Action: Oregon Department of Transportation State Transportation Improvement
Program Funding 2015-2018
Meeting Date: November 13, 2012 Agenda Item Number: 6
Department: Public Works Staff Contact: Rob Inerfeld
www.eugene-or.gov Contact Telephone Number: 541-682-5343
ISSUE STATEMENT
The Oregon Department of Transportation (ODOT) allocates both state and federal transportation
funding for projects across the state. ODOT targets funds both to its own projects on state
facilities as well as to other agencies and local governments. In a significant change from past
practices, ODOT is consolidating most of its discretionary funding programs into the process for
creating a 2015-2018 State Transportation Improvement Program (STIP). The Metropolitan
Policy Committee (MPC) and Lane Area Commission on Transportation (Lane ACT) will prioritize
the projects that are applied for within the Eugene-Springfield area (MPC) and all of Lane County
(Lane ACT). The City is applying for several projects and there are also other projects within
Eugene for which ODOT and Lane Transit District (LTD) will be submitting applications. Staff
seeks the council’s approval of a recommended priority list for all of the project applications
within Eugene.
BACKGROUND
The federal government requires ODOT to develop a new STIP every other year. The STIP
incorporates funds programmed by the Metropolitan Planning Organization (MPO) as well as
other ODOT funding programs. Traditionally, ODOT has mostly used its STIP public process to
program modernization funding. ODOT has had other discretionary grant programs to which the
City has successfully applied for funding in the past. These include the Bicycle and Pedestrian
grant program, Transportation Enhancements (TE) and Flexible Funding. All of these programs
are being consolidated into the development of the 2015-2018 STIP. Transportation funding
programs not affected by this process include Connect Oregon, Transportation and Growth
Management and Surface Transportation Program - Urban (STP-U).
The new STIP funding program is called Enhance. An overview of the program is provided as an
attachment (Introduction to Enhance and Fix-It for the 2015-2018 STIP). It is expected that out of
the approximately $227 million in funding available for the Enhance program, approximately $56
million will be programmed within ODOT Region 2 of which Lane County is one of four areas.
There is no specific amount set aside for Lane County but it will likely be between $15 and $20
million. ODOT will hold back 20 percent of the total Enhance funding to be allocated to projects for
which applications are submitted but not set as priorities by the Area Commissions on
Transportation.
S:\CMO\2012 Council Agendas\M121113\11-13-12 6-STIP Funding Priorities.doc
The MPC will hold a public hearing on Enhance project prioritization on December 13, 2012, and is
scheduled to set its priorities at its meeting on January 10, 2013, and submit them to the Lane
ACT. According to coordination protocols agreed to by the Lane ACT and MPC, in setting priorities
for the entire county the Lane ACT is required to keep the same order of project prioritization set
by the MPC but can insert other projects outside of the MPO area into the list. The Lane ACT is
scheduled to hold a public hearing on STIP priorities on Wednesday, January 9, 2013, and to set its
priority list at its February 12, 2013, meeting.
The City of Eugene is directly applying for Enhance funding for three projects:
Amazon Active Transportation Corridor
Jessen Path
Northeast Eugene Livable Streets
The City is partnering on a joint SmartTrips application with point2point Solutions, a part of LTD.
All four of these applications have been approved by the Intergovernmental Relations Committee.
ODOT, LTD and point2point are also applying for projects within Eugene for which no local match
is required. Point2point is applying for Regional Safe Routes to School (SRTS) funding. ODOT will
apply for funds for the NEPA phase of the Beltline: River Road to Coburg Road project and may
also apply for funding for Beltline Short Term Improvements. LTD has not finalized its list of
applications yet but may apply for funding for development of a new River Road transit center and
NEPA funding for the 5 EmX corridor which would go from River Road and/or Highway 99
th
through downtown Eugene to Lane Community College. Descriptions of all of these projects and
more detailed project sheets for the three Eugene-only projects are provided as attachments.
Staff seeks council approval of a priority list that will guide the City’s representatives on the MPC
and Lane ACT. The Transportation Policy Committee to the MPC will also make a
recommendation to the MPC and this will inform staff’s involvement on that committee. Here is
the recommended priority order with the caveat that LTD has not yet finalized its list and ODOT is
not sure whether it will apply for short-term Beltline funds:
1.Beltline: River Road to Coburg Road
2.Amazon Active Transportation Corridor
3.Jessen Path
4.SmartTrips
5.Safe Routes to School
6.Northeast Eugene Livable Streets
These are some of the factors that informed this order:
Beltline is an important regional priority and this is probably the only source of funding
that would move this project to the next phase.
The new STIP process replaces the ODOT grant programs that previously funded capital
active transportation projects, so it is important for the City to prioritize funding for these
through the STIP process. However, the City currently has an application in to ODOT’s joint
bicycle and pedestrian grant program for the Northeast Eugene Livable Streets project and
its inclusion as a STIP project is as a back-up (at ODOT’s recommendation).
S:\CMO\2012 Council Agendas\M121113\11-13-12 6-STIP Funding Priorities.doc
If unsuccessful at obtaining SRTS and SmartTrips funding through the STIP, point2point
could seek these funds through the next round of STP-U funding.
Staff will likely be able to provide more information about LTD and ODOT applications at the work
session.
RELATED CITY POLICIES
The proposed project list is consistent with the draft goals of the Eugene TSP, Goals 1 and 4 in
particular.
Draft Goal 1, Eugene TSP:
Create an integrated multimodal transportation system that is safe and efficient; supports local
land use and economic development plans; reduces reliance on single occupancy automobiles;
and enhances community livability.
Draft Goal 4, Eugene TSP:
Distribute the benefits and impacts of transportation decisions fairly and address the
transportation needs and safety of all users, including youth, the elderly, people with
disabilities, and people of all races, ethnicities and incomes.
COUNCIL OPTIONS
The City Council may:
1.Approve the recommended priority order in the AIS.
2.Approve a revised priority order.
3.Take no action.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends that the City Council approve Option 1.
SUGGESTED MOTION
Move to approve the provided list of 2015-2018 STIP priorities for projects within the City of
Eugene. Direct staff and the council’s MPC and Lane Act representatives to use this list as a guide
when representing the City at TPC, MPC and Lane ACT meetings regarding STIP funding.
ATTACHMENTS
A. 2015-2018 STIP Enhance Project Funding Applications within the City of Eugene
B. Introduction to Enhance and Fix-It for the 2015-2018 STIP
C. Lane ACT Draft 2015-2018 STIP Prioritization Considerations
D. Amazon Active Transportation Corridor information
E. Jessen Path information
F. Northeast Eugene Livable Streets information
G. Northeast Eugene Livable Streets map
S:\CMO\2012 Council Agendas\M121113\11-13-12 6-STIP Funding Priorities.doc
FOR MORE INFORMATION
Staff Contact: Rob Inerfeld
Telephone: 541-682-5343
Staff E-Mail: rob.inerfeld@ci.eugene.or.us
S:\CMO\2012 Council Agendas\M121113\11-13-12 6-STIP Funding Priorities.doc
ATTACHMENT A
2015-2018 STIP Enhance Project Funding Applications within the City of Eugene
November 5, 2012
Projects submitted by City of Eugene
Amazon Active Transportation Corridor $1.5 million
This project will increase access across Amazon Creek for transit users and improve conditions
for running, walking, and bicycling in the East and West Amazon Drive area. Components
include extending the existing Amazon Path through Tugman Park, reconstructing the Rexius
Running Trail, adding two pedestrian crossings over Amazon Creek, and developing a separated
two-way bicycle facility along East or West Amazon Drive.
