HomeMy WebLinkAboutItem A: City Hall Complex Strategic Issues
EUGENE CITY COUNCIL
AGENDA ITEM SUMMARY
~
Work Session: City Hall Complex Strategic Issues
Meeting Date: April 26, 2006
Department: Central Services
WWW.Cl.eugene.or.us
Agenda Item Number: A
Staff Contact: Mike Penwell
Contact Telephone Number: 682-5547
ISSUE STATEMENT
The purpose of the April 26, 2006, work session is to discuss the results from the first
Community Forum regarding the Project Values and level of police consolidation, as well as to
discuss the Space Needs Study.
BACKGROUND
The first of four community forums was held Thursday, March 23,2006, from 6 p.m.-8:30 p.m.
at the First United Methodist Church. Nearly 100 people participated. The program included an
introductory presentation regarding key issues and small group exercises-which led into large
group discussions-to facilitate a discussion of the questions posed by the City Council
regarding the project values and police consolidation options. A summary report of the forum is
included as Attachment A: Community Forum #1 Summary Report. The forum was videotaped
and copies have been made available at Eugene's three libraries.
Results from Proiect Guiding Values Discussion:
In a small group format, community members discussed the Project Values and were asked to
consider Question 1: "Which five of the project values are the most critical decision-making
guides for this project to gain your support?" Attendees identified the five values they believed
were most critical and recorded their comments. Additional values were suggested during these
small group discussions and also received votes. The results are as follows, with project values
listed in order of number of votes received:
· Proj ect Value A: Exercise fiscal responsibility ( 65 votes)
· Project Value D: Embody environmental stewardship (56 votes)
· Proj ect Value I: Plan for the future (47 votes)
· Project Value B: Produce government efficiency (43 votes)
· Project Value C: Be user-friendly (40 votes)
· Project Value E: Enhance downtown (38 votes)
· Project Value G: Maximize use of City Hall public spaces by the public and access to
government and its representatives (3 7 votes)
· Project Value F: Inspire civic pride (35 votes)
· Project Value H: Strive for simplicity (22 votes)
Additional suggested values are listed in the report. Collectively, these several additional values
totaled 51 votes. Please refer to the Community Forum # 1 Summary Report for more detail.
LICMOl2006 Council Agendas1M0604261S060426A.doc
Results from the Police Consolidation Discussion:
The project team provided five consolidation options for incorporating police facilities into the
City Hall Complex and how they relate to City Hall building configurations. The consolidation
options included the four options A-D that were presented at the March 8 City Council
Workshop, plus a fifth consolidation option (Option E: All police functions in a separate facility
from City Hall) that was discussed at the workshop. All options were shared with the public at
the March 23,2006, Community Forum as shown in the summary report (Attachment A).
In a small group format, community members discussed Question 2: "How important is it to you
to have patrol facilities on the same site as City Hall?" and Question 3: "How important is it to
you to have patrol facilities located downtown?" After discussion, group members cast their
votes on the importance of the location of police patrol facilities. Design team members then
tabulated and graphed the results and recorded comments.
Nearly 73% of those responding (66 participants) voted that it is not important to have police
patrol facilities on the same site as City Hall. Ten participants (about 11 %) voted that it is very
important to have police patrol facilities on the same site as City Hall.
Participants were divided over the importance of having police patrol facilities located
downtown. About 43% (36 voting participants) voted that it was not important (1 and 2 on the
scale), while approximately 49% (41 voting partici pants) voted that it is very important (4 and 5
on the scale).
It is noteworthy that people voting on opposite ends of the scale agreed that a mutual goal was to
integrate the police into neighborhoods and the civic fabric, and to decrease the perception of
isolation and militarization. There was concern that the police would be less visible and less
integrated in the community if they are not downtown. Yet those who voted "very important"
also supported the addition of substations. Many expressed a desire for a storefront or precinct
model of community policing and were unsure how the location of patrol facilities related to
accomplishing that objective.
Other comments included that it might be more cost-effective if police patrol facilities were
located outside of the downtown, as well as that efficient use of downtown land for other city
planning goals should be a concern. In addition, there were many who believed that it should be
an administrative decision and police patrol facilities should be located in whatever manner is the
most operationally and functionally efficient. Please refer to the forum summary (Attachment A)
for a full and unedited range of comments.
Space Needs Study:
The Space Needs Study comprises the staff and space needs (including the area calculations
summary shown on Attachment C) for a consolidated City Hall using current 2006 needs and
projected planning milestones of2010, 2015, 2025, and 2030. The study will guide future
planning efforts in building organization, size, division adjacencies, and other factors.
Key findings in the Space Needs Study include:
· Population-to-staffing projections: City staffing levels have historically grown at
approximately the same annual average rate as City population, and the combined growth
projections of all divisions except police are projected to continue at the same annual
LICMOl2006 Council Agendas1M0604261S060426A.doc
average growth rate. Police staff is projected to grow at a higher rate due to current
under-staffing as a result of significant staff reductions in the 1990s.
· Planning for the future: A healthy and equitable work environment capable of addressing
changes in service delivery over time favors an open, flexible building with an
appropriate mix of open office spaces, enclosed rooms, and private offices. As often
happens in a space needs study, the initial requests for private offices were higher than
industry standards. The design team is working with staff and Executive Managers to
reduce the number of enclosed offices.
· Area per person: The average net area required per person is approximately 245 square
feet - slightly less than other jurisdictions of similar size as listed in Attachment C.
RELATED CITY POLICIES
The City Hall Complex master planning and public participation process relates to the council
goals of effective, accountable municipal government, safe community, and sustainable com-
munity growth and change.
COUNCIL OPTIONS
The council may decide to narrow the police consolidation options for use in future planning
studies.
The council may also decide to accept the preliminary space needs findings as a guideline for
future planning studies, and select a planning milestone for use in upcoming studies such as the
renovation and/or replacement analysis. Because many factors will influence how the data
within the Space Needs Study will be implemented into a built project, it is advised that the data
guide, but not rule, the process. For example, different sites could lead to slightly different area
totals due to building layouts that respond to the opportunities and limitations of those sites. The
council may choose from the 2010,2015,2025, or 2030 planning milestones.
CITY MANAGER'S RECOMMENDATION
There are no specific recommendations on the project values at this time, but ongoing discussion
of the implications of these values and their relevance to City Council decisions is encouraged.
The City Manager recommends that the project team eliminate police consolidation options A,
D, and E, and continue using Option B and Option C in future planning studies, until other issues
(e.g. renovation and/or replacement) have been considered and one option is ready for proposed
adoption. Using multiple options accommodates choices, but narrowing the number of options
allows greater focus on future planning studies. This is not intended to preclude other options
from emerging as the planning and design process unfolds but, rather, to allow the consultant
team to focus on the two police consolidation options that currently enjoy the most community
and City Council support.
The City Manager recommends that the council adopt the Staff and Space Needs Summary as a
guide for ongoing project planning efforts. Given the council's decision to use a planning horizon
of25 years and the project value to Plan for the Future, the City Manager recommends using the
2030 planning milestone.
LICMOl2006 Council Agendas1M0604261S060426A.doc
SUGGESTED MOTION
Move to adopt police consolidation Option B and Option C for use in future planning studies
until the council is prepared to adopt a single option in relation to an overall Development Plan.
Move to adopt the 2030 staffing and space requirements identified in Attachment C to guide
future project planning efforts.
ATTACHMENTS
A. Community Forum Summary Report
B. Police Consolidation Options A-E
C. Staff and Space Needs Summary and Comparative Data
FOR MORE INFORMATION
Staff Contact: Mike Penwell
Telephone: 682-5547
Staff E-Mail: michael.j.penwell@ci.eugene.or.us
LICMOl2006 Council Agendas1M0604261S060426A.doc
Eugene City Hall Complex
Master Plan
~
~
I r J
III J: :.01
I - 1 J n
,...-
-- =-
[
I J
i" -,
Ii
I ':J...,:,
I I. -' 1
--l J--
Ir~ -- J
}
II
r r
..~ r I
. . I
~c
I .q-,
C\ - ----
-.
Il.,
r...
~
'0......"
~
fl
'::I
-~ ~ - ...........
Community Forum #1 Summary
~~~
,.?
.....
1
I'
:
.1 "lI
I.,
L-
"\
...
"
').,
~
r'I~ II
.., '::!: l~ ~:r'l
f:i'
h IIlI
~ 1
...........~ .I ~ ... 11 ~
---,
I"'J I:;
_ 'Ji
;;; il
il
I
[jl
-,
't
L' - 1
............... __ ----... '-----i.IlI ~~ : ~ _ _ ~ 1....1
I- ="',_1"
~ 51-
;:.~' ~, II
:"1 [' 0 0 1"'1 ~
!;Ii
~..;
.....0
(J
...
:]
:J
~ j
J
(
,.'"
~r"" ........ C - )~
;=
I pC
~
["l
... ~
:J....o....-...I....
City of Eugene
777 Pea rl Street
Eugene OR 97401
Thomas Hacker Architects Inc
733 SW Oak St. Suite 100
Portland OR 97205
T: 503.227.1254
F: 503.227.7818
rI
City of Eugene
City Hall Complex Master Plan
Community Forum #1 Summary Report
INTRODUCTION
The City of Eugene (City) held the first of four community forums to receive citizen input on the
future of the Eugene City Hall complex. The community forums are designed to provide input to
the City Council in order to assist them in the decision-making process around the issues related
to the City Hall Complex. The community forum was held Thursday, March 23,2006, from 6 to
8:30 p.m. at the First United Methodist Church in Eugene, and was attended by 96 people. The
purpose of this first forum was to introduce the project, gather specific community feedback for
the City Council, and foster dialogue between the community and the project team.
The forum agenda included the following items:
. Proj ect background
. Public involvement process
. Small-group work sessions and large-group discussion:
o project values
o space needs and consolidation
. Questionnaire
. Next steps
The presentation included a PowerPoint slide show conducted by the project team members from
Thomas Hacker Architects Inc. (see Appendix A: Forum #1 PowerPoint Presentation).
Following the presentation, small group exercises allowed attendees to discuss questions posed
on behalf of the City Council relating to the project values and police consolidation options.
Exhibits and dots were provided to small groups at each table to record their votes and comments
(See Appendix B: Forum #1 Small Group Agenda). After the conclusion of each small group
exercise, results were tabulated and displayed to the entire group for discussion and verbatim
comments were recorded.
Results and a record of all verbal and written comments from these exercises are included in this
report. The project team also presented next steps and participants were provided project
questionnaires (see Appendix C: Forum #1 Questionnaire and Appendix D: Questionnaire
Summary Responses) and index cards to record their comments.
