HomeMy WebLinkAboutItem 3A: Federal Priorities
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Work Session: Adoption of Federal Priority Project Lists
Meeting Date: January 13, 2010 Agenda Item Number: A
Department: City Manager’s Office Staff Contact: Brenda Wilson
www.eugene-or.gov Contact Telephone Number: 682-8441
ISSUE STATEMENT
This is an action item to adopt the Intergovernmental Relations (IGR) Committee’s recommended 2010
Federal Priorities Project List (Fiscal Year 2011 appropriations cycle). These federal priority requests
will be sent to our congressional delegation as part of our federal priority process (United Front).
The recommended 2010 City of Eugene Federal Priorities Project List includes:
Updates and Programmatic Requests:
?
Delta Ponds (Current Project)
?
Metro Waterways General Investigative Study (Current Project)
?
FAA Reauthorization (Current Project)
?
Medicare Ambulance Relief (New Project)
FY 2011 Appropriations Requests:
?
Forest Legacy (Current Project)
?
West Eugene Transportation Implementation (Current Project)
?
Special Operations Facilities Energy Efficiency and Seismic Upgrades (New Project)
?
Fire Hydrant Replacement (New Project)
?
MWMC Electrical Generator Upgrade (New Project)
Reauthorization Requests:
?
Franklin Boulevard -- Multiway Boulevard (Current Project)
?
Beltline Road and Corridor Study (Current Project)
?
West Bank Path and Pathway Lighting (Current Project)
BACKGROUND
The United Front (UF) partnership of local governments in the Lane County region develops and
maintains a concise and realistic federal agenda. Annual federal priorities are based on local and
regional needs. By assessing local federal priorities in conjunction with anticipated legislative funding
opportunities, we greatly increase the prospects for success.
Z:\CMO\2010 Council Agendas\M100113\S100113A.doc
This approach has proven very helpful for congressional delegations, for several reasons. Foremost, the
delegation members do not need to reconcile the different interests of a particular region. A joint local
effort relieves them of playing the role of arbitrator or mediator in sometimes difficult matters of local
importance. In turn, the congressional delegation can focus on advocating strongly for widely accepted
local priorities, which is a role they have repeatedly stated they prefer. Furthermore, the extensive
research and development that goes into producing the Federal Agenda eases the burden on
congressional staff in terms of preparing project justifications and advocating for funding. The
delegation’s staff often comes to depend on the reliability and accessibility of the UF’s Federal Agenda,
and the local staff who produce it. Consequently, the process helps build solid, ongoing relationships
that extend far beyond the merits of any one set of Federal Agenda projects.
The City Council must adopt the Federal Priorities Project List each year. The recommended Federal
Priorities Project List begins with a review of opportunities for funding in the next Federal budget and
goals that are specific to Eugene or the area.
Throughout the year, staff has looked into federal funding opportunities and unmet funding needs to
develop a list of potential projects for inclusion on the FY 2011 Federal Priorities Project List. On
November 12, 2009, the IGR Committee met with staff and our federal lobby firm Smith, Dawson and
Andrews, to discuss and review a list of potential priority projects for inclusion on the 2010 Federal
Priorities Project List. From that meeting, a list of possible federal funding opportunities was developed.
The proposed 2010 Federal Priority Projects were presented to the IGR Committee on December 16,
2009. The IGR Committee unanimously approved, with one possible addition (see note below), the
recommended 2010 Federal Priorities Project List (Attachment A) and directed the list move forward to
the full City Council for action. The final list will become part of the UF federal agenda which will be
presented to the area’s congressional delegation, executive department staff, and other potential funding
sources in Washington, D.C. in March 2010.
Note: As part of the 2009 United Front Federal Priorities list, the City of Eugene included a request for
an air monitoring station as part of Lane County’s BioEnergy Production Facility request. The original
request for the air quality monitoring station was to ensure the efficacy of the facility’s basic
requirement to reduce or eliminate the air quality impacts from grass seed burning in the central and
southern Willamette Valley. However, in 2009, the Oregon State Legislature passed Senate Bill 528
which ended most field burning in Oregon. Additionally, the Lane Region Air Protection Agency
(LRAPA) recently determined it would site an air quality monitoring station in west Eugene and has
identified funding to install the station, although it is still trying to identify funding for ongoing
operation of the station. Accordingly, because field burning has been eliminated in the southern
Willamette Valley and an air monitoring station is being installed in west Eugene by LRAPA, the 2009
request for the air monitoring station is not recommended for inclusion on the 2010 Federal Priorities
Project List.
RELATED CITY POLICIES
Adoption of the federal priority recommendations is the making or affirming of the City of Eugene’s
policy with respect to federal legislative issues or such other matters as may come to the council from
the IGR committee.
Z:\CMO\2010 Council Agendas\M100113\S100113A.doc
COUNCIL OPTIONS
The council may:
1.Adopt the 2010 Federal Priority Project List recommendations.
2.Modify the 2010 Federal Priority Project List.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends Council Option 1 - Adopt the 2010 Federal Priority Project List
recommendations.
SUGGESTED MOTION
Move to adopt the 2010 Federal Priority Project List recommendations.
ATTACHMENTS
A. 2010 Federal Priority Project List
FOR MORE INFORMATION
Staff Contact: Brenda Wilson
Telephone: 682-8441
Staff E-Mail: brenda.s.wilson@ci.eugene.or.us
Z:\CMO\2010 Council Agendas\M100113\S100113A.doc
PROPOSED 2010
FEDERAL PRIORITIES PROJECT LIST
Project NameRequestCurrent UF Notes
Project?
Natural Resources & Water
Forest Legacy$1.956 MYESThis request was not funded in FY 09. We have determined that the best
course of action is to modify our request for a total programmatic request
instead of an individual project request.
MWMC Electrical Generator $6 MNOJoint Project with Eugene and Springfield. Would upgrade the generators at
UpgradeMWMC to expand capacilty.
Public Safety
Police Special Operations Facility$1 MNOThis project would renovate our current Special Operations facility. It is in
desperate need of energy efficient upgrades and has unusable facilities. It
is also not up to seismic standards.
Fire Hydrant Replacements$250,000 NOOur current fire hydrant system is antiquated with 31% over 50 years old
and another 24% in the 40 to 50 year old range. The useful life of a typical
fire hydrant is 50 to 60 years which means that over the next decade, over
50% of the city's fire hydrants will be at or near the end of their useful lives.
The current cost to replace a hydrant is $5,000 - $1,500 for the hydrant and
$3,500 for installation. Although the estimate to replace these outdated
hydrants is about $10 million, EWEB has agreed to partner with us on the
installments.
Transportation & Community
Development
West Eugene Transportation Study$5 M YESThis is for environmental analysis and preliminary design.
Updates and Programmatic
Requests
Metro Waterways General $375,000 YESThis has been funded at $134,000 for completion of the feasibility Study
related to this project.
Delta Ponds$3.8 MYESThis project was funded out of the ARRA funds and contacts were signed
last week.
FAA funding~YESOngoing reqeust for continued aviation funding at maximum levels.
Support for Medicare Ambulance ~NOThere are several bills in Congress at this time. We have already asked our
Relief delegation to support some of these bills which would provide reliif to
ambulance service providers.
Reauthorization Projects
Beltline Corridor River Road to $18 MYESNEPA and preliminary design
Coburg Road
West Bank Path and Pathway $4.05MYESThia is on our current UF list at $1.75 M. We have expanded this project to
Lighting Eugene include lightening and other improvements - the cost going up to $4.05 M.
Franklin Blvd.- Eugene Segment $22.5 MYESDesign and construction