Jessen Shared Use Path $1.5 million
This new 5,900 foot long east-west shared use path will run along the north side of the Bethel
neighborhood and the south edge of Golden Gardens Park and will connect to the existing
north-south Beltline Path. The new path will give Bethel residents much improved connections
to the existing shared use path network and will enhance access to Golden Gardens Park, a
significant natural area for northwest Eugene.
Northeast Eugene Livable Streets $800k
This project will implement a portion of the Eugene Pedestrian and Bicycle Master Plan (PBMP).
This grant application would fund development of Livable Streets that are comfortable for all
users to walk or bike. The implementation of the project will complete the bicycle and
pedestrian network for a large geographic area in northeast Eugene covering 33,000 residents.
Projects include development of a bicycle boulevard network comprised of enhanced
wayfinding signs and shared lane markings, traffic calming, pedestrian islands, stutter flash
pedestrian signals (RRFBs), and widening of sidewalks at critical crossing locations.
Projects Submitted by ODOT
Beltline River Road to Coburg Road NEPA $3 - 5 million
This project will conduct required NEPA studies for the Beltline Highway River Road to Coburg
Road planning alternatives that have been developed out of the Beltline Facility Plan. The
current 2012-2015 STIP allocates $2.5 million for NEPA on the Beltline, however, it is anticipated
that further funding will be required to adequately fund NEPA analysis for the Beltline Highway.
These alternatives range from improving the existing alignment to adding a local arterial bridge
just north of Beltline Highway. While further work is still required as part of the Beltline Facility
Plan, the Plan is expected to be adopted in 2014 in conjunction with the Eugene TSP. This
funding will support the next phase of this high priority project that will address safety,
congestion and multimodal connectivity issues in the Beltline corridor.
Beltline Short Term Improvements $2 million*
To develop and construct short term improvements along the Beltline Highway (likely at and
around the Delta Highway interchange) as noted in the ongoing Beltline Facility Plan. This could
include extending the eastbound Beltline off-ramp to southbound Delta Highway or extending
the westbound off-ramp to Delta Highway to alleviate some congestion on the Beltline Highway.
This would complement other short-term improvements in the Beltline vicinity, such as the
addition of ramp meters at the River Road/River Avenue interchange and Coburg Road/Beltline
interchange.
* This is a potential request and is still under consideration and needs further development (i.e.
refined cost estimates). Based upon need, cost, and readiness, this request may need further
refined and suggested for a future STIP cycle.
Projects Submitted by point2point Solutions
Regional SmartTrips $450,000
The project funds program implementation for a residential SmartTrips program that targets
two neighborhoods in Eugene: (1) Between West 11th and West 18th Avenues and between
Bailey Hill Road and Chambers Street, and (2) the west Bethel neighborhood, and one
th
neighborhood in Springfield (the Main/McVay corridor from Glenwood to 28 Street). The
program will provide travel tools about available transportation options to increase the number
of households that walk, bike, bus, and carpool. There will be special emphasis on providing
older adults with access to information on RideSource, LTD’s EZ Access and Honored Rider
program, and travel training. We will also partner with schools in the target area to promote the
beneficial health impacts and cost-savings associated with active transportation. Program goals
include achieving a mode shift from Single Occupant Vehicle (SOV) to other modes and helping
to reduce barriers to using alternative modes for school and household travel. This project
builds on the work of recent Smart Trips programs offered in the region and as outlined in the
MPO Regional Smart Trips Strategy.
Regional Safe Routes to School (SRTS) Project $263,000
The Lane MPO Regional SRTS Project would enhance the existing SRTS program to provide a
more comprehensive regional program that serves three public school districts (Eugene 4J,
Bethel, and Springfield) across Eugene-Springfield within the Central Lane MPO area. This two-
year project would provide bike and pedestrian safety classes to 40 percent of the elementary
and middle schools in the school districts and would conduct encouragement activities
throughout these districts. The project was outlined in the recently developed Lane MPO
Regional Safe Routes to Schools Strategic Plan and would build on recent investments in
bike/ped infrastructure improvements and would utilize maps currently being developed to
show recommended walking routes to school. The SRTS bike safety education equipment would
be repaired or replaced as needed.
Projects Potentially Submitted by LTD
High Capacity Transit Corridor #5 (River Rd/Hwy 99-LCC) NEPA $1 - 2 million
This project provides funding for the NEPA process required to construct high capacity transit
along the River Road/Hwy 99 to Lane Community College main campus corridor.
River Road Station Development $2-3 million
This project provides funding for construction of a new River Road Station at the proposed Santa
Clara Crossing development. At the current station there are issues with safety and security,
access/egress on River Avenue, and congestion. To date, LTD has coordinated with the
developer of the proposed Santa Clara Crossing project to construct a transit station/park & ride
in the southeast corner of the development. The project would relieve congestion in the
Beltline-River Road area and provide a terminus point for future high capacity transit service
along River Road.
Attachment B
Introduction to and for the 2015-2018 STIP
Enhance Fix-It
September 24, 2012
1.0Overview
Thepurpose of this paper is to provide the following information:
Explainthe rationale for the change in process
Explain what types of projects are in the Enhanceand Fix-Itcategories
The framework in which the ACTs and MPOs should select the recommended
projects to be funded in the Enhancecategory
Outline the sequence of steps in the developmentof the 2015-2018 STIP
The expectation of the Oregon Department of Transportation (ODOT)is to identify and
fund the best multimodal transportation project solution to address a problem. As the
agency develops the 2015-2018 STIP, we have an opportunity to movetoward an
improved process that allows maximum flexibility in the use of limited funds. The
Oregon Transportation Commission (OTC)needs the ability to apply the available funds
in the broadest way possible.
The Oregon Transportation Plan and the supporting modal plan policies identify the
need to maintain and preserve the existing transportation assets. With limited funds it is
not possible to maintain the existing system,yet some expansion to develop a fully
multimodal system is necessary. This process will provide an opportunity for the Oregon
Transportation Commissionto provide policy direction to balance maintenance and
enhancement ofthe State of Oregon’s multimodal transportation system.
TheOTCand ODOTare changing how
Definitions:
the State Transportation Improvement
Program (STIP) is developed. The STIP
will no longer be developed as a
Enhance:Activities that enhance,
collection of programs tied to specific
expand, or improve the
pools of funding dedicated to specific
transportation system
transportation modes or specialty
programs. Beginning in the summer of
Fix-It:Activities that fix or
2012, the STIP will be divided into two
preserve the
broad categories:Fix-ItandEnhance.
transportation system
The primary objective of this change is to
enable ODOT to take care of the existing
transportation assets while still providing a measure of funding to enhancethe state and
local transportation system in a truly multimodalway.
There are a number of issues driving theneed for this change. Perhaps most
important, when revenue for transportation system maintenance and improvement is
limited and declining, it is important that transportation investments effectively address a
wide range of issues,from safety, mobility, and accessibility to economic development,
sustainability, energy, health, and community livability. In short, weneedto identify the
most effective projects based on community and state values, rather than those that fit
best into prescribed programs.The new STIP development process also alignswith
9/24/2012Page 1
ODOT’s internal effort to “right-size” the agency and reorganize along functional lines
(rather than modal or program lines) to adapt to continuing financial constraints.