The JD White Company, Inc.
Page 1
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
The forum organizers and presenters included:
Kyle Brown, The JD White Company, Inc. (JDW)
KC Cooper, JDW
Jonah Cohen, Thomas Hacker Architects Inc. (THA)
Dana Ing Crawford, THA
Mike Penwell, City of Eugene
Jana Rygas, T'nT Consulting (T'nT)
Ellen Teninty, T'nT
Maegan Vidal, JDW
Chris Watchie, T'nT
Issue 1: Project Guiding Values
Small groups were given exhibits with the nine project values adopted by the Eugene City
Council at its November 23, 2005, work session; they were:
A. Exercise fiscal responsibility
B. Produce government efficiency
C. Be user-friendly
D. Embody environmental stewardship
E. Enhance downtown
F. Inspire civic pride
G. Maximize use of City Hall public spaces by the public and access to government and its
representatives
H. Strive for simplicity
I. Plan for the future
Each group was asked to consider the question: "Which five of the project values are the most
critical decision-making guides for this project to gain your support?" After small group
discussion, individuals placed dots next to the five values they felt were most critical and
recorded comments on blank paper. Graphs illustrating the results of each question were
displayed and a large group discussion ensued. Additional values were suggested in small groups
and received votes from people at those tables. These additional values are tabulated as "other"
and are included in the comments section below.
The JD White Company, Inc.
Page 2
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
Question 1: Which five of the project values are the most critical decision-making
guides for this project to gain your support?
Figure 1: Which five of the project values are the most critical decision-making
guides for this project to gain your support? (note: numerical values indicate
number of votes)
Additional
Values (51
I. Future
Planning (47)
H. Simplicity
(22)
G. Use of City
Hall (37)
F. Civic Pride
(35)
E. Enhance
Downtown (38)
A. Fiscal
Responsibility
(65)
B. Government
Efficiency (43)
C. User-
Friendly (40)
D.
Environmental
Stewardship
(56)
Project Value A: Exercise fiscal responsibility
Votes: 65
Comments from large group discussion
. Value is strangely-worded and loaded. What is the opposite of the value, "fiscal
irresponsibility?"
. Fiscal responsibility should be an aspect of government in general, not just the Eugene City
Hall Master Plan project. It should include repairing roads and funding police.
. Building for the future is fiscally responsible. However, the 25 year planning cycle is too
short. The cycle should be 50 to 100 years.
. How will the proj ect be paid for?
. (Team response: Discussions will take place in the third phase of the project.)
. Outsource some aspects of the project to save money and stimulate the economy.
The JD White Company, Inc.
Page 3
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
Comments from small groups and written comments
. Build for 100 years. Build bigger than the present need and become a landlord in the interim.
. Important if we use this to enhance all of downtown.
. Be affordable.
. Do not spend taxpayers' money on an unnecessary new building.
. Now and for the life cycle of the building.
. Insert "actually" before "exercise."
. Long-lasting, more than 200 years.
. Be affordable.
. The fiscal aspect should not only be transparent, but true and accurate.
. V oters will not take seriously that the City values "fiscally responsibility" and
"environmental stewardship" when the executive bureaucracy is selling unneeded parking
garage to half-witted city councilors.
. Re: Fiscal Responsibility. Avoid trendy colors and design elements-they age much too fast.
. Fiscal responsibility. Any new construction, reconstruction, or retrofit of existing buildings
must not occur without voter approval.
. Fiscal responsibility $11 million to City Hall NOT parking garage
. Upfront costs
. Ongoing operating building costs
. Minimize tax increase impacts reuse existing structure (Are emergency services best located
in downtown?)
. This is a flood zone
Project Value B: Produce government efficiency
Votes: 43
Comments from large group discussion
. Construct building that will integrate the various parts of the City.
. Government should represent the people-would support the project if it is representative of
the populace.
. Need a process in which the public can express its priorities before funds are allocated for a
proj ect.
. Efficiency is a virtue when the government is acting on behalf of the populace.
. Do not like the wording of the value-it should read: Enable or facilitate government
efficiency.
. Employees may be more efficient in a better building, not just through consolidation.
. Need to know how it will be paid for-do not plan for something when you do not know how
you are going to pay for it.
The JD White Company, Inc.
Page 4
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Co-locate with County functions, wherever it makes the most sense. Make this a new value.
. The media is saying that a new City Hall will be built regardless. Council is allocating funds
for the project. Perhaps some employees could work from home to produce efficiency.
. We have an opportunity to look at decentralizing some functions to remote locations.
. Could provide mini fire and police functions to save money.
. Consider outsourcing some government work
Comments from small groups and written comments
. Add "consolidate."
. One-stop shopping versus total capitalization.
. Add through consolidation.
. "?" next to efficiency.
. Offices for city councilors to be more accessible to the public.
. Work better.
. Build a facility we are proud to show off.
. Consolidation: The future will lead to consolidating services-city, county, state. Need
partnerships (now) of multiple agencies. Think integration.
. Regarding comments on building City Hall for public-not staff. Please remember that City
staff are also tax-paying members of the public.
. My response was not captured completely. It is #13 on the Excel spreadsheet (values). It
should read: When the Government is acting in the interest of the public, efficiency is a
VIRTUE. When it is not, in-efficiency is a VIRTUE.
. Many cities have dispersed services. We would need a much bigger building. Group related
services that interact. Government efficiency important.
. Impact on efficiency of city operations. (Move police-retrofit existing structure, create a
neighborhood police)
. Walking place to place-good. Sedentary? Efficiency.
Project Value C: Be user-friendly
Votes: 40
Comments from large group discussion
. Value includes wheelchair accessibility. Accessibility to City Hall, including restrooms and
other areas, is important.
. More important to be public friendly.
. The current City Hall is not user-friendly for the sight impaired.
. Value should be edited to read: "Be user-friendly online and in buildings."
. The City needs an ombudsman-the edifice needs a public face. The ombudsman would help
people with what they need; and to navigate them through the City government.
The JD White Company, Inc.
Page 5
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. City Hall should be non-intimidating and accessible for all disabilities.
. Hearing impairment is the most common disability and should be accounted for in the future
plans for City Hall.
. Avoid computer kiosks in future plans; they are not user-friendly for the sight-impaired.
. Increase the use of way finding signage.
. Create a village green atmosphere and make City Hall inviting for people to linger and
visit-amenities.
Comments from small groups and written comments
. Add "to the public" after "friendly."
. Public- friendly is more important than staff-friendly.
. Keep the current, user-friendly building.
. Add "online and in buildings" (accessible) to the end.
. Handicapped accessible.
. For public, staff, and officials.
. Also by wheelchair users.
. Accessibility.
. The City does not have the right to provide (be landlord for) private business. There should
be no restaurants, galleries, or similar in the building. Small coffee shop O.K.
. Building should be in proximity to Lane County public services. Keep in mind
access/accessibilities for alter-abled, elderly and children. Build should reflect a welcoming
environment for all races and economic classes. A public plaza with user friendly
amenities-sitting, eating and comfortable areas for customers. Like the Atrium.
. User friendly should accommodate handicapped. Work at home whenever feasible-could
reduce area needed for workspace.
. Current building not user-friendly. Open space not effective. Consolidation is important for
user-friendly. Consider alter-abled people. Move police, concern about e.g. Blue River flood
zone. Need some downtown.
. Azra Khalidi provided a sketch outlining the potential layout of a six-story new city hall
building. The building would be situated between High and Pearl Streets on 8th Avenue. The
structure would be separated from a parking area by an alley. The first floor would house the
police department and investigation, and provide secure parking. The second floor would
house public works; the third-police administration and the City prosecutor; the fourth-the
City manager, mayor, and council; the fifth-city planning and permits, and the sixth-
finance, documents, and distribution. The structure would feature a rooftop garden and bird
sanctuary.
. Have a welcoming central courtyard-perhaps some play equipment-tables and places for
people to sit and eat lunch or relax and talk.
The JD White Company, Inc.
Page 6
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Work to have meeting rooms and spaces as welcoming and open as possible-lighting
visualization and how about rooms with circular tables so there is no head of the table
(spoken or unspoken focus of authority.)
. The current City Council chamber has City Council members elevated on a platform, tables
with recorders, and City officials below and then a railing to separate all those important
people from the other really important people. Community members are architecturally
isolated from the City Council who looks down on them. Oh well...
. Somehow figure out how to make this place youth friendly. How nice it would be to have a
courtyard where youth felt comfortable coming and hanging out.
. Do the same for other segments of the community who usually don't trust City Hall and
don't feel welcome and how may feel disenfranchised-non-English speakers, low income
folks, and the homeless. How wonderful it would be to create a place, a City Hall that really
is open to and used by all parts of this City. This is not impossible and certainly would take
some time.
Project Value D: Embody environmental stewardship
Votes: 56
Comments from large group discussion
. None
Comments from small groups and written comments
. Recycle, instead of using new resources.
. Add green building.
. Incorporate edible landscaping throughout, everywhere possible. This will be increasingly
important.
. Would like to see a green, energy-efficient building.
. In creating energy efficiency ideas into the building, make sure that those features are
showcased so the public will be able to see, understand, and learn how they work.
. Priority # 1 environmental stewardship is predicated on the careful determination of the basic
need assessment for a new site. Total energy lost or gained in materials or energy usage to
justify a new city hall. Employ independent group to analyze this in order to build trust.
Careful financial analysis with priorities of other needs of the City.
. The principle of environmental stewardship has to be paramount in the design.
. Passive solar
. Photovoltaic solar
. Native landscaping
. Energy efficiency
. Use of green building materials
. The building should be a model for the community as a work place for employees and a
meeting, working, business center for the public. Reuse-Recycle-Minimize.
The JD White Company, Inc.
Page 7
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Design with nature in mind. Manage stormwater on site, make space for wildlife/birds, and
design for cloudy winters. Have a space for public gatherings (large) inside and outside.
Integrate natural materials in the design of the building.
. Life cycle energy costs should take into account large future energy cost increase.
. The value is too vague. Value should be, "Reduce, reuse, recycle, build LEED platinum."
. Include edible landscaping.
. Maintain the water feature. Mallard ducks visit it every year.
. Consider the use of solar power.
. Consider the site as a permanent venue for the farmers market.
. Incorporate permaculture planning and a public education component.
. Include green building components (sod roofs, etc.)
. The building should be the epitome of green building-perhaps include a farmers market on
the roof?
. Do not want the safety patrol to have the problem of deterrents in the event of a quake, etc.
Fix the structure.
Project Value E: Enhance downtown
Votes: 38
Comments from large group discussion
. Incorporate open space and relate City Hall to adjacent structures. Harmonize with
surroundings.
