HomeMy WebLinkAboutAdmin Order 58-26-15 -- Proposing ROW Use Permit Fee Amendments Exhibit A to Administrative Order No. 58-26-15 Notice -- Page 1 of 4 NOTICE OF OPPORTUNITY TO COMMENT ON PROPOSED CHANGES TO THE UTILITY RIGHT-OF-WAY USE PERMITS FEE SCHEDULE. Pursuant to the provisions of Sections 2.020 and 7.300 of the Eugene Code, 1971, and as a result of an investigation of the revenue needs of the City in providing public way construction permitting services, the City Manager is proposing to amend the following fees in the Utility Right-of-Way Use Permits Fee Schedule effective November 1, 2026. (The current fees proposed to be deleted are shown in strikethrough and proposed additions are shown in bold italics.) FEES FOR WORK AFFECTING THE PUBLIC WAY I. Annual Blanket Permit For routine installation of service lines, minor repairs and maintenance over course of year by franchised utilities, City licensed facilities, and municipal utilities. A. Annual Application Fee $500.00 $535.00 B. Work Activity Fee For each work activity undertaken pursuant to annual blanket permit. $100.00 $107.00 II. Individual Site Installation Permits 1 For installation, construction, maintenance, or removal of a structure, pipe, pole, conduit, culvert, facility or other wire or cable-type facility by franchised utilities, City licensed facilities, and municipal utilities, when such work activity is not specifically authorized by a blanket permit. Individual Permit fees are incurred upon permit approval and are nonrefundable. A. Individual Permit – Standard Fees Length of Right-of-Way (RoW) Impacted Type 1 PUE*, Alley, Local Street, Neighborhood Collector Street Type 2 Major Collector Street, Arterial Street 0-99 ft. $350 $374.50 $410 $438.70 100 – 499 ft. $435 $465.45 $460 $492.20 500-999 ft. $555 $593.85 $670 $716.90 1000 – 2000 ft. $715 $765.05 $890 $952.30 2001 – 5000 ft.** Apply combination of fees, above, to equate to length of RoW impact. 1 For work affecting the public way by a party other than the operator of a franchised utility, City licensed facility, or municipal utility, general construction permit fees apply, e.g. permits for temporary private use of the public way, excavation in the right-of-way, revocable permits. Exhibit A to Administrative Order No. 58-26-15 Notice -- Page 2 of 4 *Exception: work within a public utility easement (PUE) that abuts the right-of-way for a major collector or arterial street is subject to the arterial street fee. **A standard individual permit may not pertain to more than 5000 feet of impacted right-of- way. Work that involves an impact that exceeds 5000 feet must obtain an additional individual permit. B. Individual Permit – Joint Trench Fees Fee applies to each franchised utility, City licensed facility, and municipal utility performing work within same trench. Length of RoW Impact 2 Participants 3 Participants 4 participants PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial 0-99 ft. $230 $246.10 $275 $294.25 $205 $219.35 $240 $256.80 $200 $214.00 $235 $251.45 100 – 499 ft. $285 $304.95 $345 $369.15 $250 $267.50 $305 $326.35 $235 $251.45 $290 $310.30 500-999 ft. $365 $390.55 $425 $454.75 $310 $331.70 $385 $411.95 $300 $321.00 $350 $374.50 1000 – 2000 ft. $470 $502.90 $580 $620.60 $405 $433.35 $495 $529.65 $370 $395.90 $460 $492.20 2001 – 5000 ft.** Apply combination of fees, above, to equate to length of RoW impact. *Exception: work within a public utility easement (PUE) that abuts the right-of-way for a major collector or arterial street is subject to the arterial street fee. ** An individual permit with joint trenching may not pertain to more than 5000 feet of impacted right-of-way. Work that involves an impact that exceeds 5000 feet must obtain an additional individual permit. C. Individual Permit - Aerial Installation Fees For the installation of wire or cable-type facilities in the right-of-way on existing poles or above-ground structures, with no ancillary equipment other than installation or replacement of pole anchors completed within a 10-foot radius of the existing pole or structure. For any other ancillary equipment, or for related underground facilities in the right-of-way, standard individual permit fees are applicable in addition to the fee for the aerial installation. Exhibit A to Administrative Order No. 58-26-15 Notice -- Page 3 of 4 Length of Wire / Cable Type 1 PUE*, Alley, Local Street, Neighborhood Collector Street Type 2 Major Collector Street, Arterial Street 0-99 ft. $350 $374.50 $410 $438.70 100 – 499 ft. $435 $465.45 $460 $492.20 500-999 ft. $555 $593.85 $670 $716.90 1000 – 2000 ft. $715 $765.05 $890 $952.30 2001 – 5000 ft.