HomeMy WebLinkAboutItem 2: Resolution Amending MWMC Regional Wastewater SDC Methodology ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Public Hearing: Resolution 4991 Amending the Systems Development Charge Methodology and Charges for the MWMC Regional Wastewater System Meeting Date: November 16, 2009 Agenda Item Number: 2 Department: Public Works Staff Contact: Fred McVey www.eugene-or.gov Contact Telephone Number: 682-5216 ISSUE STATEMENT The purpose of this public hearing is to provide an opportunity for public comment regarding the proposed adoption by resolution of the Metropolitan Wastewater Management Commission’s (MWMC) requested modifications to the regional wastewater system development charge (SDC) methodology. The proposed resolution implements modifications to the regional wastewater SDC methodology by incorporating changes in Eugene’s SDC Methodologies document. BACKGROUND On September 11, 2009, the MWMC approved the Commission’s Resolution 09-15 adopting amendments to the MWMC SDC Methodology. The MWMC is requesting the Eugene City Council adopt the SDC Methodology modifications consistent with provisions of the MWMC Intergovernmental Agreement adopted by the City of Eugene on May 23, 2005, and signed July 5, 2005 (Ordinance Number 20345). Mayor Piercy and the council, and interested persons, were notified of intended amendments to Eugene Systems Development Charge (SDC) methodologies on August 17, 2009. A draft of the proposed modifications was made available for public review and a notice of availability was published in the Register-Guard on September 17, 2009, and, along with the draft resolution and exhibits, has been posted at Eugene City Hall and the Public Works Engineering lobby. This information was also made available at the City’s website at www.eugene-or.gov/SDC. The MWMC has requested four primary amendments of the regional wastewater SDC methodology and rates, including: Use of actual project debt service costs in developing the SDC project valuation rather than the estimated project and debt-related costs of the current methodology; use of actual debt service costs in developing the SDC rate-supported credits; inclusion of a compliance charge covering legal, accounting, reporting, and methodology development costs within the SDC calculation of unit charges; and, modification of the steps to develop the SDC Charge Schedule which classifies the strength categories and rates for development types, including allowance for the update and adjustment of SDC strength categories by the MWMC Industrial Pretreatment Program for the purpose of maintaining consistency with user fee strength categories. As a result of these proposed amendments to the regional wastewater SDC methodology, rates will increase by approximately 19-27% depending on strength category. The regional wastewater SDC for a Z:\CMO\2009 Council Agendas\M091116\S0911162.doc single-family residence will increase from $1,146.50 to $1,458.17, a 27.2% increase. The requested implementation date for the MWMC SDC modifications is January 1, 2010. Council Action History The regional wastewater SDC methodology was last modified by Resolution No. 4875, effective June 12, 2006. The last major update to Eugene SDC methodologies was in May, 2007, when the council adopted the SDC Methodologies by Resolution No. 4900, updating the parks SDC methodology and rates. Resolution No. 4900 has subsequently been amended by Resolution Nos. 4929 (inflationary adjustment to Parks SDC rates effective April 3, 2008) and 4943 (inflationary adjustment to regional wastewater SDC rates effective July 1, 2008). On May 26, 2009, the council approved Resolution No. 4977 implementing administrative fee adjustments with an amended effective date of January 1, 2010. In addition, inflationary adjustments of SDC rates for the local wastewater, stormwater, and transportation systems were adopted by Administrative Order No. 58-08-02-F, effective April 3, 2008, and for regional wastewater SDC rates by Administrative Order No. 58-09-08-F, effective July 1, 2009. RELATED CITY POLICIES The cities of Eugene and Springfield and Lane County have established the MWMC to implement a regional, inter-agency approach to wastewater treatment. The policy issue before the council is whether to adopt by resolution a modified regional wastewater SDC methodology as requested by the MWMC. COUNCIL OPTIONS Not applicable, this is a public hearing only. CITY MANAGER’S RECOMMENDATION The City Manager recommends that the Mayor and City Council convene the public hearing. Action on the resolution is scheduled for the November 23, 2009, City Council meeting. SUGGESTED MOTION No motion is necessary. Action on this resolution is scheduled for November 23, 2009. ATTACHMENTS A. Proposed Resolution ? Exhibit A to Attachment A, the proposed modifications to the regional wastewater SDC methodology ? Exhibit B to Attachment A, the proposed regional wastewater SDC charge schedule FOR MORE INFORMATION Staff Contact: Fred McVey, Engineering Data Services Manager Telephone: 682-5216 Staff E-Mail: fred.mcvey@ci.eugene.or.us Z:\CMO\2009 Council Agendas\M091116\S0911162.doc ATTACHMENT A RESOLUTION NO. ______ A RESOLUTION ADOPTING AMENDMENTS TO REGIONAL WASTEWATER SYSTEMS DEVELOPMENT CHARGE METHODOLOGY, ADOPTING ADJUSTED REGIONAL WASTEWATER SYSTEMS DEVELOPMENT CHARGES AND AMENDING RESOLUTION NO. 4900. The City Council of the City of Eugene finds as follows: A. The System Development Charge (SDC) Methodology was adopted by Resolution No. 4900, effective on May 7, 2007. B. Resolution No. 4900 has subsequently been amended by Resolution No. 4929, effective April 3, 2008, and by Resolution No. 4977, which will become effective on January 1, 2010. In addition, inflationary adjustments to Systems Development Charges have been adopted for: (1) the Regional Wastewater System by Administrative Order No. 58-07-08-F, effective August 20, 2007, by Resolution No. 4943, effective July 1, 2008, and by Administrative Order No. 58-09-08-F, effective July 1, 2009; and (2) Local Wastewater System, Stormwater System, and Transportation System by Administrative Order No. 58-08-02-F, effective April 3, 2008. C. It is necessary to amend the regional wastewater SDC methodology in the following ways: Step Three – Project Valuation 1. Revise “” to provide that project values are updated regularly to reflect: 1) annual inflation for projects; and, 2) actual costs for any bond-funded projects. Step Four – Adjustments 2. Revise “” to provide that projected capital financing costs are added to the project costs if the project is funded through debt proceeds and to provide that future years’ interest expenses are discounted to present value using a 5% discount rate. “Methodology Element Three: Develop SDC Schedule” 3. Revise to provide that SDC strength categories can be adjusted by the Industrial Pretreatment Program for the purpose of maintaining consistency with user strength categories. The revision deletes the strength assumptions from Appendix D and provides that strength assumptions for different development types are estimated by MWMC’s Industrial Pretreatment Program. “Methodology Element Four: Calculate Offsets and Credits” 4. Revise to provide that credit will reflect the present value of future contributions (through user fees) by new development to the repayment of debt service for the cost of capital improvements that benefit existing customers. Resolution - Page 1 of 2 Methodology Element Six: Compliance Charge 5. Add a new “” to cover costs associated with complying with the state SDC statutes (ORS 223.297 to 223.314). The compliance charge includes: legal costs, annual accounting/reporting costs, and SDC development costs. D. The above-listed amendments will result in MWMC user rate increases ranging from 19% - 30%, depending on the MWMC user’s strength category, as well as adding the compliance charge. E. It is necessary to adopt adjusted regional wastewater systems development charges that reflect, and are based on, the amended regional wastewater SDC methodology. NOW, THEREFORE, based upon the above findings, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1. The amendments to the Metropolitan Wastewater Management Commission (MWMC) Regional Wastewater System Development Charge (SDC) Methodology shown in Exhibit A are adopted. Section 2. The portions of the MWMC Regional Wastewater SDC Methodology not shown as amended in Exhibit A remain unchanged and remain in full force and effect. Section 3. The MWMC Regional Wastewater SDC Charge Schedule (Table S-1), attached hereto as Exhibit B, is adopted. Section 4 . The City Recorder is requested to append a copy of this Resolution, Exhibit A and Exhibit B to Resolution No. 4900. Section 5 . This Resolution shall become effective on January 1, 2010. The foregoing Resolution adopted the ______ day of __________________, 2009. __________________________ AIC City Recorder 00241388.DOC;1 Resolution - Page 2 of 2 Exhibit A System Development Charge Methodology Prepared for Adopted by City of Eugene, Effective January 1, 2010 Page 1 OF 39 EXHIBIT A Contents System Development Charge Methodology ........................................................................ 4 Introduction ................................................................................................................. 4 System Development Charge Methodology .............................................................. 5 Overview.......................................................................................................... 5 Methodology Element One: Determine Growth Capacity Needs ............... 8 Step One - Capacity Parameters .............................................................. 