. The current City Hall closes at night-consider planning for nighttime use (i.e. include shops
on lower level, etc.)
. If the building is going to be expensive, it should be the nicest.
. Encourage employees to use and patronize downtown businesses.
Comments from small groups and written comments
. This should not mean building City Hall downtown. This should mean making the downtown
friendly and inviting at all hours-no dead zones.
. Enhance is a vague value to be a guide.
. Closed at night/how to do this? Civic centers/campuses are closed-how to make sure it does
not create a dead zone. Need G for E to happen.
Project Value F: Inspire civic pride
Votes: 35
Comments from large group discussion
. City Hall should represent local artists, as a gallery and in the building's design, such as
doors and windows.
The JD White Company, Inc.
Page 8
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. The City needs to restore public trust before moving forward with this project in order to
inspire civic pride.
. Thomas Hacker Architects should display their projects to the public-provide a sense of
what they represent. (Team response: link to THA website is on the project website.)
. This value is tied to fiscal responsibility-the public will be proud of the wise use of funds.
. If the public's key values were embodied in the city hall, "civic pride" would be the result.
Comments from small groups and written comments
. Inspire is a vague value to be a guide.
. Access to facilities for all citizens is a source of pride.
. Inspire civic pride by: restoring public trust before moving ahead-even if it takes longer
than the allotted year.
Project Value G: Maximize use of City Hall public spaces by the public and access to
government and its representatives
Votes: 37
Comments from large group discussion
. None
Comments from small groups/written comments
. Work out a plan for downtown.
. Elected officials centrally located in City Hall.
. Value G means Values Band C combined.
. Add "and restrooms."
Project Value H: Strive for simplicity
Votes: 22
Comments from large group discussion
. Focus on a timeless design.
. Include natural light by using passive systems to heat and cool buildings.
. Consider night court as a means of simplifying operations.
. Be wise in use of simplicity. Strive for appropriate simplicity.
Comments from small groups and written comments
. The current system works, having emptiness in different spaces is okay.
. Strive for appropriate simplicity.
. Later include open space.
. Simplicity is a questionable value because it is vague.
. Our group's comments on the simplicity value were passed over by the moderator. They
were not shared with the overall forum. But we got them in after all anyway.
The JD White Company, Inc.
Page 9
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
Project Value I: Plan for the future
Votes: 47
Comments from large group discussion
. Use existing EWEB buildings for expansion and allow it to facilitate a connection to the
rl ver.
. The City Planning Department needs to be more accountable in its decision-making
processes (e.g. massive hole in downtown Eugene).
Comments from small groups and written comments
. 50 years.
. Peak oil.
. Add with compact, multi-story, urban growth.
. More than 25 years-1 OO!
. It should look good! If City Hall is going to represent us, it should be modern and should last
a long time!
. All new building should be designed to add upper stories-up instead of out. Avoid urban
sprawl
. We should anticipate moving the City Hall into the EWEB administrative building and add
additional space along the river-not to the new court house.
. Use a 50-year planning cycle. Think long term.
Additional Values
Votes: 51
In small group discussions, participants could create new project values, modify existing values,
and vote on the additional values they created. These additional project values were not
uniformly presented and voted on in the large group discussion due to time constraints.
Additional values recorded on exhibits (votes)
. Value A.A: Recycle existing facilities. (5)
. Value B.B: Close to public transportation and pedestrian routes. (2)
. Value C.C: Decentralized/distributed facilities located in neighborhoods. (1)
. Value D: Reduce, reuse recycle. Build LEED Platinum. (Duck friendly too!) (5)
. Values H.H: A structure that is very modest and low cost because of all of the
other human needs that are not being met currently. (2)
. Value J: Retain the connection between the past, present, and future. (1)
. Value J: Don't demolish atrium building. (8)
. Value J: Embody cultural stewardship. Respect history. (4)
. Value J: Meet or exceed existing downtown planning guideline (FAR). (6)
The JD White Company, Inc.
Page 1 0
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Value J: Flexibility of department use. (4)
. Value J: Add a human dimension to this space, such as an ombudsman. (1)
. Value J: Reflect Northwest, local culture, and sense of place. (5)
. Value J: Accessibility in City Hall and restrooms. (3)
. Value K: Retain some of exiting building. (1)
. Value K: Display art work by local artists.
. Value X: Build Community and government participation. (1)
Additional written values
. Relationships.
. Having council members centrally located in City Hall.
. Elected officials.
Additional values from large group discussion
. Embody cultural stewardship should be a value.
. Co-locate with County functions, wherever it makes the most sense. Make this a new value.
The JD White Company, Inc.
Page 11
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
Issue 2: Police Consolidation
To stimulate dialogue in the small groups, the project team provided five graphics showing
different locations of police facilities and how they related to City Hall building configurations.
The groups then discussed Question 2: "How important is it to you to have patrol facilities on the
same site as City Hall?" and Question 3: "How important is it to you to have patrol facilities
located downtown?" Groups were provided with exhibits with scales ranging from "Not
Important" to "Very Important" that related to both? questions. After discussion, group members
placed a dot on each question's scale indicating the importance of the location of police services.
Project staff tabulated and graphed the results. Participants could record their comments on blank
paper and index cards to be documented following the forum.
Question 2: How important is it to you to have police patrol facilities on the same
site as City Hall?
Figure 2: How important is it to you to have police patrol facilities on the
same site as City Hall?
70 66
60
50
40
30
20
10
10
6
6
o
1
Not Important
2
Somewhat1mportant
4
5
Very Important
. Votes for Not Important: 66
. V otes between Not and Somewhat Important: 3
The JD White Company, Inc.
Page 12
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Votes for Somewhat Important: 6
. Votes between Somewhat and Very Important: 6
. Votes for Very Important: 10
Comments from large group discussion pertaining to "Not Important" choice
. It is too expensive to locate all City employees downtown.
. Does not foster community policing.
. Not having the police station at the same site: It's been fine all these years to have it across
the street. Our group doesn't want a new police facility, doesn't want to pay for it. We voted
no so many times.
. Good to have admin police functions with other government functions good supervision.
If police/public interface is close to other public services people in need are more likely to
use multiple services. Police should be demilitarized.
. Not important to have police inside city hall because separating police means city hall
doesn't have to be built to as high seismic standards. Separating police would save money.
. Police patrols become community policing centers. City hall-simple, lasting, beautiful.
Close to county. Citizen meeting rooms.
. Police services and municipal courts should attempt to be part of a justice center-separate
from City Hall-with additional jail cells and circuit and district courts.
. It seems horribly inefficient and expensive to have patrol officers go to City Hall to check-in,
get their vehicle and then go out in the community on patrol.
. Integration of police into City Hall doesn't preclude remote community stations. Counter the
trend to militarization of police. Integrate police force into government. This is a chance to
incorporate the values that make Eugene unique: farmers market, green building, public
participation, solar, public transportation. Affordability.
. Patrol is a function of logistics not for public discussion. Police administration and
investigations are far more important to other civic functions.
. Removal of police patrol from city hall will allow roll call to be done at ward level stations-
police will spend less time commuting and more time patrolling. City Hall should have
military-like presence of patrol removed. City Hall should emphasize open relationships and
citizen authority-not police authority.
. Police department funding has been voted down 3 times and should not be attached to city
hall funding.
. Has the defeat at the polls of building a new downtown police station reflected an opposition
to this proposition or a negative reaction to some police actions like Lara & Magana crashing
a National Guard tank into a house in Whitaker, etc. - Denny Guehler
. I believe it is important for the police and other city government. Police should not be
isolated. If they are seen as part of government as a separate entity perhaps some of the
public's fears may dissipate. Whether they are in the same building or in very close
proximity to interact with the rest of city employees/government/courts. Are we large enough
The JD White Company, Inc.
Page 13
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
to support a precinct model? One central unit that police could rotate through. The primary
location should be downtown to promote greater presence in the community.
. Patrol needs district facilities.
. Option of not having a centralized patrol facility in.
. Something downtown substation but not needed at same site.
. Good to have administrative police functions with other government functions. Good
superVISIon.
. If police/public interface is close to other public services people in need are more likely to
use multiple services.
. Police should be demilitarized.
Written comments pertaining to "Not Important" choice
. It is too expensive to locate all City employees downtown
. Does not foster community policing.
Comments from small groups and written comments
. Patrol should be located where operationally functional.
. Base patrol location on access to transportation corridors.
. Administrative decision.
. Essential facilities.
. Community policing.
. Consensus of all six table members: It is important to us that the patrol facilities not be in
City Hall.
. It is important to have patrol facilities close to other police functions and City Hall; assuming
City Hall is downtown.
. Consolidated, not necessarily at City Hall.
. Police administration in City Hall is needed, but not needed to have patrol facilities there.
. Patrol facilities should be visible downtown, but not necessarily in City Hall.
. Why worry so much about police, when fire was decided administratively? There are some
similarities in the departments.
. It is paramount to keep the chief of police separate from the city manager. This physical
division could further the necessary separation of powers.
. Important to keep police headquarters/central patrol facility separate from City Hall-too
congested, too intimidating for public. Doesn't need to be downtown. Less costly elsewhere.
. Perhaps a separation of the Eugene Police Department (EPD) and the Human Rights program
into two wings on opposite sides of a courtyard. Some people coming to the Human Rights
office are anxious about the current close proximity of the EPD.
Comments from large group discussion pertaining to "Very Important" choice
. Surprised that not too many attendees found this choice important.
The JD White Company, Inc.
Page 14
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Do not want the police militarized and separate. Want them incorporated, but understand that
people want them incorporated into the community too. Perhaps rotate police through the
downtown station.
. Once the police are removed from City Hall, there is no need for seismic retrofitting.
. Continue discussion on this topic at Friends of Eugene web site forum.
. It would be a mistake to include the police as part of the Eugene City Hall project-the bond
measure for a new station has failed three times.
. Undemocratic
Question 3: How important is it to you to have police patrol facilities located
downtown?
Figure 3: How important is it to you to have police patrol facilities located
downtown?
35
5
-
32
- 28
-
-
- 13
-
7
- 4
I I I I I
30
25
20
15
10
o
1
Not Important
2
somewha11mportant
4
5
Very Important
. Votes for Not Important: 32
. V otes between Not and Somewhat Important: 4
. Votes for Somewhat Important: 4
. Votes between Somewhat and Very Important: 13
The JD White Company, Inc.
Page 15
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. V otes for Very Important: 26
Comments from large group discussion pertaining to "Not Important" choice
. Need neighborhood precinct sites.
. Downtown has a high crime rate and it appears that locating police station there would have
no affect on the crime rate.
. Downtown parking is expensive-not cost effective to locate police there.
