HomeMy WebLinkAboutItem B: West Eugene EmX Extension
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Work Session and Possible Action: West Eugene EmX Extension
Meeting Date: March 9, 2011 Agenda Item Number: B
Department: Public Works Engineering Staff Contacts: Rob Inerfeld, PWE; Tom Schwetz, LTD
www.eugene-or.gov Contact Telephone Numbers: 541-682-5343; 541-682-6203
ISSUE STATEMENT
The City Council has this opportunity to continue the discussion from February 23, 2011, regarding the
th
proposed extension of EmX service to West 11 Avenue. Additional information, as requested by the
council, has been provided by Lane Transit District (LTD) in Attachment A.
The council may take action at this meeting. The project review schedule was organized to provide the
council an opportunity to select a preferred build route during the March 9 work session. The LTD
Board’s discussion to consider delaying a decision until June/July did not automatically change this
schedule.
BACKGROUND
th
On October 9, 2006, the Eugene City Council voted to identify West 11 Avenue as the City’s priority
for planning the next extension of EmX. The LTD Board of Directors endorsed the Eugene City
Council’s action. Based on this direction, staff began planning the West Eugene EmX Extension.
On January 24, 2011, the City Council received an update on how 58 alternatives had been reduced in
response to preliminary environmental review and issues raised by area residents, businesses, and
affected property owners. On January 31, the Joint Locally Preferred Alternative (LPA) Committee
thth
made a draft recommendation that the 13 – 11 Avenue mitigated alternative become the locally
preferred alternative for further environmental review along with the No-Build alternative. Public open
houses were held on February 1 and 8 to highlight the mitigation measures incorporated into the project
design and to reflect the Joint LPA Committee’s recommendation. A public hearing was held on
February 8, at which time members of the three deciding bodies (City Council, LTD Board of Directors,
and the Metropolitan Policy Committee) had an opportunity to submit written questions.
On Monday February 14, the Joint LPA Committee made its final recommendation (from draft
minutes):
Mr. Pryor, seconded by Ms. Ortiz, moved that the LTD JLPAC recommend to the
Eugene City Council, the Metropolitan Policy Committee, and the Lane Transit
thth
District Board of Directors that the West 13-West 11 Avenue Mitigated
ththth
Concept Alternative (3MC) and the West 6/7/West 11 Mitigated Concept
Alternative (5MC) be forwarded along with the No-Build Alternative into the
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110309\S110309B.doc
federal environmental review process for further analysis. LTD would
incorporate mitigation measures identified through subsequent analysis.
Mr. Pryor amended the motion to include mitigation measures B, C and L. Ms.
Ortiz accepted the second to the motion.
The motion passed 7:1, with Mr. Evans, Mr. Eyster, Mr. Chickering, Mr. Leiken,
Ms. Ortiz, Ms. Piercy and Mr. Pryor voting in favor of the motion, and Mr.
Gillespie voting against the motion.
The Joint LPA Committee discussed a desire to have the Eugene City Council consider both build
alternatives in the context of its land use planning deliberations.
At its February 23 work session, the City Council discussed procedural options and requested additional
information. Lane Transit District’s response is provided in Attachment A.
The main questions before the City Council are:
Is the council prepared to make a decision on a locally preferred alternative (LPA) at this meeting?
th
a.If the answer is “Yes,” does the council adopt as the LPA the 13 Avenue Alternative, the
th
6th/7 Avenue Alternative, or the No-Build Alternative?
b.If the answer is “No,” should the council request that Lane Transit District and the
Metropolitan Policy Committee delay the LPA selection process until the council is prepared
to make a decision?
For reasons of timing with the federal Small Starts grant applications and cost, Lane Transit District
prefers that a single LPA be selected at this meeting. However, if the council requests that the LPA
selection process be delayed in the interest of gathering more information, the federal environmental
review process will also need to be delayed until a single LPA is selected to avoid substantial additional
costs and uncertainty in the process. Note that the environmental review process will consider the LPA
and the No-Build option.