** Apply combination of fees, above, to equate to length of wire / cable subject to the permit. Each additional foot greater than 26,400 ft. $0.10 per foot *Exception: work within a public utility easement (PUE) that abuts the right-of-way for a major collector or arterial street is subject to the arterial street fee. ** An aerial installation permit may not pertain to more than 5000 feet of wire or cable. Work that involves more than 5000 feet of wire or cable must obtain additional, incremental aerial permits. III. Cut Moratorium Exception Fee A list of recently surfaced streets under the City’s 5-year cut moratorium can be reviewed on the City’s web site. If an exception to the City’s cut moratorium is granted, the following fees apply in addition to any applicable general construction permit fees, fee(s) for an individual permit or a work activity under an annual blanket permit. Time Since Surface Replacement Fee 0 - 12 months $1000 $8000 13 – 24 months $1000 $7000 25 – 36 months $1000 $5000 37 – 48 months $1000 $3000 49 – 60 months $1000 $2000 IV. Extension of Individual Permit Available for up to 180 days, one time per permit $0 10% of initial fee paid for individual permit V. After-the-Fact Individual Permit For work in the public way performed without a permit or beyond scope of permit. 2 X (applicable fee for individual standard or aerial permit + any moratorium fee) - No joint trench benefit VI. Failure to Maintain Approved Plans on Work Site $100 per occurrence VII. Deviation from Approved Plans $500 per occurrence Exhibit A to Administrative Order No. 58-26-15 Notice -- Page 4 of 4 Comments on the proposed amendments may be submitted in writing to AIC Surface Technical Supervisor Taunya Carley, 1820 Roosevelt Blvd, Eugene, Oregon 97402, or via e-mail to TCarley@eugene-or.gov. To be considered, written and e-mail comments must be received within 15 days from the date posting as indicated below. If the City Manager chooses to take action after considering the comments received, the proposed or modified fees will be adopted by administrative order. Jennifer D. Haruyama, City Manager Date of Posting: October 6, 2026 Exhibit B to Administrative Order No. 58-26-15 Notice -- Page 1 of 2 NOTICE OF OPPORTUNITY TO COMMENT ON PROPOSED CHANGES TO THE UTILITY RIGHT-OF-WAY USE PERMITS FEE SCHEDULE. Pursuant to the provisions of Section 2.020, and as a result of an investigation of the revenue needs of the City in providing public way construction permitting services, the City Manager is proposing to amend the Utilities Right-of-Way Use Permits Fee Schedule effective November 1, 2026. Fees proposed to be $250 or greater are set out below (fees proposed to be deleted are shown in strikethrough and proposed additions are shown in bold italics.) A full schedule of the proposed amendments can be reviewed at the City Hall bulletin board posting locations, 500 E. 4th Avenue, Eugene and on the City’s website at www.eugene-or.gov/520/Administrative-Order. I. Annual Blanket Permit A. Annual Application Fee $500.00 $535.00 II. Individual Site Installation Permits A. Individual Permit – Standard Fees Length of Right-of-Way (RoW) Impacted Type 1 PUE*, Alley, Local Street, Neighborhood Collector Street Type 2 Major Collector Street, Arterial Street 0-99 ft.$350 $374.50 $410 $438.70 100 – 499 ft. $435 $465.45 $460 $492.20 500-999 ft.$555 $593.85 $670 $716.90 1000 – 2000 ft. $715 $765.05 $890 $952.30 2001 – 5000 ft. Apply combination of fees, above, to equate to length of RoW impact. B. Individual Permit – Joint Trench Fees Length of RoW Impact 2 Participants 3 Participants 4 participants PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial PUE*, Alley, Local, Neighborhood Collector Major Collector, Arterial 0-99 ft.