HomeMy WebLinkAbout08/04/11 - City Council Newsletter
EUGENE CITY COUNCIL NEWSLETTER
August 4, 2011
City of Eugene
777 Pearl Street, Room 105
Eugene, Oregon 97401-2793
(541) 682-5010
(541) 682-5414 (FAX)
www.eugene-or.gov
IN THIS WEEK’S EDITION
PEDESTRIAN SAFETY IMPROVED AS PART OF SAFE ROUTES TO SCHOOL INITIATIVE
BLAIR BOULEVARD BUSINESSES ELIGIBLE FOR FREE RENOVATION FUNDS AND VOLUNTEER WORK
PURCHASING OFFICE AWARDED ACHIEVEMENT OF EXCELLENCE IN PROCUREMENT AWARD
WON TAN NARA DANCE ENSEMBLE AT EUGENE PUBLIC LIBRARY
WEEKEND ON THE AMAZON ULTIMATE “STAYCATION”
SOUTH BANK PATH REPAIRS BEGIN
AROUND THE CITY
Pedestrian Safety Improved as Part of Safe Routes to School Initiative
Just in time for the start of the new school year, pedestrian safety has been improved at a number of locations
around Eugene as part of the Safe Routes to School Program. In 2010, Eugene Public Works and the local Safe
Routes to School Program received $500,000 in federal funding to
make safety improvements at seven local elementary and middle
schools. One of the key improvements was to enhance crosswalks
on busy streets to make it safer for students to walk to and from
school as well as to improve safety for everyone.
"By creating a safe walking and biking environment we are creating
more active transportation choices for families, students, and our
whole community," said Shane MacRhodes, manager of the Eugene
4J Safe Routes to School Program.
2G Construction, working under contract to the City of Eugene, this
summer constructed or improved crosswalks on Queens Way near
Meadowlark/Buena Vista Elementary School; at the intersection of
Electrical equipment being installed on a new solar-
Willakenzie Road with Bogart Lane, and on Oakway Road at both
powered “stutter-flash” warning light
Lariat Drive and Bedford Way, all near Monroe Middle School; on
ndrd
22 Avenue at Onyx, Emerald, and Agate streets, and 23 Avenue at Onyx, Emerald, and Harris streets, all near
ththth
Edison Elementary; on 28 Avenue at Hilyard Street, on 30 Avenue and Alder Street, and on 29 Avenue at Harris
thth
Street, all near Camas Ridge Elementary; on Chambers Street at 15 Avenue and on 18 Avenue at Friendly Street,
near César Chávez Elementary, and on Todd Street at Ellen Avenue near McCornack Elementary.
nd th th
At four locations -- 22Avenue and Agate Street, 30Avenue and Alder Street, 15Avenue and Chambers Street,
th
and 28Avenue and Hilyard Street – pedestrian-activated rapid-flashing warning lights were added. At three of the
locations the lights are solar-powered. The lights are scheduled to be activated next week. These are very similar to
the flashing lights, sometimes called stutter-flash signals, previously installed on Bailey Hill Road near Churchill High
School and at two locations on River Road. Other enhancements include path and sidewalk improvements, new
bicycle parking facilities, wayfinding signs, and speed-reader boards on Cal Young near Meadowlark/Buena Vista
Elementary.
The rapid-flashing lights are intended to draw the attention of motorists and alert them when pedestrians are crossing
busy streets. Motorists are required to come to a full stop and remain stopped while pedestrians are in a crosswalk. A
video providing additional information and driving tips on rapid-flashing beacons is available on the internet at
www.eugene-or.gov/trafficsafety.
For more information, contact Project Manager Patrick Cox at 541-682-6854.
EUGENE CITY COUNCIL NEWSLETTER PAGE 1
August 4, 2011
Blair Boulevard Businesses Eligible for Free Renovation Funds and Volunteer Work
The City of Eugene’s Community Development Division, in partnership with Wells Fargo, and two local nonprofit
agencies, eDev and Neighborhood Economic Development Corporation (NEDCO), will award $9,500 in grants for
both exterior and interior improvements to businesses along Blair Boulevard
in Eugene. Three businesses will receive a $3,000 grant from Wells Fargo
for improvements. The businesses will be expected to complete their
renovations by the end of October. Wells Fargo employees plan to assist in
doing the renovation work. Extra technical assistance will also be provided
by eDev, NEDCO and professional community design volunteers. Once the
renovations are complete, a design review board will award an additional
$500 bonus grant from Wells Fargo to the most improved business.