RELATED CITY POLICIES
From Eugene-Springfield Transportation System Plan (TransPlan):
TSI Transit Policy #2: Bus Rapid Transit
Establish a Bus Rapid Transit (BRT) system composed of frequent, fast transit service along major
corridors and neighborhood feeder service that connects with the corridor service and with activity
centers, if the system is shown to increase transit mode split along BRT corridors, if local
governments demonstrate support, and if financing for the system is feasible.
From the Growth Management Policies:
Growth Management Policy 11
Increase the use of alternative modes of transportation by improving the capacity, design, safety,
and convenience of the transit, bicycle, and pedestrian transportation systems.
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110309\S110309B.doc
COUNCIL OPTIONS
ththth
1.
Select a single locally preferred alternative (e.g., the 13 Avenue or 6/7 Avenue alignment with
specific mitigation as described by the Joint LPA Committee).
2.
Select the “No-Build” alternative. This action would end the project.
3.
Request that Lane Transit District and the Metropolitan Policy Committee delay the LPA selection
process until the council is prepared to make a decision.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that the council support LTD’s construction of EmX in West Eugene
and directs the City Manager to inform the LTD Board that the council is opposed to the No-Build
option.
If the council approves the above, then the City Manager recommends that the council adopt one of the
following alternatives:
thth
(a)The council selects the 13/11 route as the preferred route for West Eugene EmX;
ththth
(b)The council selects the 6/7/11 route as the preferred route for West Eugene EmX;
thth
(c)The council requests LTD to undertake additional analysis of both the 13/11 and the
ththth
6/7/11 routes, and that upon completion of that additional analysis, the council will select its
preferred alternative.
thth
Unless the council needs additional information in order to choose between the 13/11 and the
ththth
6/7/11 routes, the City Manager recommends that the council makes that selection on March 9. On
the other hand, if the council still has questions about which of these two routes would be a better route,
and additional analysis would assist the council in choosing, then the City Manager recommends that
you choose alternative (c).
SUGGESTED MOTIONS
1.Move to direct the City Manager to inform the LTD Board that the council is opposed to the No-
Build option.
If the council is prepared to select a Locally Preferred Alternative, then one of the following motions
may be chosen:
thth
2a. Move to select the West 13/West 11 Avenue Mitigated Concept Alternative (3MC), including
mitigation measures B, C and L, to be forwarded into the federal environmental review process for
further analysis as the locally preferred route for West Eugene EmX; or
ththth
2b. Move to select the West 6/7/West 11 Mitigated Concept Alternative (5MC), including mitigation
measures B, C and L, to be forwarded into the federal environmental review process for further
analysis as the locally preferred route for West Eugene EmX.
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110309\S110309B.doc
ATTACHMENTS
A.Responses to LPA Decision Makers, prepared by Lane Transit District, March 1, 2011
FOR MORE INFORMATION
Staff Contact: Rob Inerfeld, Public Works Engineering
Telephone: 541-682-5343
Staff E-Mail: rob.inerfeld@ci.eugene.or.us
Staff Contact: Tom Schwetz, Lane Transit District
Telephone: 541-682-6203
Staff E-Mail: tom.schwetz@ltd.org
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110309\S110309B.doc
ATTACHMENT A
February 8, 2010 Public Hearing and February 24 Eugene City Council Work Session
RESPONSES TO LPA DECISION MAKERS
Prepared by Lane Transit District, March 1, 2011
Public Hearing Decision-Maker Written Questions
Councilor Pryor
1.When would construction actually begin? How long would construction in front of a
business take? What accommodations would be made for business disruptions?
Response:
Please see the attached construction mitigation overview letter from Wildish Construction.
Based on Wildish’s experience, construction would take place in five-block segments which
would be completed over a two-week period. This construction strategy would occur on one
side of the street at a time as a means to limit the time and extent of construction impacts.