At the core of this new approach isa single application process for all projects that will
be funded under the Enhanceside of the STIP. The OTC will select Enhanceprojects
based on recommendations developed by local governments,public agencies and
citizen representatives through a process conducted by the Metropolitan Planning
Organizations (MPOs), where applicable, and the Area Commissions on Transportation
(ACT).The Fix-Itportion of this process will be discussed in Section 1.6below.
The purpose of this guidance document is to provide some perspective and
considerations for reviewers to use when evaluating and prioritizing Enhanceproject
applications. Project activities that are eligible for Enhancecategory funds include:
Bicycle and/or Pedestrian facilities on or off the highway right-of-way
Development STIP (D-STIP) projects (development work for projects that will not
be ready for construction or implementation within the four years of the STIP)
Modernization(projects that add capacityto the system, in accordance with ORS
366.507)
Most projects previously eligible for Transportation Enhancement funds
Projects eligible for Flex Funds (the Flexible Funds program funded Bicycle,
Pedestrian, Transit and Transportation DemandManagement (TDM) projects,
plans, programs, and services)
Protective Right-of-Way purchases
1
Public Transportation(capital projects only, not operations)
Safe Routes to School(infrastructure projects)
Scenic Byways(construction projects)
Transportation Alternatives (new with MAP-21, the federal transportation
authorization)
Transportation Demand Management
Because of the wide diversity of projectapplications that the departmentexpectsto
receive,we do not advisea formal scoring process.This STIPdevelopmentprocess
will ultimately be subjective and largely driven by matching identified problems with
cost-effective solutions that reflect local values and concerns. However, there are some
practical sideboards that we can establish to help guide the decision-making process.
The remainder of this document will provide those policy-based and practical
parameters.
We note that these guidelines are not intended to be definitive or inclusive of all
possible considerations. Other considerations of local or regional importance may be
factored into any selection recommendation process. The only real requirements within
the selection recommendation process are that the projects legitimately address at least
one of the benefit areas included in the application (to address multiple areas generally
1
Public transportation capital projects are eligible for Enhance funds. It is important to note, however,
that the funds from the Federal Transit Administration (FTA) are not included in the Enhance funds.
Those dollars remain separate and are solely for public transportation projects.
9/24/2012Page 2
makes for a stronger application) and whatever logic and rationale is usedto make the
decisions is clearly and thoroughly documented.
The OTC has also provided significant guidance over the last year about what will
constitute a successful project as funding becomes more limited,and projects become
more difficult to implement. As has beenthe case for many years, the OTC continues
to put a strong emphasis on preserving the existing transportation systemfirst. This is
evidenced by the funding split between the Fix-Itportion of the proposed new STIP (76
percent) and the Enhanceportion (24percent).
In addition, this process applies primarily to projects that will be ready for construction or
implementation in 2016 to 2018, becauseprojects for 2015 are largely alreadyselected.
Becausethe STIP is updated every two years, there will be an opportunity to review the
later projects in the STIP and to improve on the STIP selection process for the next
STIP update cycle.
Note also that all legal obligations to develop the STIP, including any minimum
expenditures, will continue to be honored in this STIP and all later STIPs. This includes
any federal requirements that may change with updates tofederal law,including the
2012MAP-21 transportation authorization legislation,and any successor legislation.
ODOT will try to mirror changes in law in the STIP process, whereappropriate. For
example, MAP-21places Transportation Enhancement, Recreational Trails, and Safe
Routes to School, that were formerly separate programs,under one “Transportation
Alternatives”(TA)program. Similarly, inOregon’s process,thetypes of projects
allowed under the new TA program are eligible to applyfor fundingunder Enhance.
1.1The Oregon Transportation Plan
The Oregon Transportation Plan (OTP) set the stage for ODOT’s transition to a more
multimodal agency with multiple goals and policy objectives when it was adopted in
2006. Demonstrating how a project will meet or advance the OTP goals and objectives
will be an asset to any Enhanceapplication and will ultimately strengthen its chances of
implementation.
The OTP Goals
1.Mobility andAccessibility
2.Management of the System
3.Economic Vitality
4.Sustainability
5.Safety andSecurity
6.Funding the Transportation System
7.Coordination, Communication and Cooperation
Embedded in these policies and actions are a set of priorities to be considered after
maintaining and preserving the system.This includes recognizing some key priorities
embedded both in the OTP and inOTCdiscussions:enhancing economic development
opportunities; supporting compact mixed use development, integrating multimodal
systems; maintaining the safety of the system and making strategicinvestments that
contribute measurable benefits to the efficiency of the system.The direction of the OTC
9/24/2012Page 3
and the policy framework of the Oregon Transportation Plan areaugmented by the
governor’sdirection thatprovides more specific guidance.
1.2Governor’s Direction
One excellent source of guidance todeterminewhich project applications represent the
best high-value, multimodal project opportunities comes from the office of Governor
John Kitzhaber. Thegovernorlaid out a variety of principles about how to make
transportation system investmentsand how to conductthe investment decision-making
process.
On August 24, 2011,the governor met with the OTC and talked about his direction and
expectations. The governor laid out sixprinciples he wants brought to the fore in
transportation decision making. Those sixprinciples are:
1.Have the right group of people at the table at the beginning of the process to
define the problem and solution together
2.Determine who is best positioned to manage/own facilities
3.Create programs that invest in the transportation system AND meet a multitude
of community objectives
4.Move us closer to a sustainable, safe, lower carbon, multi-modal system
5.Maximize benefit for the least cost under limited resources
6.Move us closer to a transportation funding mechanism for the future
Additionally, thegovernor stressed that to support sustainable communities, state
agencies shall seek to help enable and encourage local communities to achieve the
following objectives:
Resilient local economies that provide a diversity of economic opportunities for all
citizens
Workers supported by lifelong education to ensure a globally competitive
workforce
An independent and productive citizenry
Youth supported by strong families and communities
Downtowns and main street communities that are active and vital
Development that wisely and efficiently uses infrastructure investments and
natural resources
Affordable housing available for citizens in community centers
Healthy urban and rural watersheds, including habitats for fish and wildlife
Clean and sufficient water forall uses
Efficient use and reuse of resources and minimization of harmful emissions to the
environment
Project applications that demonstrate alignment with these various directives and
principles will ultimately have an improved chance of being chosen forimplementation.
9/24/2012Page 4
The following bullet points summarize his key themesthatprovide not only guidance in
the selection of projects,but also for other transportation issues that the Commission
often addresses.
Maximize and leverage investments by looking for:
projects with the potential to be both effective and efficient
o
projects that involve multiple funding sources
o
projects that are complementary to other projects or community
o
development activities and offer the chance for the whole to be greater
than the sum of the parts
Investments must achieve multiple objectives
Conduct proactive asset management (strategically take care of what we already
have)
Move toward a more multimodal transportation system by maximizing funding
flexibility and consider a wider range of community issues and benefits
As funding decreases,and projects become increasingly difficult to implement we
need to transition and transform the way we work—to look for new ways of doing
business
Use Regional Solution Centers to reduce bureaucratic barriers and help identify
opportunities to partner and leverage projects
Look for projects that result in GHG emissions reductions
Continue to develop a Rapid Passenger Rail Plan
Implement least cost planning principles
Incorporate practical design principles from planning to project development
Weigh all the values we have–including energy, job creation and health–in
final design
1.3Legislative Direction
This new approach will also be responsive, at appropriate points in the process,to
various legislative actions. Examples of prior legislation that apply to the STIP are listed
below(from Oregon Revised Statutes).