8 Step Two - Growth Capacity Requirements ........................................... 9 Methodology Element Two: Develop Cost Basis ........................................ 10 Step One - System Valuation .................................................................. 10 Step Two - Existing System Allocation.................................................. 11 Step Four - Project Cost Allocation ........................................................ 12 Step Five - Adjustments .......................................................................... 16 Methodology Element Three: Develop SDC Schedule ............................... 17 Methodology Element Four: Calculate Revenue Offsets and Credits ....... 17 Past Payments ......................................................................................... 18 Future Payments ..................................................................................... 18 Methodology Element Five: Periodic modification of existing sytem and future project values …………………………………………………………. 21 Methodology Element Six: SDC Compliance Charge……………………. 21 Appendixes A System Component Definitions B Capacity Parameter Allocation C Growth Capacity Allocation Documentation D User Capacity Requirements E GO Bond Credit Calculation Tables 1 Summary of Key Methodological Requirements ................................................................. 4 2 Example Calculation for Single (Average Flow) Capacity Parameter ................................ 7 3 Summary of Facility Process Component Allocation to System Capacity Parameters ..... 9 4 Existing System Available Capacity by Parameter ............................................................ 12 5 Summary of Project Type Allocation Criteria .................................................................... 15 6 Growth Allocation Percentages by Project Type ................................................................ 16 B-1 Design Criteria Basis For Unit Processes Driven By Peak Flow ................................... B-24 C-1 Capacity Summary of MWMC Liquids Facilities .......................................................... C-29 C-2 Projected 2025 Peak Flow Breakdown ............................................................................ C-31 C-3 Capacity Summary of MWMC Biosolids Facilities (annual average dry tons per year) ................................................................................................................................... C-33 E-1 GO Bond Credit per $1,000 Assessed Value By Annexation Year ................................ E-39 Page 2 OF 39 Figures 1 Overview of MWMC SDC Methodology ......................................................................... 5 2 Existing System Allocation .............................................................................................. 11 3 Project Cost Allocation .................................................................................................... 13 4 SDC Schedule Development ........................................................................................... 16 Page 3 OF 39 System Development Charge Methodology Introduction This document serves as the system development charge (SDC) methodology for the Metropolitan Wastewater Management Commission (MWMC) Regional Wastewater System. The MWMC is the regional wastewater treatment agency for the Eugene- Springfield metropolitan area. System development charges may be collected from all development that connects to the Regional Wastewater System, including development that changes the use of existing development, when the change of use results in a greater impact on the system. The methodology contained in this document was developed in accordance with Oregon SDC legislation (ORS 223.297-223.314), and with the guidance of a Citizen Advisory Committee (CAC) appointed by MWMC. Table 1 provides a comparison of key methodological requirements from the Oregon Revised Statute (ORS) to elements of the MWMC methodology. TABLE 1 Summary of Key Methodological Requirements Oregon Law Requirement MWMC Methodology Reimbursement Fee Determine that existing capacity exists Explicitly calculates the portion of existing capacity available to new users based on rated design capacities. Methodology based on, when applicable: Methodology includes: (a) Rate-making principles employed to finance (a) Consideration of capital financing costs publicly-owned capital improvements (b) Adjustment for grant-funded facilities (b) Prior contributions by existing users (c) Valuation based on appreciated cost (i.e., adjusted for (c) Gift or grants inflation) (d) Value of unused capacity or cost of existing (d) Determination of unused capacity facilities (e) Other relevant factors Promote objective of future system users (1) Includes a credit against SDCs for properties subject to contributing no more than an equitable share of past general obligation bond debt service charges through existing system costs property tax payments. (2) Provides guidance to calculate a credit against SDCs for future estimated user charge payments used to fund debt service associated with projects included on the SDC project list. Improvement Fee Methodology demonstrates consideration of Provides a structured process for allocation of capital project projected costs of capital improvements identified costs that is to be applied to an adopted project list in an adopted plan or list Page 4 OF 39 EXHIBIT A TABLE 1 Summary of Key Methodological Requirements Oregon Law Requirement MWMC Methodology Methodology demonstrates consideration of the Allocates future improvement costs to growth in proportion to need for increased capacity in the system to meet capacity requirements future users’ demands Combined Fee Demonstrate that charge is not based on Determines total growth capacity requirements and the portion providing the same capacity of capacity to be met through existing system available capacity and future capacity expansion. Calculates a weighted average cost of capacity. Compliance Charge Annual accounting of revenue attributed to the Includes development of a charge to recover the costs of costs of complying with the statutes complying with the provisions of ORS 223.297 to 223.314. System Development Charge Methodology Overview The SDC methodology for MWMC is based on a combined reimbursement and improvement structure, as shown in Figure 1. The methodology consists of the following elements: ? Determine capacity needs ? Develop cost basis ? Develop SDC schedule ? Calculate revenue offsets and credits ? Application of cost index ? Determine compliance charge Page 5 OF 39 FIGURE 1—OVERVIEW OF MWMC SDC METHODOLOGY Determine Capacity Needs Existing DemandGrowth Demand Existing FacilitiesNew facilities Develop Cost Basis Existing . Capacity ($) New Capacity ($) .Growth units (Avg. Flow, Peak Flow, BOD, TSS) TOTAL SDCREIMB. FEEIMPROVEMENT FEE Develop SDC Schedule Average Flow (gal.)Peak Flow (gal.)BOD (lbs)TSS (lbs) Calculate Offsets & Credits Past paymentsFuture Payments The reimbursement fee is based on the value of available capacity in the system that will serve growth. The improvement fee is based on future facility costs associated with providing growth’s additional capacity needs (above what is already available in the system). Together, the reimbursement and improvement fees recover costs equal to growth’s capacity needs. Existing system available capacity and future improvement costs needed to expand capacity for growth are distributed to capacity parameters (average flow, peak flow, biochemical oxygen demand [BOD], and total suspended solids [TSS]), and spread over the total growth units projected for the period to determine weighted average reimbursement and improvement unit costs. The SDCs for individual developments are then determined by applying the unit costs (by fee element and capacity parameter) to the individual development estimated capacity requirements, and summing the results. The total SDC for each development is then reduced by any applicable credits for past and future capital payments. Table 2 provides an example calculation for a single capacity parameter. The numbers included in the table are intended to illustrate the methodology only (when applied to the single capacity parameter of average flow); the numbers do not represent MWMC planning criteria or cost data. Furthermore, the total SDC would include similar calculations for other capacity parameters (i.e., peak flow, BOD, and TSS). In the example provided, total system capacity needs at the end of the planning period are 60 million gallons per day (mgd). Existing users are estimated to require 45 mgd (90 percent) of existing capacity, leaving 5 mgd (10 percent) available for growth. However, growth’s total needs are 15 mgd, meaning that additional investment will be required to expand system capacity by 10 mgd. Page 6 OF 39 TABLE 2 Example Calculation for Single (Average Flow) Capacity Parameter* Existing Future Element Total System Expansion Determine Capacity Needs Systemwide Capacity (mgd) 60 50 10 Existing Users (mgd) 45 45 0 Growth (mgd) 15 5 10 Determine Cost Basis Needs 10% 100% Systemwide Cost $50,000,000 $12,000,000 Growth Cost $17,000,000 $5,000,000 $12,000,000 Determine SDC Schedule Weighted Average Unit Cost ($/mgd) $1,133,333 $333,333 $800,000 User Capacity Requirement (mgd) 0.00035 0.00035 0.00035 Total SDC $396.67 $116.67 $280.00 *Example only; not MWMC specific The example reimbursement fee cost basis includes 10 percent ($5 million) of existing system value, associated with providing 5 mgd of capacity. The improvement fee cost basis includes the costs to expand the facilities by 10 mgd, in this case