Work Session: Street Repair Review Panel Recommendation
of 2012 Bond Measure to Fix Streets
Meeting Date: May 23, 2012 Agenda Item Number: A
Department: Public Works Staff Contact: Kurt Corey
www.eugene-or.gov Contact Telephone Number: 541-682-8421
ISSUE STATEMENT
This work session is an opportunity for the Eugene City Council to discuss the citizen Street Repair
Review Panel’s (SRRP) recommendation for funding capital pavement preservation projects with a
General Obligation (GO) bond measure to fix streets. The council is asked to provide direction for
development of a resolution to place a GO bond measure on the ballot in November 2012.
BACKGROUND
Council Action History
Following considerable study and discussion, including forming a Council Committee on Transportation
Funding and convening an ad hoc citizen Street Maintenance Task Force, the council on July 28, 2008,
approved Resolution 4953, calling a city election on a measure authorizing the issuance of $35.9 million
of general obligation bonds to fund street preservation projects. Eugene voters on November 4, 2008,
passed the five-year general obligation bond to fix streets, payable from property taxes beginning
November 2009 and continuing through November 2013. The final set of street projects to be paid from
this bond measure will occur in the summer of 2013.
The 2012 Pavement Management Report was presented to the council on February 29, 2012, and
provided updated information on the condition of asphalt paving in Eugene using 2011 rating and
inventory data. The report showed progress had been made on the condition of Eugene’s streets, but
more work was needed to further reduce the backlog of needed repairs on the 1,364 lane-miles of streets
in the city. Specifically, the 2012 report calculated the backlog of repairs on improved asphalt streets was
$118 million; a reduction in the estimated backlog of needed repairs of more than $50 million since the
2008 bond was approved. Despite this short-term downward trend the backlog is projected to continue to
grow unless there is an increase in funding that is both sufficient and sustainable.
In anticipation of the expiration of the 2008 bond measure, at the October 26, 2011, council work session,
the council provided direction to staff to work with the citizen Street Repair Review Panel to develop a
recommendation on a 2012 bond measure. The 11 community members serving on the Street Repair
Review Panel were: John Barofsky, Howard Bonnett, Janet Calvert, Mel Damewood, Paul Holbo, Bob
Kline, Steve Lee, Ollie Snowden, Clayton Walker, Gary Wildish, and Sue Wolling. The group met five
times over a four-month period before unanimously approving the recommendation on April 10, 2012, to
renew the bond measure to fix streets.
S:\CMO\2012 Council Agendas\M120523\S120523A.doc
Placing a measure on the November 2012 ballot would allow Public Works staff to continue a seamless
process of designing and bidding an annual street repair program. It takes several years to plan and
design major street repair projects. This would also provide public and private utilities sufficient time to
complete their work in advance of street repairs. If voters approved a new bond measure late in calendar
2012, it would allow construction to occur during the summer of 2014. If a new bond measure was
approved by voters in November 2012, the taxes would first be levied in November 2014, after the 2008
bond ends in 2013. This would be clearly stated in the bond measure ballot materials.
Use of Bond Proceeds
The citizen Street Repair Review Panel recommended the renewal of a bond measure to fix streets and
unanimously concluded that the resolution for the future bond measure should include four principal
areas:
Issuance of General Obligation Bonds:
The City should issue a maximum of $43 million of
general obligation bonds to fund street preservation projects. The measure would generate
approximately $8 million in net revenues annually, plus inflation for five years. Of that amount, the
SRRP recommended that over the five years of the bond, an average of six percent, or $516,000, be
allocated annually for bicycle and pedestrian improvements.
The measure is expected to cost an average homeowner in Eugene $0.65 per $1,000 of assessed value
each year for five years or about $127 per year. This rate is also the approximate average tax rate
levied over the five years of the current bond measure. Attachment A includes a comparison of the
estimated 2008 and projected 2012 general obligation bonds effect on the taxpayer.
Street Project Criteria:
To guide the selection of street projects, the citizen SRRP recommended
the following primary street project criteria: use of the most current engineering and cost-benefit
information about needed street rehabilitation and reconstruction; citizen input with respect to
prioritizing major streets in need of reconstruction; and geographic distribution throughout the
community to ensure all areas of the City receive benefit from the bond proceeds.