ORS 184.621
.The OregonLegislature included ten considerations for use in
developing STIP criteria in the Jobs and Transportation Act (JTA). The ten
considerations directly relate to categories of benefits included in the application. Also,
nine of the ten categories listed below have been selected by the STIP Stakeholder
Committee for analysis in Oregon’s least cost planning process (Mosaic) and, in turn,
relate closely to the goals and policies of the OTP. All these parallels ensure that the
STIP Enhanceprocess reflects the goals and policies of the OTP, the priorities of the
STIP Stakeholder Committee, and the legislature’s STIP considerations.Specific
language from the JTA:
“The Oregon Transportation Commission shall work with stakeholders to review and
update the criteria used to select projects within the Statewide Transportation
Improvement Program. When revising the project selection criteria the commission shall
consider whether the project:
(1)Improves the state highway system or major access routes to the state highway
system on the local road system to relieve congestion by expanding capacity,
9/24/2012Page 5
enhancing operations or otherwise improving travel times within high-congestion
corridors.
(2)Enhances the safety of the traveling public by decreasing traffic crash rates,
promoting the efficient movement of people and goods and preserving the public
investment in the transportation system.
(3)Increases the operational effectiveness and reliability of the existing system by using
technological innovation, providing linkages to other existing components of the
transportation system and relieving congestion.
(4)Is capable of being implemented to reduce the need for additional highway projects.
(5)Improves the condition, connectivity and capacity of freight-reliant infrastructure
serving the state.
(6)Supports improvements necessary for this state’s economic growth and
competitiveness, accessibility to industries and economic development.
(7) Provides the greatest benefit in relation to project costs.
(8) Fosters livable communities by demonstrating that the investment does not
undermine sustainable urban development.
(9)Enhances the value of transportation projects through designs and development that
reflect environmental stewardship and community sensitivity.
(10)Is consistent with the state’s greenhouse gas emissions reduction goals and
reduces this state’s dependence on foreignoil.”
ORS 184.611
.This statute addresses prioritization of freight mobility projectsand reads
“(1) As used in this section, “freight mobility project” means a project that supports the
safe, reliable and efficient movement of goods between and among local, national and
international markets.(2) The Legislative Assembly finds that investment in freight
mobility projects will yield a return on the state’s investment in terms of improved
economic opportunity and safety.(3) In developing the STIP, the Department of
Transportation shall give priority to freight mobility projects that:(a) Are located on
identified freight routes of statewide or regional significance;(b) Remove identified
barriers to the safe, reliable and efficient movement of goods; and(c) Facilitate public
and private investment that creates or sustains jobs.”
ORS 366.507
. This statute addresses Modernization program funding,conditions and
criteria.
ORS 366.514
. This statute addresses the use of state highway funds for footpaths and
bicycle trails. It includes the requirement that “The amount expended by the department
or by a city or county as required or permitted by this section shall never in any one
fiscal year be less than one percent of the total amount of the funds received from the
highway fund.” and related definitions and exemptions.
1.4OTC Perspective
In the past year the OTC has studied the existingfunding and institutional realities
facing ODOT and Oregon transportation system development, future challenges, and
how other DOTs addressed financial limitations and achieved improved partnerships
with transportation stakeholders and jurisdictions. The OTC Workshop in October2011
highlighted severalkey pointsincluding:
Funds are not keeping up with expenditures
9/24/2012Page 6
All modes are underfunded
The transportation system will deteriorate from its current condition, both
physically and operationally
New strategies are being implemented to maximize our investments
The organization is being reduced in size and services to match projected
funding levels
The OTC has also reviewedthe role of Area Commissions and identified that ACTs are
underutilized,given the experience and commitment of the ACT members.
1.5OTC Priorities
The OTC commissionersidentified the following thematic priorities during the October
2011 workshop:
The need to achieve a truly multimodal system
Work to integratehealthinto transportation discussions
Improve transportation system efficiency by implementing technology solutions
Look for ways to be innovative in project funding, packaging, and implementation
Continue developing and seeking approval for sustainable funding mechanisms
Look for creative ways to resolve intergovernmental transportation system
problemscooperatively
In November 2011, the OTC invited the chairsof the Area Commissions on
Transportation (ACTs) and other advisory committees to participate in presentations
focused on some of the challenges that Oregon faces. A key theme was that now,
more than ever, we need to engage transportation stakeholderstoidentify issues and to
develop creative and sustainable multimodal transportation system solutions.
The presentations were followed by a roundtable discussion with the advisory
committees on their perspectives on opportunities and challenges. The OTCand
ODOT believe that ACTs have been underutilized given the experience and
commitment of the ACT members, and many ACT members expressed desire to play a
broader role. It was agreed that this would be the first meeting of this type and not just a
one-time event.
The 2015-2018 STIP selection process will address these priorities by expanding the
“universe” of potential transportation projects that are compared sidebyside. This will
avoid the artificial separation of projects by funding source that existed up to this point.
The overarching point of agreement that emerged in the past yearwas similar to some
of the conclusions that emerged from the governor’sdirection and the previous OTC
work:ODOT no longer has the resources to keep doing what wehavebeen doing and
how wehavebeen doing it, and neither do the local jurisdictions. While our collective
years of experience still have value, in order to be successful, we will all need to evolve
and adapt to the financial and institutional changes that havetaken place over the last
20 years. Rather than viewing this as a negative situation, it should really be seen as
an opportunity for all of us to improve the way we do things to manage the
transportation system in Oregon.
9/24/2012Page 7
1.6Fix-It Program for STIP
The Fix-Itcategory includes all the capital funding categories that maintain or fix
ODOT’s portion of the transportation system. It isimportant to note that the capital
funding categories do not include the noncapital maintenance and operations programs
becausethese are not included in the STIP. Noncapital maintenance/ operations and
other agency funding is addressed by the OTC via the state budget decisions.
Project activities eligible for the Fix-Itcategory of funds include:
Bicycle and pedestrian facilitieson state routes only
Bridges (stateowned)
Culverts
High Risk Rural Roads
Illumination, signs and signals
Landslides and Rockfalls
Operations (includes ITS)
Pavement Preservation
Rail-Highway Crossings
Safety
Salmon (Fish Passage)
Site Mitigation and Repair
Stormwater Retrofit
Transportation Demand Management(part of Operations)
Workzone Safety (Project specific)
The selection of projects for the Fix-Itcategory is intended to start withinput from
ODOT infrastructure management systems and besupported by consultation with ACTs
and MPOs.Management systems are repositories of data about the system. They can
identifyproblems and the general idea for a solution. Management system analysis is
used, for example,for State Bridge, Pavement Preservation, and Safety projects. The
systems provide asset management information and help prioritize needs.Each ODOT
transportation region will then share the Fix-Itproject lists with itsACTs and MPOs in
order to:
1.Identify opportunities toleveragefunds
2.Identify opportunities to maximize projects’ support of Oregon objectives,
community goals and system asset management
3.Identify opportunities to coordinate project timing and outcomesbetter
4.Identify opportunities to coordinate safety improvements
At the July 18, 2012,OTC meeting the OTCdirected ODOT to begin work on the Fix-It
category project lists for the 2015-2018 STIP. The Commission requested ODOT
prepare an expanded project list that willbe available to the ACTsand other STIP
contributors asthey discusspotential Enhanceprojects,so there is opportunity to look
9/24/2012Page 8
at linkages, leveraging resources, enhancing project benefits, etc. This will also provide
an opportunity for ACTs to direct comments to ODOT program managers regarding
proposed Fix-Itprojects in an area.
