Loading...
HomeMy WebLinkAboutItem A: West Eugene EmX Update ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Work Session: West Eugene EmX Update Meeting Date: June 23, 2010 Agenda Item Number: A Department: Public Works Engineering Staff Contacts: Rob Inerfeld, PWE; Tom Schwetz, LTD www.eugene-or.gov Contact Telephone Numbers: 541-682-5343; 541-682-6203 ISSUE STATEMENT At this City Council Work Session, Lane Transit District (LTD) staff will provide an update on the West Eugene EmX Extension (WEEE) with an emphasis on the change in the corridor selection process and the winnowing of the number of alternatives under consideration. BACKGROUND Process Change for West Eugene EmX Project – The Story of 58 Through the extensive outreach conducted in the refinement of the alternative alignments for the West Eugene EmX Extension (WEEE) project, 58 distinct alternatives have emerged for evaluation. Not only is this a large number for the community to sort out in the process of selecting a Locally Preferred Alternative (LPA), it is a large number to take into the currently defined federal process. This Agenda Item Summary (AIS) provides a summary of the following: ? A description of the change in process that will more easily facilitate the process of selecting a preferred alternative; ? An overview of the various public meetings held to discuss the process change; ? A review of the new information developed as part of the preliminary analysis completed to date for the project, the staff recommendations for an initial winnowing of alternatives, and the feedback received about this information during the public meetings; and ? A description of the process and general schedule from this point forward. Summary of Process Change As in previous EmX development efforts, the general approach has been to balance the operational needs for EmX operations in a corridor with the intent to develop design options that avoid and minimize negative impacts where possible. This has resulted in a wide range of alternative permutations – 56 distinct build alternatives, in addition to the no-build and transportation system management alternatives – making 58 alternatives in all. In discussions with LTD Board Members, City Councilors, members of various committees involved in the project, and members of the public, there is general agreement that it would be confusing and difficult for the community to try and sort out differences among 58 alternatives. Through discussion with Federal Transit Administration (FTA) staff, they have indicated that there is a way of working through a project development process that better fits our needs. Z:\CMO\2010 Council Agendas\M100623\S100623A.doc The process envisioned for the project to date has been a combined Alternatives Analysis (required by FTA) and Draft Environmental Impact Statement (required for use of federal capital funds). FTA also provides for a sequential process where the alternatives analysis can be prepared first, using the same analysis we are preparing for the original process. This analysis will be used to winnow the range of alternatives down to a more manageable number. The alternatives analysis will be followed by a process of selecting a preferred alternative to be taken into the preparation of the Draft Environmental Impact Statement. This has the benefit of breaking the overall decision into more manageable pieces which will assist in facilitating the community’s decision-making on the project. It also puts the first part – the selection of the locally preferred alternative – into this calendar year. Public Outreach on Process Change At an open house on June 9, LTD was able to share the results of the preliminary analysis to date and made recommendations. Sixty-four people attended the open house and provided comments (summarized in the next section). In addition to this open house, other public meetings on this topic include: June 1 – EmX Steering Committee o June 2 – WEEE Corridor Committee o June 3 – WEEE Design Options Local Advisory Committee meeting o June 3 – WEEE Design Options Open House o (June 9 Open House on Process Change) o June 15 – WEEE Corridor Committee (Review of data and recommendations) o June 17 – MPO Citizen Advisory Committee o Out of 64 attendees at the June 9 open house, 29 comments were received which are summarized in the following table: - Terminus Options - Retain Eliminate Seneca Terminus Option8 13 Commerce Terminus Option 15 6 Cone/Willow Creek Terminus Option 1 18 - Alignment Alternatives Amazon Alignment Alternative 1 27 7th Place Alignment Alternative 9 15 In the next section there is more information about the preliminary analysis of the alignment and terminus options. Results from Preliminary Analysis Information from the technical analyses completed to