Secondary street project criteria established by the citizen SRRP included the following: overlay
projects will generally receive higher priority than reconstruction projects; arterial and collector
streets are generally prioritized over local streets; and additional criteria includes streets with utility
needs, presence of bike lanes or routes, Pedestrian and Bicycle Master Plan projects, transit routes,
and local streets that serve schools or commercial or industrial areas.
If approved, the bond proceeds will fix approximately 74 lane-miles of streets and fund pedestrian
and bicycle improvements.
Bond Criteria and Use:
The citizen SRRP recommended the continuation of the bond criteria to
limit the use of bond proceeds for specific street preservation projects included in the resolution. If
all of the listed projects are completed and there are bond proceeds remaining, the council may add
other street preservation projects to the list.
The bond proceeds will be used to overlay or reconstruct the driving surface of streets as well as to
preserve existing integral elements of the street such as curbs, gutters, sidewalks, on-street bike lanes,
traffic signals, street lights, medians, traffic calming devices, and other integral parts of a street
S:\CMO\2012 Council Agendas\M120523\S120523A.doc
preservation project. These preservation efforts will be undertaken only to preserve existing elements,
not to expand the motor vehicle capacity of the street system.
Regarding the use of the average annual allocation for bicycle and pedestrian improvements
dedicated to off-street bike and pedestrian path preservation and repair projects, the SRRP
recommended allowing the use of bond funds to support bicycling and walking projects guided by the
Pedestrian and Bicycle Master Plan, City staff, and the Bicycle Pedestrian Advisory Committee.
Bond proceeds would pay bond issuance costs as well.
Accountability and Transparency:
The citizen SRRP recommended the continuation of the
accountability and transparency requirements in the resolution. To promote accountability and citizen
involvement, the City Manager should contract with an outside auditor to prepare an annual written
report on whether the bond proceeds were used in compliance with the limitations of the bond
measure, and continue the use of the citizen Street Repair Review Panel to prepare an annual report
documenting the City’s use of the bond proceeds and noting whether the bond proceeds were used in
compliance with the terms of the resolution.
Timing
The citizen Street Repair Review Panel recommended that the measure be placed on the November 6,
2012, ballot. Should the council wish to proceed with this election date, a resolution placing the measure
on the ballot should be approved no later than July 23 to comply with the election timelines for the
November election. The council tentative agenda includes a work session on June 27 to provide final
direction for changes to the resolution in order to allow for adequate bond counsel review and approval of
any changes and action on July 9 to place the measure on the November ballot.
RELATED CITY POLICIES
The council’s goals include “Transportation Initiative: Develop mechanisms to adequately fund our
transportation system for cars, trucks, bikes and pedestrians including maintenance and preservation and
capital reconstruction.”
COUNCIL OPTIONS
The focus of this council work session is to determine more specifically what to include in the resolution
placing a bond measure on the ballot to fix streets. The resolution will become part of the materials
included in the Voters’ Pamphlet, and resolution language is the basis for the language contained in the
ballot title (caption, question and summary).
The council has before it policy decisions related to the size of the measure and restrictions on uses of the
revenue:
Measure size:
The citizen Street Repair Review Panel recommended a total measure of $43
million, which works out to be approximately $8 million plus inflation annually. The council
could choose a different amount for the bond measure. Attachment A includes the estimated
effect on taxpayers from different bond amounts.
Project list:
The citizen SRRP reviewed and approved a list of streets to be improved by the new
bond measure. The proposed project list to be included in the measure is provided as Attachment
S:\CMO\2012 Council Agendas\M120523\S120523A.doc
B. A map of the proposed projects is provided as Attachment C. The council could modify the
project list or adopt other measure language as deemed appropriate.
Pedestrian and bicycle improvements:
The citizen SRRP recommended an average annual
allocation of $516,000 for pedestrian and bicycle improvements. The council could choose to
maintain the language in the 2008 bond measure or to choose a different amount.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that a GO bond measure to fund $43 million ($8 million plus inflation
annually over five years) of capital pavement preservation projects and pedestrian and bicycle
improvements should be prepared for the November 2012 ballot. The resolution placing the measure on
the ballot should include a project list and incorporate any additional language as directed by the council
at this meeting.