. Moving the police out of City Hall frees up space and may determine that no new City Hall is
needed.
. Need to integrate the police within the community and government.
. The project team should educate interested parties regarding Measure 16 from 2002-the
availability of State bonds for essential service facilities.
Comments from large group discussion pertaining to "Very Important" choice
. The question is worded poorly-the police's ability to respond is a key part of their
functions. You do want some police downtown. Need substations.
. Locating police downtown does not preclude remote sites and community policing.
. Favors downtown location to promote density, and participation with the community. If they
are not downtown they will be less visible.
. Where do police begin their patrols?-we are discussing where they begin. The police need
to be close to City Hall. It could be more cost effective for the facilities to not be on the same
site as City Hall.
Written comments
. Demilitarized precincts on either side of the river.
. It is important not to be downtown.
. Patrol in neighborhood precincts.
. It is important to have patrol facilities away from downtown.
. Important to be outside downtown.
. Convenient!
. Some, or all?
. Some patrol facilities located downtown.
. More important to have highly visible, well lit sub-stations.
. Patrol officers and facilities should be spread throughout the community. At least one facility
in downtown core.
. Avoid police fortress.
. Do not isolate police from the public. Deinstitutionalize.
. Do isolate public from police (not consensus!).
. I agree wholeheartedly that the EPD be demilitarized and be more community-friendly. Also,
neighborhood precincts with walking patrols would facilitate this.
The JD White Company, Inc.
Page 16
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. It's important to have some police presence downtown, but I'd like to see precincts.
. Lane County Disaster Manager, speaking to City Club, reported in December 2005 "if you
have critical services in the basement, you might want to move these services to the 2nd
floor." Our comments: If an earthquake of the size that would topple buildings in the
downtown happens... dams will probably break and the city downtown may be severely
flooded... Leading us to believe the Police Dept. should be moved out of the downtown
core. .. closer to the hills.
It depends on how it pencils out. (Keeping police facilities there)
. I think police presence should be more evenly distributed in "substations" rather than
downtown concentration.
. Having satellite police stations set up with or similarly like our fire stations that seem to work
well for response.
. Patrol offices can be spread throughout the city. There must be some patrol facilities
downtown but not all facilities need to be downtown.
. Precincts! == sense of community. This is possible and works. What about a precinct model
with a downtown precinct located to allow interaction between patrol and city employees?
What about victim and arrestees interactions with public? It should be different than
interaction with patrol.
. Police patrol should be outsourced to the satellite community police centers.
. All city government functions should be located within the designated downtown area.
. Dispersing patrol into neighborhoods helps build community relationships, dissipate the
militaristic model that presently exists in our dept. model.
. Think about the future of policing needs in the next 20-30 years of growth. That to me means
dispersing them to precincts.
. Why patrol not downtown? Does not promote community policing! Create neighborhood
precincts and spread the Patrol Division out across the City.
. Re Question 3: 1. Land costs downtown are too high to use it to store automobiles. 2.
Establish precinct stations out in the community. 3. The Chief belongs near the City Manager
in City Hall-the rest of the police functions belong in precinct stations or in a single facility
located at 2nd and Chambers.
. 50% of opinion favored dispersing police functions, principally for economic cost and
efficiency reasons. A minority felt it was important that police not be isolated from the
public/other city government.
. For diversity of earthquake safety, have a police station on each side of the river.
. Revised to read: How important is it to you to have some patrol facilities located downtown?
. If patrol function is moved from existing building, important to find ways to bring light into
rehabilitated spaces (glass block?).
. It is not important to have the police downtown: Dispersal to neighborhood police stations
could be enabled by this.
The JD White Company, Inc.
Page 17
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
Other Comments from Large Group Discussion
. Would like an e-mail highlighting the results of the forum.
. Would like a broader discussion of principles, otherwise citizens will lose interest in process.
. The City Council disregards participation and the Whole Foods process colors the City Hall
process. There is a low level of trust with the City Council at the moment.
. Project information is biased-you should not be selling the project to the public.
. The City Council has decided not to maintain the City Hall facility as a means of making the
problems seem worse than they really are.
. Why not maintain the status quo?
. Include "other" as part of tallying votes for the values voting exercise.
. Improve microphone sound quality for future meetings.
. Please speak to our civic groups as part of outreach process.
. By the time a farmers market becomes part of City Hall, the conglomerates will have already
absorbed demand.
. Include the public in conceptual design choices before any bond measure.
Other Written Comments
. As an aside use Ballot Measure 16 from 2002 as a tool for financing.
. Do not like police department getting funded in this manner-by passing overwhelmingly
defeated tax levies.
. Issue seems disembodied from other parameters.
. Why 20 minutes for this weird make-work issue?
. What about community policing? Decentralization.
. What about other, bigger problems with the bubble diagrams that are not related to police?
. What about a farmer's market downtown?
. Process is not very open because the dot game is only polling.
. "Other City Hall Functions" is all the interesting stuff.
. When only one speaker has a mike it is not a community discussion.
. Why do city space uses seem to have 300-400 square feet per employee?
. Space numbers and what is in and out of the picture on the propaganda map in Newsletter #1
are confusing and arbitrary.
. The time management and focus plan need work!
. This public involvement process is empty at its heart as long as you let the City Council keep
it on a too tight a leash.
. After largely wasting people's time tonight, are you going to have: 1) less participation, or 2)
angry participation, next time?
The JD White Company, Inc.
Page 18
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. No Police in City Hall- LACK OF TRUST!!! No militarized police. No more 'tank' /SW AT
raids. Last Tuesday, March 14, there was a 5:00 a.m. "tank"/SW AT raid on a Eugene family
(near 22nd Street) who are pillars of the Eugene community. This family owns two bakeries,
a restaurant, and runs a charter school. Neighbors turned out and tried to stop the attack. A
10-year-old boy was on his knees in the front yard; hands on his head; with multiple assault
rifles pointed at his small body. WE ARE OUTRAGED that the out-of-control SWAT team
is once again, attacking citizens and terrorizing our neighborhoods with the "tank."
Concussion (flash-bang) grenades were thrown into the house. A young man was arrested
with an ounce of marijuana. Our new police chief, Bob Lehner, promised/stated to the press
that the "tank" would only be rolled out for hostage situations/violent emergencies. What
happened to the SWAT matrix? This was a LOW RISK search warrant. The EPD and LCSO
are more and more becoming "bad guys." The citizens of Eugene deserve an apology. Why
are Lt. Tom Turner and Capt. Steve Swenson STILL employed by the city when they are
ignoring Constitutional rights of citizens and generating lawsuits?
. Look at the IAP2 spectrum again please. Where on the scale is "selling an idea" to the public
like Newsletter #1? How will you redress that newsletter?
. This process should have been used to determine the Whole Foods/parking garage issue.
. Related to comment #2, if at any time it becomes apparent to me that the City officials have
already decided the outcome of the City Hall Master Plan, I will withdraw from participation
and be very vocal about it.
. Above all, use existing structures.
. City staff walking between offices is often a welcome activity. Fresh air (?), exercise, change
of scenery, opportunity to relax/rejuvenate before that next meeting or. .. (Far too much
sitting; far too little space/time to think/be alone for short periods/freshen up.
. Opinion without rationale doesn't help responsible decision-makers. Informed opinion is
more objective than frivolous opinion.
. Install microphones in all executive staff offices wired to a public switchboard in the lobby
so citizens can check to make sure staff isn't scheming secretly against the public interest.
. City propagandists are positing theories of "nodal development" and "urban density" that are
mutually contradictory.
. The questions can be interpreted in any way, as they are so general. There was no way to
clearly state that we like the current city hall, that it can be updated successfully, and
enlarged simply.
. Suggestion on process: Provide vehicle for internet communication; virtual
discussion. [accessthediscussion@ friendsofeugene.org]. Get this to the planning team.
. How do we verify that what we are relating here tonight will be conveyed correctly to City
Council?
. How can we rearticulate our choice-can we restructure the next forum?
. There are a number of questions within the questions and it is difficult to articulate.
The JD White Company, Inc.
Page 19
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. There was discussion at some point to luring non-profit groups i.e., Women Space, that
benefited by being in close proximity to police services. What has become of this idea? I
recall Women Space, at one point anyway, wanted this relationship.
. It seemed like a sadly confusing and cumbersome process tonight. I'm glad I came anyway
because I appreciate that you took all comment down and invited us to write down any that
didn't get voiced.
. City planning should be centered on utilizing existing resources more than spending extra-
even if it's "in the budget". The presentation could have included the lowest cost plans as A
& B & not left it out. Since you didn't include it on the overhead, display, I lost trust in the
process-seems misleading.
. How is this structure going to be paid for, and what services and needs are not being funded
to build this structure?
. Mayor Piercy has stated that she thinks a good place for an expanded farmer's market is in
the city hall complex. Why is it not included?
. Next session: Have a roving microphone for public comments so we can hear.
. The only reason to redo city hall is to make it earthquake proof. Without the police patrol in
the building, the city hall does not need fixing.
. Broader base of participation: How can we increase the diversity of comments? This group is
the usual public process "groupies". All generally anti-government. How about a "kid's
night" to draw families or other ways to attract broader range of ideas.
. The police need to be watched in a clear bubble building by the public and civil rights
advocates.
· I agree! (sort of).
. Minimize impact of opinions of those who just don't believe in government.
. You need to reestablish public trust; many feel this is already a done deal.
. Where were all of the other councilors and Mayor? Betty Taylor was the only one present.
. Are meetings between design team and council open for public observation?
. Downtown based on the Pareto Principle, The 80/20 rule. Business: 20% of goods, services,
and customers accounts for 80% of the business. Which single enterprise, besides
governance, has the most draw to downtown? It has local material, production, and transport.
It not only has a major draw but fills a basic need. It has an exponentially expanding
customer base. It is so successful that it is looking for more space. It keeps money local
instead of removing it. It is not empty storefronts and offices. It is not a gamble of a tax
subsidized anchor store. It is not based on the SEPARATE ISSUE of high density. It is
locally grown food, The Farmers Market. The Pareto business tool shows that expanding the
Farmers Market is a much more viable and proven option than Whole Foods. The Pareto
business tool shows we are wasting our time and revenue on Whole Foods. We really should
be talking about our FARMERS MARKET having too little space and how to expand its
space Happy Humus!
. I am very much in favor of a new City Hall.
. Include as many non-Western, non-European images and touches as possible.
The JD White Company, Inc.
Page 20
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
. Thanks for the public forums. I'm wondering how or whether you are contacting those who
ordinarily don't come to such forums. What a revolutionary idea to go to youth centers and
homeless shelters to listen and learn. White Bird, St. Vincent de Paul's, Looking Glass, New
Roads, Centro Latino, and Sponsors are places that immediately come to mind.