2.How many construction jobs would the project create? How long would they be employed?
Would contracts likely be awarded to local contractors-subs?
Response:
In Lane County in 2009, $1 million spent on the construction of "commercial and institutional
buildings" would create about 9.5 direct jobs and about 6.5 indirect and induced jobs, for a
total of about 16 jobs, during the course of construction. An EmX $80-$90 million EmX project
would therefore be expected to create approximately 1,280-1,440 jobs.
3.Talk about the use of lottery funds and whether they could be used for schools if not EmX.
Response
Lottery fund receipts are allocated into several categories. There are some funds dedicated to
specific uses by voters, other elements are developed through each legislative session. The
EmX request is out of the economic development category. Based on this, the legislature
could decide to put more of the total into education and less into economic development. It is
more likely that the existing categories will remain in place. The legislature would then decide
where the EmX request would be placed among its economic development priorities.
Here is a description of the allocation of Lottery Funds from the state’s website:
Oregonians vote to approve the broad categories that receive Oregon Lottery funds.
Over the years, voters have approved constitutional amendments allowing Lottery
funds to be used for economic development (1984), public education (1995) and
natural resources (1998). Some funds are constitutionally dedicated by voters. Then,
February 28, 2011West Eugene EmX Extension 1
every two years, Oregon's Legislature and Governor appropriate the remainder of
Lottery funds within those categories approved by voters.
Lottery funds distribution 2009-11 biennium were:
Public Education (61%)
Economic Development (23%)
State Parks & Natural Resources
Problem Gambling Treatment (1%)
Councilor Farr
1.Please provide statistics (as available) on business interruption during construction phase of
Franklin Blvd line (referencing testimony made by Casey Dresser Springfield Cleaners)
Response
During Gateway EmX construction, LTD communicated in advance with businesses about the
expected construction timeline and impacts through 1:1 conversations, e-mail and website
updates, flyers, roadside and detour signage, and news releases. LTD’s contractors maintained
access to businesses at all times by phasing activities, by working on one-half of driveways or
roadways at a time, by using faster-cure concrete, and/or by providing alternate access
routes. LTD communicated to the general public through news releases, e-newsletter, web
updates, and “Business Open During Construction” signs that access to businesses remained
open during construction. LTD staff worked individually with businesses to address specific
issues, such as ensuring access for their freight deliveries, and coordinating work with the
utility providers to prevent or minimize any water or power disruption.
This level of direct and active interaction with businesses and property owners to minimize
construction impacts is typical of all EmX projects and can be expected if a build alternative is
selected for the West Eugene Extension.
In response specifically to Springfield Cleaners:
The property owner and Ms. Casey Dresser, the business owner, wanted to maintain on-
street parking spaces adjacent to the business’ own internal parking lot. LTD met this goal
by working with the City of Springfield and ODOT and by purchasing property across the
street from the cleaners to accomplish the widening needed to create inset on-street
parking adjacent to the cleaners. This design preserved three of the original four parking
spaces.
Prior to construction, LTD staff met with the business owner and spoke by phone with the
property owner to describe the construction process and timeline. To minimize impacts,
LTD’s contractor phased construction activities to preserve access at one or more of three
of the business access points for employees and customers. LTD created flyers describing
the phasing of construction for the business to give to customers who might experience a
February 28, 2011West Eugene EmX Extension 2
change in access between dropping off and picking up their laundry. LTD also built a new
parking lot entrance as part of a sidewalk ramp upgrade and used a more expensive
process to quickly cure the concrete to reopen the driveway within two days. LTD
scheduled the driveway work to coincide with the slower business days as described by the
business owner. LTD staff placed “Business Open During Construction” signs on the
sidewalk outside the business, and spoke by phone with Ms. Dresser several times during
construction to ensure that all was progressing smoothly. Ms. Dresser appeared to
appreciate LTD’s efforts and thanked LTD staff for their support.
