Loading...
HomeMy WebLinkAboutItem 5: PH on PROS Project and Priority Plan ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Public Hearing: Parks, Recreation and Open Space Project and Priority Plan Meeting Date: April 10, 2006 Agenda Item Number: 5 Department: Public Works Staff Contact: Carolyn Weiss www.eugene-or.gov Contact Telephone Number: 682-4909 ISSUE STATEMENT The purpose of this public hearing is to provide an opportunity for public input regarding the proposed Parks, Recreation and Open Space Project and Priority Plan. The council is scheduled to take action on this item on May 8, 2006. BACKGROUND The Project and Priority Plan contains specific project information, including a timeframe for project implementation and cost estimates. To aid in reviewing the plan, the project information is structured in several different formats including tables organized by planning area and tables organized by project type. The Project and Priority Plan also includes maps showing existing and proposed resources for each planning area and for the entire city. The Parks, Recreation and Open Space (PROS) Comprehensive Plan, adopted by City Council on February 13, 2006, provides concepts, principles, goals and strategies to guide preservation and enhancement of Eugene’s Parks, Recreation and Open Space system. The projects identified in the Project and Priority Plan are some of the means by which the strategies identified in the PROS Comprehensive Plan can be implemented. As was the case with the PROS Comprehensive Plan, the Project and Priority Plan is the direct result of outreach to thousands of Eugene residents. The Project and Priority Plan is intended to be a living document, and as such, individual projects may be delayed if funding cannot be identified within the shown timeline. Likewise, individual projects may be moved forward if funding is identified earlier than shown in the timeline. A City Council work session was held on the proposed Project and Priority Plan on February 13, 2006. Attachment A to this agenda item summary (AIS) is a memorandum responding to questions from the council regarding growth allocation percentages. The memorandum describes how the growth allocation percentages were calculated, and describes the relationship of these percentages to the System Development Charge methodology currently under review by a Rates Advisory Committee. Attachment B is a spreadsheet responding to questions from the council regarding projected service levels for each planning area based on the priority assignments in the Project and Priority Plan. This analysis includes projected service levels resulting from the implementation of Priority 1 projects. L:\CMO\2006 Council Agendas\M060410\S0604105.doc An additional memorandum is forthcoming which responds to questions raised by the council at its work session regarding funding assumptions. The memorandum and accompanying chart will identify the assumptions that are being made to forecast future funding levels for the implementation of projects contained within the plan. RELATED CITY POLICIES City policies related to this item include: - The PROS Comprehensive Plan, adopted by City Council on February 13, 2006 - Arts and Outdoors Theme for Eugene, City Council Priority Issue COUNCIL OPTIONS 1. Direct staff to respond to public hearing testimony at a work session scheduled for May 8, 2006. 2. Direct staff to make modifications to the PROS Project and Priority Plan and return to the council. 3. Take no action. CITY MANAGER’S RECOMMENDATION The City Manager recommends that the council direct staff to respond to the public hearing testimony at a work session scheduled for May 8, 2006. SUGGESTED MOTION None; this is a public hearing only. ATTACHMENTS A. Memorandum providing Clarification of Preliminary Growth Allocation Figures in the PROS Project and Priority Plan. B. Projected Service Level Analysis by Planning Area C. Additional Information Related to Preliminary Growth Allocation Figures in the PROS Project and Priority Plan FOR MORE INFORMATION Staff Contact: Carolyn Weiss, Parks and Open Space Planning Manager Telephone: 682-4909 Staff E-Mail: carolyn.j.weiss@ci.eugene.or.us L:\CMO\2006 Council Agendas\M060410\S0604105.doc ATTACHMENT A Public Works Engineering City of Eugene MEMORANDUM 858 Pearl Street Eugene, Oregon 97401 (541) 682-5291 (541) 682-5032 FAX Date: March 6, 2006 To: Mayor Piercy and City Council From: Fred McVey, 682-5216 Engineering Data Services Manager Subject: Clarification of Preliminary Growth Allocation Figures in the PROS Project and Priority Plan In a February 27, 2006 council work session on the