Below are the principles guiding the Fix-Itcategory of STIP funding.
Category Funding Allocation and Project Selection Guiding Principles
Fix-It
BalanceMaintain relative balance between Fix-Itprograms while
allowing route priority within individual programs, taking into
account risks (safety), sustainability, and magnitude of
investment.
LeverageLeverage existing funding to attract more revenue
opportunities to support a sustainable transportation system.
MaintenanceFocus investments on features that are difficult and
expensive to maintain.
SafetyMaintain or improve transportation safety on the system
within funding level availability.
Regulatory ComplianceEnsure minimum environmental, federal, state, and local
compliance is maintainedon the transportation system.
EconomyMaximize economic opportunities and minimize economic
hardships as a result of transportation investments.
Cost EffectivenessAllocate funding in a way that maximizes return on
investment to support a sustainable transportation system.
System ContinuityFund investments that minimize risk of transportation system
failure.
When the initial proposed lists of Fix-Itprojects are developed, ODOT staff will report
back to the OTC on how the proposed dispersal of funds will affectthe overall condition
of the system.
2.02015-2018 STIPCycle Enhance Project Selection
Described below are key steps in the 2015-2018 STIP update cycle. Seethe attached
timeline for a list of all due dates and other key dates in this process. There is also an
information and instructions document to accompany the Enhanceapplication. All
these documents are available on ODOT’s website.
2.1OTC approvalof 2015-2018 STIP Process
Throughout the springof 2012, ODOT has had discussions with the OTC about
approaches to the 2015-2018 STIP funding and project selection. At the OTC’s July
2012 meeting, the Commission decided to go ahead with the Fix-Itand Enhance
approach to the STIP. The Commissiondirected ODOT to begin the Fix-Itproject
selection process and wait until Septemberto provide the final decision on the proposed
Enhanceprocess.
9/24/2012Page 9
The September approval target provides moreopportunity for ODOT to reach out to
ACTs,MPOs,and others,in order for stakeholders to better understand the process,
and for ODOT and the OTC to hear concerns and make improvements to the Enhance
process to respond to those concerns. During the summerof 2012, ODOT staff is
discussing the new process with each ACT and others.
2.2Application Available
The Enhanceprojects application will be available in September 2012, shortly after the
OTC meeting andprovided thedecisionis to move forward. The application contains
basic project information and it includes a section on benefit of the projects. These are
organized in categories. First is benefits to the state system, then nine more categories
mirror the categories of impacts that the STIP Stakeholder Committee designated as
most important for Oregon’s least cost planning process to evaluate. Least cost
planning, now called Mosaic, is being developed and tested for use in the planning
process, not for project-level decisions at this time. However, the nine Mosaic
categories are basic categories of impacts of the transportation system and investments
in that system and this application provides a qualitative way to respond to those same
categories for project decisions.
The benefits section is also similar to the project selection criteria many individual STIP
funding programs used for recent STIP cycles. The application does not use the term
“criteria,”because it is intended to be broader than any of the criteria used in the past to
include a wide range of modes and possible investments. The benefits information will
also be used to prioritize and compare projects.
Not all projects are expected to have impacts on all categories of benefit. Reviewers
will need to discuss the different benefits of different projects and use a consensus
process to develop their prioritized lists.
Regions, ACTs, and MPOs may not add to or alter the application or the benefit
information requested. This is a change from prior STIP procedures. It is important that
all Enhanceprojects are evaluated similarlyacross the state.
ODOT staff can provide assistance in answering questions about the application and
about the application review process. Each region has designated a representative to
lead this process for the region and they are the ones to whom to direct questions.See
below for thelist of region representatives.(If you are unsure about which region to
direct questions to, see the onlineODOT Region Map.)
9/24/2012Page 10
RegionRepresentativePhoneEmail
Region 1Jeff Flowers503.731.8235Jeffrey.A.FLOWERS@odot.state.or.us
Region 2Terry Cole503.986.2674Terry.D.COLE@odot.state.or.us
Region 3 Lisa Cortes541.957.3643Lisa.CORTES@odot.state.or.us
Region 4Katie Parlette541.388.6037Katie.M.PARLETTE@odot.state.or.us
Region 5Dawn Hubble541.963.1325Dawn.L.HUBBLE@odot.state.or.us
2.3Application Due
12:00
Applications must be receivedbythe appropriate ODOT region mailbox before
PM, noon, on November 27.
The region emails are listed below. See the application
instructions for further details about how to use email to submit applications.Other key
dates in this process are listed in the attached draft Timeline.
Region 1STIPEnhanceAppsRegion1@odot.state.or.us
Region 2STIPEnhanceAppsRegion2@odot.state.or.us
Region 3STIPEnhanceAppsRegion3@odot.state.or.us
Region 4STIPEnhanceAppsRegion4@odot.state.or.us
Region 5STIPEnhanceAppsRegion5@odot.state.or.us
2.4Region Staff Review of Applications
Applications received by the due date will be reviewed by ODOT region staff for general
eligibility and completeness. Applications will be checked to verify that:
1.The sponsoris a public agency
2.The proposed project is of the type covered by Enhancefunds
3.The application is complete. Information that must be included:
Item 1: Project sponsor
Item 3: Project name
Item 5: Project summary
Item 8: Project problem statement
Item 9: Project location
Item 11: Project description
Item 14: Timetable lines 1 and 8
Item 27: Estimated project costs
Item 28: Project participantsand contributions
Item 29: Project sponsor signature
Regions will send applicationsfor Enhanceprojects that include at least this information
to ACTs and MPOs for review and prioritization inearly December2012.
9/24/2012Page 11
2.5ACT and MPO Application Reviews
Regions will send eligible, complete applications to the applicable ACT and MPO for
review.The current long-standing STIP development processes in which ACTs, MPOs,
and region staff work together to prioritize projects,are expected to continue.
Generally, where an MPO is part of an ACT, there are processes in place to discuss
MPO priorities within the ACT and agree on area priorities.ThePortland area is unique
in that there is an MPO, but not an ACT.ODOT Region 1 will work with its stakeholders
to better define thecoordination process
Definitions:
for the region as a whole.
150 percent List:
Projectsrecommended through the STIP
Update processand withinthe boundaries
A list of projects
of anMPO need to be included in the
generated early during
Metropolitan Transportation Improvement
the review of
Program (MTIP). The MPO Policy Board
applications that would
approves the final MTIP and then sends it
use roughly 150 percent
to the governor for further approval. After
of the region’s available
these approvals, the MTIP is incorporated
STIP Enhance funds
into the STIP.
Recommended List:
Regions, ACTs, and MPOs will receivea
A list of projects
template to report their conversations and
generated after projects
process to develop their recommended
are scoped to identify a
projectlists. This will provide a record of
final recommendation
what concerns they discussed, how they
from ACTS that would
selectedpriorities, and why they selected
use roughly all of the
projects. This record will be important. It
region’s available STIP
should be developed during selection of
Enhance funds
the 150percentlist. It can later be revised
or updated during conversations to reduce
the list to the final recommended list.This recordwillbeessentialtothe OTC, OTC
advisory committees, and othersin order to understand how the projects were selected.