2.Please provide ridership (not boarding) numbers for Gateway (testimony stated, “no more
than 10 riders at anytime)
Response
The model used to forecast transit use provides output in terms of “person-trips”. LTD’s
automatic passenger counters collect passenger data as individual “boardings”. LTD’s most
recent origin and destination survey indicates that there are approximately 1.5 boardings per
person-trip on the system. With the addition of the Gateway corridor, EmX now averages
9,200 boardings each weekday. These boardings equate to approximately 6,100 person-trips.
Current EmX productivity is 87 boardings per revenue hour.
3.Is it a fact that you do not respond to questions on Facebook, only on private (not public)
email?
Response
No. LTD continues to make every effort to provide information and answers to legitimate
questions about the West Eugene EmX project via Facebook. Our experience, however, is that
some individuals who are posting questions and comments about the project are not looking
for constructive conversation. LTD staff make a good faith effort to publicly answer questions
to these individuals, often resulting in follow-up comments from these individuals that contain
offensive or belittling responses to staff and borderline cyber-bullying of other Facebook fans.
4.Can you (with numbers) substantiate claim of greenhouse gas reduction? (Erin Ellis says you
cannot).
Response
There is extensive evidence documenting greenhouse gas emissions reductions resulting from
increasing transit ridership. Table 1 below provides some examples. Calculating greenhouse
gas emissions is a complex undertaking. There are number of factors to consider in making an
estimate. In Table 2 below is the estimate of greenhouse gas reductions that would come from
a one-time investment in $500,000 of additional regular service (not EmX). LTD recently
prepared this estimate as part of a discussion at MPC. As can be seen, an estimate of
reductions can be made and LTD intends to develop an estimate of greenhouse gas emissions
February 28, 2011West Eugene EmX Extension 3
as part of the completion of the environmental process. One complication in preparing an
estimate for the West Eugene project relates to the work being done at the state and national
level to develop a set of models that can be used consistently across regions. The Eugene
Springfield region is involved in that effort .
Table 2
Estimate of Annual Greenhouse Gas Emissions
$500,000 LTD Fixed Route Service (10,800 Service Hours)
Explanation
Annual Project Service hours-$500,000 10,800Hours in Service
Annual boardings 11,718,289
Service hours 305,720
Boardings per service hour 38.33
Project Service Hours multiplied by
Project Boardings for 10,800 service hours 413,965 boardings per service hour
33 percent of boardings are transfers from
one bus to another bus
Transfer rate 1.50
Project Boardings minus 30 percent
Linked trips for 10,800 service hours 275,977 transfers to avoid double counting
Based on 2007 LTD Origin-Destination
Survey indicating that 60% of riders have an
auto at home
% of trips that will revert to Auto Trips 0.60
Trips that will revert to Auto Trips 165,586 Potential New Auto Trips without Project
Systemwide Passenger miles 42,347,694
Systemwide Boardings 11,718,289
Average Miles per boarding 3.61
Person miles traveled 598,397 Potential New Auto Trip Distances (miles)
Conversion factor to person km traveled 1.61
Potential New Auto Trip Distances
Person km traveled 963,420 (kilometers)
CO2 factor-incremental bus to sedan 135
Potential New CO2 emissions (grams/km)
CO2 grams 130,061,664without Project
CO2 conversion grams to tons 0.0000011
Potential New CO2 emissions tons without
CO2 tons 143Project
Source: Mikhail V Chester and Arpad Horvath - "Environmental assessment of passenger transportation should include
infrastructure and supply chains." Environmental Research Letters 4 (2009) 024008 (8pp)
5.Celina Angelo said you misled people about tree removal (including response by Mark
Pangborn, “they didn’t ask”) Please respond.