. Civic Campus Concept
After attending the public forum on the City Hall last week, I was struck by the concept of a
"Civic Campus". I do not believe that all city functions must reside in a single building.
However, the civic campus concept allows for proximity of city services in an attractive
downtown setting.
A "Civic Campus" would consist of adjacent buildings with a park-like "courtyard"
separating them. The campus could be composed of existing buildings and buildings yet to
be constructed. Moreover, the campus could accommodate a number of concerns raised at
the forum.
Eugene is the proud home of a plethora of non-profit agencies that provide a wide variety of
services, education, arts programming, recreation and advocacy. Some such as the Lane
Independent Living Alliance or LILA are due to be displaced by East Broadway re-
development. Affordable, accessible space could be made for some of these organizations in
a civic campus. Inclusion of non-profit organizations offers municipal and community
acknowledgement of their importance.
The courtyard of the campus would also offer a home for the Farmers' Market, a concern
raised by two speakers at the Forum. An open courtyard would also provide a venue for any
number of community cultural and political activities.
Putting a "human face" on city business was also mentioned. An information service could
be positioned at street level near the courtyard. Citizens could receive direction to specific
city services. Personnel who worked in the information desk should be fully aware of city
government and its workings. Ideally, the information desk could be the repository of
community-wide information to be provided to inquiring citizens and visitors.
A small percentage of ground-floor space could be made available for commercial
endeavors. For example, a small cafeteria like those operated by clients of the Oregon
Commission for the Blind, would be appropriate.
Design of the civic campus should also include features reflective of Eugene's four sister
cities. Artistic and cultural elements of Kakagowa, Chinjou, erkutzk and Kathmandu could
be incorporated in the structural design, artwork and landscape of the Civic Campus.
In surveying the space needs of city government, a "Civic Campus" would address the
concerns of municipal workers and city residents. As we plan for the next 25 - 50 years we
ought to look at re-defining Eugene's downtown and its city services. A well-defined civic
campus offers an opportunity to address city government needs and citizens' concerns.
Next Steps
KC Cooper discussed the project next steps and how the participants' feedback would inform the
City Council. A summary report of the forum will be presented at the City Council's next
session. Project updates, newsletters, project questionnaire, and materials from the forum can be
The JD White Company, Inc.
Page 21
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Summary Report
found at www.eugenecityhall.com and at Eugene's three libraries. KC noted that participants can
also provide their comments on the web site or the Eugene City Hall comment line
( 541.682.5222).
The JD White Company, Inc.
Page 22
April 2006
Appendix A:
Forum #1 PowerPoint Presentation
"
[B!J~~ CCOOy~ 1I\{~ ~
Citizen Forum #1 Agenda
· Project background
· Public involvement process
· Small group work sessions and large group
discussion:
- Project values
- Space needs and consolidation
· Questionnaire
· Next Steps
"
[E)!S~ CCOOy [Hld 1M~ IP1m
Welcome!
Citizen Forum #1
March 23, 2006
6-8:30 p.m.
First United Methodist Church
1376 Olive Street
Eugene, Oregon
1
"
[B!J~~ CCOOy~ 1I\{~ ~
What Is Values-Based Decision Making?
· Inclusive criteria
· Exploration of alternatives
· Accurate information
-- __OW" ----- ----~ -........____~___~_~~
2
~
[E)!S~ ~ [Hld 1M~ IP1m
Citizen Forum #1 Agenda
· Project background
· Public involvement process
· Small group work sessions and large group
discussion:
- Project values
- Space needs and consolidation
· Questionnaire
· Next Steps
3
"
[B!J~~ CCOOy~ 1I\{~ ~
Defining The Issues
· Dispersed services
· Flexibility
· Energy consumption
· Accessibility
· Security and safety
· Civic presence and connection
"
[E)!S~ CCOOy [Hld 1M~ IP1m
City-Occupied Sites
Downtown Eugene aerial photograph illustrating the current distribution, location, size, and number of staff.
The departments and sites shown (City Hall, Public Works, City Prosecutor, Atrium, and Finance and
Information Services (located in Library building) will likely be considered for consolidation with the exception
of the Roosevelt Yards, 2nd and Chambers, and Skinner Butte facilities.
t
fO(K(!Vt!,,\vard:s.,..~nn.~:- -. -
, , ~!..oIIXI.J.
., li~~l.~ ~
....,..
l
2nd & Chilmbo.r5 0-1,-,_ SM-I ~
I." @~ 1,,~:lJ
io'..,yoo.,._ J
.n
- ---l
- I)
1
ICily Hall ~
...eta '.',
II)..,...... ~
I
, "I
I
c.JCotn:I~ I
I
I
1
.J
l>ubMc "\:A~
~ :21 ri~~
....- ~~~~ lp,...~., .' I
Atrium -=-- .~~.:......a. _ 'D~
Libnlry" I~
~ - ~--J!-~ ...........,
(;111 0J:ll:~ ~ I r;:cy 00l1Jt-0II0J0IM! ~ (;~ I...... a-ul I I GI... SlI_
:-1
4
"
[Bl)l~~ CCOOy ~ li\{~ ~
C '..:.J~ __ -
Seismic Design in Oregon
Chart illustrating the increase in 800
Oregon's code requirements for 700 1993
standard facilities since 1945. The LO l(ln~ 3
"""
original City Hall was constructed in m ()iJO
-
1964. New buildings constructed to a
house or deliver emergency services *' 500 1988
w Zono 28
such as police stations must withstand f: 400 rnM..!..li!
0 1se2
heavier structural forces than standard ..... Zone Z
(1)
buildings and are referred to as .:.t: 300 CitY1 H.dl
m
"Essential Services Facilities" (ESF). :I
0- 1951
€ 200
~
100 195~
19-4&
(J
Hl1l0 HJ~ Hl60 1970 1980 '990 2000
Years
[E)!S~ CCOOy [Hld 1M~ IP1m
Phase 2 Schedule
Project decision points are ordered to coincide with Council workshops and work sessions and will be
informed by public input.
P;;I~ 1 D 10 Pha;ep~ Ph lmple;~~l:eli~n PIUfi
AtMsernenl el/e prnen an dse Phase
1005 JanuaJy febR/dJy Murch April May June July Augusl September Cktoblll I November Doccmbcr 2007-2008
2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006 2006
Tedmical Rese4lrch & . . . . . .
Analysis
Concepl Design . . . . .
Nelghbmftood & . . . . . . . . . . . .
Orgunizdlloncl Oulre<<h
Cilizen Interviews . . .
Council Workshops
Comlnunitl' fOR/IllS
Council Work Sessions
(voting & decision-
making sessions)
5
"
[B!J~~ CCOOy~ 1I\{~ ~
Eugene City Council Adopted
Position Statements
· Incorporate meaningful sustainable design goals.
· Utilize a long-term planning horizon of 25 years.
· Consolidate City services to the greatest practical
extent.
· Develop the project in consideration of the Downtown
Plan while not limiting location choices to 8th Avenue.
"
[E)!S~ CCOOy [Hld 1M~ IP1m
Public Participation Core Values
(As established in 2005 by the International Association For Public Participation)
1. The public should have a say in decisions about actions that could affect their
lives.
2. Public participation includes the promise that the public's contribution will
influence the decision.
3. Public participation promotes sustainable decisions by recognizing and
communicating the needs and interests of all participants, including decision-
makers.
4. Public participation seeks out and facilitates the involvement of those potentially
affected by or interested in a decision.
5. Public participation seeks input from participants in designing how they
participate.
6. Public participation provides participants with the information they need to
participate in a meaningful way.
7. Public participation communicates to participants how their input affected the
decision.
Above all, the process must be inclusive and fair.
6
"
[B!J~~ CCOOy~ 1I\{~ ~
Public Participation Spectrum and Tools
An illustration of the spectrum of public involvement and tools to consider specific to the
Eugene City Hall public involvement process.
IH(:REIISING ~[VU. Of PUBLI(: INVO~l,It...[tH
lHFOfl;M
CONSUl.1
INVOLVE
COLLA&ORAl(
U.1POWEA
Tilfl__ p...&lI~
=1~n>11~
1MfW~ nI [II~"",,,
lJ>Ij lIg-~ llI1d'Of
"'-"'I\A1I:ln
uCUlitI ~ '-lI*~
:~~
Vof[n o-r1JPt, _h._
pJbll(: II~~. 10''''>-
_ ~ ...... 11\0I I."rJtc
(ltl'Ul'nl"OIIIlIOlj._..
::.~~-::;::.
10;0 1_ _v. pUP-
"'L1,~,~ull/OIO
lJIICIbIIri ~ II. h>
wIllp,at ...._
_....~lll
_I.......... -..-
InpUql""1~
nn"i."'!I'" r. hoI....,p-
IhII ~
'N~
. ~- "-
. ~"'J
. ~ ,.,.....,.".
. , QUA 11V-'l-
. 1.~ pbll;
"~
'~r_
. If1ImowI
1JOCIi~
'~iJ'O'.oIII
- L.J Y Illl 0'QIi]t
. ~ IliUa
. IIIuot ~"91
. ~...y I."...
. ~..- .fln:ay
, (",pm,..""
. fl..Ud.
'~I~
.,,~
jn.1E-.". \II ~,
, NWo'\PIptr ~
. Wr;,l."IlIWP" ~
.-;fIL
. ~.m.'lAC1
.~....,,-
. Dw.c.-~"i
.~~
il;tI i*l'ltl Atlo\I
. .:c..r.. IO"VPII
. ~.lIRJo IIO'I'.~
. lA'II"1l1J! r&4) ~ oOaI
. 1.1. b.... 11_
1..-IJu_11
. :=::: ~
. 1I'lr:1OpIImy~'
.....un,j
. luiL 1laoI...,.
. O'-H.......
.~.--.
, Cdcl~ lIiII
-r-
.. Nt".'nt..~_1II1a.
Copyright IAP2. All rights reserved.
"
[E)!S~ CCOOy [Hld 1M~ IP1m
Project Values
The following project values were adopted by the Eugene City Council at the November 23,2005
work session and are intended to guide the project's progress.
A. Exercise fiscal responsibility
B. Produce government efficiency
C. Be user-friendly
D. Embody environmental stewardship
E. Enhance downtown
F. I nspire civic pride
G. Maximize use of City Hall public spaces by the public and access
to government and its representatives
H. Strive for simplicity
I. Plan for the future
7
"
[B!J~~ CCOOy~ 1I\{~ ~
Question #1
Which 5 of these values are the most critical decision-making guides for
this project to gain your support?