estimated to be $12 million. The total costs allocated to growth are equal to the total capacity required by growth (5 mgd existing +10 mgd expansion) = 15 mgd total. At this point the SDC schedule can be developed. First, the weighted average unit costs are developed. This is accomplished by dividing the reimbursement fee and improvement fee cost bases by the total growth capacity units (15 mgd in this case). By dividing the individual fee elements by the total growth units, the combined fee is based on a weighted average cost per unit. This is demonstrated in Table 2 where the individual unit costs are $333,000 per mgd ($5 million/15 mgd) and $800,000 per mgd ($12 million/15 mgd), respectively, for reimbursement and improvement elements; and $1.1 million per mgd ($17 million/15 mgd) overall. The SDC for a user who requires 350 gallons per day (.000350 mgd) would equal $116.67 reimbursement ($333,333 X 0.000350) + $280 improvement ($800,000 X 0.00035) for a total of $396.67. The same fee would result from using the total cost per unit ($1.13 per gallon per day) multiplied by the 350-gallon-per-day user requirements. As the example demonstrates, the methodology meets the key requirements of the law, as identified in Table 1: ? Determines the amount of available capacity that exists and allocates costs to growth accordingly. ? Allocates improvement costs to growth in proportion to future capacity needs. Page 7 OF 39 ? Does not recover the costs of the same capacity through the reimbursement and improvement fees. Recovers cost associated with existing capacity through the reimbursement fee, and recovers costs associated with new capacity through the improvement fee. The charges to individual developments are based on a weighted average cost of capacity. Each element of the methodology is discussed in more detail below. Methodology Element One: Determine Growth Capacity Needs Oregon SDC law requires explicit analysis of capacity required to serve growth—and demonstration of how those capacity needs will be met through existing and future facilities. Therefore, it is necessary to first determine the appropriate capacity parameter(s), and growth’s capacity requirements. Step One - Capacity Parameters The appropriate capacity measure relates to the sizing criteria of the wastewater system, and may, to improve equity, require consideration of multiple parameters to assess the impact of the utility’s various types of users. As wastewater systems must be sized to meet all of their customers’ demands, flows and strength loadings are important sizing criteria. MWMC provides service to a diverse customer base, so consideration of varying flow and load requirements of different customer types is one facet that ensures the equity of the SDCs. The four capacity measures or parameters used in the methodology are: ? Average flow ? Peak flow ? BOD ? TSS These parameters are defined as follows: ? —The average daily flow in the dry season as defined in the National Average Flow Pollution Discharge Elimination System (NPDES) permit. Because the NPDES permit requires the Eugene-Springfield Water Pollution Control Facility (WPCF) to meet permit discharge limits on a monthly basis, the average flow is presented in terms of dry season maximum month values when discussing “capacity.” The dry season maximum month flow includes base flow (customer flow) and the baseline or dry season infiltration and inflow (I/I). ? —The peak hour flow in the wet season associated with the 5-year, 24-hour Peak Flow storm event. Peak flow includes average flow and the additional increment of wet weather I/I. ? —The quantity of oxygen used in the biochemical Biochemical Oxygen Demand oxidation of organic matter in a specified time and at a specified temperature. BOD is a measurement of wastewater strength. ? —Solids in the wastewater that are removable by laboratory Total Suspended Solids filtering and approximate the quantity of solids that are available to be removed from the wastewater through sedimentation. TSS is a measurement of wastewater strength. Page 8 OF 39 Table 3 provides the allocations of existing and future facility process components to the system capacity parameters: average flow, peak flow, BOD, and TSS. A description of process components is provided in Appendix A. The rationale for the allocation percentages is provided in Appendix B. These allocations are used to determine the projected costs of capacity to be used by new development that establish the reimbursement fee and improvement fee cost bases. The underlying approach is to evaluate the following criteria for each facility process component: ? Functional performance ? Design basis The functional performance criterion considers the actual purpose of the facility on a daily basis. Is the purpose of the facility to remove BOD or TSS from the wastewater? Or is the purpose of the facility to simply pass the flow (average and/or peak) and remove some other parameter not represented by BOD or TSS such as screenings, grit, or pathogens? These questions are answered by the functional performance component. The design basis considers what system capacity parameter or combination of parameters drives the sizing of the facility and, therefore, the constructed cost. The allocation basis for each facility component presented in Table 3 combines both the functional performance and design basis considerations. In addition to these system parameters, because there can be projects that provide overall support for the wastewater system, a separate category of “indirect” support facilities is used to provide for reallocation of these support-type costs across all of the system capacity parameters. TABLE 3 Summary of Facility Process Component Allocation to System Capacity Parameters System Capacity Parameter Average Peak Facility Process Component Flow Flow BOD TSS Indirect Total Collection system pipeline ¼ ¾ -- -- -- 1 Collection system pump stations ¼ ¾ -- -- -- 1 Preliminary treatment ¼ ¾ -- -- -- 1 Primary treatment ¼ -- ¼ ½ -- 1 Secondary treatment ¼ -- ½ ¼ -- 1 Disinfection/outfall ¼ ¾ -- -- -- 1 Biosolids (same for all three subcomponents) -- -- ½ ½ -- 1 Tertiary filters ¼ -- ¼ ½ -- 1 Reuse facilities 1 -- -- -- -- 1 Odor control -- -- ½ ½ -- 1 Peak flow management -- 1 -- -- -- 1 Support facilities (Indirects) -- -- -- -- 1 1 Step Two - Growth Capacity Requirements In developing SDCs, costs related to growth (see ‘Cost Basis’ below) are spread over growth’s total capacity requirements over the study period to determine the overall cost per Page 9 OF 39 unit of growth by capacity measure. The study period is defined as a 20-year period, consistent with facility planning requirements. The Department of Environmental Quality (DEQ) stipulates that entities that own and operate wastewater facilities assume a 20-year planning horizon when developing facility plans (see DEQ Guidance for Development of Wastewater Facilities Plans, 2000). To determine the capacity required by growth, the capacity required by existing users is subtracted from the capacity projected in the facility plan to be required at the end of the planning period. For peak flow estimates, existing users’ current capacity requirements are adjusted for anticipated I/I reductions (see Guidelines for the Preparation of Facilities Plans and Environmental Reports for Community Wastewater Projects, 1999). Methodology Element Two: Develop Cost Basis The cost basis represents the total costs that the SDCs are intended to recover. The following methodological issues were addressed in developing the reimbursement and improvement fee cost bases: ? —The method for valuing existing Existing System Valuation (Reimbursement Fee) facilities with capacity to serve growth. ? —The method for allocating existing Existing System Allocation (Reimbursement Fee) system facility value to growth. ? The method for valuing future projects. Project Cost Valuation (Improvement Fee) ? —The method for allocating future projects Project Cost Allocation (Improvement Fee) to growth. ? —Deductions or additions to the cost basis to recognize past or future Adjustments capital funding methods. Each issue is discussed below. Step One - Existing System Valuation Calculation of the reimbursement fee begins with a review of MWMC’s fixed asset records to determine the value of the existing system. The system is valued based on the inflation adjusted original cost approach. Under this approach, the original cost of existing system assets is adjusted by the Engineering News-Record national 20-city average Construction Cost Index from the time of construction to estimate current values. The inflation adjusted cost approach recognizes appreciation in the system since assets were constructed and assumes that the wastewater system is maintained in perpetuity. Page 10 OF 39 Step Two - Existing System Allocation The existing system allocation methodology, for use in determining the reimbursement fee cost basis, is a three-step allocation process 1 comprised of the following steps, as illustrated in Figure 2: R-1.Allocate existing facility costs to facility process components (e.g., primary treatment, secondary treatment). R-2.Allocate costs by component to system capacity parameters (e.g., average flow, peak flow). R-3.Allocate costs to growth based on estimated available capacity by service parameter. The allocation of existing facility costs to facility process components is fairly straight- forward, as most projects relate directly to an individual component (e.g., secondary clarifiers are a part of secondary treatment), or support the entire treatment system (e.g., control systems). Existing facility costs (valued in terms of inflation-adjusted costs) by process