HomeMy WebLinkAboutItem A: Envision Eugene - Land Need for Single-Family Homes and Public Uses
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Work Session: Envision Eugene - Land Need for Single-Family Homes and Public Uses
Meeting Date: November 9, 2011 Agenda Item Number: A
Department: Planning and Development Staff Contact: Lisa Gardner
www.eugene-or.gov Contact Telephone Number: 541-682-5208
ISSUE STATEMENT
This work session provides an opportunity to update the City Council on analysis of Eugene’s future
land need for single-family housing and public lands. The legal steps and current status of identifying
potential Urban Growth Boundary expansion areas will also be addressed.
BACKGROUND
This work session is part of an ongoing conversation about Eugene’s 20-year land need for all land
types, including:
Public and semi-public
Single-family housing
Multi-family housing
Commercial
Industrial
This work session will focus on land need related to public and semi-public uses and single-family
housing.
Public and Semi-Public Lands
Public and semi-public lands include uses such as parks, schools, public facilities and religious
institutions. Some of the land need for these uses is planned to be included inside the current Urban
Growth Boundary (UGB), while other uses specifically require a UGB expansion to address the need.
Those uses requiring a specific UGB expansion include Golden Gardens Community Park, Santa Clara
Community Park, and Bethel School District. Attachment A provides additional information on the
amount and locations of these uses.
Those public and semi-public uses that are planned to be included inside the current UGB may still
trigger a UGB expansion to off-set the use of land that is needed inside the current UGB and currently
planned for other uses. Attachment A also identifies the types of public uses that are planned to be
included inside the current UGB.
For semi-public uses, the Eugene Comprehensive Lands Assessment initially projected a future need of
an additional 45 acres for religious institutions. However, as a result of the partially vacant lands
analysis, it has been determined that there is enough partially vacant land that is currently owned by
churches to accommodate future growth.
S:\CMO\2011 Council Agendas\M111109\S111109A.doc
The Technical Resource Group of the Community Resource Group and the Planning Commission have
reviewed the work on public and semi-public land need, and have concurred with the results.
Single-Family Housing
There are several factors that determine the future land need for single-family homes. An important first
step is identifying how many homes can be accommodated inside the current UGB. There are five
different ways to accommodate new single-family homes inside the current UGB:
On lands that are currently vacant
On lands that are currently partially vacant
Through redevelopment of existing developed land
Through code changes that allow or promote alternative dwelling types (efficiency strategies)
Through re-designation of parcels to low-density residential lands.
The work around partially vacant land and redevelopment has recently been completed and is further
explained below. The identification of lands that are appropriate to re-designate to low-density
residential is underway and summarized below.
Partially Vacant Lands
State statute requires that local jurisdictions identify partially vacant lands within the urban growth
boundary (UGB) and attribute future development to those lands. Partially vacant lands are those that
have some level of development, but also have a vacant portion of the property with potential for
additional development without demolishing the existing dwelling. In general, partially vacant lands
occur on lots that are one acre in size or larger. Lots smaller than one acre in size are addressed under
the “Redevelopment” category below. Staff worked closely with the Technical Resource Group
(TRG) and a sub-committee of the TRG that was dedicated to this task. The resulting analysis goes
beyond what is required by the state and provides a thoughtful and reasonable approach to predicting
future development activity on these lands.
Redevelopment
Redevelopable lands are those that are less than one acre in size and have some level of development
that may or may not be removed to add new housing. It is not feasible to identify specific properties
that will redevelop over the next 20 years because the factors that go into the decision to redevelop are
highly unpredictable. The City also has limited data to help understand the historic redevelopment
rate for single-family homes. However, by reviewing the amount of new dwellings on lots less than
one acre in size that have occurred historically, a reasonable prediction of the future amount of new
dwellings can be made. Based on this review, it is assumed that approximately 600 single-family
dwelling units will be produced through redevelopment over the next 20 years. The TRG and its sub-
committee worked closely with staff to develop the methodology and analysis.
Re-Designation of Parcels to Low-Density Residential
Staff have identified and sent letters to a group of landowners to explore their interest in changing their
property’s current land use designation from Medium Density Residential (MDR) to Low Density
Residential (LDR). This will make development of single-family homes more feasible on certain
properties, thus helping to address the need for additional land for single-family home development.
