
BOND
LANE
SORREL
POND
OAKMONT
GILHAM
GARFIELD
GILLESPIE
BUTTE
WILLAKENZIE
NORTH BELTLINE FLOODWAY
WILDWOOD
CREEKSIDE
CHASE
COMMONS
CRESCENT
BREWER
MARCHE
CHASE
TANDY
TURN
COUNTRY
LANE
WEST UNIVERSITY
SPRINGFIELDCOBURG RDPOLK STI-105
N
O
R
T
H
W
E
S
T
E
X
P
R
E
S
S
W
A
Y GILHAM RDW 6TH AVE
HARLOW RDDELTA HWYMAXWELL RD
CRESCENT AVE
CAL YOUNG RD
CH
A
D
D
R
RIVER AVE
HORN LN
WILKES DR
GARFIELD STOAKWAY RDPARK AVE N GAME
FARM
RD
E 11TH AVE GATEWAY STHOWARD AVE
DIVISION AVE
HUNSAKER LN
W C E N T E N N IA L B L VD
MLK JR BLVD
W 2ND AVE
AYRES RD
N DELTA HWYCOUNTY FARM RDFRANK
L
I
N
B
L
V
DGOODPASTURE I S LAND RD
BELTLINE RD
LEO HARRIS PKW Y
MINDA DR
COUNTRY CLUB RD
MCKINLEY STJEPPESEN ACRES RD
GREEN ACRES RD
N GARDEN WAYBOGART LNE 7TH AVE
GAME FARM RD
BELTLINE RD
W 1ST AVE
I-105Wil
l
am
et
t
e
River
McKe
n
z
i
e
Ri
ve
r
BELTLI
N
E
ROAD
Eugene Country Club
Golf Course
(Private)
River Ridge
Golf Complex
(Private)
Oakway
Golf Course(Private)
Other Sub-Area Projects
Loca�ons to be Determined
0
Scale
1/2 Mile1/4 SDC Projects: Willakenzie Planning District
Eugene Parks and Recreation System October 2019
Index
RR/SC
SE
W
SW
B
CC
Legend
Willakenzie Sub-Area
City of Eugene Parks
Other Conserved Lands
Park Facility on School Property
Private Golf Course
Public School
Recrea�on Facility
Exis�ng Hard-Surface Shared-Use Paths
Exis�ng So�-Surface Trails
Eugene Urban Growth Boundary
Proposed Projects
New or Improved Recrea�onal Facility
Improvement of Exis�ng P
I5Nark or Natural Area
New Park or Park Amenity
BNew Park Site Acquisi�on
New Trails, Paths, and Access Improvements
New So�-Surface Trails (conceptual alignment)
W1
W1
W1
W1
W2
W3
W23
W29
W27
W26W24
W37
W38
W20
W30
W39
W40
W28
March 2024
21
Caution:
This map is based on imprecise
source data, subject to change,
and for general reference only.
Parks and Recreation SDC Incentive Areas
0 1 20.5
Miles I5 SBI5 NBHW
Y
9
9
N
RIVER
RDCOBURG RDW 11TH AVE
WB BELTLINE RD
W 18TH AVE
WB I105EB I10
5
E 30TH AVEHILYARD STBAILEY HILL RDPOLK STCHAMBERS STEB BELTLINE RDROYAL AVE
ROOSEVELT BLVD
IRVING RD
WILLAMETTE STW 7TH AVE
N
O
R
T
H
W
E
S
T
E
X
P
R
E
S
S
W
A
Y GILHAM RDW 6TH AVE
I105 EB
HARLOW RD
HIGH STB
E
T
H
E
L
D
R
OAK STI105 WBSB DELTA HWYNB DELTA
HWY
E 19TH AVE
BARGER DR
W 28TH AVE
W 13TH AVE
S BERTELSEN RDCRESCENT AVE
DONALD ST
W D ST
W 1ST AVE
HAWKINS LNE 24TH AVE
CAL YOUNG RD
HARRIS STIRVINGTON DR
FRANK
L
I
N
B
L
V
D
LINCOLN STCITY VIEW STGATEWAY STCH
A
D
D
R
BELTLINE RDRIVER AVE
ELMIRA RD
AGATE STI105N PARK AVEHORN LN
CREST DR
WILKES DR
AWBREY LN
W AMAZON
DROAKWAY RDPARK AVE
W 7TH PL
SENECA RDN GAME
FARM
RDTANEY STHOWARD AVE
ASPEN STW 24TH AVEPRAIRIE RDRIVER LOOP 2
NORKENZIE RDPATTERSON STALDER STWILLAKENZIE RD
HUNSAKER LN
LYNNBROOK DR
AUGUSTA STARROWHEAD ST
W 2ND AVE
S DANEBO AVEN DELTA HWYAYRES RD
BAILEY LN
E 46TH
A
V
ELAKE DRS
B
I
5
O
N
R
P
BLACKFOOT AVE
GIMPL HI
L
L
R
D
E 40TH AVEBRITTANY STE 43RD A
V
E
LE
O
H
A
R
R
I
S
P
K
W
Y
BRAE BURN DRSPRING BLVDW 5TH AVE
R
A
I
L
R
O
A
D
B
L
V
D
SPRING CREEK DR
E 7TH AVE
E ENID RD
GAME FARM RD
LAKEVIEW DR
MAXWELL RD
MENLO LP
E 4TH AVE MILL STW 5TH AVEPRAIRIE RDGAME FARM RDMAXWELL RD
´
6/10/2020
Legend
Eugene UGB
Major Streets
Water Bodies
Key Corridors
Frequent Transit Network (0.25 mile buffer)
Frequent Transit Network (0.5 mile buffer)
Parks and Recreation SDC Incentive Areas
March 2024
17 March 2024