Response
February 28, 2011West Eugene EmX Extension 4
Tree removal and replacement on the Gateway project involved the removed trees ranging in
size, age, species and health over a seven-mile distance. Prior to beginning tree felling for the
Gateway EmX project, we estimated that LTD would remove 286 trees along the Pioneer
Parkway median. There were some trees we did not need to remove (notably the large
sequoia at the corner of Pioneer Parkway East and Centennial). Sixty-five percent of the
Pioneer Parkway trees were less than 10 inches in diameter; 40 percent were less than five
inches in diameter. Along International Way, LTD removed 98 trees. LTD planted more trees
than were removed in addition to adding new landscaping and art. The trees removed (and
replaced) as part of the project represented only a very small fraction of the total number of
trees along the corridor.
For the new trees planted, LTD pre-purchased saplings still in the ground at the nursery prior
to construction. This did two things: saved project funding, and guaranteed appropriate
aged/sized trees for replanting. Trees have a better chance for survival after replanting, and
grow stronger and faster if they aren’t too big or too small according to LTD’s landscape
architect and arborist advisors, and our experience. For replanting, LTD typically uses two to
three-inch caliper tree to meet this standard.
th
Recently in Eugene, LTD removed five street trees for the new 11 Avenue curbside stations
located adjacent to SELCO Community Credit Union and the LTD Eugene Station. LTD paid the
City of Eugene an amount equal to the value of the removed trees; this money enables the City
to plant new street trees in suitable locations of their choosing.
6.It was claimed that you have not accounted for one million/annually in operation costs.
Please respond.
Response
Please see response to question 7, below.
7.Bob Macherioni says you “cooked the books” regarding reported ridership numbers. Please
respond.
Response
All analysis for the project ridership and cost estimating has been completed in accordance
with national standards defined by the Federal Transit Administration. The modeling
completed for the alternatives analysis utilized the network of routes that existed in 2007.
This network was revised to reflect the level of service and routing that might be expected in
2031. The model generated a ridership forecast and estimated high level system-wide costs.
This level of analysis is typically used to make preliminary locally preferred alternative
decisions.
February 28, 2011West Eugene EmX Extension 5
Because the model doesn’t incorporate intersection delay into corridor-level travel time
information, LTD developed an operating cost analysis to better understand the specific costs
associated with running EmX service along the build corridors, and costs for the network of
routes operating in 2011. This cost analysis used more accurate travel time estimates
incorporating intersection delay gathered by DKS Associates and the end result was specific to
this route network. Comparing results from the alternatives analysis modeling and the
corridor specific cost analysis should not be done. This is because the level of specificity in the
operating cost analysis is much greater and is based upon a present day network of routes
that operate along the corridor.
A final adjustment will be necessary as part of the small starts application process. This will
involve a detailed refinement of the route network in order to optimize the effectiveness of the
bus system. This refinement of our future route network is an area where we believe public
involvement is critical. Another piece of the process will take the corridor travel time
information and incorporate it into the final modeling work. Using actual travel time data
overcomes the operating cost shortcoming in the alternatives analysis modeling and will
provide a better understanding of the 2031 costs and ridership that can be expected if EmX
service is implemented in the corridor. The corridor cost modeling process will also be refined
to provide the best information about opening day costs of system operation. Both processes
are important and would ultimately be used in the project’s grant funding application.
8.Dave Kleger says that “ride refusal/full” has increased significantly Do you keep statistics on
this?
Response
Yes. Below is a table that quantifies the number of riders who were not able to board a bus
due to the bus being full, showing a substantial increase and indicating continuing high
demand for additional service.
February 28, 2011West Eugene EmX Extension 6
9.Can you provide number of hours spent conducting public forums or open houses or on
one-on-one or similar group meetings?
