Loading...
HomeMy WebLinkAboutItem 4: Adoption of Resolution 5045 Extending the Completion Date for a MUPTE (The Paradigm on Pearl)-and att A ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Action: Adoption of Resolution 5045 Extending the Completion Date for Construction of Residential Units Granted a Multiple-Unit Property Tax Exemption under Resolution No. 5032 (The Paradigm on Pearl) Meeting Date: October 24, 2011 Agenda Item Number: 4 Department: Planning and Development Staff Contact: Nan Laurence www.eugene-or.gov Contact Telephone Number: 541-682-5340 ISSUE STATEMENT The City Council is asked to approve a resolution granting a four-month extension for the previously th approved Multiple-Unit Property Tax Exemption (MUPTE) for “The Paradigm on Pearl” at 17 and Pearl. BACKGROUND On May 9, 2011, the council approved a MUPTE for The Paradigm on Pearl. The adopted resolution reflected a provision in the state statutes that required the project to be completed for occupancy by January 1, 2012, the scheduled sunset date for the MUPTE statute. The 2011 state legislature has since adopted a statute that extends the sunset date by ten years. The developer of The Paradigm on Pearl project is now requesting a four-month extension of the required completion date. The City’s ordinance provides for the possibility of project extensions in the event of intervening circumstances beyond the control of the developer. Request for Extension This project has made good progress under construction, but has experienced delays for three reasons.  First, the excavators encountered unexpected occurrences of solid rock in several locations, including the elevator shaft, which were not indicated in the comprehensive soil study performed before excavation. This required contracting with a Seattle firm to supply a highly specialized drill rig to complete excavation.  Second, unseasonably heavy rainfall from May to July resulted in rainwater pooling in the excavated pit on the building site, which required a time-consuming water removal process on several occasions.  Third, the closing of the construction loan was delayed for several months. This delay prevented the builders from ordering certain components and concluding other time-sensitive contracts until the construction loan was closed. S:\CMO\2011 Council Agendas\M111024\S1110244 -and att A.doc For these reasons, the developer of The Paradigm on Pearl requests an extension until April 30, 2012, to complete the project, which will allow construction to proceed under normal, reasonable, and safe working conditions. Council action on this request on October 24 will help determine the next steps for this project. The developer has expressed an intention to invest the cost savings afforded by this extension in upgrading the project’s environmental certification from LEED-Silver to LEED-Gold. They also intend to make other improvements to the building, including: 1.Replace wood finished wainscoting on the first-floor façade on Pearl Street with stone masonry. th 2.Replace the wooden power pole and streetlight on 17 and Pearl with a new, architecturally appealing streetlight. th 3.Include additional public seating on 17 Avenue adjacent to the courtyard entrance. th 4.Improve the grand entrance to the building on the corner of Pearl and 17 with a more elaborate design than currently planned, in fabricated steel and other upgraded materials. These project improvements have been added as requirements to the resolution extending the project completion date. Financial and/or Resource Considerations The MUPTE program provides tax exemptions for a limited time to encourage new, higher density housing in targeted areas. The City and other local taxing districts forgo revenue for 10 years when a property is approved for the exemption. The land, however, continues to be taxed during the exemption period. Once the tax exemption expires, taxes on the entire improved property result in substantially greater revenue for the taxing districts. RELATED CITY POLICIES MUPTE is enabled by state statute. The City of Eugene has participated in the MUPTE program since 1978. Encouraging housing in the core area is consistent with numerous adopted planning and policy documents. Examples include: Growth Management Policies Policy 1 Support the existing Eugene Urban Growth Boundary by taking actions to increase density and use on existing vacant land and under-used land within the boundary more efficiently. Policy 2 Encourage in-fill, mixed-use, redevelopment, and higher density development. Policy 3 Encourage a mix of business and residential uses downtown using incentives and zoning. Refinement Plans The Downtown Plan and relevant neighborhood refinement plans include policies encouraging residential development at higher density as well as a variety or mix of structure types providing a range of housing opportunities. S:\CMO\2011 Council Agendas\M111024\S1110244 -and att A.doc Envision Eugene The MUPTE program is