A. Exercise fiscal responsibility
B. Produce government efficiency
C. Be user-friendly
D. Embody environmental stewardship
E. Enhance downtown
F. I nspire civic pride
G. Maximize use of City Hall public spaces by the public and access to
government and its representatives
H. Strive for simplicity
I. Plan for the future
[E)!S~ CCOOy [Hld 1M~ IP1m
Preliminary Space Needs
Illustration highlighting relative space needs of each City service.
Preliminary Space Needs
o fiRE ~.. EMS. CI tY COUNCil COUNCIL
O LIBI~ARY. RlCt l~iA~YOR CHAMBE~S MUNICIPAL ~O$(CU1OO
CUUURAt svcs
O RECORDS CITY
MCHIVE MEETlN G ~MGf;: ...,
ROOMS ~..~~~~ ......,,'...... ~\\
FINANe{ ~ ~ ~ '.. ........ '
O~.. ~,
.........------
H IJMAN RESOURCES
&- ~rSK SVCS
I PlJI~UC -- - -I
STAlF _
T
SEe U RE
PARKING
8
[B!J~~ CCOOy~ 1I\{~ ~
Consolidation Option A
Option includes all police
functions, municipal courts,
non-secure parking, and other
City Hall functions within one
building envelope.
A CON SO LI Dl.. T ION
OPrJON
ON E au ILDI NG
FULL CONSOUDAnDN
....( ~UBLlC ro.)
OTHER
CITY HAll
FUNCTIONS
BUILDI NG ENvROPl:
[E)!S~ CCOOy [Hld 1M~ IP1m
Consolidation Option B
Option includes all police
functions in a separate wing on
one block adjacent to other
City Hall functions. Municipal
courts, non-secure parking,
and other City Hall functions
would occupy another wing on
the same block.
B CONS,O 1,101\ T I ON
OPIION
CAMPUS MOD~L
POLICE FUNCTIONS S,EP^RAH WING
..../~ P~BLlC r.)
t=.
OTHER
CITY HALL
F U NeTIO NS
BUILDING ~NVnopr
au ILOIf.:G ENVELOPE
9
[B!J~~ CCOOy~ 1I\{~ ~
Consolidation Option C
Option includes police patrol
and secure parking in a
separate building within
walking distance of City Hall.
Municipal courts, non-secure
parking, and other City Hall
functions would be located
within a separate building
envelope. City Hall would
comprise other police
functions, including:
administration, investigation,
lobby, and storefront.
C. CONSOllDAf ION
OPIION
PATROL FU NcnONS SEPARATE
Wll HIN WAllo;lNG DIs,rANCE
E1Ui.I.OING [l'NnOPE
,
I
I
,
I
l~
~ :~
~ '
~ :
is I
~ .
~ \
,
,
I
I
I
l'Il
~:
,
I
I
I
[E)!S~ CCOOy [Hld 1M~ IP1m
Consolidation Option D
Option includes police patrol
and secure parking located
remotely (i.e. not within walking
distance). Municipal courts,
non-secure parking, and other
City Hall functions would be
located within a separate
building envelope. City Hall
would comprise other police
functions, including:
administration, investigation,
lobby, and storefront.
D CONSOli DMI ON
OP110..,
IJATROL FUNCTIONS REMOTE
~ ~ ..:..
i , ... ,
, I
I I
I I
:~ ~I
IU i:
I~
I I
I I
I I
I I
I j
\ ,
10
[B!J~~ CCOOy~ 1I\{~ ~
Consolidation Option E
Option includes all police
operations separate from City
Hall functions, either nearby or
remote.
E. CONSOLI OMION
GPrI DN
ALL POLICE FU NCTIONS SEPARATE
~
~
~
~
5
)
!l;1
~
OTHER l:'
CIIY HALL
ru NCTIONS
~
5
;5l
...:.,.
~
~
[E)!S~ CCOOy [Hld 1M~ IP1m
Question #2
How important is it to you to have patrol facilities on the
same site as City Hall?
1
Not Important
2
3
Somewhat Important
4
.
5
Very Important
Question #3
How important is it to you to have patrol facilities located
downtown?
1
Not Important
2
3
Somewhat Important
4
.
5
Very Important
11
"
[B!J~~ CCOOy~ 1I\{~ ~
Thank You!
Additional forums are scheduled for:
May 25, 2006
August 24, 2006
November 9, 2006
12
Appendix B:
Forum #1 Small Group Agenda
~ :~t)~ ~!f ~nn ~~~ ~~
:r~:~'~~~ ~lJ~ ~ 11~l.\~ ~lJ
Community Forum #1
Small Group Agenda
Question #1 Instructions:
1) As a group, look at the nine Project Values.
2) You are answering Question #1: "Which five of these values are the
most critical decision-making guides for this project to gain your
support?"
3) Discuss your opinions on the importance of each-you will be reporting
back to the large group.
4) Assign a note-taker from the group. On the blank paper provided, record
opinions about the importance of each value or any values you would like
added.
5) After discussing, each participant places one dot on each of the values
they feel is most important-a total of five dots per person.
6) When finished, give the values sheet to a staff person for tabulation.
Question #2 Instructions:
1) Look at the sheet with Questions 2 & 3.
2) As a group discuss the Question #2: "How important is it to you to have
patrol facilities on the same site as city hall?"
3) Share your opinions, have the note taker record opinions on the blank
paper provided.
4) When finished discussing, each participant places one dot along the scale
to indicate their opinion of the importance of this issue.
Question #3 Instructions:
1) As a group discuss Question #3: "How important is it to you to have
patrol facilities located downtown?"
2) Share your opinions, have the note taker record opinions on the blank
paper provided.
3) When finished discussing, each participant places one dot along the scale
to indicate their opinion of the importance of this issue.
4) When finished, give the sheet to a staff person for tabulation.
Appendix C:
Forum #1 Questionnaire
~~~nm roJr!y IHm1U nlmrwr ~
Community Forum #1
Questionnaire
1. What do you like and/or don't like about the current City Hall building?
2. Would you like a tour of the Eugene City Hall building? _ Yes No
3. What, if any, public amenities would you like to see in a City Hall Complex?
(some examples include plazas, food or beverage service, public meeting
space, information kiosks, etc.)
4. Do you have access to any newsletters, emaillists, electronic updates,
websites, etc. that could share information about the City Hall Master Plan
project?
Group Opportunity Contact Info
5. Can you suggest any groups that would be interested in a presentation on the
Eugene City Hall Master Plan project?
Group Contact Info
6. Do you have any suggestions on how the forum process could be improved?
(over)
Please tell us who you are!
Name:
Address:
Phone: day
evening
Email:
Thanks for completing this questionnaire and
participating in discussions about City Hall.
Your Opinion Matters!
Appendix D:
Questionnaire Summary Responses
City of Eugene
City Hall Complex Master Plan
Community Forum #1 Questionnaire Responses
Project questionnaires were distributed to all the participants at the March 23, 2006 Community
Forum, and 69 completed the questionnaire. Participants' responses to the questions follow.
Question #1-What do you like and/or don't like about the current City Hall
building?
. Dislike current earthquake-risk problem. Very much like having City Council chambers
at center of complex.
. It is ugly and looks run-down.
. Democratic-rooms and passageways are communal-like, on same level. External spaces
compatible with internal focus.
. I do not have a lot of experience with the present City Hall, but the City Council "island"
strikes me as pretentious; an adequately sized, integrated meeting room would be just
fine.
. Like location. Do not like ugly building, services not consolidated.
. It is ugly and not inviting to the public.
. Like open space and central council chamber.
. Outdated and not very attractive-could be renovated or moved to current Federal
building.
. ( +) Good location and great inner courtyard. (-) Not energy efficient and aesthetically
unpleasing exterior.
. Too dilapidated. Inaccessibility.
. Ugly one-story, dated building==no civic presence. Poor use of space (one city block).
. Lots of wasted space.
. I do not want to see us having to dig first responders out of rubble or civilian command
and control in the event of an earthquake.
. It is there, and it is paid for. A big plus!
. I like the open design, especially the pond.
. Like that it is paid for.
. (-) Too removed from sidewalk, aloof, unfriendly. (+) Symbolism of council in center.
. Unattractive, uninviting, does not promote civic pride.
. It is paid for already. Our streets are falling apart and the City wants to build a new City
complex. Think again!
. Do not like: energy use is high, lack of space, accessibility, departments scattered in other
buildings, no bathroom in City Council chambers. Like: openness.
. Poor signage-how about maps like they have at malls which show where various shops
are located. Like the architectural style.
The JD White Company, Inc.
Page 1
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Meeting hall in center. City manager system of government-remove him. Do not like
unconnected nature of administrative officers.
. A work of art-keep it!
. There's nothing I like about it (except the location-rebuild there), ugly, unsafe, obsolete,
poor use of land, inefficient, ugly.
. Like: location. Do not like: lack of use of atrium (space now at a premium). Also-more
function, less style and appeal to artistic factions.
. Like: efforts to make it accessible. Dislike: cramped inside building.
. Landscaping is good on 8th and Pearl Street. City Hall and Council chambers are good-
looking. Rooms are small for meetings and no air during night meetings.
. Too small for City government.
. Street level access/interaction is very tough!
. Location good. Facility bad.
. Not very attractive outside.
. Like: architecture/symbolism of council chamber center. Classic form of democracy.
Dislike: not large enough to accommodate City functions.
. Like: connection of chamber to outside, location is convenient. Dislike: just about
everything else, lack of street presence, low density, mean spaces for staff.
. It has historic value. It is a comfortable, usable building, non-intimidating. It's affordable
as-is and can easily be enlarged if needed.
. I like it because it is central and easily accessible. I do not like the aesthetics of the
architecture.
. Old looking-needs paint.
. Lack of direct sunlight entering building. Non-utilization of water feature. Waste of
material on the exterior of the building.
. (1) It is purposefully anti-monumental and symbolically communitarian. (2) It is one of
our best examples of 1960s modern architecture. (3) It is one of the best and most
important buildings by local architects.
. Old City Hall-City functions should be in one place (planning, building, administration,
mayor). Get cops out of downtown.
. The style is hideous. The council chambers are awful for meeting. I have been in the seats
as well as taken testimony. The meeting room for small meetings is not convenient for
more than a few observers. The entire site does not meet the City's stated goal of compact
urban development. CH's FAR is about .6: 1 when it should be at least, but really, more
than 2: 1.
. Like: The central council chamber's formal presence as per the physical orientation and
infrastructural concept. Don't Like: The aesthetic quality of the total buildings
presentation. Especially in its relation to the street.
. It's fine as it is, if it were seismically updated.
. City Council meeting room (McNutt) is too small. The rest of the building is O.K.