Response
Staff hours worked to prepare and attend public meetings varies depending on the type of
meeting. For an open house or public hearing, the amount of staff time is about 80 hours per
event. For a one-on-one meeting, approximately four hours per event. For civic and
neighborhood group meetings, about 12 hours of total staff time. To determine the precise
amount of LTD (and partner agency staff) time spent conducting public meetings over the past
four and one-half years (since the Eugene City Council selected the corridor) will require more
detailed analysis. Since release of the Alternatives Analysis in October 2010, LTD and partner
agency staff have spent hundreds of hours preparing for and conducting public meetings
including one-on-one meetings with property and business owners.
10.Brian Weaver suggests that even though mitigation has occurred, right of way in the initial
concept will eventually be claimed as right of way.
Response
The mitigation adopted as part of the LPA officially refines the project design; if a build
alternative is selected, any previous versions of the project alternatives are no longer part of
the project and would not be funded by FTA for construction. A final LPA report will be
completed following the LPA adoption process that will define the project and all adopted
mitigation. This definition of the project will be analyzed in the subsequent environmental
review process (along with No-Build) and will be defined and reviewed in great detail in all
grant request documents.
February 28, 2011West Eugene EmX Extension 7
11.Please get Greg Rickoff’s testimony regarding number of students on campus without cars.
Response
The following is excerpted from the letter from University of Oregon President Richard
th
Lariviere provided by Greg Rikhoff, U of O Director of Community Relations, at the February 8
public hearing.
Councilor Poling
1.What is the total number of buildings that are identified to be “torn down” as stated by one
speaker?
Response
thth
Under the West 6/7 Alternative mitigation concept, one building could be directly impacted
by project construction potentially requiring LTD to acquire the complete property and
demolish a portion of the building as part of the project’s roadway widening. Under the West
thth
13 -11 Alternative mitigation concept, no buildings would be directly affected and no
complete property acquisitions would be required. The building and property acquisition for
ththth
the West 6/7 Alternative is a vacant motel located on the south side of West 7 Avenue
between Monroe and Madison Streets. This alternative would likely impact only the portion of
this L-shaped building closest to the street, allowing for future remodeling and reuse of the
building.
2.Will the projected $30 million in state funding really come from lottery money to be used
for schools, if not used for EmX or any other transportation project?
Response
Please see response to question 3 from Councilor Pryor, above, and the response to Councilor
Clark, below.
February 28, 2011West Eugene EmX Extension 8
3.Have seen a recent increase in the use of articulated buses throughout the community? Are
th
the articulated buses being used on West 11? If so, what impact are they having on
th
increased ridership, operating costs, frequency, and number of buses on West 11?
Response
thth
LTD does not currently run articulated buses on West 11/13 Avenue, with one minor
th
exception. Route 78 leaves Seneca Station and travels three blocks on West 11 Avenue to
th
Bailey Hill Road when it begins its inbound service to UO via West 18 Avenue.
4.Who is paying for radio and newspaper ads? Is it being paid for by taxes on businesses?
Response
LTD’s revenues are made up of tax receipts, fares, and advertising revenue. The budget for
communications varies each year. Project specific advertising budgets use project funds and
are allocated in the year they are needed to support the project outreach or implementation.
For West Eugene outreach, a budget of $140,000 was outlined. Half of this amount was set
aside for the media purchases. We have not spent the amount allocated.
February 28, 2011West Eugene EmX Extension 9
Additional Questions and Responses from Eugene City Council February 23 Work
Session
Councilor Clark
What is the State’s financial condition and how might it affect lottery backed mechanisms?
Response
Councilor Clark made reference to the annual report of the State Debt Policy Advisory
Commission and the state treasurer's press release summarizing that report. The commission's
report concluded that the state's debt capacity would remain scarce in the 2011-2013
biennium. Councilor Clark asked that we report back on the state's financial health and how
that might affect the financing of the West Eugene EmX Extension.