component are then allocated to capacity parameters based on the allocation fractions in Table 3. The final step in the allocation process is to multiply the costs by capacity parameter by the percent of capacity available by parameter. To determine the available capacity for a parameter, the amount of capacity that is currently being used (or required for existing users) is subtracted from the current rated capacity. If the current capacity requirement is equal to or greater than the existing capacity, then there is no available capacity, and none of the costs related to that parameter is included in the reimbursement fee cost basis. Table 4 shows existing system available capacity by parameter based on system planning criteria. The documentation for these figures is provided in Appendix C. 1 The numbering of the steps for the existing system allocation process is preceded by an “R” to identify these steps as relating to the Reimbursement Fee calculation.Later processes relating to the Improvement Fee calculation are indicated by an “I” in the number sequence. Page 11 OF 39 Flow Flow FIGURE 2—EXISTING SYSTEM ALLOCATION Existing Facilities Step R-1: Allocate to Process Components Assets Replaced by Project List Step R-2: Allocate to System Capacity Parameter Avg. Peak BOD TSS Step R-3: YES NO Available Reimbursement No Capacity? Reimbursement Fee Cost Basis TABLE 4 Existing System Available Capacity by Parameter Average Flow Peak Flow BOD TSS Variable (mgd) (mgd) (lbs/day) (lbs/day) Existing capacity 49.0 175 66,000 71,600 Current loading (current capacity required) 43.8 264 54,800 64,700 Available capacity (value) 5.2 None 11,200 6,900 Available capacity (%) 10.5% 0% 17% 9.6% Source: 2004 Facilities Plan Step Three – Project Valuation Calculation of the improvement fee begins with a review of MWMC’s adopted 20-Year Project List to determine the value of future projects. Project values are updated regularly to reflect: 1) annual inflation for projects,:, as estimated by applying the Engineering News Record national 20 city average Construction Cost Index to the original project estimate, and 2) actual costs for any bond-funded projects. Step Four - Project Cost Allocation The project cost allocation methodology, for use in determining the improvement fee cost basis, is a four-step allocation process consisting of the following steps: Page 12 OF 39 I-1.Allocate project costs to facility process components (e.g., primary treatment, secondary treatment). I-2.Allocate costs by components to system capacity parameters (e.g., average flow, peak flow). I-3.Allocate project costs to type (capacity improvement, performance upgrade, or rehabilitation). I-4.Allocate costs to user type (existing customers or projected growth). The project cost allocation methodology provides an equitable basis for determining the projects or portions of projects that are related to growth capacity needs and are, thereby, included in the improvement fee portion of the SDC calculation. The methodology is not tied to a specific list of projects intended to be funded by SDCs (20-year project list), but is intended to provide a consistent framework for allocation of future projects to growth. Each step of the methodology is described below. The general allocation process is also presented graphically in Figure 3. FIGURE 3—PROJECT COST ALLCOATION Page 13 OF 39 20-Year Project List Allocate to Process Components STEP I-1 STEP I-2 Allocate to System Capacity Parameters Avg. Flow Peak Flow BOD TSS Allocate to Project Type STEP I-3 Performance Rehabilitation Capacity STEP I-4 Allocate to User Type % of Total Future % of Capacity Load Expansion 0% Allocation Basis The allocation of future projects to facility process components is generally fairly straightforward, as most projects relate directly to an individual component or support the entire treatment system. The refinement of the facility component allocation process for MWMC relates to recognition of peak flow management costs. While it is likely that future project lists will include projects entirely related to peak flow management, it is also likely that portions of projects relating to various aspects of the treatment process (e.g., secondary treatment) will also play a role in future peak flow management. The following question needs to be answered when allocating project costs to facility components: “Which specific facility component does the project expand or improve?” If the project expands or improves more than one facility component, then project costs should be apportioned relative to the expansion or improvement of each applicable component. The allocation fractions from Table 3 are used to distribute costs by facility component to capacity parameter, as was done for the existing system cost allocations. The basis for these allocations is described in Appendix B. Step I-3 of the project cost allocation methodology is to allocate costs to project types. The three project types, which are intended to be representative of the complete project list, are: 1.—Projects or portions of projects that are related to increasing liquids and/or Capacity biosolids conveyance, treatment, and disposition capacity beyond existing design Page 14 OF 39 standards (i.e., projects that provide the next capacity increment within the planning period). 2.—Projects that increase system capacity by increasing the Performance Improvements level of performance provided by facilities. Unlike ‘capacity’ projects that relate only to the next increment of capacity, performance upgrades are generally sized based on total projected capacity needs at the end of the planning period (existing and future). 3.—Projects designed to remedy an existing system deficiency and do not Rehabilitation enhance system capacity. Capacity and performance upgrade projects can be new facilities, or upgrade/expansion of existing facilities. Rehabilitation projects are the replacement of outdated or worn out equipment or facilities. The majority of the projects will typically fall completely into one project type. However, some projects may be split between capacity and performance types. The general criteria for allocating projects to the above categories are shown in Table 5. These criteria should be applied in the development of specific projects for inclusion in the appropriate planning document or project list and should be considered and evaluated as part of the process of adoption of such a plan or project list. TABLE 5 Summary of Project Type Allocation Criteria Project Type Potential Criteria Capacity Adds new facilities/expands existing facilities Provides new liquids treatment or biosolids capacity beyond existing system design standard or beyond the current permitted capacity Performance Improvements Adds new facilities/improves existing facilities Provides capacity/enhanced capability sized for total future capacity needs Driven by new regulatory requirement Driven by increase in community performance standard Technological efficiencies Rehabilitation Replaces existing facility or portion of facility Does not serve growth either through existing available or new capacity Preserves existing facility performance/capacity Once project costs have been allocated to system component and project type categories, and the costs have been distributed to the system capacity parameters, the final step in the project cost allocation process is to assign costs to user types. For the purposes of the SDC methodology, there are two user types: 1) existing customers, and 2) new customers or growth. Costs that are allocated to growth are incorporated into the SDC improvement fee calculation. Costs allocated to existing customers must be paid through some other funding sources (e.g., existing reserves or future user rates). Page 15 OF 39 As indicated in Figure 3, the allocation of project costs to growth is a function of the type of project and a detailed capacity analysis that identifies growth’s share of: 1) planned capacity expansion, and 2) total future load. Costs by capacity parameter are allocated to growth as follows: Capacity Projects: Growth’s share of capacity expansion (%) X project cost ($) Performance Upgrades: Growth’s share of total future system capacity (%) X project cost ($) Rehabilitation Projects: Allocation to growth = 0% Where: 1.Growth’s share of capacity expansion = Projected growth capacity requirement (not met by existing available capacity) divided by additional capacity to be added to the system by planned improvements. 