. Separation from street (physically and visually).
. Cool architecture.
. Open, inviting environment.
. I do not like design because it is an inefficient use of energy and space.
. I like the Council chamber and bridge to the County building.
The JD White Company, Inc.
Page 2
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Too close proximity to police.
. It feels oppressive due to police presence.
. I don't like the movement to replace it-money is "short" and already misallocated, e.g.
Whole Foods parking lot subsidy.
. It is set up in a way that City Council is our government with City Council chambers
being right in the center. I also like the water with the ducks that live there.
. Energy is wasteful, fairly inaccessible, architecture is not inspiring, and there are poor
working conditions for staff.
. Just needs to be seismically retrofitted-move all police to neighborhood precincts (in
fire stations)?
. It's ugly.
. It has no "presence."
. It's paid for.
. It has nice Council chamber and outdoor space.
. It's downtown, without taking up much space.
. Like its external appearance.
. Concerned about the seismic problem.
. I like the statement it makes about the relationship between the people and the
government.
. Inviting architectural space with the round Council Chamber.
. Landscaping-I would change the design to be more native but. . . the Sister Cities are
represented there.
. Good idea, but outdated and ugly.
. Lots of wasted space.
. Accessibility is poor.
. I like the late art deco nature of it.
. It's a fortress. The open space is totally uninviting. Accessibility is uninviting, it is
sprawling, it's energy inefficient, i.e. There's not much I like.
. I like the location. I like the City Council chambers.
. I do not like the lack of interaction between the streetscape and the interior space of the
building.
. Don't like water feature and wasted space in the layout.
. Inefficient (i.e. office space, energy, and building layout). Structurally unsound (roof
leaks, poor ventilation, poor lighting, and poor heating).
. Hard to find things-better signage and design.
. Bathrooms are locked-against public.
. Like fountains and open courtyard.
. Needs upgrading.
. Needs to be energy efficient.
. I was not aware that it was City Hall until someone told me. It seems like a fortress-you
have to go inside the outer walls to get anywhere.
. I like the open feeling, how spaces flow smoothly into another.
. It doesn't meet any of my needs.
The JD White Company, Inc.
Page 3
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
Question #2-Would you like a tour of the Eugene City Hall building?
Yes No
29 respondents would like to take a tour of City Hall.
Question #3-What, if any, public amenities would you like to see in a City Hall
Complex? (some examples include plazas, food or beverage service, public
meeting space, information kiosks, etc.)
. More public meeting space; natural landscaping. More workspace for City councilors,
and better access for staff by City councilors.
. Plaza and public meeting.
. Plenty of capacity-yes, plazas and food, etc.
. Definitely public meeting space.
. Public meeting space.
. Plazas, public meeting space, and information kiosks. Include access to mayor and
councilors.
. Information kiosks, public meeting space, a park presence.
. Food or beverage service, public meeting space, information kiosks, greenspace, office
space for social/environmental non-profits.
. A plaza and public meeting space would be great.
. Public meeting rooms of various sizes are needed in Eugene. City Hall should create
some good public spaces too (i.e. courtyard). Other suggestions: (1) Lots of natural
lighting-this is Eugene, we need more light. (2) Good ventilation system that
automatically uses plenty of fresh air (important for crowded meeting rooms) (3) Plenty
of FREE parking after 5 p.m. for public involvement.
. I would like to see a soup kitchen to feed hungry people in downtown Eugene and having
facilities for homeless families.
. As much skylighting and green courtyard with food and beverage (small). Good safe
(off/on) bus stop and bike lanes (secure, better bike parking). Perhaps skywalk between
government buildings to avoid traffic. Solar panels.
. Should be a green building. A rathskeller in the basement like the German tradition. How
about farmer's market on top?
. Just what is already there.
. More food and beverage service. Expand the farmer's market.
. (1) Plaza. (2) Great room, community hearth, gathering place. (3) Large public meeting
room.
. Plaza/garden space, art, public meeting space, food services should be outside-eat drink
downtown.
. Greater access to expandable meeting/open space.
. Plaza, food service, more bathrooms, more public meeting rooms, accessibility, energy
efficiency and use of renewables (solar), green building, use recycled and non-toxic
materials, sustainability, plan for future uses and expansion.
. All of the examples.
. I'd like to see public areas connecting government functions.
. Toilets. Not food->work!
The JD White Company, Inc.
Page 4
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Public meeting spaces, information kiosks. No poorly run, poorly attended cafes. Go
patronize downtown cafes.
. All departments, at least the main offices, housed there.
. Plaza, information desk and friendly personnel.
. All of the above and wheelchair accessibility to all corners of the City Hall, including
restrooms.
. Outdoor space, some flexible meeting/conference space.
. Keep it to City Hall government functions. Let private sector benefit from doing business
around City Hall.
. Farmer's market.
. Meeting space, food service of some sort, outdoor civic streets, and connections to
downtown civic/public spaces. Separate police patrol building with patrol parking in
some form within walking distance-Police Consolidation Option C.
. Plaza, meeting space.
. Free and large public meeting space, but it does not need to be part of City Hall at all;
anywhere in central Eugene is fine.
. Public meeting space (larger than Harris Hall).
. Public meeting place with HOH/deaf accessibility in form of assistive listening devices.
. Educational showcases of energy efficient design.
. Public meeting space.
. Move public open space and transit orientation, better places to congregate-integrate
with Saturday Market. Muti-use sustainable.
. Public meeting space, no food and beverage service, info center (not necessarily kiosk), a
public plaza is not vital; there is one at the County building and the park blocks are very
close.
. (1) Formal public entrance, in correlation to and in combination with: a formal public
aesthetic. (2) Retention of and reference to the current council chambers (3) Ample staff
amenities. (4 ) Welcoming public interior amenities: plazas, food or beverage service,
public meeting space, information kiosks; information staffing.
. A park or greenway.
. Unimportant-other than public rest rooms.
. Yes-all of the above. Important to maximize public contact with City Hall as city
government.
. Open space that is inviting to the public.
. Kiosk not necessary at the City Manager's office.
. Clear directions to services.
. A realization that the people are the government, such as the plaque states inside the City
Council chambers.
. Food would be nice, public meeting space is an excellent idea. Keep a place for the
ducks.
. Public seating areas, creation of a village green, and ambiance that allows for easy access
to the business activities.
. Bare bones, low cost, keep taxes down.
. Encourage plazas, food, or beverage service to be just outside.
. Meeting spaces.
The JD White Company, Inc.
Page 5
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Free public meeting space, public plazas, and civic art.
. Public meeting spaces!
. Plaza
. Water feature
. Public art
. Well connected to public transit
. Multicultural representation
. Interesting design (visually)
. No food and beverage service.
. Use downtown businesses.
. More people, helping public and less kiosks.
. No, no, no private business in City Hall. Why can't government be government?
. City Hall should concentrate on city services, not trendy food and beverage places. Open
space is desirable, but should be elevated and planned to complement city service
prOVISIon.
. Meeting space, informational kiosks. City Hall should not be a place for commerce.
. Office for City Councilors.
. All those enumerated here sound good.
. Greenery, quiet spaces, and water.
The JD White Company, Inc.
Page 6
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
Question #4- Do you have access to any newsletters, emaillists, electronic
updates, websites, etc. that could share information about the City Hall Master
Plan project?
Group
Fairmount Neighbors
(partial list )
Eugene Tree
Foundation
Other cities
BRING Recycling
Linda Swiser, ABC
FAN
AlA Local
Friendly area
neighborhood
association
Customers
Staff
Customers
Lane Independent
Living Alliance
City Newsletter
SHHH
Deaf e-mail group
Eugene Permaculture
Guild
Several
Yahoo! Groups:
West University
Neighbors (members
only list serve)
Lunch groups
Whiteaker
Community Council
(maybe)
Vision for Intact
Ecosystems and
Watersheds
Opportunity
Neighborhood association. Chair can get
information into FNA newsletter. I can
consolidate e-mail lists of neighbors
Input on landscape, urban design interests
Research their buildings-more successful and
attractive examples.
Quarterly newsletter
Newsletter and electronic newsletter
Monthly meeting
Quarterly newsletters to 3,400 households
Web site editorial by me
Newsletter editorial by me
Newsletter editorial by me
E- mail list
E- mail list
Website
Friends of Eugene
NLC
Laurel Hill Valley
Citizens
AFSCME
Unitarian
Universalist Church
Email
Email
AFSCME 1724.org, newsletter website
Website and chat list
The JD White Company, Inc.
April 2006
Page 7
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
Question #5- Can you suggest any groups that would be interested in a
presentation on the Eugene City Hall Master Plan project?
Group
League of Women Voters
Rotary Club
ABC
Grower's Market
AlA Local
FOE
NLC
ENI
Eugene Bike Coalition
Neighborhood Associations
Friends of Eugene
Citizens For Public Accountability
Neighborhood committees
Lane Independent Living Alliance
Human Rights Program-Accessibility Committee
Oregon section of American Society of Landscape Architects
American Institute of Architects-Eugene Chapter
SHHH
High schools
University of Oregon
Lane Community College
Latino community
West University Neighbors general meeting first Thursday of
every month 7pm @ The Parlour at Central Presbyterian Church
555 East 15th Avenue, Eugene
Friends of Eugene
League of Women Voters
Landwatch
Whiteaker Community Council
Crest Drive Citizens Association
Unitarian Universalist Church
Question #6-00 you have any suggestions on how the forum process
could be improved?
. I wish you would not have begun the March 23 forum by emphasizing the negatives
about the current City Hall's design. I feel it can be retrofitted, preserved, and be a source
of community pride.
. More publicity, so more of the public can be included.
. Stay on time and task.
. Folks in this group tend to be from south and close-in west Eugene. Better outreach to
north and far west and northwest Eugene. The group's reaction to your comment of,
"Some people feel more secure with police around vs. feeling more secure with less
police." The overall reaction of the group was, "More secure with less police." This told
The JD White Company, Inc.
Page 8
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
me the group is of generally more singularly minded than Eugene as a whole. This group
is not going to give you a cross section of Eugene.
. Thank you for your presentation!
. Seem to be working fine.
. Fiscal responsibility is very important and money is needed in many areas (roads, etc.)
and whether it is renovation or moving to an existing building-that would work.
. Yes. I would have liked to have seen more of this consideration and congeniality
extended to the citizens and taxpayers over the downtown developmental decisions such
as the Whole Foods development and adjacent parking garage.
. No, I am new to Eugene.
. Not at this time. Stay tuned.
. Cannot hear comments from public. Only speaker has microphone.
. Increase diversity of participants.
. More group discussions! Whole system thinking!