PROS Project and Priorities Plan (Project Plan) members of Council requested clarification of the relationship of the Project Plan to the development of an updated parks SDC. Specifically, clarification was sought on the significance of the “preliminary growth allocation” percentages included in the Project Plan and the method of determining these allocation figures. Relationship of Project Plan to Parks SDC Adoption of a project plan is a prerequisite for updating and modifying the parks SDC insofar as a new or modified SDC methodology must demonstrate consideration of the project costs listed in an adopted plan. To be considered for use in developing the parks SDC the adopted plan must meet certain criteria specified in ORS 223.309, specifically that the plan include a list of the capital improvements and the estimated cost, timing and percentage of costs eligible to be funded with revenues from improvement fee SDCs. The preliminary growth allocation figures included in the Project Plan are intended to satisfy the requirement to provide an estimated “percentage of costs eligible to be funded with revenues from the improvement fee”. The need for an estimate of the percentage of SDC funding of projects in the Project Plan has required analysis of parks capacity needs of growth during development of the Project Plan. The capacity analysis used to derive the preliminary growth allocation percentages is consistent with methods, described in more detail below, used in preliminary development of an updated parks SDC methodology. The Project Plan is a reference document to be considered in development of the SDC, but does not prescribe the form of the SDC methodology nor the amount of the SDC. The SDC methodology may consider the Project Plan using a variety of means, factors and assumptions. Various policy and methodological alternatives will be considered through adoption of a modified parks SDC, subsequent to the separate adoption of the Project Plan. For these reasons, the affect of preliminary growth allocation percentages contained in the Project Plan on the future modified parks SDC is variable and has yet to be determined. Project Plan Growth Allocations Calculation of Preliminary Growth Allocation Oregon SDC statutes [ORS 223.229] define the portion of system costs that may be allocated to growth through the SDC. For an improvement fee SDC, the growth allocation is determined by the projected costs of capital improvements that are needed to increase capacity in the systemto meet the demands of new development. Demands for capacity in the system – both for existing and future park users (growth) – are generally based on the projected level of service (LOS) which quantifies total future park acreage or facilities per demand unit (generally population). Future parks acreage is determined by the existing system inventory plus those system elements added by projects in the Project Plan. The capacity requirements for existing development and growth are estimated by multiplying the future LOS for each park type by the population of each group. Project Plan costs are then allocated in proportion to each group’s relative need for the new acreage, as determined by the capacity analysis. Table 1 at the end of this document presents a capacity analysis based on the proposed Project Plan. In Table 1, columns ‘a’ and ‘b’ provide existing and planned future LOS calculations by park type for developed and undeveloped land. The future LOS reflects total planned acreage, adjusted for park projects included in the Plan that are not owned or funded by the City. The future LOS is based on 1 forecast population for 2025, and for all parks projects projected for completion by 2025. Total capacity needs for the existing 2004 population and the increment of growth between 2004 and 2025 are presented in columns (f) and (h) of Table 1, respectively. Capacity needs are the product of the future LOS and the population attributable to each population group. As an example, for neighborhood park development (in the bottom half of the table), the additional need for neighborhood park development for the existing population (36.5 acres, shown in column ‘g’), is equal to the total need (132.3 acres shown in column ‘f’) less the existing inventory (95.8 acres shown in column ‘c’), as existing park users’ needs are assumed to be met first by existing parks and facilities. For growth, the additional need of 34.7 acres (column ‘j’) from projects equals the total need (column ‘g’). The capacity analysis for land acquisition and development of other park types follows this same methodology. Table 2, also