2.Growth’s share of total future system capacity = Projected growth capacity requirement (total) divided by total future system capacity requirement. Table 6 summarizes the growth allocation percentages by project type. The documentation for these figures is provided in Appendix C. TABLE 6 Growth Allocation Percentages by Project Type Project Type Average Flow Peak Flow BOD TSS Capacity (growth’s share of capacity 100% 29.4% 100% 100% expansion) Performance (growths share of total 26.1% 10.8% 25.9% 26.1% future system capacity) Rehabilitation 0% 0% 0% 0% Source: 2004 Facilities Plan Step Four - Adjustments The methodology includes the following adjustments to the reimbursement and improvement fee cost bases: ? . Existing (and if Gifts or grants from federal or state government or private persons applicable in the future, planned) asset costs are reduced by the percent of the asset that is funded by grants. ? . Projected Ratemaking principles employed to finance the capital improvements capital financing costs are added to the project costs if the project is funded through debt proceeds. Future years’ interest expense is discounted to present value using a 5% discount rate. Page 16 OF 39 Unit Methodology Element Three: Develop SDC Schedule Unit costs for each capacity parameter are determined by dividing the adjusted cost basis by the projected growth capacity requirements. The unit costs are then multiplied by the estimated capacity requirements of different types of users, as determined from MWMC’s Industrial Pretreatment Program. Figure 4 illustrates this process. FIGURE 4—SDC SCHEDULE DEVELOPMENT This approach uses flow and strength assumptions that are consistent with the system capacity parameters described previously. For example, average flow is defined as dry season maximum month flow. This capacity measure is used in estimating user capacity Capacity Unit Costs Requirement / SDC / Unit = Avg. Flow Avg. Flow Avg. Flow X $/mgd mgd/unit $/unit = Peak Flow X Peak Flow Peak Flow mgd/unit $/mgd $/unit BOD X = BOD $/lb BOD $/unit lbs/unit TSS X = TSS $/lb TSS $/unit lbs/unit requirements. The peak-to-average flow ratio reflects the system planning assumptions. The flow assumptions for various land uses (development types) are presented in Appendix D. If information for a particular development is not found in Appendix D, the SDC will be formulated using average data of like or similar development as determined by the City Engineer. Strength assumptions for different development types are estimated by MWMC’s Industrial Pretreatment Program. Methodology Element Four: Calculate Revenue Offsets and Credits To comply with Oregon SDC law, the SDC methodology must ensure that future system users contribute no more than an “equitable share” of the capital costs of existing facilities. Before real property is developed, it may have been subject to taxes that supported capital funding of some of the Regional Wastewater System. After a development connects to the system, it will pay rates and, possibly taxes as well, that may also support some level of capital funding. The SDC methodology therefore considers past and future payments to be made by new developments, which may partially fund the same facilities for which the SDCs were paid. Page 17 OF 39 Past Payments A portion of MWMC’s existing facility costs were funded through general obligation (GO) bonds. The debt service on the bonds was retired through property taxes. Undeveloped land in the cities of Eugene and Springfield was subject to property taxes, and therefore a GO bond credit is included in the methodology. The credit is equal to the present value of past payments on bond principal, expressed in dollars per $1,000 of assessed valuation. The credit shall accrue from the year of annexation, and be based upon the assessed value of the real property at the time of application for connection to the system. Appendix E shows the calculation of the GO bond credit. Future Payments At the time of adoption of the project list upon which SDCs are to be based, or any periodic modification to such list, a credit against the SDCs will be calculated. The credit will reflect the present value of future contributions (through user fees) by new development to the repayment of debt service for the cost of capital improvements that benefit existing customers.. The credit analysis is structured as follows: 1.Debt services costs attributable to projects on the SDC project list are allocated between growth and existing users, based on the projects funded with the debt proceeds. 2.Future user fee billing units (average flow and pounds of BOD and TSS) are estimated for each year of the planning period based on system planning criteria 3.The annual user rate supported debt service per billing unit is determined by dividing the existing users’ share of debt service payable each year from user fees (from Step 1) by the annual billing units estimated for each year (from Step 2), over the life of the debt. 4.The present value of the future stream of rate payments is determined for each year of the planning period to determine the credit amount per unit of capacity. Page 18 OF 39 Methodology Element Five: Periodic modification of existing sytem and future project values The value of existing available capacity and future available capacity may be adjusted from time to time as stated in Methodology Element Two: Step One and Step Three. Methodology Element Six: Compliance Charge A charge is included for the costs of complying with the provisions of ORS 223.297 to 223.314, including: ? Legal costs (both litigation costs and annual routine legal fees) ? Annual Accounting/auditing costs ? Annual reporting costs ? SDC methodology development costs In developing the compliance charge, the total costs associated with SDC compliance activities are projected for the planning period. The costs are then attributed to the capacity parameters in proportion to the combined reimbursement and improvement costs. As with the improvement and reimbursement fees, the costs by parameter are then divided by the number of growth units projected for the planning period in order to determine a compliance cost per unit of capacity. Page 19 OF 39 Page 20 OF 39 EXHIBIT A Appendices Page 21 OF 39 EXHIBIT A APPENDIX A System Component Definitions The below facility process components were selected because they represent existing distinct processes/components, as well as new processes/components anticipated in the future (e.g., tertiary filters and effluent reuse). These facility components also relate differently to system capacity parameters (discussed in Methodology Element Two), so the initial allocation of project costs to facility components facilitates the next step of allocating costs to capacity parameters, and ultimately to user type. As regulatory requirements change in the future, MWMC should review the facility component categories, and update as appropriate. —The pipelines owned and operated by MWMC that collect Collection System Pipeline sewage from individual customers and deliver it to the treatment plant. —MWMC pump stations that impart energy into the Collection System Pump Stations wastewater so that it flows through the collection system pipes or is lifted to a higher elevation. The influent screw pumps at the Eugene/Springfield Water Pollution Control Facility (WPCF) are included in this component. —Screenings and grit removal facilities. Preliminary treatment Preliminary Treatment facilities are sometimes referred to as headworks facilities because they are located at the front or head end of treatment plants. —The sedimentation process intended to remove suspended solids from Primary Treatment the wastewater. This component includes the primary sedimentation settling tanks and associated pumping systems for material that is removed from the top (scum/skimmings) and bottom (primary sludge) of the settling tanks. —A biological process to remove the soluble and colloidal organic Secondary Treatment matter that remains after primary treatment. Facilities typically include aeration basins and the associated blowers that provide air to the basins, and secondary clarification settling tanks and the associated pumping facilities that transport the settled biological sludge to subsequent biosolids processing facilities. —Process elements at the downstream end of the treatment process. Disinfection/Outfall Disinfection kills or inactivates remaining pathogens contained in the treated wastewater, and the outfall conveys the treated wastewater to the Willamette River where it can be distributed through a diffuser in an environmentally sound manner. —Management and disposal of the organic and inorganic suspended solids that Biosolids have been removed from the wastewater through the treatment processes. This facility component is divided into three subcomponents because of differences in available and future required capacity. The three subcomponents are as follows: Page 22 OF 39 EXHIBIT A ? The general subcomponent consists of biosolids thickening and anaerobic General— digestion at the WPCF; the biosolids pump station/force main system that conveys digested biosolids from the WPCF to the Biosolids Management Facility (BMF); and facultative sludge storage lagoons and drying beds at the remote BMF. The majority of the infrastructure associated with this “General” subcomponent were constructed in the 1980s and early 1990s. ? —MWMC-installed mechanical biosolids dewatering at the remote BMF for Dewatering the purpose of removing water from the biosolids so that the remaining biosolids volume is reduced. This dewatering facility was designed to accommodate 7,000 dry tons of biosolids on an annual average basis. ? —MWMC is in the process of expanding the capability of the biosolids Biocycle Farm management program by constructing a poplar plantation or biocycle farm (BF) that can accept non-dewatered biosolids, therefore limiting dependence on the cooperative farms land application program that typically uses dewatered biosolids. —Filters to remove TSS and to a lesser degree BOD/ammonia from the Tertiary Filters secondary effluent. —These facilities enable reuse of effluent and include UV disinfection; Reuse Facilities pumping of filtered, disinfected effluent; pipelines to convey the water to the end use site; and irrigation distribution/application systems. —Facilities that collect and treat odorous air generated by the treatment of Odor Control wastewater and biosolids. —A new facility component that functions to convey, treat, and Peak Flow Management discharge wet season peak flow (based on the 5-year, 24-hour rainfall event). Facilities must be provided so that the peak flow can reach and pass through the WPCF without overtopping structures so that untreated/partially treated sewage does not spill onto the ground and/or into waterways. —These facilities serve MWMC’s overall mission as opposed