date suggests that certain alternatives may no longer be viable. This information is detailed and summarized in the attached Key Preliminary Results and West Eugene EmX Extension Alternatives Analysis Refinement Evaluation. Z:\CMO\2010 Council Agendas\M100623\S100623A.doc The Alternatives Analysis Refinement Evaluation is a determination of whether or not the proposed alignment alternatives and terminus options selected for further study in March 2008 are reasonable or promising alternatives based on the initial technical findings and the project’s evaluation criteria. Following are the project’s eight primary evaluation criteria and measures: 1.Improve customer convenience by reducing travel time, increasing service reliability, and making other service improvements. 2.Improve operating and other efficiencies to maximize the use of scarce resources. 3.Support development that is consistent with planned land use documents and serve as a catalyst for planned transit-oriented development. 4.Help accommodate future growth in travel by increasing public transportation’s share of trips. 5.Consider the mobility and safety needs of pedestrians, bicyclists, and motorists. 6.Provide for a fiscally stable public transportation system. 7.Design the project in a way that protects resources in the natural and built environment. 8.Support LTD’s sustainability policy and the City of Eugene’s efforts to reduce greenhouse gas emissions. Based on the project’s evaluation criteria and the results of the preliminary analysis, LTD staff is recommending eliminating two of the three terminus options: ? Both full-length terminus options at Ed Cone and Ed Cone/Willow Creek. Stormwater runoff from either of these full-length options could result in impacts o to protected plant species and Bureau of Land Management (BLM) wetlands west of Beltline Road. The additional costs to construct these options are projected to exceed available o funding. The incremental additional ridership gains from extending the terminus to Ed o Cone or both Ed Cone and Willow Creek is projected to be below levels that would merit seeking the required additional construction funding, or justify the long-term additional operational costs to extend service to these points. ? The Seneca Terminus option. Cost and ridership projections indicate the Commerce Terminus would provide o better service for the corridor. Based on the project’s evaluation criteria and the results of the preliminary analysis, LTD staff is also ththth recommending eliminating two alternatives connecting either West 6/7 Avenues or West 13 Avenue th to West 11 Avenue: thth ? Both Amazon alignments. (These would have connected West 13 Avenue to West 11 Avenue via either a route on the north side of the Amazon channel or through a relocation and restoration of the existing channel.) Both Amazon design options could result in impacts to endangered plant species, o historic resources (the channel), low income housing, and park land. The Amazon restoration design option would require eight residential o displacements and relocations. thththth ? West 7 Place. (This would have connected the West 6/7 alternative to West 11 th Avenue via West 7 Place at Seneca Road.) Z:\CMO\2010 Council Agendas\M100623\S100623A.doc th Projected boardings along West 7 Place are extremely low. o This alternative would result in numerous strip commercial property acquisitions o as a result of required right-of-way widening; thereby not serving as a feasible alternative to avoid similar acquisitions along the more direct alterative routing th along West 11 Avenue. In addition to the No-Build and Transportation System Management (TSM) alternatives, LTD staff is recommending further consideration of the remaining build alternative alignments. These alternatives include: ? West 13th Avenue between the Downtown Eugene Station to West 11th Avenue via Chambers Street (this alternative includes two design options: a two-lane transitway or a frontage alley design option on West 13th between Polk and Tyler Streets), ? West 6th/7th Avenues between the Downtown Eugene Station to West 11th Avenue via Garfield (this alternative includes four design options: a Lincoln/Charnelton couplet or a two-way bus lane on Charnelton; and either adding or reassigning an existing lane on West 6th and West 7th Streets between Blair and Fillmore Streets), and ? West 11th Avenue (Between Garfield Street and the Commerce Street terminus). Process and Schedule from this Point Based on the analysis described above, the LTD Board is scheduled on June 23 to take action to winnow the 58 alternatives down to eight, including No-Build and TSM. These eight alternatives will be incorporated into an Alternatives Analysis Report which, following review by FTA, is scheduled to be released