included at the end of this document, shows the allocation of project list acreage to existing development and growth, based on the capacity analysis provided in Table 1. Project list acreage in Table 2 comes from column ‘d’ in Table 1. Existing deficiency and growth acreages also come from Table 1, columns ‘g’ and ‘j’, respectively. Using the example stated above for neighborhood park development, the growth need is calculated to be 34.7 acres, which represents 49 percent of the total acreage (71.2 acres) added by the project list. This percentage is then used in Project Plan as the preliminary growth allocation for all neighborhood park development projects. A separate capacity analysis was conducted for certain facility types for which separate project costs are itemized in the project list. Similar to the park acreage analysis, the capacity analysis for facilities is based on the future LOS for the existing and 2025 populations, but the capacity is expressed as number of facilities per population rather than by acres. 1 2025 is used as the capacity planning period for all part types, except natural area parks, where acquisitions and development within the planning window are assumed to meet capacity needs through 2050. Project Plan Growth Allocations Key Assumptions . The following key assumptions are used in the park capacity analysis and preliminary growth allocation ?Capacity is considered by park type on a system-wide basis as opposed to individual park-by-park basis. ?Capacity and costs are analyzed for land acquisition and development costs separately. ?Existing park users’ needs are assumed to be met first by existing parks and facilities. ?All park types are considered in the cost allocation: Neighborhood Parks, Community Parks, Natural Area Parks, Urban Plazas, Metropolitan Parks, and Linear Parks. ?Allocations for facilities are determined based on capacity analysis by facility type. ?Improvements to Special Facility parks and facilities are allocated in proportion to future 2025 population, as all park users – existing and new – are assumed to benefit from these facilities. ?Cost allocations are based on planned level of service (LOS) resulting from the PROS Project Plan, as opposed to exiting LOS. ?The improvement fee cost basis exclude projects, or portions of projects identified as “renovation” in the Project Plan. ?The improvement fee cost basis exclude projects, or portions of projects that have been estimated to be funded through other funds, e.g. grants. If you have any questions regarding this information, please contact me at 682-5216 or by email at fred.mcvey@ci.eugene.or.us. Project Plan Growth Allocations Table 1 Land Acquisition and Development Capacity Analysis (f) = (b X (h)=(b X (i)=surplus (a) (b) (c) (d) (e) = (c+d) pop) (g) = (f-c) pop) (g) ( j) = (h- i) Existing Population (167,081) Growth Population (43,819) Existing Planned Added by From Existing Existing From LOS LOS Project Existing Inventory Total Future Total Need (Surplus) / Total Need Project List (acres/1,000 (acres/1,000 Plan Inventory (acres) (acres) (acres) Deficit (acres) (acres) (acres) Park Type population) population) (acres) (acres) Land Acquisition NEIGHBORHOOD 55.0 265.6 210.4 (0.2) 55.2 0.2 55.0 PARKS 1.2606 1.2595 210.6 URBAN PARKS 1.6 2.7 2.1 1.0 0.6 0.0 0.6 0.0066 0.0126 1.1 COMMUNITY PARKS 161.5 380.7 301.6 82.4 79.1 0.0 79.1 1.3118 1.8050 219.2 METROPOLITAN 1.3 655.8 519.5 (134.9) 136.3 134.9 1.3 PARKS 3.9170 3.1094 654.5 NATURAL AREA PARKS 1,490.5 2,977.2 1,968.6 481.8 516.3 0.0 516.3 8.8985 11.7822 1,486.8 LINEAR PARKS 13.0 214.1 169.6 (31.5) 44.5 31.5 13.0 1.2038 1.0153 201.1 SPECIAL FACILITIES 0.3 131.0 103.8 (26.9) 27.2 na 0.3 0.7823 0.6212 130.7 Total Acquisition 2,904.0 1,723.1 4,627.1 3,275.6 371.7 859.1 166.6 665.5 17.3806 19.6052 Development NEIGHBORHOOD 71.2 167.0 132.3 36.5 34.7 0.0 34.7 PARKS 0.5735 0.7919 95.8 URBAN PARKS 0.0 1.1 0.9 (0.2) 0.2 0.2 0.0 0.0066 0.0052 1.1 COMMUNITY PARKS 56.4 200.2 158.6 14.8 41.6 0.0 41.6 0.8604 0.9492 143.8 METROPOLITAN 25.5 216.9 171.9 (19.5) 45.1 19.5 25.5 PARKS 1.1456 1.0285 191.4 NATURAL AREA PARKS 0.0 16.8 13.3 (3.5) 3.5 3.5 0.0 0.1006 0.0797 16.8 LINEAR PARKS 8.0 15.4 12.2 4.8 3.2 0.0 3.2 0.0443 0.0728 7.4 SPECIAL FACILITIES 2.0 82.5 65.4 (15.1) 17.1 na 2.0 0.4820 0.3913 80.5 Total Development 536.8 163.1 699.9 554.5 17.7 145.4 23.3 107.0 3.2128 3.3187 Project Plan Growth Allocations Table 2 Allocation of Project List Acreage/Cost Existing Deficiency Growth (thru 2025) Growth (beyond 2025) Project List Park Type Acreage Acreage % Acreage % Acreage % Land Acquisition NEIGHBORHOOD PARKS 55.0 - 0% 55.0 100% - 0% URBAN