Support Facilities (Indirects) to one specific facility component. Examples include control systems, civil infrastructure such as roads within the WPCF site, and equipment storage facilities. Page 23 OF 39 A-23 APPENDIX B Capacity Parameter Allocation Basis System Capacity Parameters are based on permitting requirements. Facility process components (defined in Appendix A) are allocated to each of the system capacity parameters, as described below. Collection System Pipelines This category consists of major gravity sewer pipelines and force mains (pressure lines) that convey flow for the regional wastewater collection system. Since the primary function of the pipelines is to convey flow, the allocation is assigned to either average or peak flow and none to wastewater strength parameters (i.e., BOD and TSS). The majority of the time the conveyance system is carrying average flows. However, the limiting design criteria when sizing pipelines is based on peak flows. An assessment of the wet season I/I, which is the key driver in determining the peak flows, can be used as a guide in determining the average/peak allocation breakdown. Table B-1 presents the wet season I/I as a percentage of total peak flow for existing capacity, current loading, and future required capacity. TABLE B-1 Design Criteria Basis For Unit Processes Driven By Peak Flow Average Wet Weather I/I as a Wet Weather I/I Total Peak Flow Flow Percentage of Total Peak (mgd) (mgd) (mgd) Flow, % Existing capacity 49 126 175 72% Current loading (current 43.8 220.2 264 83% capacity required) a Projected 2025 loading 59.3 218.7 277 79% (future capacity required) Notes: a) Net reduction in total I/I occurs between now and 2025 as a result of I/I reduction efforts by the cities. The range of wet weather I/I as a percentage of total peak flow for these three scenarios ranges from 72 to 84 percent. The arithmetic average of these three values is 78 percent. Therefore, a reasonable approach is to allocate a quarter to functional use basis, or average flow; and three quarters to the design criteria sizing basis, or peak flow. ? Average Flow – 1/4 ? Peak Flow – 3/4 Page 24 OF 39 EXHIBIT A Collection System Pump Stations The category collection system pump stations consist of pump stations that impart additional head or pressure to the wastewater so that the flow is conveyed to the WPCF. An example of such a facility is the Wilakenzie Pump Station. These regional pump stations have the same functional and design criteria basis as the regional collection system pipelines, and, therefore, the allocations are: ? Average Flow - 1/4 ? Peak Flow - 3/4 Preliminary Treatment Preliminary treatment facilities are located between the pump stations and primary treatment, consisting of screenings and grit removal facilities. Minimal organic matter (BOD) is removed during preliminary treatment. Also, solid materials removed during preliminary treatment tend to be large and heavy in nature; these materials are not typically considered a “suspended” material (or TSS). Consequently, the loading parameters of BOD and TSS generally do not apply to preliminary treatment, and the unit process category is entirely flow based. The functional and design criteria basis for preliminary treatment are very similar to that of the collection system facilities, and, therefore, the allocation is identical to the preceding categories. The split between average and peak flow is as follows: ? Average Flow - 1/4 ? Peak Flow - 3/4 Primary Treatment Primary treatment consists of the four, large, circular concrete basins (primary clarifiers) and the associated equipment used to remove solids that settle to the bottom of the basins. The purpose of primary treatment from a functional basis is to remove TSS and to a lesser degree BOD. Typical percent removal across primary treatment for TSS and BOD are 60 and 30 percent, respectively. In other words, twice as much TSS is removed relative to BOD. For the design criteria basis, typical primary clarifiers sizing is governed by both average and peak flow, but for MWMC, where the parallel primary/secondary approach is proposed for peak flow management, the peak flow will be split between primary treatment and secondary treatment. Likewise, if the high-rate clarification peak flow management is ultimately implemented (because regulatory approval is not obtained for the parallel primary/secondary approach), the peak flow will be split between the primary treatment and the high-rate clarification. Therefore, only average flow is considered in the cost allocation. Combining the functional basis with the design criteria basis, the following allocation is for primary treatment: ? Average Flow - 1/4 ? BOD - 1/4 ? TSS - 1/2 Page 25 OF 39 A-25 Secondary Treatment Secondary treatment consists of two trains of aeration basins, eight secondary clarifiers, and the associated blowers and pumps that function to treat and remove organic loading (BOD) and to a lesser extent TSS from the wastewater. On a functional basis, secondary treatment is regarded as removing roughly twice as much BOD relative to TSS. For the design criteria basis, typical secondary treatment sizing is governed by both average and peak flow, but for MWMC, where the parallel primary/secondary approach (or high- rate clarification approach as a second choice) is proposed for peak flow management, the peak flows will be split between primary treatment and secondary treatment. Therefore, only average flow is considered in the cost allocation. Combining the functional basis with the design criteria basis, the following allocation is for secondary treatment: ? Average Flow - 1/4 ? BOD - 1/2 ? TSS - 1/4 Disinfection/Outfall Following secondary treatment, the wastewater is disinfected (chlorinated and dechlorinated) and discharged to the Willamette River through an outfall pipe. Both the function and sizing of these facilities are entirely based on flow. The relationship between the functional basis and design criteria is identical to that for the collection system facilities and, therefore, the following allocation is for disinfection/outfall: ? Average Flow - 1/4 ? Peak Flow - 3/4 Biosolids Biosolids are a byproduct of wastewater treatment and are produced during the primary treatment, secondary treatment, and to a lesser degree tertiary treatment processes. The three subcomponents used to allocate biosolids treatment, handling, and disposal/reuse costs for purposes of SDC calculations are: ? General ? Dewatering ? Biocycle Farm The definitions of these subcomponents are presented in Appendix C, Growth Capacity Allocation Documentation. The three subcomponents were developed for the SDC update because of the differing available capacities and growth percentages associated with facilities in the subcomponents. However, in terms of allocating the facility components to the wastewater parameters, the methodology is identical—independent of which subcomponent is being considered. Page 26 OF 39 A-26 Biosolids facilities at the WPCF and the BMF are both sized and function to treat the BOD and TSS removed during the treatment process; therefore, their allocation is split equally between BOD and TSS. ? BOD - 1/2 ? TSS - 1/2 Tertiary Filters The existing WPCF does not have tertiary filters. The 20-year project list recommends that tertiary filters be installed to enable the WPCF to consistently meet the NPDES permit discharge requirements. The permit includes mass limits for BOD and TSS. As influent flows to the WPCF increase in the future, the effluent concentration required to meet the mass limits decreases. Addition of the filters will assist with meeting these more stringent effluent concentrations. From a functional basis, the main purpose of the filters is to remove TSS, and to a lesser degree BOD. From a design criteria sizing basis, average flow is used to determine the size of the facilities. In the wet weather season, a portion of the peak flow may be routed to the filters for additional treatment. However, the associated peak flow loading rate onto the filters will not be the limiting factor in terms of design criteria sizing. Following is the allocation for the tertiary filter treatment category: ? Average Flow – 1/4 ? BOD – 1/4 ? TSS – 1/2 Reuse Facilities Reuse facilities may be constructed to comply with more stringent regulatory requirements related to temperature and/or thermal load restrictions of Willamette River discharges. Reuse facilities would allow flow to be diverted from the river by reusing plant effluent for irrigation. The basic design criterion used to size reuse facilities is average flow; so this parameter receives 100 percent of the allocation. ? Average Flow – 100 percent Odor Control Odor control facilities function by collecting odorous air from preliminary/primary liquids treatment processes and biosolids treatment/handling processes and treating the air to remove the odors. Odor generation is dependent on the influent loading levels and, therefore, the allocation is split equally between BOD and TSS because both parameters contribute to the sizing and function of the odor control systems. ? BOD – 1/2 ? TSS – 1/2 Peak Flow Management There are a number of future capital improvement projects that specifically function to convey, treat, and discharge the wet season peak flow. For example, the parallel primary/secondary peak flow management approach is proposed solely to address peak Page 27 OF 39 A-27 flows. Also, there are facilities such as the dry weather headworks where a portion of their function or design criteria sizing is based on peak flow. The peak flow management category is allocated entirely to peak flow, as both the ongoing function and the sizing design criteria