As a result of sharp declines in projected general fund revenue at the state level, The State
Debt Policy Advisory Commission is recommending that no net increase in general fund
backed debt be authorized by the Legislature and governor for the next two years. According
to the commission's report, general fund debt capacity is expected to return in the 2013-15
biennium, because state revenues are projected to increase and also because deficit
borrowing approved by the 2003 legislature will be repaid in full.
The report also notes that, through refinancing of a portion of existing lottery backed bonds,
$282 million in lottery backed bond capacity will be available for the 2011-2013 biennium.
State Treasurer Ted Wheeler noted in his press release that “We recognize that there are
pressing economic development needs today across the state, and I will work with the
Legislature and the Governor to make sure that Lottery-backed debt is allocated to those
economic development projects that get us the biggest bang for the buck.” The legislature will
decide where the EmX request will be placed among its economic development priorities for
2011-2013.
As noted in the staff response during the February 23 work session, LTD’s strategy for
obtaining $30 million in lottery backed bonds for use as local match has been to spread the
request over three biennium's. During the 2009-2011 biennium, LTD received $1.6 million. The
requests for the 2011-2013 and 2013-2015 bienniums would be $8.4 million, and $20 million
respectively. Particularly given that the estimated opening year for a West Eugene project has
moved to 2017, LTD feels that there is flexibility to obtain the needed match within the
constraints of the state's debt capacity.
February 28, 2011West Eugene EmX Extension 10
Councilor Taylor
Could the $30 million lottery money be used for schools?
Response
Please see response to Councilor Pryor Question 3.
Is it true that the EmX costs more to operate?
Response
Below is a summary of operating costs comparing No-Build to projected costs for the West
thththth
6/7 and the West 13-11 Alternatives for 2015 and 2031. While new EmX service does
cost more to operate than regular bus service initially, over time, the efficiency gained through
operating in transit priority lanes, replacing less efficient existing service, and attracting and
carrying more passengers outweigh the additional costs.
Year 2010Year 2015Year 2031
Operating Operating Change vs. Operating Change vs.
CostCostNo-BuildCostNo-Build
Alternative
No-Build$996,000$1,066,000$2,040,000
West 13th to West 11th $1,538,000$472,000$1,616,000-$424,000
West 6th/7th to West 11th$2,032,000$966,000$2,538,000$498,000
All costs in 2009 dollars
Councilor Ortiz
I would not put forth TSM as an alternative. It doesn’t do anything to take the buses off the
regular roads. We don’t have enough money to pay for the streets we own. Are dedicated lanes
really LTD’s responsibility?
Response
Yes. The cost of maintenance for new facilities that would be built on city right of way as part
of the project (including transitways and BAT lanes) would be paid for by LTD through an
intergovernmental agreement with the City.
Councilor Zelenka
I would like to see a list of all of the adjustments you have made to accommodate requests and
what the impact it had on the EmX system.
Response
February 28, 2011West Eugene EmX Extension 11
This data is being compiled by LTD to account for the current mitigation concepts of both build
alternatives and will be made available as soon as possible.
Councilor Farr
How many off street parking spaces would be removed?
Response
This data is being compiled by LTD to account for the current mitigation concepts of both build
alternatives and will be made available as soon as possible.
February 28, 2011West Eugene EmX Extension 12
Additional Questions Received from the Public Related to the Eugene City Council
February 23 Work Session
1.Population and employment chart shows 2006 then 2031. You made the comment “as you can
see, the Gateway employment has grown substantially”. 2031 employment is based on
speculation. Therefore, it would be incorrect to make the statement as fact.
Actually, the reference was to the historic growth in the Gateway area, which more than
doubled between 1990 and 2006 - substantially faster than any of the other corridors.
2.Referencing Councilman Farr’s request: would also like the numbers on how many trees were
killed (type and sizes) and how many trees were planted (type and sizes)
See Response number 5.
3.Could you better explain the statement: money saved on 13th could be used to improve other
services.