for public review and comment in mid-September 2010. At that time, the Locally Preferred Alternative (LPA) decision-making process would begin. This process will include a variety of public outreach efforts, the work of several advisory committees (EmX Steering Committee, MPO Citizen Advisory Committee, and WEEE Corridor Committee), and meetings of the Joint LPA Committee. The Joint LPA Committee will develop a recommendation to the three deciding bodies – LTD Board, Eugene Council and Metropolitan Policy Committee (MPC) based on the analysis and public input. The members of the Joint LPA Committee are Mayor Piercy and Councilors Ortiz and Pryor from the Eugene City Council; Mike Eyster, Greg Evans, and Dean Kortge from the LTD Board; and Rob Handy and Sonny Chickering representing the MPC. The three deciding bodies will then work on reaching a common LPA to move into the environmental process. RELATED CITY POLICIES From Eugene-Springfield Transportation System Plan (TransPlan): TSI Transit Policy #2: Bus Rapid Transit Establish a Bus Rapid Transit (BRT) system composed of frequent, fast transit service along major corridors and neighborhood feeder service that connects with the corridor service and with activity centers, if the system is shown to increase transit mode split along BRT corridors, if local governments demonstrate support, and if financing for the system is feasible. From Adopted Growth Management Policies: Growth Management Policy 11 Increase the use of alternative modes of transportation by improving the capacity, design, safety, and convenience of the transit, bicycle, and pedestrian transportation systems. Z:\CMO\2010 Council Agendas\M100623\S100623A.doc COUNCIL OPTIONS Provide feedback to LTD and City staff. CITY MANAGER’S RECOMMENDATION This item is for discussion only. SUGGESTED MOTION None. ATTACHMENTS A. West Eugene EmX Extension Alternatives Analysis Refinement Evaluation B. Key Preliminary Results (summary table) FOR MORE INFORMATION Staff Contact: Rob Inerfeld, Public Works Engineering Telephone: 541-682-5343 Staff E-Mail: rob.inerfeld@ci.eugene.or.us Staff Contact: Tom Schwetz, Lane Transit District Telephone: 541-682-6203 Staff E-Mail: tom.schwetz@ltd.org Z:\CMO\2010 Council Agendas\M100623\S100623A.doc West Eugene EmX Extension Alternatives Analysis Refinement Evaluation Evaluation Framework for Refinement of Alternatives The West Eugene EmX Extension project’s evaluation framework consists of the project’s Purpose and Need Statement and the project’s Goal and Objectives (provided as a separate handout). The same evaluation criteria and measures used during the project’s screening evaluation phase are being used during the project’s Alternatives Analysis phase. The Alternatives Analysis is a determination of whether or not the alignment alternatives are reasonable or promising alternatives based on the project’s evaluation measures. Following is a summary of the evaluation criteria and measures: 1. Improve customer convenience by reducing travel time, increasing service reliability, and making other service improvements. ? Round-trip transit travel time between select origins and destinations ? Ridership information 2. Improve operating and other efficiencies to maximize the use of scarce resources. ? Operating service hours (round-trip travel time proposed service frequency) ? Operating hours of regular service replaced by EmX within the corridor 3. Support development that is consistent with planned land use documents and serve as a catalyst for planned transit-oriented development. ? Vacant and redevelopable land value near the alignment ? Number of mixed-use centers (land-use nodes) served by the alignment 4. Help accommodate future growth in travel by increasing public transportation’s share of trips. ? Population and employment density near alignment ? Transportation mode shift 5. Consider the mobility and safety needs of pedestrians, bicyclists, and motorists. ? General assessment of alternative’s interface with pedestrian, bicycle, and vehicle facilities 6. Provide for a fiscally stable public transportation system. ? General assessment of alternatives affect on the fiscal stability of the public transportation system 7. Design the project in a way that protects resources in the natural and built environment. ? Potential for acquisitions and/or displacement of residents, businesses and parking ? Potential impacts to street, landscape, and charter trees ? Likelihood of adverse impact to environmentally-sensitive natural resources (i.e., wetlands, parklands, historic resources, critical habitat, endangered species) 8. Support LTD’s sustainability policy and the City of Eugene’s efforts to reduce greenhouse gas emissions. ? General assessment on the alternative’s ability to support LTD’s