consistent with the current Envision Eugene work and, specifically, the “Promote compact urban development and efficient transportation options” pillar and strategies contained within it. Eugene Counts Increased downtown development is one of the desired outcomes identified under the Council Goal of Sustainable Development. COUNCIL OPTIONS The council may approve or deny the extension. CITY MANAGER’S RECOMMENDATION The City Manager recommends approving the resolution to grant the extension. SUGGESTED MOTION Move to adopt Resolution 5045 extending the completion date for construction of residential units granted a Multiple-Unit Property Tax Exemption under Resolution No. 5032, as amended under Resolution No. 5045 (The Paradigm on Pearl). ATTACHMENTS A. Proposed Resolution B. Letter from Dan Neal, Manager, Pearl Street Sustainable Housing FOR MORE INFORMATION Staff Contact: Nan Laurence, Planning and Development Department Telephone: 541-682-5340 Staff E-Mail: nan.laurence@ci.eugene.or.us S:\CMO\2011 Council Agendas\M111024\S1110244 -and att A.doc ATTACHMENT A RESOLUTION NO. ___ A RESOLUTION EXTENDING THE COMPLETION DATE FOR CONSTRUCTION OF RESIDENTIAL UNITS GRANTED A MULTIPLE-UNIT PROPERTY TAX EXEMPTION UNDER RESOLUTION NO. 5032. (Paradigm on Pearl Project; Pearl Street Sustainable Housing LLC/Applicant). The City Council of the City of Eugene finds that: A. Pearl Street Sustainable Housing LLC is the owner of real property located at 1647 th through 1689 Pearl Street and 231 through 235 East 17 Avenue, Eugene, Oregon and had submitted an application pursuant to the City’s Multiple-Unit Property Tax Exemption Program (Sections 2.945 and 2.947 of the Eugene Code, 1971), with respect to residential units to be constructed on the property. B. On May 9, 2011, the City Council adopted Resolution No. 5032 approving a multiple- unit property tax exemption for the construction of residential units on the property. That Resolution required that construction be completed on or before January 1, 2012, and provided that no extension was to be expected if the project was not completed by the deadline. C. Subsection (5) of Section 2.947 of the Eugene Code, 1971 authorizes the Council to extend the deadline for completion of construction of multiple-unit housing for an additional 12 consecutive months if it finds that the failure to complete construction by the time specified in the resolution approving the tax exemption was due to circumstances beyond the control of the owner, and that the owner had been acting in good faith and with due diligence. D. The property owner advises that circumstances beyond its control have resulted in construction delays and that completing construction by the January 2, 2012 deadline would require workers to work up to 60 hours per week. Therefore, the property owner has requested an extension of time until April 30, 2012, to complete construction of the residential units. An extension of the construction completion deadline will allow workers to work a normal 40 hour work week, which will result in labor cost savings. Those savings will be used to make additional improvements to the building that were not included in the original plan. E. The Council finds that the property owner has been acting in good faith and with due diligence, and the inability to meet the January 1, 2012 construction deadline is due to circumstances beyond its control. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EUGENE, a Municipal Corporation of the State of Oregon, as follows: S:\CMO\2011 Council Agendas\M111024\S1110244 -and att A.doc Section 1. Based on the above findings which are adopted, Pearl Street Sustainable Housing LLC is granted an extension to April 30, 2012, in which to complete construction of the residential units for which a property tax exemption was granted under Resolution No. 5032, provided that the following improvements to the project are made: (a) Use of stone masonry on the first floor along the expanse of the Pearl Street side, rather than wood finished wainscoting. th (b) Replace large wooden power pole and streetlight on 17Avenue and Pearl Street with a new, architecturally appealing, metal streetlight. th (c) Include additional public seating on 17 Avenue adjacent to the courtyard entrance. th (d) Improve the grand entrance to the building on the corner of 17Avenue and Pearl Street with a more elaborate design and fabricated steel and other more expensive building materials. (e) Take reasonable steps necessary to qualify for LEED-Gold certification. Section 2. The City Recorder is requested to forward a copy of this Resolution to Pearl Street Sustainable Housing LLC, and to append a copy of this Resolution to Resolution No. 5032. Section 3 . This Resolution shall become effective immediately upon its adoption. The foregoing Resolution adopted the _____ day of October, 2011. _____________________________________ Deputy City Recorder S:\CMO\2011 Council Agendas\M111024\S1110244 -and att A.doc %XXEGLQIRX&