The program is lending support and momentum to the exciting energy and
artistic creativity shown by the many small businesses in the Blair Boulevard
area. For more information, contact William Ellis at 541-682-5444 or
William.r.ellis@ci.eugene.or.us.
Purchasing Office Awarded Achievement of Excellence in Procurement Award
The City of Eugene Purchasing Office has been awarded the Achievement of Excellence in Procurement Award
(AEP) for 2011 from the National Purchasing Institute (NPI). The award recognizes organizational excellence in
procurement by measuring innovation, professionalism, e-procurement, productivity, and leadership attributes of the
procurement function. AEP awardees obtain a high score on a rating of standardized criteria that represent the
leading edge of the industry. Receiving this award reflects efforts by the Purchasing Office to provide efficient
purchasing services to City departments, vendors, and citizens.
For additional information, please contact Assistant Finance Director Mia Cariaga at 541-682-5408 or
mia.cariaga@ci.eugene.or.us
Won Tan Nara Dance Ensemble at Eugene Public Library
The Downtown Eugene Public Library will host a free performance by the Won Tan Nara Dance Ensemble at 6 p.m.
on First Friday, Aug. 5. Led byAlseny Yansane, this troupe delights audiences with the high-spirited dance and high-
energy percussion of Guinea, West Africa.
Alseny Yansane,
a long-time dancer with the world-renowned Les Ballets Africains,
has dazzled audiences around the globe with his fancy footwork, powerful percussion,
and heart-stopping acrobatics. He is internationally recognized as a cultural
ambassador for his knowledge of the dances, rhythms, and traditions of each
geographical region of Guinea. “Won Tan Nara” means "We Are One" in Susu,
Yansane’s native language.
The Downtown Library stays open until 8 p.m. on First Fridays. This performance is
part of Summer Reading 2011, featuring a series of free events for all ages united by
the theme “One World, Many Stories.”
For more information, visit www.eugene-or.gov/library or call the Eugene Public Library at 541-682-5450.
Weekend on the Amazon Ultimate “Staycation”
The City of Eugene Youth and Family Program is offering a two-day campout, including theater, swimming and
biking, all at Amazon Park, from Aug. 6 - 7, for just $5. Set up a campsite on Saturday afternoon and swim at
Amazon Pool. Bring a dinner to cook outside, attend Free Shakespeare in the Park’s opening night, and then gather
around the campfire in Amazon Park. On Sunday, enjoy a free breakfast. Pre-registration is required. For more
information, call 541-682-5373.
Campers can also participate in the Hilyard Center take-out fundraising dinner on Saturday evening, and on Sunday,
join the Blackberry bRamble 10-100-mile bike rides and afternoon bike events. Participation in these events may
have additional fees. Register for the Adapted Cycling Fundraising Dinner at www.eugene-or.gov/recadaptive.
Register for Eugene GEARs Blackberry bRamble and bicycle celebration at www.eugenegears.org.
For more information, contact Gina Tafoya at 541-682-5373.
EUGENE CITY COUNCIL NEWSLETTER PAGE 2
August 4, 2011
South Bank Path Repairs Begin
Work begins this week on a project to repair sections of the Ruth Bascom South Bank Path, making it safer and more
enjoyable for people to walk, run, cycle and skate on the path.
Delta Construction, working under contract to the City of Eugene, will
reconstruct about 4,000 feet of path between the west end of Maurie
Jacobs Park near North Polk Street, to RiverPlay Park on the west end of
Skinner Butte Park. In some areas, crews will remove the old path and
construct a new 12-foot-wide path in its place. In other areas, the existing
deteriorated asphalt path will be overlaid with a new concrete surface. The
project also includes improving connections to the path from North Adams
Street (near the River House recreation center) and from North Grand
Street, as well as repairing the existing connector from North Washington
Street (on the east side of Skinner Butte Park).
The work will be done in several phases, with completion scheduled in
October. Sections of the path will be closed for several weeks while
reconstruction work is being done. Alternate routes include the North Bank
Path on the other side of the river and the local street system in the north
Whiteaker area. Signs and maps will be posted in the project area to assist
cyclists and other path users in navigating around construction zones.
The $430,000 project is funded primarily by the 2008 bond measure approved by Eugene voters to fix streets and
bike paths. Elsewhere along the riverbank path system, work continues on a federally funded extension of the West
Bank Path. Crews this week are focusing on constructing a retaining wall under the Beltline Bridge. Meanwhile, the
Public Works Department is evaluating the need for future repairs of the South Bank Path from RiverPlay to the
DeFazio Bridge.
For more information, contact Project Manager Doug Singer at 541-682-8460.
EUGENE CITY COUNCIL NEWSLETTER PAGE 3
August 4, 2011