PARKS 1.6 1.0 65% 0.6 35% - 0% COMMUNITY PARKS 161.5 82.4 51% 79.1 49% - 0% METROPOLITAN PARKS 1.3 - 0% 1.3 100% - 0% NATURAL AREA PARKS 1,490.5 481.8 32% 516.3 35% 492.4 33% LINEAR PARKS 13.0 - 0% 13.0 100% - 0% SPECIAL FACILITIES 0.3 - 0% 0.3 100% - 0% Total Acres 1,723.1 565.2 33% 665.5 39% 492.4 29% Development NEIGHBORHOOD PARKS 71.2 36.5 51% 34.7 49% - 0% URBAN PARKS 0.0 - 0% 0.0 0% - 0% COMMUNITY PARKS 56.4 14.8 26% 41.6 74% - 0% METROPOLITAN PARKS 25.5 - 0% 25.5 100% - 0% NATURAL AREA PARKS 0.0 - 0% 0.0 0% - 0% LINEAR PARKS 8.0 4.8 60% 3.2 40% - 0% SPECIAL FACILITIES 2.0 - 0% 2.0 100% - 0% Total Acres 163.1 56.1 34% 107.0 66% - 0% Project Plan Growth Allocations 2012 Natural Acres 2006 Natural Acres 2012 Developed Acres 2006 Developed Acres 2012 Total Acres 2006 Total Acres 2012 Park Count 2006 Park Count NOTES Spending 2007-2011 Project 2007-2011 Project Count % of Population Public Works Engineering City of Eugene MEMORANDUMMEMORANDUM 858 Pearl Street Eugene, Oregon 97401 (541) 682-5291 (541) 682-5032 FAX Date: April 4, 2006 To: Mayor Piercy and City Council From: Fred McVey, 682-5216 Engineering Data Services Manager Subject: Additional Information Related to Preliminary Growth Allocation Figures in the PROS Project and Priority Plan In advance of an April 10, 2006 public hearing on the PROS Project and Priorities Plan (Project Plan) staff received a request from Roxie Cuellar of the Home Builders Association of Lane County to make additional information available to the public. This memo and attachment provides additional information and clarification related to growth allocation percentages contained in the Project Plan. Staff had previously provided to the Mayor and City Council clarification of the preliminary growth allocation percentages included in the draft Project Plan as requested in a February 27, 2006 council work session. This clarification was contained in a memo dated March 6, 2006 which was included as Attachment A to the AIS for the public hearing on the Project Plan. Additional information and clarification requested include: ?The estimated acquisition acreage for each individual acquisition project on the project list ?The proposed acreage to be developed for each park project on the proposed project list as well as what part of the project acreage would be set aside as natural area. ?Explanation of why there are no existing deficiencies identified in the growth allocation percentages with respect to neighborhood park land acquisition when Table B-1 of the PROS Comprehensive indicates an existing deficiency for neighborhood parks. ?Explanation of why there are no existing deficiencies identified in the growth allocation percentages with respect to neighborhood park land acquisition when proposed neighborhood parks are to be developed in existing neighborhoods. The estimated acquisition acreage for park land acquisition projects in the Project Plan is provided in the project list spreadsheet attached to this memo as Table A. A clarification is that acres considered in growth allocation percentages include only City-owned parks and facilities; acres in Tables 1 and 2 of the March 6 memo on growth allocation are net of other agency-owned acres. Also provided in Table A attached to this memo is the proposed acreage to be developed for each park project. A requested clarification was to identify portions of future developed parks to be considered April 4, 2006 Memo page 1 “natural areas”. While the portions of existing parks which function as natural area elements have been inventoried, the exact acreage of portions of future parks to provide the function of natural areas has not been established. It is impossible to identify the portions of future parks that might be designated as natural area until specific sites are acquired and park design is complete. The natural area portions of a developed park are designated and improved based on needed park functions and natural resource values of the individual park site. A clarification was requested as to why the “March 6 memo to the council states that there are no existing deficiencies with respect to neighborhood parks when that position is in conflict with the PROS plan adopted by council”. The first point of clarification is that the March 6 memo on growth allocations shows no existing deficiencies in neighborhood park land acquisition while it does show an existing deficiency for developed neighborhood park acreage. As explained in the previous memo, growth allocations are based on examination of system-wide capacity using an analysis of the future level of service (LOS) resulting from the proposed