While this template is still under development,weanticipate the ACTs will provide
responses to questions similar to:
How does this project improve transportation choices for people in your
community?
Why is now the right time for this project?
How does this project improve the lives of people in your community?
The Oregon Transportation Commission is the state’s final decision-making body,
responsible for approving the final STIP and sending it to US DOT for final approval.
ACTs work with their ODOT region and sometimes other ACTs in the regionto put
together the region’s final recommended STIP project list. This list then goesto the
OTC for approval.
9/24/2012Page 12
ODOThas expectations for how the applications will be reviewed and for documenting
how the final lists were selected. The following expectations will be included in the
direction to ACTs, MPOs, and others to guide their review of applications and their
development of prioritized project lists:
a.The process used to review applications and establish priorities should be
as inclusive of participants and as transparent as possible.
b.No benefit category is to be defined as more important than others,and
project applications do not need to show benefit in all categories to be
eligible. Reviewers are to discuss the project benefits holisticallyand
strive for consensus. Becausedifferent types of projects will have
different kinds of benefits, to decidebefore review that certain benefits are
most important will disadvantage some projects that may be important to
the area. Likewise, reviewers should not use overall numerical scores to
determine outcomes, but use a discussion and consensus process.
Reviewers mayuse qualitative rankings within the benefit categories. For
example, different projects may have high, medium, or low benefits for
individual benefit categories such as mobility or livability. Discussion and
consensus will then decide how to prioritizeprojects with very different
benefits.
c.Reviewers can use state and local plans and goals and policies described
in plans to help determine priority. Plans may include the Oregon
Transportation Plan, the Oregon Highway Plan, other Oregon
transportation topic or mode plans, local transportation system plans, local
comprehensive plans, etc.
d.Reviewers are expected to consider the merits of the project regardless of
the level of detail in the application. For example, some jurisdictions may
have access to considerable data and analyses to support their project.
Other jurisdictions with more limited staff resources and experience may
have less detail to report, but their applications must be considered
equally.
e.ODOT will require that the decision-making processbe documented in a
consistent manner throughout the state. The department will provide a
template to accomplish this.
f.Some programsincluded in Enhancehave previously developedSTIP
selection criteria. Reviewers are not required to use these other STIP
criteria in establishing priorities. However,reviewersare welcome to
consider these other STIP criteria if they are helpful in the prioritization
process.
g.Reviewers must include any required elements of project prioritization in
their evaluations. For example, ODOT is required in statute to give priority
to freight projects in the STIP. ODOT region staff will explain such
requirements to reviewers. The final list and documentation will show how
they were considered. Similarly, ODOT will ensure that the final STIP
meets all legal requirements, such as minimum amounts for certain types
of projects including bicycleand pedestrianprojects.
9/24/2012Page 13
h.MPOs will need to maintain their appropriate role in the prioritization and
selection process. (They are federally-chartered bodies with specified
project selection responsibilities.) ODOT expectsthat the ACTs will
coordinate as they do today in similar processes with the MPOs. ODOT
region staff isresponsible forensuringthis coordination is accomplished.
2.6ACTDevelopment of 150PercentList
ACTs and MPOs will receive the applications from ODOT region staff in early
December. Reviewers will then prioritize and narrow considered projects to their “150
percentlist.” This means that highest-priority projects will be listed to a bit over the
expected fundingavailablefor the region’s Enhanceprogram.
2.7Scoping of 150PercentLists
All projects on the150percentlist of projectswill then be “scoped” in more detail,
meaning that their location, components, cost,and details will be examined more
closely to verify estimates and establish the final project scope.ODOT region staff will
managethe scopingprocesswith assistance from other ODOT staff and/or the local
jurisdiction.Region staff will work with applicants to accomplish the detailed scoping.
This detailed information will be shared with ACTs and MPOs to help reviewers narrow
the list to the finalregion-wide recommendedlist.
2.8Statewide Advisory Committee Review
During scoping of the 150percentlistthe followingstatewide committees,advisoryto
the OTC,will also review the lists of potential projects:
the Transportation Enhancement Advisory Committee working jointly with the
•
Oregon Bicycle and Pedestrian Advisory Committee
the Oregon Freight Advisory Committee
•
These advisorycommittees will review the projects in the 150percentlists and share
any feedback on the projects and priorities from their respective areas of expertise
with the OTC.
Theadvisory committees will provide thematicanalysis regarding the 150percentlists
in a memo format. This memo may focus comments at statewide, ODOT region-wide
and ODOT area-wide geographicscale.They will be asked to provide their comments
while scoping of the 150percentlists is ongoing.
2.9OTCReview of STIP Development
TheOTC will review the overall progress of the STIP developmentperiodically
throughout the process. The commission will analyze the 150percentlists and input
from the statewide advisory committees and other stakeholders foroverallthemes and
will providefeedback and additional direction to the ACTs.
2.10ACTDevelopment of Final Recommendation
Information from scoping and from the statewide advisory committee reviewswill be
passed back to the ACTs and MPOs, for their next step toreducethe 150percentlist to
the recommended list of projects for the STIP. Each region will have a slightly different
process to develop the finallist, but will be in generalalignment with past practices.
9/24/2012Page 14
2.11OTC Review and “20percent”Project Identification
The OTC will review the recommended lists and consider the 20percentof the
Enhancebudget that was held back for statewide consideration by the OTC. The OTC
will considerany apparent gaps in the recommended lists,such as a multimodal focus,
andstatewide goals, policies, and priorities.
2.12Draft STIP
Once the recommended STIPis complete, including assigningthe OTC’s statewide 20
percent, the Draft STIP will be compiled, presented to the OTCand released for public
review and comment.
2.13Final STIP
After the application review and STIP development steps, there are several more steps
that need to occur before the STIP is final. For example, technical steps, such asair
quality conformity determinations will be completed where needed. Any further
metropolitan area projects from their Transportation Improvement Programs are added
in also. Comments received on the Draft STIP are considered before the STIP is
finalized. When these steps are complete, a Final STIP is prepared and released for
public comment.
2.14OTC STIP Approval
The OTC has final approval of the STIP for all of ODOT. After the public comment
period on the Final STIPand consideration of comments received, the Final STIP goes
to the OTC for approval. The OTC has the authority to make changes or add conditions
to projects.
2.15STIP Federal Approval
The final step in the STIP process is federal agenciesapproval. After OTC approval,
the STIP must receive approvals fromthe Federal Highway and Federal Transit
Administrations. The new STIP is active once federal agencies approved.
3.0The 2017-2020 STIP
The 2015-2018STIP will set in place projectsfor implementation in 2016, 2017,and
2018 (projects for 2015 wereselected withprevious procedures.)The Oregon STIP is
updated every two years. This means that in two years,we will have the opportunityto
revisit projects slated for 2017 and 2018 and make any necessary improvements to the
selection processbased on lessonslearned from this selection cycle.