S:\CMO\2011 Council Agendas\M111109\S111109A.doc
The decision to re-designate properties will be made based on:
Willingness of property owner
Resulting land use pattern
Impact on accommodating multi-family housing need
Based on these criteria, staff currently recommends re-designating two areas in north Eugene (see
Attachment B). Approximately 80 additional single-family dwelling units can be accommodated
through this action. An area in west Eugene is still under review, but is large enough to accommodate
up to 950 additional single-family dwelling units, see Attachment C.
Urban Growth Boundary Expansion
In the event of a UGB expansion, the state requires specific steps to identify priority areas for expansion.
Property owners who live outside the current UGB and have a Lane County land use designation that
makes them a priority for consideration have been notified of this process. In addition to a letter sent on
October 5, 2011, two drop-in information sessions have been held, and a phone line has been established
to answer questions from property owners. Attachment D is a copy of the letter and a map of the
properties that received these letters.
Next Steps
A council public hearing on the topics discussed in this agenda item summary is scheduled for
November 21. An online open house began on November 1 to provide access to this information as well
as on-line survey tools to collect feedback. A physical open house is scheduled for November 14, 2011.
Attachment E is a full calendar of Envision Eugene events and work sessions through February.
RELATED CITY POLICIES
Growth Management Policies
COUNCIL OPTIONS
No formal action is required at this time.
CITY MANAGER’S RECOMMENDATION
No action is required on this item. Therefore, no recommendations are offered by the City Manager.
SUGGESTED MOTIONS
No action is required on this item. Therefore, no motions are suggested.
ATTACHMENTS
A.Public Land Need Summary
B.Re-Designation Study Area - North Eugene
C.Re-Designation Study Area - West Eugene
D.Letter Sent to Property Owners in Expansion Study Area (including map of area)
E.Envision Eugene Calendar
S:\CMO\2011 Council Agendas\M111109\S111109A.doc
FOR MORE INFORMATION
Staff Contact: Lisa Gardner, 541-682-5208
Staff E-Mail: lisa.a.gardner@ci.eugene.or.us
Project Website: www.envisioneugene.org
S:\CMO\2011 Council Agendas\M111109\S111109A.doc
AttachmentA
EnvisionEugene
PublicLandNeedSummary
Publicandsemipubliclandsincludeusessuchasparks,schools,publicfacilitiesandreligious
institutions.SomeofthelandneedfortheseusesisplannedtobeincludedinsidethecurrentUrban
GrowthBoundary(UGB),whileotherusesspecificallyrequireaUGBexpansiontoaddresstheneed
(seeattachedmap).TheusesthatrequireaspecificUGBexpansioninclude:
PublicAgencyExpansionNeedExpansion
amount
BethelSchoolDistrictNewSchooltoaddressincreasing80acres
enrollmentprojections
CityofEugeneGoldenGardensCommunityParkto223acres
developtourbanstandards
CityofEugeneSantaClaraCommunityParktodevelop19acres
tourbanstandards
TOTAL259acres
ThosepublicandsemipublicusesthatareplannedtobeincludedinsidethecurrentUGBmaystill
triggeraUGBexpansiontooffsettheuseoflandthatisneededinsidethecurrentUGBandcurrently
OpenSpaceProjectand
plannedforotheruses.Forinstance,basedontheParks,Recreationand
PriorityPlan,anadditional160acresofparklandisplannedforinsidethecurrentUGB.Muchofthe
160acresoffutureparkland,about154acres,willoccuronlandthatiscurrentlydesignatedfor
singlefamilyhomes(seetablebelow).Thus,whenplanningforourfuturelandneedforsingle
familyhomes,wemustincludeinouranalysistheassumptionthatapproximately154acresof
existinglandforsinglefamilyhomesmayactuallybeutilizedforthepurposesofparks.Theusesthat
requirelandinsidethecurrentUGBinclude:
PublicAgencyExistingLandNeedAmountAllocationtoMetroPlan
Designations
CityofEugeneParks,Recreationand160acresLDR:154acres
OpenSpaceprojectsMDR:2acres
Commercial:4acres
CityofEugeneInfrastructurefacility20acresIndustrial:14acres
needsLDR:6acres
UniversityofOregonAcquisitionplans30acresCommercial:15acres
LDR:9acres
MDR:3acres
HDR:3acres
TOTAL210acres
November1,2011
%88%',1)28(
October55,2011
DearProppertyOwner,
ŶǀŝƐŝŽŶƵŐĞŶĞistheCityofEugennĞ͛Ɛlongranggeplanningeefforttodeterrminehowthhecitywill
accommoodatepopulattiongrowthooverthenext20years.TheegoalsofŶǀǀŝƐŝŽŶƵŐĞŶĞĞareto:
1)Determinehowwmuchlandwillbeneedeedforresidenntial,commerrcialandinduustrialuses,as
reequiredbystaatelaw,and
2)Describehowwwewanttouuseourexistinngandnewlaandaswegroow,toshapewwhatour
coommunitywilllooklikeanndfeellikeinthefuture.
