Work Session: Authorize Additional Street Preservation Projects to Use Anticipated
Bond Proceeds Remaining Upon Completion of 32 Streets Identified in Bond Measure
Meeting Date: May 11, 2011 Agenda Item Number: A
Department: Public Works Engineering Staff Contact: Mark Schoening
www.eugene-or.gov Contact Telephone Number: 541-682-5243
ISSUE STATEMENT
The City Council is requested to authorize the additional streets shown on Attachment A to the list of
streets to be repaired with bond measure proceeds. The estimated cost of the additional streets is
$6,560,000. The list of additional streets was endorsed by the Street Repair Review Panel at its April
20, 2011, meeting.
BACKGROUND
The Voters’ Pamphlet for the Bond Measure to Fix Streets included the following language:
The use of bond proceeds for street preservation projects would be limited to a list of 32 projects. If
all 32 projects are completed, the council would be authorized to add other street preservation
projects to the list in order to use remaining bond proceeds.
With two years of construction completed and several bid openings for the current year of construction,
it is anticipated that there will be approximately $10 million in bond measure proceeds remaining after
completion of the 32 streets identified in the bond measure. There are several reasons for the amount of
anticipated remaining funds. As a result of the length and depth of the recession, the bidding climate for
pavement preservation projects has been extremely favorable for public agencies. On several streets the
level of pavement deterioration visible on the pavement surface did not extend the full depth of the
pavement and the base had not failed. This resulted in an anticipated reconstruction project becoming a
much less expensive pavement overlay project. Finally, through an innovative construction method
known as partial depth reclamation, the cost to reconstruct several streets was substantially reduced.
The Voters’ Pamphlet for the Bond Measure to Fix Streets also included the following language
regarding the identification of the 32 streets included in the bond measure:
The criteria for choosing bond projects included:
a) citizen input with respect to prioritizing major streets in need of reconstruction;
b) scientific information about needed street rehabilitation and reconstruction from the
pavement management system; and
c) geographic distribution throughout the community to ensure all areas of the City receive a
benefit from the bond proceeds.
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110511\S110511A.doc
City staff used the above criteria in identifying additional projects to be constructed with remaining
bond proceeds. The first criterion applied was geographic distribution to assure that additional projects
were identified in all eight council wards. The second criterion applied was scientific information. This
prioritized overlay projects over reconstruction projects. Also, arterials and collectors were prioritized
over local streets due to their greater importance to the mobility of larger numbers of citizens and
businesses. Finally, transit routes, presence of bike lanes and missing or substandard access ramps were
also considered. The third criterion was citizen input prioritizing major streets and reconstruction
projects.
The Street Repair Review Panel (SRRP) met on April 20, 2011, and was requested to confirm that staff
appropriately applied the project selection criteria from the 2008 Voters Pamphlet and to endorse the
staff’s recommended list of additional street repair projects. Initially staff presented a list of projects
that totaled $12,330,000. The list of projects was split into two groups. The projects in Group A would
be initiated immediately following council approval with construction planned for 2013. The initiation
of projects in Group B would be contingent upon the extremely favorable bidding climate continuing for
the remainder of 2011 and for 2012.
After much discussion the SRRP endorsed a list of streets with an estimated cost of $6,560,000. The
projects presented by staff, but not endorsed by the SRRP are shown on Attachment B. The SRRP
expressed interest in a more in-depth review of streets to be considered with the estimated $3,440,000
remaining in the event the council endorses the list of streets on Attachment A. Some of the concerns
expressed by the SRRP included consideration of pavement overlay projects rather than pavement
reconstruction projects, consideration of alternative modes, a desire to select from a larger array of
streets, and a desire to tour the streets being considered. Staff will schedule future meetings with the
SRRP to develop a list of additional streets for council consideration. The SRRP will be presented
numerous streets to consider in addition to those shown on Attachment B in developing a recommended
list for the City Council.
RELATED CITY POLICIES
The council’s goals include “Transportation Initiative: Develop mechanisms to adequately fund
our transportation system for cars, trucks, bikes and pedestrians including maintenance and preservation
and capital reconstruction.”
COUNCIL OPTIONS
The council may:
1.Authorize the additional streets shown on Attachment A to the list of streets to be repaired with bond
measure proceeds.
2.Add or delete from the additional streets shown on Attachment A and authorize the amended list.
3.Take no action.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that the City Council authorize the additional streets shown on
Attachment A to the list of streets to be repaired with bond measure proceeds. Public Works staff will
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110511\S110511A.doc
work with the Street Repair Review Panel to develop an additional list of projects for City Council
consideration for the estimated $3,440,000 remaining should the council follow the City Manager’s
recommendation.
SUGGESTED MOTION
Move to authorize the additional streets shown on Attachment A to the list of streets to be repaired with
bond measure proceeds.
ATTACHMENTS
A. Additional Streets to Be Repaired with Proceeds from the Street Bond Measure
B. Additional Streets Not Endorsed by the Street Repair Review Panel
FOR MORE INFORMATION
Staff Contact: Mark Schoening
Telephone: 541-682-5243
Staff E-Mail: mark.a.schoening@ci.eugene.or.us
\\Cesrv500\cc support\CMO\2011 Council Agendas\M110511\S110511A.doc
Additional Streets to be Repaired with Proceeds from the Street Bond Measure
Ped Ramps
Bike
Proposed Functional Transit Missing or Programmed
Street nameFromToWard(s)Facilities/
TreatmentClassificationRoute?Need Cost
Route?
Upgrades
5th AvenueHigh StreetBlair Street7Reconstruct/OverlayLocal (High - Wash.)YesYesYes $ 2,000,000
Major Collector (Wash -
Blair)
West 18th AvenueWashington Street 510' east of 1ReconstructMinor ArterialYesYesYes $ 2,300,000
Chambers
Coburg RoadCity LimitsCrescent Avenue4,5OverlayMajor ArterialYesYesYes $ 260,000
Harris Street18th Avenue28th Avenue3Reconstruct/OverlayNeighborhood YesYesNo $ 800,000
Collector
Marshall AvenueHughes Echo Hollow Road6OverlayNeighborhood NoYesNo $ 310,000
Collector
Roosevelt Blvd.Danebo RoadTerry St.8OverlayMinor ArterialNoYesYes $ 200,000
Donald StreetWillamette Street40th Avenue2Reconstruct/OverlayMajor CollectorYesYesNo $ 690,000
Total
$ 6,560,000
ATTACHMENT
A
Additional Streets Not Endorsed by the Street Repair Review Panel
Ped Ramps
Bike
Proposed Functional Transit Programmed
Missing or
Street nameFromToWard(s)
Facilities/
TreatmentClassificationRoute?Need Cost
Route?
Upgrades
West Amazon Hilyard StreetFox Hollow Road2ReconstructMinor ArterialYesYesYes $ 1,400,000
Valley River WayValley River DriveSouth End5ReconstructMajor CollectorYesYesNo $ 570,000
Garden WayHarlow Road110' south of Sisters 4OverlayMajor CollectorYesYesYes $ 160,000
View
Willakenzie RoadBogart LaneCoburg Road4OverlayMajor CollectorNoYesYes $ 300,000
5th AvenueHWY99Bailey Hill Road7, 8Reconstruct/OverlayMajor CollectorNoYesNo $ 1,420,000
7th PlaceHWY99Bailey Hill Road7, 8Reconstruct/OverlayMajor CollectorNoYesNo $ 1,920,000
Total
$ 3,340,000