9/24/2012Page 15
Attachment C
ȋ Ȍ
Lane Area Commission on Transportation (LaneACT)
DRAFT 2015-2018 STIP Prioritization Considerations
Enhance Projects
Summary
It will be the responsibility of the LaneACT to review submitted Enhance applications and
provide a prioritized recommendation to ODOT staff by March 15, 2012. While templates are
still under development, previous discussions with the Governor and Oregon Transportation
Commission (OTC) have provided a list of themes for consideration when selecting project
priorities. It is important to note that other considerations, of local or regional importance, may
be factored into any selection recommendation process, this includes any considerations of
importance established by the LaneACT in their review. This document summarizes the
‘Introduction to Enhance and Fix-it for the 2015-2018 STIP’ to assist in this considerations
discussion.
Governor’s Direction
One excellent source of guidance to determine which project applications represent the best
high-value, multimodal project opportunities comes from the office of Governor John Kitzhaber.
On August 24, 2011, the governor met with the OTC and talked about his direction and
expectations, where he laid out six principles he wants brought to the fore in transportation
decision making. Those six principles are:
1.Have the right group of people at the table at the beginning of the process to define the
problem and solution together
2.Determine who is best positioned to manage/own facilities
3.Create programs that invest in the transportation system AND meet a multitude of
community objectives
4.Move us closer to a sustainable, safe, lower carbon, multi-modal system
5.Maximize benefit for the least cost under limited resources
6.Move us closer to a transportation funding mechanism for the future
Additionally, the governor stressed that to support sustainable communities, state agencies shall
seek to help enable and encourage local communities to achieve the following objectives:
Resilient local economies that provide a diversity of economic opportunities for all
citizens
Workers supported by lifelong education to ensure a globally competitive workforce
An independent and productive citizenry
Youth supported by strong families and communities
Downtowns and main street communities that are active and vital
Development that wisely and efficiently uses infrastructure investments and natural
resources
Affordable housing available for citizens in community centers
Healthy urban and rural watersheds, including habitats for fish and wildlife
Clean and sufficient water for all uses
Efficient use and reuse of resources and minimization of harmful emissions to the
environment
Project applications that demonstrate alignment with these various directives and principles will
ultimately have an improved chance of being chosen for implementation. The following bullet
points summarize his key themes that provide not only guidance in the selection of projects, but
also for other transportation issues that the Commission often addresses.
Maximize and leverage investments by looking for:
projects with the potential to be both effective and efficient
o
projects that involve multiple funding sources
o
projects that are complementary to other projects or community development
o
activities and offer the chance for the whole to be greater than the sum of the
parts
Investments must achieve multiple objectives
Conduct proactive asset management (strategically take care of what we already have)
Move toward a more multimodal transportation system by maximizing funding
flexibility and consider a wider range of community issues and benefits
As funding decreases, and projects become increasingly difficult to implement we need
to transition and transform the way we work—to look for new ways of doing business
Use Regional Solution Centers to reduce bureaucratic barriers and help identify
opportunities to partner and leverage projects
Look for projects that result in GHG emissions reductions
Continue to develop a Rapid Passenger Rail Plan
Implement least cost planning principles
Incorporate practical design principles from planning to project development
Weigh all the values we have – including energy, job creation and health – in final design
Oregon Transportation Commission Priorities
In the past year the OTC has studied the existing funding and institutional realities facing ODOT
and Oregon transportation system development, future challenges, and how other DOTs
addressed financial limitations and achieved improved partnerships with transportation
stakeholders and jurisdictions. The OTC commissioners identified the following thematic
priorities during the October 2011 workshop:
The need to achieve a truly multimodal system
Work to integrate health into transportation discussions
Improve transportation system efficiency by implementing technology solutions
Look for ways to be innovative in project funding, packaging, and implementation
Continue developing and seeking approval for sustainable funding mechanisms
Look for creative ways to resolve intergovernmental transportation system problems
cooperatively
LaneACT Considerations
While a template is still under development, we anticipate the ACTs will provide responses to
questions similar to:
How does this project improve transportation choices for people in your community?
Why is now the right time for this project?
How does this project improve the lives of people in your community?
Other potential LaneACT considerations to discuss:
Does the project relate to a Fix-It project?
Is the project cost effective?
Does the project enhance safety?
Does the project promote/enhance economic development opportunities?
2015-18 STIP
GRANT APPLICATION
Amazon Active
Attachment D
Transportation Corridor
The Amazon Active Transporta-
tion Corridor prioritizes active
transportation modes.
The projects identified for this grant
would increase mobility for active
transportation users in south Eugene.
They would also reduce user conflicts
by providing separated spaces for dif-
ferent transportation modes and in-
crease access across the Amazon
Creek.
Projects include:
- Extension of the Amazon Path to the
south from 34th Avenue to the Tug-
man Park Path
- A two-way protected cycle track on
West Amazon Drive (Hilyard to Snell)
- Replacement of the bridge across
Amazon Creek at 39th Avenue and the
installation of two new bridges (36th;
Dillard Road)
- Reconstruction of the Rexius Run-
ning Trail (Hilyard to Martin)
- Pedestrian crossing Improvements at
34th Avenue across Hilyard Street
The improvement of walking, transit and
bicycling in the Amazon Active Transpor-
tation Corridor reduces user conflicts,
increases safety, promotes environmental
stewardship, improves livability, and pro-
vides greater mobility options for residents
and visitors of south Eugene.
Visit the project website at www.eugene-or.gov/activeamazon
CITY OF EUGENE
2015-18 STIP
GRANT APPLICATION
Amazon Active
Transportation Corridor
Amazon Path Extension
thth
The popular Amazon Path which extends from 19 Avenue to 34 Av-
enue provides comfort and convenience for north/south cyclists and
SHGHVWULDQV&XUUHQWO\WKHZLGH·SDWKHQGVDWWK$YHQXH$VD
UHVXOWPDQ\VRXWKERXQGWUDLOXVHUVDUHIRUFHGWRVKDUHDQDUURZ·
sidewalk located on the west side of Hilyard Street which is uncomfort-
able for path users who compete for the limited space. This grant
th
would fund the widening of the sidewalk from 34 Avenue to Tugman
3DUNZKHUHWKHZLGHQHGVLGHZDON· shared use path standard) would
connect to the existing Tugman Park path network.
([LVWLQJ·SDWKDW
north end of project
area.
7KH$PD]RQ3DWKGHFUHDVHVLQZLGWKIURP·
([LVWLQJ·VLGHZDONDW
QHDUUG$YHQXHWR·VRXWKRIWK$YHQXH
south end of project
WKHQQDUURZVWR·WR7XJPDQ3DUN3LQN
7KH
area would be widened
VLGHZDONZRXOGEHZLGHQHGWRD·SDWK
WR·
VWDQGDUG
CITY OF EUGENE
Visit the project website at www.eugene-or.gov/activeamazon
2015-18 STIP
GRANT APPLICATION
Amazon Active
Transportation Corridor
Amazon Creek Crossings
There is currently one pedestrian bridge across the Amazon Creek be-
tween Hilyard Street and Fox Hollow Road, a distance of approximately
3/4 miles. The result is a barrier between East and West Amazon Drive
that divides the neighborhood. Some residents choose to leap across the
creek and there is evidence of homemade bridges erected from debris in
several locations. The grant funding would provide an additional 2 bridges
and replacement of the existing bridge on 39th Avenue (Top Image) to
provide safe, barrier free access across the Amazon Creek.
Participants at two public workshops selected 36th Avenue and Dillard
Road as preferred additional bridge locations. There is also a possibility of
an art bridge (by Lee Imonen) that was previous designed for a location
north of the project site (Bottom Image). If the bridge could be con-
structed for a cost that is comparable to prefabricated bridges, the design
will be used for one of the three bridge locations.