sustainability policy ? Potential for alternative to attract an increase in public transportation’s share of trips and the concurrent reduction in vehicle miles traveled and/or single occupancy vehicle use. Page | 1 June 9, 2010 Summary of Evaluation Results This section summarizes the evaluation results, which is a determination of whether or not the proposed alignment alternatives and terminus options selected for further study in March 2008 are reasonable or promising alternatives based on the initial technical findings and the project’s evaluation measures. Key findings from the preliminary draft technical project’s evaluation measures reports related to are summarized in Tables 1A through 1D below. Additional data from the preliminary draft technical reports are provided in two tables provided separately (“Potential significant Adverse and Beneficial Effects by Mode and Length” and “Alternatives Analysis: Key Preliminary Results”). The technical reports will be available upon request from LTD as they become finalized, and they will be posted to the project website at http://weemx.ltd.org. Summary of Mode and Length Alternatives by Evaluation Criteria Evaluation Criteria ? Still meets WEEE Project’s Purpose and Need for that Evaluation Criteria Probably will meet WEEE Project’s Purpose and Need and Evaluation Criteria with modifications ? and / or mitigation will not Probably meet WEEE Project’s Purpose and Need and Evaluation Criteria with modifications and / or mitigation ? Does not meet WEEE Project’s Purpose and Need for that Evaluation Criteria NA Not Applicable Relatively higher number of significant adverse impacts identified Table 1A. Summary of Mode and Length Alternatives by Evaluation Criteria: Bus Alternatives Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst Support sustainability and efforts to Eliminate the Alternative or Design Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience future growth in Recommendation to Retain or Improve operating and other Sensitive to natural and built oriented - for planned transit Accommodate development reduce GHG efficiencies resources Option travel Alternative / Design Option / Alt # Terminus Option Bus Alternatives No-Build Alternative NA NA NA NA NA NA NA NA R 1 Full Length Alternatives TSM Alternative NA NA NA NA NA NA NA NA R 2 Full Length Alternatives Page | 2 June 9, 2010 Table 1B. Summary of Mode and Length Alternatives by Evaluation Criteria: Seneca Road Terminus Alternatives Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst Support sustainability and efforts to Eliminate the Alternative or Design Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience Accommodate future growth in Recommendation to Retain or Improve operating and other Sensitive to natural and built oriented - d transit development reduce GHG efficiencies resources for planne Option travel Alternative / Design Option / Alt # Terminus Option BRT Alternatives With Seneca Road Terminus th W 13 Avenue – Amazon via North of Amazon Design Option ??????? 3 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 4 Option E th W 13 Avenue – Amazon via Amazon Restoration Design Option ??????? 5 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 6 Option E thth W 13 Avenue – W 11 Avenue ???????? 7 – Frontage Alley Design Option E – Two-Lane Transitway Design ???????? 8 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ?????? 9 – Add-A-Lane Design Option E – Reassign-A-Lane Design ?????? 10 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Charnelton Two-Way Design Option ?????? 11 – Add-A-Lane Design Option E – Reassign-A-Lane Design ?????? 12 Option E ththth W 6 / 7 Avenues – W 7 Place via Lincoln / Charnelton Couplet Design Option ???????? 13 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???????? 14 Option E ththth W 6 / 7 Avenues – W 7 Place via Charnelton Two-Way Design Option ???????? 15 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???????? 16 Option E Page | 3 June 9, 2010 Table 1C. Summary of Mode and Length Alternatives by Evaluation Criteria: Commerce Street Terminus Alternatives Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst d efforts to Eliminate the Alternative or Design Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience Accommodate future growth in Recommendation to Retain or Improve operating and other Sensitive to natural and built oriented Support sustainability an - for planned transit development reduce GHG ncies resources Option efficie travel Alternative / Design Option / Alt # Terminus Option BRT Alternatives With Commerce Street Terminus th W 13 Avenue – Amazon via North of Amazon Design Option ??????? 17 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 18 Option E th W 13 Avenue – Amazon via Amazon Restoration Design Option ??????? 