Not sure there is a better way to explain it then how it was put at the work session which is
that the additional cost above the 13th alignment needed for operating the 6th/7th alignment
could be used for additional service on other parts of the system.
ththth
To put it another way, the 6/7 alignment’s operating costs are $494,000 more than the 13
alignment. That is the equivalent to 80% of the operating cost of the recently discontinued
Breeze route.
4.When Councilwoman Betty [Taylor] asked if the 13th option cost more, you replied: no, the per
boarding cost was better. Why didn’t you answer her question. Yes, it costs more. Based on
your cost analysis, it costs $450,000 more per year (Jan 31, 2011 analysis). Since the summary
charts don’t show the ridership numbers for 2015, could you pass on that information?
See response above outlining comparison of operating costs.
5.Could you please send me the data that supports the statements made about the life cycle of the
different size buses. 150k miles vs. 800k miles life expectancy.
This data is being compiled by LTD and will be made available as soon as possible
6.Mark Pangborn made the statement: that’s why when you go to large communities, you see the
large buses. May I remind you that Eugene is not one of these “large communities”.
February 28, 2011West Eugene EmX Extension 13
Thank you for that reminder. However, our region’s use of transit in terms of productivity
rivals that of large communities. LTD’s high productivity exceeds that of many large
communities. Based on 2009 National Transit Database figures, our productivity and ridership
exceed regions with 3-5 times our population. At these levels of productivity and ridership,
larger buses are warranted (See Tables 1-4 below).
Table 1. Ridership Productivity
ProductivitPopulatio
Agency Rank y n
Lane Transit District 48 40.55 291,600
Sacramento Regional Transit District 49 40.51 1,097,932
Metro Transit (Minneapolis, MN) 71 36.36 1,858,545
Broward County Transportation Department (Ft.
Lauderdale, FL) 72 36.28 1,751,234
rd
When excluding rail service in the calculation, Lane Transit District has the 33 highest
productivity in the nation. This represents a higher productivity than larger districts such
as:
Table 2. Ridership Productivity (Bus Only)
Agency Rank Productivity Population
Lane Transit District 33 40.55 291,600
Detroit Department of
Transportation 40 37.92 951,270
Milwaukie County Transit System 45 37.15 940,164
TriMet 53 36.21 1,488,169
In terms of absolute ridership, Lane Transit District had 11.7 million boardings in 2009 and
th
ranked 80 overall. This compares favorably with other larger districts, including:
Table 3. System Ridership
Agency Rank Ridership Population
Lane Transit District 80 11,732,650 291,600
Memphis Area Transit Authority 82 11,472,021 888,627
Snohomish County Public Transportation 89 10,292,248 730,405
February 28, 2011West Eugene EmX Extension 14
Benefit Area (North of Seattle)
Jacksonville Transportation Authority 90 10,253,890 827,453
Riverside Transit Agency 107 7,965,801 1,695,000
nd
The LTD population took 40.2 trips per capita (TPC) in 2009, ranking 42 out of all
agencies. This compares favorably to other agencies, including:
Table 4. Trips per Capita
Trips per
Agency Rank Capita Population
Lane Transit District 42 40.2 291,600
San Diego Metropolitan Transit
System 45 39.6 2,220,359
Miami-Dade Transit 47 39.1 2,402,208
Denver Regional Transit District 49 37.0 2,619,000
7.Mayor Piercy made the comment that EmX has already been chosen by the community and you
all were there to pick a build option. I thought No Build was still on the ballot?
Could not find where she said this. Yes, No-build is a choice available to the decision-makers.
8.What is the additional cost for construction work to be performed at night?
Work at night and on weekends costs more than work performed during a weekday. For this
reason, night and weekend work is done only on critical sections. For example, night work was
done on the Gateway project on some of the more complicated intersections where traffic
management would be too difficult during the daytime. The additional cost for this type of
work would be established at the time the project moved into the construction contracting
phase.
February 28, 2011West Eugene EmX Extension 15