Project Plan, with land acquisition and park development levels of service evaluated separately. In the case of neighborhood park land acquisition, the future LOS resulting from the projects in the proposed Project Plan is slightly less than the existing level of service. After allocating existing neighborhood park land to meet the needs of the existing population, all of neighborhood park land acquisition in the Project Plan is needed to meet the capacity needs of growth. In contrast, the future LOS for developed neighborhood parks resulting from the projects in the proposed Project Plan is higher than the existing LOS. When the future acres of developed neighborhood park are allocated to existing and future population, an existing deficiency is shown for developed parks serving the existing population resulting in 51% of future developed acreage needs allocated to existing population and 49% of future park development needs being allocated to growth, again on a system-wide basis. Comparisons between the LOS planning analysis reflected in Table B-1 of the PROS Comprehensive Plan and the LOS resulting from the project plan are irrelevant to growth allocation percentages. Growth allocation percentages must consider the capacity provided in the system by projects in the Project Plan rather than a conceptual planning analysis contained in PROS Comprehensive Plan document. Because LOS and capacity is evaluated on a system-wide basis, rather than on an individual project basis, the proximity of future projects to developed or undeveloped neighborhood areas does not affect the growth allocation percentages. A system-wide analysis and the simplifying assumption that capacity needs of the existing population are met first by the existing parks inventory avoids the complexity of an overly detailed and speculative analysis of the exact location of individual parks and park service areas in relation to the exact location of, and resulting population related to, individual developments. We hope that this additional information and clarification is helpful to the public in providing informed and meaningful comment on the proposed Project Plan. If you have any questions regarding this information, please contact me at 682-5216 or by email at fred.mcvey@ci.eugene.or.us. April 4, 2006 Memo page 2 Table A: PROS Project and Priority Plan - Project Acres Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds new parks and open space - Acquire a neighborhood park site to serve this area (B3) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Acquire a neighborhood park site to serve this area (B5) acres 4 0 4 4 $500,000 $500,000 100% $500,000 Redevelop W. University acres 0 0 $60,000 $0 0% $0 - Acquire neighborhood park to serve this area (S6) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Acquire a neighborhood park site (R1) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Acquire neighborhood park site (R2) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Acquire a neighborhood park site (R3 and R4) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Develop Ferndale Park Site 4 4 0 $480,000 $480,000 49% $233,946 - Develop Rosetta Place as neighborhood park acres 1 1 0 $120,000 $120,000 49% $58,486 Acquire land for combined neighborhood park and Ridgeline "Gateway" 10 0 10 2.50 7.5 $1,250,000 $937,500 100% $937,500 (WC1) acres Acquire land for combined neighborhood park and Ridgeline "Gateway" 10 0 10 2.50 7.5 $1,250,000 $937,500 100% $937,500 (WC3) acres - Acquire land for neighborhood park (WC5) 4 0 4 4 $500,000 $500,000 100% $500,000 acres - Develop Hawkins Heights as a neighborhood park (WC4) acres 3 3 0 $360,000 $360,000 49% $175,459 - Develop neighborhood park (WC5) 2 2 0 $240,000 $240,000 49% $116,973 acres - Develop Videra Park to serve WC-6 acres 2 2 0 $240,000 $240,000 49% $116,973 - Acquire land for neighborhood park (W11) acres 4 0 4 4 $500,000 $500,000 100% $500,000 Develop Willakenzie school site as neighborhood park, with play area - acres 5 5 0 $600,000 $600,000 49% $292,432 and ballfields Acquire a neighborhood park site to north, adjacent to Golden Gardens - acres 4 0 4 4 $500,000 $500,000 100% $500,000 (B1) - Develop neighborhood park site (B3) acres 4 4 0 $480,000 $480,000 49% $233,946 April 4, 2006 Memo page 3 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds - Develop neighborhood park site (B4) acres 2 2 0 $200,000 $200,000 49% $97,477 - Develop neighborhood park site (B5) acres 4 4 0 $480,000 $480,000 49% $233,946 - Develop neighborhood park site (B1) acres 2.3 2.3 0 $276,000 $276,000 49% $134,519 - Develop neighborhood park site (S6) acres 4 4 