SUGGESTED MOTION
Direct the City Manager to bring a resolution placing a $43 million GO bond measure to fix streets on the
November 2012 ballot, consistent with the proposed project list included as Attachment B.
ATTACHMENTS
A. Effect on Taxpayer - 2008 vs. 2012 GO Bonds and Different Bond Amounts
B. Proposed List of Projects to Be Included in the Bond Measure
C. Map of Proposed Projects
FOR MORE INFORMATION
Contact: Kurt Corey, Public Works Director
Telephone: 541-682-8421
Staff E-Mail: Kurt.A.Corey@ci.eugene.or.us
S:\CMO\2012 Council Agendas\M120523\S120523A.doc
Attachment A
General Obligation Bonds to Fix Streets Effect on Taxpayer
Comparison of 2008 GO Bonds vs. 2012 GO Bonds
and Estimation for Different Bond Amounts
2008 General Obligation Bonds to Fix Streets
ACTUALS THROUGH FY12; PROJECTED TO FY1
4
Assessed
GrossCity-wideTaxValue ofCost to
Bond ParAnnualAV inRateAverageAverage
AmountLevy Amount1000'sPer 1000HomeHome
FY106,500,000$ 7,146,667 11,590,081 $0.62158,447 $98
FY116,810,000$ 7,477,333 11,741,991 $0.64163,303 $104
FY127,140,000$ 7,808,511 12,017,702 $0.65168,546 $110
FY137,480,000$ 8,170,213 12,408,380 $0.66173,602 $114
FY147,970,000$ 8,691,489 12,830,434 $0.68178,810 $121
$ 35,900,000Average:$0.65Average:$109
39,294,213
2012 General Obligation Bonds to Fix Streets
Estimated Using the Average Tax Rate of the 2008 Measur
e
Assessed
GrossCity-wideTaxValue ofCost to
Bond ParAnnualAV inRateAverageAverage
AmountLevy Amount1000'sPer 1000HomeHome
FY158,000,000$ 8,680,000 13,279,717 $0.65184,175 $120
FY168,290,000$ 9,000,000 13,758,056 $0.65189,700 $123
FY178,590,000$ 9,320,000 14,253,623 $0.65195,391 $127
FY188,900,000$ 9,660,000 14,767,039 $0.65201,253 $131
FY199,220,000$ 10,000,000 15,298,586 $0.65207,290 $135
$ 43,000,000Average:$0.65Average:$127
46,660,000
Estimated Effect on Taxpayer from Different Bond Amount
s
TaxCost to
Bond ParRateAverage
AmountPer 1000Home
$ $0.53$10435,000,000
$ $0.61$11940,000,000
$ $0.65$12743,000,000
$ $0.68$13345,000,000
$ $0.76$14950,000,000
$ $0.84$16455,000,000
$ $0.91$17860,000,000
$ $0.99$19465,000,000
$ $1.06$20770,000,000
AttachmentB
ProjectListfor2012BondMeasuretoFixStreets
Map#StreetNameLimits
WASHINGTONSTVANBURENST
101STAVE
BLAIRBLVDWESTEND
201STAVE
BLAIRBLVDGARFIELDST
302NDAVE
BERTELSENRDWESTEND
405THAVE
BERTELSENRDCOMMERCIALST
506THAVE
BERTELSENRDOSCARST
607THAVE
7THAVE/HWY99BAILEYHILLRD
707THPL
WASHINGTONSTGARFIELDST
813THAVE
BERTELSENRDCOMMERCEST
913THAVE
FAIRMOUNTBLVDAGATEST