$230 $246.10 $275 $294.25 $205 $219.35 $240 $256.80 $200 $214.00 $235 $251.45 100 – 499 ft. $285 $304.95 $345 $369.15 $250 $267.50 $305 $326.35 $235 $251.45 $290 $310.30 500-999 ft.$365 $390.55 $425 $454.75 $310 $331.70 $385 $411.95 $300 $321.00 $350 $374.50 1000 – 2000 ft. $470 $502.90 $580 $620.60 $405 $433.35 $495 $529.65 $370 $395.90 $460 $492.20 2001 – 5000 ft. Apply combination of fees, above, to equate to length of RoW impact. Exhibit B to Administrative Order No. 58-26-15 Notice -- Page 2 of 2 C. Individual Permit - Aerial Installation Fees Length of Wire / Cable Type 1 PUE*, Alley, Local Street, Neighborhood Collector Street Type 2 Major Collector Street, Arterial Street 0-99 ft.$350 $374.50 $410 $438.70 100 – 499 ft. $435 $465.45 $460 $492.20 500-999 ft.$555 $593.85 $670 $716.90 1000 – 2000 ft. $715 $765.05 $890 $952.30 2001 – 5000 ft.** Apply combination of fees, above, to equate to length of wire / cable subject to the permit. Each additional foot greater than 26,400 ft. $0.10 per foot III. Cut Moratorium Exception Fee Time Since Surface Replacement Fee 0 - 12 months $1000 $8000 13 – 24 months $1000 $7000 25 – 36 months $1000 $5000 37 – 48 months $1000 $3000 49 – 60 months $1000 $2000 VII. Deviation from Approved Plans $500 per occurrence Comments on the proposed amendments may be submitted in writing to AIC Surface Technical Supervisor Taunya Carley, 1820 Roosevelt Blvd, Eugene, Oregon 97402, or via e-mail to TCarley@eugene-or.gov. To be considered, written and e-mail comments must be received within 15 days from the date posting as indicated below. If the City Manager chooses to take action after considering the comments received, the proposed or modified fees will be adopted by administrative order. Jennifer D. Haruyama, City Manager Date of Publication: October 6, 2026. Exhibit C to Administrative Order No. 58-26-15 Findings – Page 1 City Manager’s Findings Proposed FY27 Utility Permit Fee Schedule Amendments Pursuant to Section 2.020(2) of the Eugene Code, 1971, the City Manager has considered the following factors in determining the proposed FY27 Utility Permit fee schedule amendments: (a)Applicable policies, enactments and directives of the Council. 1)7.010 Definitions2)7.290 Public Way Construction and Use Permit Required Standard Specifications,Drawings and Design Standards3)7.295 Public Way Construction and Use Permit Application4)7.300 Public Way Construction and Use Permit Fees (b)The amount charged by the City in the past. Amounts charged by the City in the past are reflected on the proposed fee schedule. (c)The full costs of providing the service supported by the fee. For the period from October 1, 2026, through September 30, 2027, the total program cost is estimated to be $1,165,846. This includes $1,017,095 for FTE, $71,262 for materials and supplies (such as computers and related technology), $7,126 for overhead associated with materials and supplies, and $70,362 for fleet. The average revenue for this same period, with the proposed increases, is $1,103,498, which will still not provide full cost recovery; it will result in a shortfall of $62,347 for the next year. Future increases will be considered to attain full cost recovery. (d)The amounts charged by other comparable providers. The City of Eugene’s offering of a “Blanket Permit” is unique; we are not aware of any other jurisdictions that offer this. Individual Permit fees tallied at Price Per Linear Foot (350 ft project) are as follows: Eugene $1.31 Medford $1.37 = 4.6% more than the COE Salem $1.39 = 6.1% more than the COE Bend $1.71 = 30.5% more than the COE Exhibit C to Administrative Order No. 58-26-15 Findings – Page 2 (e) The revenue needs of the City as determined by the adopted city budget. See findings under (c), above. The adopted biennium budget revenue for Utility Permits (Maintenance Division) is $2,000,000. This is the revenue needed to meet the operational needs of the City as determined by the current service level. The program needs revenue to cover existing and future costs of the program to maintain service levels and to lessen the burden on current funding streams. This amount still does not bring the program to full cost recovery. $0.00 $0.50 $1.00 $1.50 $2.00 Eugene Medford Salem Bend Price Per Linear Foot (350 ft project)