0 $480,000 $480,000 49% $233,946 - Develop Terra Linda Park as neighborhood park acres 4.3 4.3 0 $516,000 $516,000 49% $251,492 - Develop Lone Oak park site as neighborhood park with athletic fields acres 3.9 3.9 0 $468,000 $468,000 49% $228,097 - Develop Wendover Park site as neighborhood park acres 1 1 0 $120,000 $120,000 49% $58,486 Develop recreational amenities along Amazon Greenway to serve - acres 4 4 0 $480,000 $480,000 49% $233,946 neighborhood park needs (WC2) - Develop Creekside Park as neighborhood park acres 3.17 3.17 0 $380,400 $380,400 49% $185,402 - Acquire a neighborhood park (W4) acres 4 0 4 4 $500,000 $500,000 100% $500,000 - Develop Chase Commons as neighborhood park acres 4 4 0 $480,000 $480,000 49% $233,946 - Develop neighborhood park site (R1) acres 4 4 0 $480,000 $480,000 49% $233,946 - Develop neighborhood park site (R2) acres 4 4 0 $480,000 $480,000 49% $233,946 - Develop neighborhood park site (R3 and R4) acres 4 4 0 $480,000 $480,000 49% $233,946 Develop Ridgeline "Gateway" park (WC3) as both trailhead and outdoor - acres 5 5 0 $600,000 $600,000 49% $292,432 recreation area with picnic, play area, basketball, etc. NEIGHBORHOOD PARK TOTAL 130.7 70.7 60 5 55 $ 16,000,400 $15,315,400 72% $10,988,745 Acquire 100+ acres surrounding Golden Gardens ponds for community acres 100 0 100 100 $2,000,000 $2,000,000 49% $979,472 park - Acquire Amazon Park inholdings along Hilyard for community park use acres 1.5 0 1.5 1.5 $1,000,000 $1,000,000 49% $489,736 - Acquire community park site to serve Santa Clara acres 40 0 40 40 $5,000,000 $5,000,000 49% $2,448,680 April 4, 2006 Memo page 4 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds - Develop Santa Clara Community Park, including lighted ballfields acres 40 40 0 $3,600,000 $3,600,000 74% $2,653,377 Acquire portion of Union Pacific area for neighborhood and community acres 20 0 20 20 $2,500,000 $2,500,000 49% $1,224,340 park, including improved connections, recreation and open space COMMUNITY PARK TOTAL 201.5 40 161.5 0 161.5 $ 14,100,000 $14,100,000 55% $7,795,605 Acquire land to provide urban open space within Courthouse acres 0.75 0 0.75 0.19 0.56 $562,500 $421,875 35% $149,362 neighborhood Acquire land for urban plaza to be developed in partnership with transit acres 0.5 0 0.5 0.25 0.25 $425,000 $106,250 35% $37,617 Acquire land to expand park blocks acres 0.5 0 0.5 0.13 0.38 $425,000 $318,750 35% $112,851 Acquire land for an urban plaza in Santa Clara acres 0.5 0 0.5 0.13 0.38 $425,000 $318,750 35% $112,851 URBAN PLAZA TOTAL 2.3 0 2.3 0.7 1.6 $ 1,837,500 $1,165,625 35% $412,681 Acquire land for Amazon Creek Greenway (WC2) 4 0 4 1 3 $500,000 $250,000 100% $250,000 acres - Implement plan for Jefferson Area Greenway and linear park acres 3.97 3.97 0 $476,400 $119,100 40% $47,765 Implement greenway/linear park plan for Amazon Creek from - acres 3.97 3.97 0 $1,000,000 $0 40% $0 Headwaters to Fairgrounds in partnership with ACOE - Implement Rasor Park Master Plan acres 2 2 0 $240,000 $240,000 40% $96,251 Acquire linear park along Roosevelt drainage channel acres 10 0 10 10 $200,000 $100,000 100% $100,000 LINEAR PARK TOTAL 23.9 9.9 14 1 13 $ 2,416,400 $709,100 70% $494,016 Acquire land on priority stormwater corridors that link with developed parks, acres 30 0 30 15.00 15 $600,000 $0 35% $0 include trails Acquire additional river frontage, including property to the north acres 30 0 30 7.50 22.5 $600,000 $150,000 35% $51,959 Acquire land for natural areas within Willamette/McKenzie River acres 100 0 100 50.00 50 $1,000,000 $0 35% $0 confluence - Acquire land for natural areas and access to Gillespie Butte acres 1.7 0 1.7 1.7 $212,500 $212,500 35% $73,609 April 4, 2006 Memo page 5 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds Acquire natural areas to connect Ridgeline system east to Pisgah and acres 55 0 55 41.25 13.75 $550,000 $137,500 35% $47,629 Willamette River system Acquire natural areas to complete Moon Mountain to Spencer Butte - acres 325 0 325 325 $3,250,000 $3,250,000 35% $1,125,779 segment Acquire additional ridgeline to complete Fern Ridge to West Eugene 1000 0 1000 750.00 250 $10,000,000 $2,500,000 35% $865,984 Wetlands acres - Acquire additional ridgeline to complete Willow Creek to Bailey Hill Road acres 300 0 300 300 $3,000,000 $3,000,000 35% $1,039,180 Acquire additional ridgeline to complete Bailey Hill Road to Blanton - 300 0 300 300 $3,000,000 $3,000,000 35% $1,039,180 Heights acres - Acquire natural area within Royal Mixed Use area acres 50 0 50 50 $500,000 $250,000 35% $86,598 Acquire land for natural areas along McKenzie River (Rivers to Ridges) acres 80 0 80 80.00 0 $800,000 $0 35% $0 Acquire additional Amazon Headwaters property 50 0 50 12.50 37.5 $500,000 $250,000 35% $86,598 acres Expand Ridgeline Trail natural area park to include Spencer Creek area 500 0 500 375.00 125 $5,000,000 $1,250,000 35% $432,992 acres NATURAL AREA TOTAL 2821.7 0 2821.7 1331.3 1490.5 $ 29,012,500 $14,000,000 35% $4,849,508 Acquire land to provide significant riverfront open space within acres 1.76 0 1.76 0.44 1.32 $1,500,000 $900,000 100% $900,000 courthouse/cannery neighborhood METROPOLITAN PARK TOTAL 1.8 0 1.8 0.4 1.3 $1,500,000 $900,000 100% $900,000 - Acquire land in front of SMJ House acres 0.3 0 0.3 0.3 $171,000 $171,000 21% $35,529 SPECIAL FACILITY TOTAL 0.3 0 0.3 0 0.3 $171,000 $171,000 21% $35,529 NEW PARKS AND OPEN SPACE TOTAL 3182.1 3061.5 1338.4 1723.1 $65,037,800 $46,361,125 55% $25,476,084 new recreation facilities Develop spray parks at Washington and or Monroe Parks ea 2 2 $150,000 $150,000 54% $81,031 Develop soccer fields at Bethel Community Park ea 2 2 $440,000 $440,000 43% $189,369 Develop a running trail to serve the Bethel area lf 2600 2600 $44,200 $44,200 100% $44,200 Develop soccer field at N. Westmoreland ea 1 1 $220,000 $220,000 43% $94,684 April 4, 2006 Memo page 6 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds Develop Striker Fields as community park with significant athletic fields, acres 40 40 $5,000,000 $5,000,000 43% $2,151,919 lighting, within sports complex model Provide synthetic surface field to serve Bethel/Danebo in partnership ea 1 1 $893,000 $446,500 43% $192,166 with school district Provide additional dog off-leash facilities north of beltline (WK) ea 1 1 $150,000 $150,000 83% $124,663 Develop trails within West Eugene Wetland sites lf 10000 10000 $160,000 $80,000 28% $22,142 Develop primary Ridgeline trails miles 15 15 $1,350,000 $1,012,500 28% $280,236 Provide trailheads and interpretive facilities within existing WEW sites ea 3 3 $180,000 $90,000 32% $28,672 Develop trails, trailheads, and interpretive facilities throughout Ridgeline mile 8 8 $720,000 $540,000 28% $149,459 Develop trails, trailheads, and interpretive facilities in WEW ea 1 1 $60,000 $30,000 28% $8,303 Develop trail facilities throughout the Ridgeline system miles 5 5 $450,000 $450,000 28% $124,550 Provide covered centrally located skate park with bicycle facilities ea 1 1 $200,000 $200,000 73% $145,440 Provide interpretive facilities and trails at Skinner Butte Park, enhance ea 1 1 $550,000 $550,000 28% $152,366 accessibility Provide children's play area in downtown area ea 1 1 $130,000 $130,000 54% $70,642 Develop regional play area in Alton Baker Park ea 1 1 $1,000,000 $1,000,000 54% $543,402 Develop multi-cultural community center/aquatic center in ea 1 1 $10,000,000 $10,000,000 52% $5,194,286 Whiteaker/Skinner Butte area Develop major indoor/outdoor aquatic facility and community center ea 1 1 $14,000,000 $14,000,000 52% $7,272,001 Develop Environmental Education Center ea 1 1 $1,750,000 $875,000 21% $181,800 Develop environmental education site behind River House ea 1 1 $200,000 $200,000 21% $41,554 Develop a second Willamette River boat launch ea 1 1 $390,000 $390,000 21% $81,031 NEW RECREATION FACILITIES TOTAL $38,037,200 $35,998,200 48% $17,173,918 improving existing facilities Upgrade State Street Park ea 1 1 $200,000 $0 0% $0 Upgrade Charnel Mulligan acres 1.2 1.2 $150,000 $0 0% $0 Upgrade Tugman Park ea 1 1 $275,000 $0 0% $0 April 4, 2006 Memo page 7 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds Enhance Crest Heights prairie habitat acres 3 3 $75,000 $0 0% $0 Upgrade Bond Lane park ea 1 1 $200,000 $25,000 54% $13,419 Upgrade Sladden Park acres 1.2 1.2 $150,000 $0 0% $0 Upgrade Lafferty Park ea 1 1 $100,000 $25,000 54% $13,419 Implement Friendly Park plan ea 1 1 $100,000 $0 0% $0 Upgrade Kincaid Park ea 1 1 $100,000 $50,000 54% $27,170 Upgrade University Park ea 1 1 $150,000 $0 0% $0 Enhance natural area at Bramblewood acres 4 4 $100,000 $0 0% $0 Upgrade Berkeley Park ea 0.53 0.53 $100,000 $25,000 49% $12,185 Complete Petersen Barn Park, including parking revisions ea 2 2 $400,000 $100,000 74% $73,705 Develop play area at Ascot ea 1 1 $75,000 $50,000 54% $27,170 Renovate Sheldon Community Center and pool ea 1 1 $5,800,000 $0 0% $0 Improve Echo Hollow Pool ea 1 1 $4,500,000 $0 0% $0 Implement Amazon Park master plan ea 1.5 1.5 $2,749,000 $400,000 77% $308,433 Implement Westmoreland Park master plan ea 14.43 14.43 $500,000 $125,000 74% $92,131 Enhance Spencer Butte Trail system ea 1 1 $500,000 $0 0% $0 - Implement Wild Iris Ridge Habitat Enhancement Plan 123 123 $615,000 $67,650 35% $23,434 acres Restore Willow Creek between 