sizing are based solely on peak flow. ? Peak Flow – 100 percent Support Facilities (Indirects) The support facilities or indirect category captures certain types of treatment plant facilities that serve multiple functions, such as the laboratory, land acquisition, and instrumentation and control systems. Costs of these types of facilities are allocated across the other 11 components in proportion to the weighted average allocation percentages. For the reimbursement fee, the weighted average reflects the direct allocation of existing asset costs to the 11 facility components. For the improvement fee, the weighted average reflects the allocation of the 20-year project list to the 11 facility components. ? Support facilities allocated proportionally to the other 11 facility components. Page 28 OF 39 A-28 APPENDIX C Growth Capacity Allocation Documentation Liquids Treatment A summary of the MWMC liquids treatment capacity is presented in Table C-1. TABLE C-1 Capacity Summary of MWMC Liquids Facilities Average Flow Peak Flow BOD TSS (mgd) (mgd) (lbs/day) (lbs/day) Population Existing capacity -- 49 175 66,000 71,600 Current loading (current 217,737 43.8 264 54,800 64,700 capacity required) Available capacity (value) -- 5.2 None 11,200 6,900 Available capacity (%) 10.5% 0% 17.0% 9.6% Projected 2025 loading 297,585 59 277 74,000 87,600 (future capacity required) a Growth loading 79,848 15.5 30 19,200 22,900 Required Capacity 10 102 8,000 16,000 Expansion Growth share of 2025 load 26.8 26.1% 10.8% 25.9% 26.1% Growth share of capacity 100% 100% 29.4% 100% 100% expansion Notes: A The 30-mgd peak flow attributed to growth consists of 15.5 mgd of average flow and 14.5 mgd of wet season I/I flow. See the following discussion for a detailed derivation of these values. The rationale for these values is presented in the following paragraphs. Average Flow The existing capacity is stated in the current NPDES permit as 49 mgd that represents the dry season design rating for the WPCF. The current loading or current required capacity is 43.8 mgd (presented in DSMM terms). The DSMM value is used to compare to the dry season design rating of the WPCF because the NPDES discharge permit stipulates that the WPCF meet monthly average permit requirements. Therefore, discharge permit requirements must be met on a dry season, maximum-month influent condition. This 43.8-mgd value is determined as follows: Page 29 OF 39 A-29 Current average flow (presented as DSMM) = ((129 x 217,737 x 1.5)/1,000,000) + 1. 7 = 43.8 i Where: 129 is the average gallons per capita per day (gpcd) of the dry season values from - 1990 to 2002 217,737 is the population served in 2002 - 1.5 is the selected peaking factor to convert average dry season flow to maximum - month dry season flow (based on 1990 to 2002 data) 1.7 is the current industrial flow in mgd - i The available capacity in terms of average flow is 5.2 mgd (49 – 43.8). The projected 2025 average flow is determined as follows: Projected 2025 average flow (presented DSMM) = ((129 x 297,585 x 1.5)/1,000,000) + 1. 7 = 59.3 mgd Where: 129 is the average gpcd of the dry season values from 1990 to 2002 - 297,585 is the projected population to be served in 2025 - 1.5 is the selected peaking factor to convert average dry season flow to maximum - month dry season flow (based on 1990 to 2002 data) 1.7 is the projected industrial flow in mgd (it has been assumed that the - industrial flow will remain constant over the study period) The total required capacity to meet the needs of growth in terms of average flow is 15.5 mgd (59.3 – 43.8). Peak Flow A summary of the peak flow breakdown is presented in Table C-2. The existing capacity in terms of peak flow is not defined in the NPDES permit, but the plant was originally designed for a peak flow of 175 mgd, and therefore that is defined as the existing capacity. MWMC does not currently have the collection and treatment capabilities to accommodate the existing peak flow (which is greater than 175 mgd), and therefore the current peak flow loading (required capacity) cannot be explicitly measured at the WPCF. Using a computer model of the collection system MWMC is able to estimate the current peak flow. DEQ defines the peak flow as the peak hour or peak instantaneous flow that occurs during the 5-year, 24-hour storm (3.9 inches of rainfall). Under these rainfall conditions, the model predicts a current flow of 264 mgd. Therefore, there is no available capacity in terms of peak flow. Since the current average flow is 43.8 mgd, the current wet season I/I is 220.2 mgd (264 less 43.8). Using the projected future 2025 population and land use, the model predicts peak flows of 294 mgd without I/I reduction efforts outlined in the 2000 WWFMP and 277 mgd with I/I Page 30 OF 39 A-30 reduction efforts outlined in the 2000 WWFMP. Therefore, it is estimated that the I/I reduction efforts will reduce I/I by approximately 17 mgd. Wet season I/I in 2025 attributed to existing users is determined by subtracting the anticipated reduction in wet season I/I (17 mgd) from the current wet season I/I (220.2 mgd) yielding 203.2 mgd. Finally, wet season I/I attributed to growth in 2025 is 14.5 mgd and is determined by taking the 2025 total peak flow projection of 277 mgd and subtracting both the 2025 average flow (59.3 mgd) and the 2025 wet season I/I attributed to existing users (203.2 mgd). Therefore, the peak flow in 2025 attributed to growth is 30 mgd (15.5 mgd of average flow plus 14.5 of wet season I/I flow). TABLE C-2 Projected 2025 Peak Flow Breakdown Average flow attributed to existing users (includes dry 43.5 mgd season I/I) Average flow attributed to future users (includes dry 15.5 mgd (59.3 – 43.8) season I/I) Wet season I/I attributed to existing users 203.2 mgd (220.2 – 17) Wet season I/I attributed to future users 14.5 mgd (277 – 59.3 – 203.2 Total peak flow 277 mgd Total peak flow attributed to growth 30 mgd (15.5 + 14.5) BOD The methodology for BOD is similar to that of average flow. The existing capacity, although not explicitly stated in the current NPDES permit, is 66,000 lbs/day, which was the value used for the original WPCF design. The current loading or current required capacity in presented in DSMM terms is 54,800 lbs/day and is determined as follows: Current BOD = (0.185 x 217,737 x 1.3) + 2,402 = 54,800 lbs/day (actual calculated value of 54,756 lbs/day rounded to the nearest hundred pounds). Where: 0.185 is the selected pounds per capita per day (ppcd) based on dry season - values from 1990 to 2002 217,737 is the population served in 2002 - 1.3 is the selected peaking to convert average dry season load to DSMM load - (based on 1990 to 2002 data) 2,402 is the current industrial BOD load in lbs/day - The available capacity in terms of BOD is 11,200 lbs/day (66,000 – 54,800). Page 31 OF 39 A-31 The projected 2025 average load is determined as follows: Projected 2025 BOD = (0.185 x 297,585 x 1.3) + 2,402 = 74,000 mgd (actual calculated value of 73,971 lbs/day rounded to the nearest hundred pounds) Where: 0.185 is the selected pounds per capita per day (ppcd) based on dry season - values from 1990 to 2002 297,585 is the projected population to be served in 2025 - 1.3 is the selected peaking to convert average dry season load to DSMM load - (based on 1990 to 2002 data) 2,402 is the projected industrial flow in lbs/day (it has been assumed that the - industrial load will remain constant over the study period) The required capacity to meet the needs of growth in terms of BOD is 19,200 lbs/day (74,000 – 54,800). TSS The methodology for TSS is identical to that of BOD. The existing capacity, although not explicitly stated in the current NPDES permit, is 71,600 lbs/day, which was the value used for the original WPCF design. The current loading or current required, presented in DSMM terms, is 64,700 lbs/day and is determined as follows: Current TSS = (0.205 x 217,737 x 1.4) + 2,224 = 64,700 lbs/day (actual calculated value of 64,715 lbs/day rounded to the nearest hundred pounds) Where: 0.205 is the selected pounds per capita per day (ppcd) based on dry season - values from 1990 to 2002 217,737 is the population served in 2002 - 1.4 is the selected peaking to convert average dry season flow to maximum - month dry season flow (based on 1990 to 2002 data) 2,224 is the current industrial TSS load in lbs/day - The available capacity in terms of TSS is 6,900 lbs/day (71,600 – 64,700). The projected 2025 average TSS is determined as follows: Projected 2025 TSS = (0.205 * 297,585 * 1.4) + 2,224 = 87,600 mgd (actual calculated value of 87,631 lbs/day) rounded to the nearest hundred pounds) Where: 0.205 is the selected pounds per capita per day (ppcd) based on dry season - values from 1990 to 2002 297,585 is the projected population to be served in 2025 - Page 32 OF 39 A-32 1.4 is the selected peaking to convert average dry season load to DSMM load - (based on 1990 to 2002 data) 2,224 is the projected industrial TSS load in lbs/day (it has been assumed that the - industrial load will remain constant over the study period) The required capacity to meet the needs of growth in terms of TSS is 22,900 lbs/day (87,600 – 64,700). Biosolids Treatment The three subcategories used to allocate biosolids treatment, handling, and disposal/reuse costs for purposes of SDC calculations are: ? General ? Dewatering ? Biocycle farm Table C-3 presents a capacity summary of the MWMC biosolids facilities. TABLE C-3 Capacity Summary of MWMC Biosolids Facilities (annual average dry tons per year) Subcomponents General Dewatering Biocycle Farm Existing capacity 5,869 7,000 2,811 Current loading (current capacity required) 5,869 5,869 2,811 Available capacity None 1,131 None Available capacity (%)0% 