Oregonlaawandcommmunityvaluestthecitygrowwasefficientlyyaspossible.Thatmeans
requirethatusing
landinsidethecurrentturbangrowtthboundaryttothegreatestextentposssible,beforelookingtoexxpand
theĐŝƚLJ͛Ɛurbangrowthhboundary.Technicalanaalysisisunderwaytodeterminehowmmanyjobsandd
homesweecanfitinsidetheexistinggurbangrowtthboundarywwhilestillmaaintainingtheehighqualityof
lifewecurrentlyexperrienceinourccommunity.Althoughourranalysisisnotcomplete,itispossiblethat
Eugenemmayneedtoaddadditionalllandtoitsurbangrowthboundaryforrsinglefamilyyhomes.
Tohelpprrotectfarmandforestland,statelawhhasspecificreequirementsaaboutwhereacitycanexpand
itsurbanggrowthboundary.Thefirsstorhighestprioritytypeoflandtheciitymustconssiderforexpaansion
islandthaatisplannedforresidentiaal,commerciaal,orindustriialusesorcurrrentlyhasthhoseusesonit,oris
completelysurroundeddbythoseusses.Theidenttificationofffirstprioritylaandsisbasedontheplannning
designatioonassignedtoeachpropeertybyLaneCCounty.Onceethisfirstpriooritylandisiddentified,theecity
mustcheccktoseeifitmeetsthecittLJ͛Ɛlandneedd(i.e.doesitprovidesuitaableorappropriatelandfoor
singlefammilyresidentiaalhousing).AAmapoffirsttpriorityareaasaroundEuggeneisontheebackofthisletter.
rrtantforyoutoknowthattyourproperttyislocatediinafirstpriorrityarea.TheeCityisrequired
Itisimpo
toconsideeralloftheseelandsfirstiftheurbangrowthboundaaryisexpandeed.Thisdoessnotmeanthhat
theurbanngrowthbounndarywillexppand,orthatyourproperttywouldbeinncludedifanexpansionis
necessaryy.Itdoesmeaanthatyourpropertyisinncludedintheecurrentstuddyarea.Therremaybeobvvious
reasonswwhyyourproppertyisnotsuuitabletoinclludeforresiddentialland.OOverthenexttfewmonthss,the
Citywillbbedetermininngifexpansionisnecessaryyfor
singlefammilyresidentiaalhousingandifso,whereeitwould
occur.
FForMoreInformatioon
Ifyouhavvequestionsoorwouldlikeadditionalinfformation
rrwebsite:wwww.envisioneuggene.org
Visitou
aboutEnvvisionEugenee,thereareseeveralwaystoogetin
Clickon͞džƉĂŶƐŝŽŶAnnĂůLJƐŝƐ͟onleftside
touchwithus(seetheinformationprovidedinthegrey
boxatright).
aaDropInInfoSession:
Attend
Tuesday
October18
Thankyouuforyourtimme.TheplannningteamanddIlook
Dropinbbetween12pmmand2pm
forwardtodiscussingoourcommuniiƚLJ͛Ɛfuturewithyou.
orbetwween4pmand66pm
thtth
99W.100Avenue(10&Olive)
Sendanemail:
envisioneugene@ci.euugene.or.us
LisaGardnner
PlanningDDirector
propertyownerphonemessageline:
Callour
CityofEugenePlanningDivision
5416825686
)LUVW3ULRULW\/DQG6XUURXQGLQJ(XJHQH
MARTINLUTHERKINGJRBLVD
StudyAreas
Caution:
Thismapisbasedonimprecise
EugeneUrbanGrowthBoundary
sourcedata,subjecttochange,and
forgeneralreferenceonly.
10/5/11