1015THAVE
FAIRMOUNTBLVDAGATEST
1117THAVE
FILLMORESTCHAMBERSST
1219THAVE
FRIENDLYSTPOLKST
1322NDAVE
HAWKINSLNBRITTANYST
1425THAVE
COLUMBIASTSPRINGBLVD
1527THAVE
SPRINGOVERPASSAGATEST
1630THAVE
MILLST(WEST)FERRYST(EAST)
1730THAVE
MILLSTWILLAMETTEST
1830THAVE
WILLAMETTEST100'EASTOFDENSMORERD
1939THAVE
HILYARDSTDONALDST
2040THAVE
NSHASTADILLARDRD
2143RDAVE
ECHOHOLLOWRDJUHLST
22AVALONST
WILLAKENZIERDKENTWOODDR
23BESTLN
39THAVEWILLAMETTEST
24BRAEBURNDR
MILLSTPEARLST
25BROADWAY
WOODSIDEDRFORRESTERWAY
26BUFFWAY
WESTERNDRHARLOWRD
27CALVINST
SPRINGBLVD50'NOFCRESTADERUTAST
28CAPITALDR
MINDADR400'SOUTHOFMINDADR
29CARMELAVE
AVALONSTJUHLST
30CASCADEDR
MLK,JRBLVD(EAST)MLK,JRBLVD/CLUBRD
31CENTENNIALLP
28THAVE29THAVE
32CITYVIEWST
SSFERRYSTBRIDGE50'SOFEWEBON/OFFRAMP
33COBURGRD
5THAVESOUTHEND
34COMMERCIALST
FORRESTERWAYTANDYTURN
35CORYDONST
HILYARDSTDILLARDRD
36EASTAMAZONDR
KNOOPAVEROYALAVE
37ELIZABETHST
WSHWY99ROYALAVE
38FAIRFIELDAVE
19THAVE24THAVE
39FILLMOREST
SPRINGBLVDAGATEST
40FIRLANDBLVD
COBURGRDWSDRWY1033
41FORRESTERWAY
ROOSEVELT6THAVE
42GARFIELDST
GOODPASTUREISRD(EASTINTERSECTION)GOODPASTUREISRD
43GOODPASTURELOOP
(WESTINTERSECTION)
44INTERIORSTNORTHENDOFCULDESACSOUTHENDOFIMPROVEDSECTION
AttachmentB
Map#StreetNameLimits
BESTLNADKINSST
45IONEAVE
HWY99NFAIRFIELDAVE
46JACOBSDR
8THAVE18THAVE
47JEFFERSONST
NSADDR1424SOUTHEND
48JUHLST
ECHOHOLLOWRDELIZABETHST
49KNOOPAVE
NORKENZIERD640FEETWESTOFNORKENZIERD
50LARKSPURAVE
NORKENZIERD(N)NORKENZIERD(S)
51LARKSPURLOOP
NORTHENDWESTERNDR
52LEIGHST
AVE13THAVE
5TH
53LINCOLNST
TOMAHAWKLNHARLOWRD
54LYDICKWAY
1STAVE8THAVE
55MADISONST
GARDENWAYHONEYSUCKLELN
56MAHLONAVE
30THAVE(NORTH)30THAVE(SOUTH)
57MILLST
1STAVEBLAIRBLVD
58MONROEST
FIRLAND43RDAVE
59NORTHSHASTALOOP
PIONEERPIKENORTHEND
60PIONEERCT
CHASASTFIRACRESDR(INCLCULDESAC)
61PIPERLN
24THAVE29THAVE
62POTTERST
OAKWAYRDCALYOUNGRD
63ROLANDWAY
BAILEYLNWESTERNDR
64SATREST
COBURGRDESDRWY1023
65SHARONWAY
FAIRMOUNTBLVDCAPITALDR
66SPRINGBLVD
WARRENSTWINTERCREEKDR
67TIMBERLINEDR
HARLOWRD580'NORTHOFHARLOWRD
68TOMAHAWKLN
CRESCENTAVEHOLLYAVE
69TULIPST
23RDAVE27THAVE
70VANNESSST
8THAVE13THAVE
71WASHINGTONST
ESHILYARDSSFOXHOLLOW
72WESTAMAZONDR
CALVINSTWESTEND/MONROEMIDDLESCHOOL
73WESTERNDR
24THAVE29THAVE
74WILLAMETTEST
10THAVE13THAVE
75WILLAMETTEST
CALYOUNGRDSHARONWAY
76WOODSIDEDR
69
43
23
50
45
29
61
22
51
46
48
76
30
65
63
26
49
41
52
38
37
35
6068
54
42
31
2
1
4
58
3
55
1
33
5
7
6
53
34
25
9
71
8
75
44
10
47
12
11
13
14
66
39
70
62
28
67
15
32
74
57
17
18
16
72
40
19
59
20
24