Reconstruct the Rexius Running Trail
Many attendees of the public workshops mentioned the substandard
condition of the Rexius Running Trail during the rainy season. This
older path was constructed using a standard that is no longer recom-
mended because it can get muddy in wet conditions. The Rexius Trail
is susceptible to flooding and many trail users report running in the bike
lanes on East and West Amazon Drive to avoid the muddy segments
which introduces user conflicts and diminishes the recreational experi-
ence of the trail. This grant would fund reconstruction of the Rexius
5XQQLQJ7UDLOXVLQJDVWDQGDUGGHYHORSHGIRU3UH·V7UDLOZKLFKKDVEH
come a showcase soft surface running trail.
CITY OF EUGENE
Visit the project website at www.eugene-or.gov/activeamazon
2015-18 STIP
GRANT APPLICATION
Amazon Active
Transportation Corridor
Two-Way Protected Cycle Track
Cyclists travelling south on the Ama-
zon Path will have the option of using a
two-way separated cycle track once
they reach 34th Avenue. The cycle
track would provide a user experience
similar to the Amazon Path because it
will feature a physical barrier between
the bikeway and roadway. This facility
type was overwhelmingly supported by
Two-Way
participants at two public workshops
Cycle Track
because it provides the separation of a
shared use path with the lower cost of
Physical
a bike lane. The cycle track would
Barrier
extend from Hilyard Street on the
north to Snell Street on the south. It
would also feature an enhanced pedes-
trian crossing of Hilyard Street at 34th
Avenue.
This cycle track is envisioned as a criti-
cal component of the River-to-Ridges
Active Transportation Corridor that
will provide a family friendly bikeway
between the Ruth Bascom Riverbank
Path System on the north and the
Ridgeline Trail on the south.
Top: The Two-Way Protected Cycle Track
ZRXOGIHDWXUH·RIRSHUDWLQJVSDFHIRU
cyclists and a concrete barrier separating
the bikeway and roadway.
Bottom: Character images of what the
cycle track might look like featuring a
concrete barrier to separate cyclists and
drivers.
CITY OF EUGENE
Visit the project website at www.eugene-or.gov/activeamazon
2015-18 STIP
GRANT APPLICATION
Attachment E
Jessen Path
& Lighting Project
The Jessen Path & Lighting Pro-
ject enhances the recreation val-
ue of Golden Gardens Park and
increases multimodal access.
A shared use path through Golden
*DUGHQV3DUNLVLGHQWLILHGLQWKHFLW\·V
transportation plan (TransPlan) and in
WKHSDUN·VPDVWHUSODQ7KHDGGLWLRQ
of a shared use path will increase use
and appreciation of Golden Gardens
Park and provide a safe and comforta-
ble transportation alternative to busy
roads like Barger Street for local resi-
dents and park visitors.
This proposed linear path facility
would serve the 222-acre natural area
located along Jessen Drive north of
Barger Street connecting Terry Street
on the west to the Beltline Path on the
east. The path alignment would fea-
ture bucolic viewing opportunities of
native trees and grasses, wildflowers,
and local wildlife along the Amazon
Creek and park pond areas.
7KH-HVVHQ3DWKZRXOGIHDWXUHD·
shared use path, pedestrian scale lighting,
interpretive signs, and park benches.
The Amazon Channel provides a ribbon of green through Golden Gardens Park.
CITY OF EUGENE
2015-18 STIP
GRANT APPLICATION
Jessen Path
& Lighting Project
Jessen Shared Use Path
$·FRQFUHWHVKDUHGXVHSDWKZRXOGEHFRQVWUXFWHGVRXWKRIWKH$PD]RQ
Channel, north of Jessen Drive connecting on the west at N Terry Street and
on the east at the Randy Pape Beltline Path. Pedestrian scale lighting will pro-
vide safety for users of the path and will include shields to minimize skyward
illumination and the lighting of sensitive natural areas.
Over the years, visitors and residents alike have requested a shared use path
([LVWLQJ´'HVLUH/LQHVµRUZRUQGLUWSDWKV7RS
that would accommodate all users including walkers, bicycliss, families with
would be improved for ADA accessibility and
strollers, and people with mobility assistance devices. The proposed path
\HDUURXQGHQMR\PHQWE\LQVWDOOLQJDOLJKWHG·
DOLJQPHQWZLOOJHQHUDOO\IROORZH[LVWLQJ´'HVLUH/LQHVµLGHQWLILHGE\DZRUQ
concrete path (Below).
dirt paths where some park users have been treading without a formalized
path for years. The addition of the path will enable safe year-round access
and broaden the park clientele to include users with mobility limitations. The
SDWKZLOOEHDSSUR[LPDWHO\·LQOHQJWKDQGZLOOEHFRQVWUXFWHGWR&LW\RI
(XJHQH·VVWDQGDUGVIRUVKDUHGXVHSDWKV
Increasing the Inventory of Educational and
Recreational Resources
Golden Gardens Park is a jewel in this neighborhood.
Not only does it provide a natural respite from urban
living, but it provides a variety of unique wildlife habi-
tat that can be enjoyed throughout the seasons.
Benches, interpretive signs, and bicycle parking will be
added along the proposed shared use path. These
park amenities will encourage users from outside the
area to travel to Golden Gardens Park and make it a
true regional destination where visitors can rest and
enjoy spending time in this natural environment.
Above: additional interpretive signs will be developed to educate and
identify points of interest to park visitors.
CITY OF EUGENE
Attachment F
%LF\FOH%RXOHYDUGRQORFDOVWUHHW%LNH/DQHVRQEXV\URDG
0RVWELF\FOLVWVDUHPRUHFRPIRUWDEOHRSHUDWLQJRQORFDOVWUHHWV/HIW
WKDQRQEXV\
URDGZD\V5LJKW
&LW\RI(XJHQH·VQRUWKHDVWQHLJKERUKRRGVSURYLGHDQ
LQWHUFRQQHFWHGQHWZRUNRIELNHODQHVRQEXV\URDGV7KLVDSSOLFDWLRQZRXOGKHOS
IXQGDVHFRQGDU\QHWZRUNRIORFDOVWUHHWV
:D\ILQGLQJ6LJQ6KDUHG/DQH0DUNLQJ6KDUURZ
(QKDQFHG3HGHVWULDQ&URVVLQJ
&RPSRQHQWVRIWKH1((XJHQH/LYDEOH6WUHHWV3URMHFWLQFOXGHGHVWLQDWLRQEDVHG
ZD\ILQGLQJVLJQV/HIW
VKDUHGODQHSDYHPHQWPDUNLQJV&HQWHU
DQGHQKDQFHG
SHGHVWULDQFURVVLQJV5LJKW
1((XJHQH/LYDEOH6WUHHWV3URMHFW
Attachment G
NE EUGENE LIVABLE STREETS PROJECT
k
k
k
k
k
Proposed
Bikeways
City of
Eugene
´
Legend
Existing
Proposed
00.10.20.4
Caution:
Bikeway
Accessway
This map is based on imprecise
Miles
Street
source data, subject to change,
Livable Street
!
and for general reference only.
Water Body
k
1 in = 5 miles
Enhanced Crossing
Eugene UGB
Produced by Eugene PWE June 4, 2012 (Ad Hoc 0612-1677)