19 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 20 Option E thth W 13 Avenue – W 11 Avenue ???????? 21 – Frontage Alley Design Option R – Two-Lane Transitway Design ? ???????? 22 Option ththth W 6 / 7 Avenues – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ????? 23 – Add-A-Lane Design Option R – Reassign-A-Lane Design ????? 24 Option R ththth W 6 / 7 Avenues – W 11 Avenue via Charnelton Two-Way Design Option ????? 25 – Add-A-Lane Design Option R – Reassign-A-Lane Design ????? 26 Option R ththth W 6 / 7 Avenues – W 7 Place via Lincoln / Charnelton Couplet Design Option ???????? 27 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???????? 28 Option E ththth W 6 / 7 Avenues – W 7 Place via Charnelton Two-Way Design Option ???????? 29 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???????? 30 Option E Page | 4 June 9, 2010 Table 1D. Summary of Mode and Length Alternatives by Evaluation Criteria: Full-Length Cone Terminus Alternatives Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst Support sustainability and efforts to esign Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience Accommodate future growth in Recommendation to Retain or Eliminate the Alternative or D Improve operating and other Sensitive to natural and built oriented - for planned transit development reduce GHG efficiencies resources Option travel Alternative / Design Option / Alt # Terminus Option BRT Alternatives With Full-Length Alternative – Cone Terminus thth W 13 Avenue – Amazon via North of Amazon Design Option – W 11 Avenue ??????? 31 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 32 Option E thth W 13 Avenue – Amazon via Amazon Restoration Design Option – W 11 Avenue ??????? 33 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 34 Option E thth W 13 Avenue – W 11 Avenue ??????? 35 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 36 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ???? 37 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???? 38 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Charnelton Two-Way Design Option ???? 39 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???? 40 Option E thththth W 6 / 7 Avenues – W 7 Place – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ??????? 41 – Add-A-Lane Design Option E – Reassign-A-Lane Design ??????? 42 Option E thththth W 6 / 7 Avenues – W 7 Place – W 11 Avenue via Charnelton Two-Way Design Option ??????? 43 – Add-A-Lane Design Option E Page | 5 June 9, 2010 Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst Support sustainability and efforts to esign Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience Accommodate future growth in Recommendation to Retain or Eliminate the Alternative or D Improve operating and other Sensitive to natural and built oriented - for planned transit development reduce GHG efficiencies resources Option travel Alternative / Design Option / Alt # Terminus Option – Reassign-A-Lane Design ??????? 44 Option E Page | 6 June 9, 2010 Table 1E. Summary of Mode and Length Alternatives by Evaluation Criteria: Full-Length Cone / Willow Creek Terminus Alternatives Evaluation Criteria 1 2 3 4 5 6 7 8 R/E Support planned land use / catalyst Support sustainability and efforts to ative or Design Consider mobility and safety needs Provide for fiscally stable system Improve customer convenience Accommodate future growth in Recommendation to Retain or Improve operating and other Sensitive to natural and built oriented Eliminate the Altern - for planned transit evelopment reduce GHG efficiencies resources Option travel Alternative / Design Option / Alt # Terminus Option d BRT Alternatives With Full-Length Alternative – Cone / Willow Creek Terminus thth W 13 Avenue – Amazon via North of Amazon Design Option – W 11 Avenue ??????? 45 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 46 Option E thth W 13 Avenue – Amazon via Amazon Restoration Design Option – W 11 Avenue ??????? 47 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 48 Option E thth W 13 Avenue – W 11 Avenue ??????? 49 – Frontage Alley Design Option E – Two-Lane Transitway Design ??????? 50 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ???? 51 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???? 52 Option E ththth W 6 / 7 Avenues – W 11 Avenue via Charnelton Two-Way Design Option ???? 53 – Add-A-Lane Design Option E – Reassign-A-Lane Design ???? 54 Option E thththth W 6 / 7 Avenues – W 7 Place – W 11 Avenue via Lincoln / Charnelton Couplet Design Option ??????? 55 – Add-A-Lane Design Option E – Reassign-A-Lane Design ??????? 56 Option E thththth W 6 / 7 Avenues – W 7 Place – W 11 Avenue via Charnelton Two-Way Design Option ??????? 57 – Add-A-Lane Design Option E – Reassign-A-Lane Design ??????? 58 Option E Page | 7 June 9, 2010 Page | 8 June 9, 2010