11th & 18th 60 60 $300,000 $0 0% $0 acres Implement Ridgeline master Plan ea 1 1 $500,000 $0 0% $0 Implement Skinner Butte Park Master Plan acres 22.52 22.52 $5,722,000 $3,147,100 100% $3,147,100 Provide accessible trails within Hendricks Park Forest lf 3500 3500 $152,250 $0 0% $0 Implement Hendricks Park Forest Management Plan acres 2 2 $700,000 $25,000 64% $15,963 Replace aging infrastructure at Alton Baker Park acres 2 2 $200,000 $0 0% $0 Renovate Alton Baker Canoe Canal for kayaking, recreation, and natural 0 $5,000,000 $0 0% $0 resource benefits Complete Alton Baker Park, update WABP Development Plan and acres 30 30 $3,664,000 $0 28% $0 EABP Master Plan Implement Morse Ranch master plan acres 3 3 $600,000 $120,000 100% $120,000 Upgrade Campbell Center with fitness center ea 1 1 $2,600,000 $2,288,000 0% $0 Develop parking and access to Laurelwood "Back 9" and Ribbon Trail acres 2 2 $400,000 $200,000 21% $41,554 south end April 4, 2006 Memo page 8 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds Replace Maintenance Buildings at Laurelwood ea 1 1 $944,000 $0 0% $0 Improve Tennis Courts at WHS in partnership with Bethel School ea 1 1 $100,000 $0 0% $0 District 52 Complete second phase of River House Master Plan ea 1 1 $1,200,000 $600,000 21% $124,663 Renovate park restrooms ea 7 7 $840,000 $0 0% $0 Develop children's play area renovation program ea 1 1 $200,000 $0 0% $0 Decommission wading pools ea 1 1 $500,000 $0 0% $0 Renovate park irrigation systems ea 1 1 $1,000,000 $0 0% $0 Renovate park lighting systems ea 1 1 $500,000 $0 0% $0 Renovate tennis courts, including resurfacing ea 1 1 $1,000,000 $250,000 81% $201,279 Implement habitat management plans ea 1 1 $1,000,000 $0 0% $0 IMPROVE EXISTING FACILITIES TOTAL $ 43,961,250 $7,497,750 57% $4,241,623 access improvements Improve access to Friendly & Lafferty Parks (See S2 on Map 3) ea 1 1 $150,000 $112,500 49% $54,831 Improve access to Kincaid and Milton (See S4 on Map 3) ea 1 1 $150,000 $112,500 49% $54,831 Develop access improvements to meet neighborhood park needs (See ea 1 1 $100,000 $75,000 49% $36,554 B2 on Map 3) Develop access improvements to serve this neighborhood (See B6 on ea 1 1 $25,000 $18,750 49% $9,139 Map 3) Improve access to Frank Kinney, Edgewood and S6 (See S7 on map 3) ea 1 1 $150,000 $112,500 49% $54,831 Improve access to Fairmount and Laurel Hill Park (See S1 on Map 3) ea 1 1 $150,000 $112,500 49% $54,831 Improve access to Amazon Park (See S3 on Map 3) ea 1 1 $150,000 $112,500 49% $54,831 Improve access to Tugman Park (See S5 on Map 3) ea 1 1 $150,000 $112,500 49% $54,831 Improve access to existing parks (See R5 on Map 3) ea 1 1 $100,000 $75,000 49% $36,554 April 4, 2006 Memo page 9 Capacity- related Acquis- Total Project ition Table A: PROS Develop-Acqis-Partner Estimated Costs Net Preliminary Preliminary Acres Project and Priority Plan - Project Acres & Growth Units Quantity ment ition Funded Acquisition of Growth Growth Net of Acres Acres Acres Development Renovation, Share Cost Allocation Partner Cost Grants & Funded Other Funds Improve access to existing parks (See R6 on Map 3) ea 1 1 $100,000 $75,000 49% $36,554 Enhance access to Striker Fields (See W3 on Map 3) ea 1 1 $100,000 $75,000 49% $36,554 Enhance access to Brewer & Bond Lane parks (See W5 on Map 3) ea 1 1 $100,000 $75,000 49% $36,554 Improve connectivity to Sheldon (See W6 on Map 3) ea 1 1 $100,000 $75,000 49% $36,554 Enhance access to Crescent Park (See W7 on Map 3) ea 1 1 $50,000 $37,500 49% $18,277 Improve access and parking at Cal Young Sports Park (See W2 on Map ea 1 1 $100,000 $0 49% $0 3) Enhance access to Willakenzie school and Ascot Park (See W9 and ea 2 2 $100,000 $75,000 49% $36,554 W10 on Map 3) Replace pedestrian bridges at Amazon Park, add new bridges where ea 1 1 $500,000 $0 0% $0 needed Develop access improvements between parks, schools and lf 2000 2000 $32,000 $24,000 21% $4,987 neighborhoods to WEW system and bike system Develop pedestrian improvements to link downtown with Skinner Butte Park, SMJ house, and riverfront system (excluding pedestrian bridge at ea 1 1 $1,400,000 $700,000 21% $145,440 train station) Improve access north/south of Beltline ea 1 1 $300,000 $0 0% $0 Complete comprehensive POS Signage System ea 1 1 $300,000 $300,000 21% $62,331 Complete ADA improvements ea 1 1 $200,000 $200,000 21% $41,554 Improve Royal Avenue to enhance park/school connectivity ea 1 1 $100,000 $50,000 21% $10,389 Provide access to Golden Gardens ea 1 1 $150,000 $150,000 21% $31,166 ACCESS IMPROVEMENTS TOTAL $4,757,000 $2,680,250 34% $908,147 GRAND TOTAL $151,793,250 $92,537,325 52% $47,799,772 April 4, 2006 Memo page 10