16.2%0% Projected 2025 loading (future capacity required) 8,600 7,000 3,612 Growth loading 2,731 1,131 801 Required Capacity Expansion 2,731 None 801 Growth share of 2025 load31.8% 16.2% 22.2% Growth share of capacity expansion100%0%100% The definition and capacity assessment development for these three subcomponents are presented in the following paragraphs. General The general subcomponent consists of biosolids thickening and anaerobic digestion at the WPCF; the biosolids pump station/force main system that conveys digested biosolids from the WPCF to the BMF; and facultative sludge storage lagoons and drying beds at the remote Page 33 OF 39 A-33 BMF. The majority of the infrastructure associated with this “General” component was constructed in the 1980s and early 1990s. The current loading or current required capacity is presented as annual average dry tons of digested biosolids. Current biosolids loading = 4,962 x 1.183 = 5,869 tons per year Where: 4,962 dry tons per year (actual 2002 value) - 1.183 factor to convert actual value to a value that can be directly compared to - the projected 2025 capacity value when a greater biosolids load will be generated by changes in the treatment process, and is calculated as follows: = {(60 x 1.23) + (40 x 1.11)} /100= 1.183 - Where: - 60 is the weighting given to BOD for biosolids production - 1.23 is the BOD ppcd ratio (selected/actual) calculated as follows: - = 0.185/0.15 = 1.23 - Where: - 0.185 is the selected annual average BOD ppcd for projected - influent BOD values 0.15 is the actual BOD ppcd (annual average over 12-year - period) 40 is the weighting given to TSS for biosolids production - 1.11 is the TSS ppcd ratio (selected/actual) calculated as follows: - = 0.233/0.21 = 1.11 - Where: - 0.233 is the selected annual average TSS ppcd for projected - influent TSS values (average of dry (0.205) and wet (0.26) seasonal values) 0.21 is the actual TSS ppcd (annual average over 12-year - period) Some existing biosolids facilities in the “general” subcomponent have more than 5,869 dry tons per year of processing capacity while other existing facilities have less. However, in aggregate there is no available capacity and the existing capacity is assumed to be 5,869 dry tons per year as well. The projected 2025 biosolids is 8,600 dry tons per year on an average annual basis. This value is estimated based on a computer model of the WPCF that predicts biosolids Page 34 OF 39 A-34 production among many other parameters. The projected biosolids production in 2025 is anticipated to increase at a slightly greater rate than the rate of population growth because of the addition of tertiary filters that will remove additional solids from the wastewater. The additional capacity needed to accommodate growth is 2,731 dry tons per year (8,600 –5,869). Dewatering MWMC recently installed mechanical biosolids dewatering at the BMF for the purpose of removing water from the biosolids so that the remaining biosolids volume is reduced. This dewatering facility was designed to accommodate 7,000 dry tons of biosolids on an annual average basis. Therefore, the available capacity is 1,131 (7,000 less 5,869). The additional capacity needed to accommodate growth is 1,131 dry tons per year (7,000 – 5,869). Biocycle Farm MWMC is in the process of expanding the capability of the biosolids management program by constructing a poplar plantation or biocycle farm (BF) that can accept non-dewatered biosolids, therefore limiting dependence on the cooperative farms land application program. Phase 1 is currently under construction and is slated to be online spring 2004, and it is assumed that the added flexibility that the Phase 1 BF provides will benefit existing users only. Phase 1 has a capacity to accept 2,811 dry tons per year. For the purpose of determining “available capacity” for the purpose of SDC development, it is assumed that there is no existing available capacity associated with the Phase 1 Biocycle Farm. Phase 2 and 3 will expand the capacity to 3,612 dry tons per year The additional capacity to meet the needs of growth is 801 dry tons per year (3,612 –2,811) Page 35 OF 39 A-35 APPENDIX D User Capacity Requirements Springfield Dry Season Traffic/ Eugene Flow Base Flow Average Flow Dry Season Max Wet Season Peak Wastewater BPR/HUD Wastewater Estimation Impact Impact Month Impact Flow Impact Type of Establishment Code Code Use Code Unit (FEU) (gal/FEU/day) (gal/FEU/day) (gal/FEU/day) (gal/FEU/day) 30 4111-4990 4X TRUCK TERMINAL TGSF 100 137 205 398 151 6371-6379 63 MINI WAREHOUSE TGSF 30 41 61 119 170 4111-4990 4X UTILITIES TGSF 100 137 205 398 200 1111-1139 1X OTHER RESIDENTIAL (SFD W/OTHER USES) DU 175 239 359 696 220 1130-1139 11 OTHER RESIDENTIAL – MUTI FAMILY DU 150 205 307 597 200 1300 13 OTHER RESIDENTIAL – RESIDENTIAL HOTEL/MOTEL TGSF 200 273 410 796 240 1400 14 OTHER RESIDENTIAL – MOBILE HOME PARK DU 150 205 307 597 210 1111-1129 1F SFD / DUPLEX DU 175 239 359 696 300 1510-1590 15 MOTEL / HOTEL TGSF 200 273 410 796 400 7212-7900 7X PUBLIC PARK TGSF 160 219 328 636 435 7X MULTIPURPOSE RECREATION FACILITY (Indoor) TGSF 160 219 328 636 443 7212-7900 7X THEATER TGSF 160 219 328 636 488 7X OUTDOOR ATHLETIC COMPLEX TGSF 160 219 328 636 491 7212-7900 7X TENNIS COURT TGSF 160 219 328 636 492 7212-7900 7X RACQUET CLUB TGSF 160 219 328 636 493 7212-7900 7X HEALTH CLUB TGSF 160 219 328 636 494 7212-7900 7X BOWLING ALLEY TGSF 160 219 328 636 495 7212-7900 7X RECREATIONAL CENTER TGSF 160 219 328 636 500 3X INDUSTRIAL PROCESS LOW STRENGTH TGALEF 1000 1,366 2,049 3,978 500 3X INDUSTRIAL PROCESS MEDIUM STRENGTH TGALEF 1000 1,366 2,049 3,978 500 3X INDUSTRIAL PROCESS HIGH STRENGTH TGALEF 1000 1,366 2,049 3,978 500 3X INDUSTRIAL PROCESS VERY HIGH STRENGTH TGALEF 1000 1,366 2,049 3,978 500 3X INDUSTRIAL PROCESS SUPER HIGH STRENGTH TGALEF 1000 1,366 2,049 3,978 520 6812 68 ELEMENTARY SCHOOL TGSF 50 68 102 199 522 522 68 MIDDLE SCHOOL TGSF 50 68 102 199 530 6813 68 HIGH SCHOOL TGSF 50 68 102 199 540 6821 68 COMMUNITY COLLEGE TGSF 50 68 102 199 550 6821 68 UNIVERSITY TGSF 50 68 102 199 560 6911 69 CHURCH TGSF 50 68 102 199 Page 36 OF 39 A-36 565 6811-6839, 68 DAY CARE CENTER TGSF 50 68 102 199 7111-7123 590 7111 68 LIBRARY TGSF 50 68 102 199 591 6994 69 FRATERNAL ORGANIZATION TGSF 50 68 102 199 600 5410-5499 54 SERVICE STATION / MARKET TGSF 180 246 369 716 610 6511-6519 65 HOSPITAL TGSF 150 205 307 597 620 6511-6519 65 NURSING HOME TGSF 150 205 307 597 630 6511-6519 65 CLINIC, MEDICAL OFFICE TGSF 150 205 307 597 700 5810 5A FAST FOOD RESTAURANT TGSF 720 500 683 1024 1989 720 8221,8222 82 VETRINARIAN SERVICES TGSF 200 273 410 796 750 6710-6759 67 OFFICE PARK TGSF 100 137 205 398 770 6710-6759 67 BUSINESS PARK TGSF 100 137 205 398 730 6710-6759 67 GOVERNMENT BUILDING TGSF 100 137 205 398 732 6710-6759 67 US POST OFFICE TGSF 100 137 205 398 800 5910-5999 59 RETAIL TGSF 50 68 102 199 831 5810 5B QUALITY RESTAURANT TGSF 720 500 683 1024 1989 832 5810 5C HIGH TURNOVER RESTAURANT TGSF 720 500 683 1024 1989 EATING PLACE WITH MINIMAL FOOD PREPARATION*** TGSF 300 410 615 1,193 835 5820 5D DRINKING PLACE WITH MINIMAL FOOD TGSF 340 464 697 1,353 PREPARATION**** DRINKING PLACE WITH RESTAURANT LIKE FOOD TGSF 500 683 1024 1989 PREPARATION 840 6411,6419-64 AUTO CARE TGSF 40 55 82 159 6499 841 5511-5599 55 NEW CAR SALES TGSF 50 68 102 199 847 6412 6B CAR WASH TGSF 500 683 1,024 1,989 848 5511-5599 55 TIRE STORE TGSF 50 68 102 199 850 5410-5499 54 SUPERMARKET TGSF 180 246 369 716 851 5410-5499 54 CONVENIENCE MARKET TGSF 180 246 369 716 854 5211-5392, 5X DISCOUNT MARKET TGSF 30 41 61 119 5610-5733 890 5211-5392, 5X FURNITURE STORE TGSF 30 41 61 119 5610-5733 895 7212-7900 7X VIDEO ARCADE / OTHER ENTERTAINMENT TGSF 160 219 328 636 900 6111-6133 61 FINANCIAL INSTITUTION TGSF 110 150 225 438 251 1210-1290 12 B ELDERLY HOUSING - DETACHED TGSF 100 137 205 398 252 1210-1290 12A ELDERLY HOUSING - ATTACHED TGSF 100 137 205 398 253 1210-1290 12C CONGREGATE ELDERLY CARE FACILITY TGSF 100 137 205 398 120 2111-2190 21 HEAVY INDUSTRY/INDUSTRIAL** TGSF 50 68 102 199 120 2220-2395, 2X HEAVY INDUSTRY/INDUSTRIAL** TGSF 50 68 102 199 2510-2790 120 2400,2421-24 HEAVY INDUSTRY/INDUSTRIAL** TGSF 50 68 102 199 2499 120 2810-3999 3X HEAVY INDUSTRY/INDUSTRIAL** TGSF 50 68 102 199 120 2810-3999 3X HEAVY INDUSTRY/INDUSTRIAL/ WHOLESALE** TGSF 50 68 102 199 Page 37 OF 39 A-37 710 6141-6190, 6X GENERAL OFFICE BLDG TGSF 100 137 205 398 6500, 6520- 6599, 6810 860 5111-5199 51 WHOLESALE TRADE TGSF 50 68 102 199 870 5211-5392 5X CLOTHING / DRYGOODS / HOUSEWARES TGSF 30 41 61 119 820 6211-6215 6A LAUNDRY TGSF 100 137 205 398 900 6212-6290 62 OTHER SERVICES TGSF 100 137 205 398 110 6611-6629 66 CONSTRUCTION TRADE TGSF 100 137 205 398 440 6811-6839 68 OTHER EDUCATIONAL/CULTURAL TGSF 50 68 102 199 450 7212-7900 7X OTHER ENTERTAINMENT TGSF 160 219 328 636 820 SHOPPING CENTER TGSF 100 137 205 398 ABBREVIATIONS TGSF - THOUSAND GROSS SQUARE FEET TSFGLA - THOUSAND SQUARE FEET GROSS LEASABLE AREA DU - DWELLING UNIT TGALEF - THOUSAND GALLONS ESTIMATED FLOW VFP - VEHICLE FUELING POSITIONS Page 38 OF 39 A-38 APPENDIX E GO Bond Credit Calculation TABLE E-1 GO Bond Credit per $1,000 Assessed Value By Annexation Year Year of Annexation by Year Cumulative Credit (per $1,000 AV) 1979 $0.09 $5.29 1980 $0.07 $5.19 1981 $0.14 $5.12 1982 $0.18 $4.98 1983 $0.17 $4.80 1984 $0.22 $4.63 1985 $0.33 $4.40 1986 $0.40 $4.07 1987 $0.45 $3.67 1988 $0.49 $3.22 1989 $0.48 $2.73 1990 $0.45 $2.25 1991 $0.21 $1.80 1992 $0.15 $1.59 1993 $0.19 $1.45 1994 $0.17 $1.25 1995 $0.16 $1.09 1996 $0.20 $0.92 1997 $0.24 $0.72 1998 $0.20 $0.48 1999 $0.19 $0.28 2000 $0.05 $0.09 2001* $0.05 $0.05 * Properties annexed subsequent to debt retirement (2001) not eligible for credit. 00241505.DOC;1 Page 39 OF 39