. Do not schedule it during other neighborhood meetings (i.e. Walnut Station).
. You need a better writer on staff. Questions are more ambiguous than necessary.
. Preliminary education and decision to broaden education. Arrange government leaders to
prevent chaos. All new buildings must be constructed to allow adding upper stories-
growth cannot be stopped in the short-term so anticipate the need for expansion. We must
build up not out.
. Keep it limited to the groups who have positive vision of Eugene and keep in mind that
the new building should serve the purpose of next generations and the building should
reflect the picture of what Eugene is-display of outstanding art work by local artists-
pottery, paintings, weaving (hand-woven pieces), wood carvings, etc. Future City Hall
can look better than Jacobs Gallery. All entrances (street) should be wheelchair
accessible and should have signs for the blind/visually impaired. Build the new City Hall
maybe 6 floors high (like Key Bank in the downtown) with stable ground foundation and
should create double square footage in comparison to what City services have as a whole.
City should turn current City Hall into a convention center and open to public meetings
from citizens (e.g. City Club).
. Keep participants focused on the task.
. Somehow, we need to reach to non-vocal, non-attendees that represent a broader group of
citizens beyond those attending the sessions. Assign people to tables so that there is more
balance around tables.
. More facts and figures. More details, more public discussion as a larger group, or
circulating the groups. Stop using generalities that can be interpreted differently by
different people (such as the people at the forum may use the terms differently than the
City government).
. A more organic process that is more informative of the issue, which is primarily why we
are here, it is a real necessary project to begin with. It would have been appropriate to
have greater line information about process before meeting. Hopefully we will be more
versed before the next meeting.
. Yes, FM devices hooked into existing microphone system with receivers and neck loops,
head sets.
. Open discussion of ideas and values before we are made to choose those that are given.
The JD White Company, Inc.
Page 9
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Do not make the meetings so long. I like the pizza. P.S. I do not see much cultural
diversity at this meeting-please make sure you invite other members of the community
that may not be as vocal (Hispanic especially).
. (1) Tell the City Council to get out of the way. (2) Take destruction of the existing City
Hall off the table. (3) Then engage the public in a real process.
. Better participants. I was shocked at the paranoia and immaturity of some of the
participants. The Council's goals were so generic that they provided no direction for a
rowdy group of people whose motives seem to be to disrupt rather than provide useful
assistance. Our table thought that the bubbles designating City services should include
the Department for the Development of Conspiracies or Paranoia Development.
. Consider alternatives that include preservation of the current City Hall as is, upgrading
for safety needs, and devote remaining funds to parks and greenways.
. Remember to use gender neutral words-not "you guys." Rather, "you folks" or "you
all." (First female used "you guys." Casey?)
. Please do not call Annette "the lovely Annette." It's confusing and even disturbing,
appears to be humorous but comes across as patronizing if not sexist-despite being said
by a fellow woman.
. O.K.
. Explain all steps of the current meeting at beginning of the meeting. Ensure that ideas
that come out of these sessions that may not mesh with pre-conceived ideas are given
equal status in moving forward.
. More discussion and information before questions-such as space and cost required by
patrol cars.
. When specific issues are raised, explain where in the process they will be addressed.
. Allow and encourage open-ended questions, such as having us decide how this process
runs, giving us the right to choose which options to rate.
. Nobody cares except you.
. Only organic food please and no white plates.
. No Pepsi-fruit juice or similar.
. Do one on Farmers Market (year round covered) and homeless shelter.
. Give up this pipe dream of new construction. Hard times are ahead.
. Recycle. Spending $1.2 million is a waste of tax dollars. Get a clue!
. No plastic water bottles. Please use water and recycled paper cups. (No dump space left).
. You delete the five alternatives. No new City Hall/Police Station.
. Regarding our bad planning department-we've already met the limits of growth. We
dumped millions of gallons of untreatable sewage into the river because there was too
much rain last year.
. The City Council needs to be clear about one thing-do not build a new City Hall/Police
station with funds you requested from other funding pools. The public is outraged that
you apparently have been pilfering and pooling our funds to do your deal just in case the
public vehemently opposes it. We don't trust the planning department or City Manager.
. I believe after the Whole Foods parking garage ordeal that the public process does not
feel safe or even like it matters. Faith needs to be restored.
The JD White Company, Inc.
Page 1 0
April 2006
City of Eugene City Hall Complex Master Plan
Community Forum #1-Questionnaire Responses
. Structure forums to better use the community's wisdom in the room beyond vote
responses to canned information. Otherwise actual value of participating drops
significantly.
. Suggest simplifying forum agendas to create space to have dialogue.
. Craft questions in a manner that permits a full spectrum of responses.
. If you want to get responses from the public you need to allocate enough time for the
public to provide them.
. Fewer structural exercises and more open discussion amongst participants.
. The meeting is not a good cross-section of my community or neighborhood or the people
I work with.
. Stop people from pontificating on personal issues and stick to the topic at hand.
. Pretty good job.
. I think the facilitators did a goodjob with an unruly group of Eugeneans.
. I think the time to go down the individual values was not too useful.
. I think it's important to start the interactive part of the evening a bit earlier in the process.
At the same time, it is important to keep control and limit comments to the matter at
hand. I am really not interested in a free-for-all discussion where folks are basically just
using the air time to espouse their particular editorial comments.
. Please discourage renegades who bring their own agendas that don't relate to the City
Hall proj ect.
. Better phrasing of questions.
. Try to keep comments focused on issues at hand and refrain from political commentary.
. More open discussion.
. Best of luck.
. Have an agenda, so people will know the flow, and not waste time.
The JD White Company, Inc.
Page 11
April 2006
A CONSOLIDATION
OPTION
OTHER
CITY HALL
FUNCTIONS
NON-SECURE
PARKING
BUILDING ENVELOPE
PUBLIC
~
w
cc:
:J
U
w
(/)
I
\
\
,
,
ONE BUILDING
FULL CONSOLIDATION
,
POLICE
LOBBY
POLICE
ADMIN
POLICE
PATROL
U1
m
o
C
;0
m
SECURE
PARKING
I
/
,
.....--------....
CITY OF EUGENE EUGENE CITY HALL COMPLEX MASTER PLAN :~~HMI~sECHT~cIKNEcRm
B
CONSOLIDATION
OPTION
CAMPUS MODEL
POLICE FUN CTI 0 NS SEPARATE WI N G
~
r7
~
PUBLIC
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
~
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
,
OTHER
CITY HALL
FUNCTIONS
POLICE
ADMIN
MUNICIPAL
COURTS
w
cc
:J
U
w
(/)
NON-SECURE
PARKING
I
\
\
,
,
~
~
~
~
~
~
~
~
~
~
~
,
,
\
\
I
I
I
I
I
POLICE
PATROL
(/)
rrl
n
c
:;0
rrl
SECURE
PARKING
I
/
BUILDING ENVELOPE
.....--------",.".
,
BUILDING ENVELOPE
CITY OF EUGENE EUGENE CITY HALL COMPLEX MASTER PLAN :~~HMI~sECHT~cIKNEcRm
C CONSOLIDATION
OPTION
OTH ER l.:~~
CITY HALL
FUNCTIONS
BUILDING ENVELOPE
NON-SECURE
PARKING
PATROL FUNCTIONS SEPARATE
WITHIN WALKING DISTANCE
~
~
PUBLIC
,
\
I
I
I
I
I
\
I
CITY OF EUGENE EUGENE CITY HALL COMPLEX MASTER PLAN :~~HMI~sECHT~cIKNEcRm
~
,
,
,
,
,
,
w
0....
o
---.J
W
>
Z
w
(9
z
o
---.J
:J
co
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
POLICE
STOREFRONT
POLICE
LOBBY
,-
I
I
I POLICE
I ADMIN
I
\
,------------;
,--------------,
I
(./)
rrl
n
c
;0
rrl
POLICE
PATROL
w
cc
:J
U
w
(/)
\
SECURE
PARKING
,-------------;
O CONSOLIDATION
OPTION
OTHER
CITY HALL
FUNCTIONS
NON-SECURE
PARKING
BUILDING ENVELOPE
PATROL FUNCTIONS REMOTE
PUBLIC
~
#
#
#
#
#
~
\;/
POLICE
STOREFRONT
~
~
~
POLICE
LOBBY
,-
I
I
I POLICE
I ADMIN
I
\
,------------;
~
~
I
w
lY:
:J
U
w
(/)
\;/
\;/
,
\
I
I
I
I
I
\
CITY OF EUGENE EUGENE CITY HALL COMPLEX MASTER PLAN :~~HMI~sECHT~cIKNEcRm
,--------------,
w
0....
o
--.J
W
>
Z
w
(.9
z
o
--.J
:J
co
(/)
m
n
c
;:0
m
POLICE
PATROL
SECURE
PARKING
\ I
,-------------;
E CONSOLIDATION
OPTION
ALL POLICE FUNCTIONS SEPARATE
PUBLIC
OTH ER ':......
CITY HALL
FUNCTIONS
':\
I
I
I
I
I
NON-SECURE
PARKING
PUBLIC
~
.
.
w
0....
o
---.J
W
>
Z
w
OJ
C
-
r
o
Z
C)
m
Z
<
m
r
o
U
m
-------------,
,.
I
I
I
I
I
I
I
I
w
Ice
:J
IU
w
IV)
\
POLICE
ADMIN
(.9
z
o
---.J
:J
co
SECURE
PARKING
\
I
(/)
0'
CI
:;0
rrll
I
I
I
I
I
I
I
,--------------------------,
CITY OF EUGENE EUGENE CITY HALL COMPLEX MASTER PLAN :~~HMI~sECHT~cIKNEcRm
Eugene City Hall Complex Master Plan
Attachment C - Space Needs Study
Space Needs
Process and Projection Methodology
The preliminary Staff and Space Needs Summary shows current and projected staff and space
needs to the year 2030. Due to the difficulty in forecasting needs 25 years from now, the design
team gathered detailed space needs information for the intermediate milestones of 2010, 2015,
and 2025, and used a multiplier to assist in determining staff and space projections to the final
milestone of 2030. For several divisions, the staff and/or space needs are currently under-
served, resulting in higher average growth between early milestones (e.g. 2006 and 2010) than
between later milestones (e.g. 2015 and 2025). The final milestone of 2030 was established by
continuing the staff and space growth rates projected between 2015 and 2025.
City of Eugene
Staff and Space Needs Summary
Annual Net
Personnel Growth Net Square Feet Area
Department I Division Rate Fa eto r
2006 2010 2015 2025 2030 2006.30 2006 2010 2015 2025 2030 2030
1 City Council/Mayor 13 13 13 15 16 0.6% 3,227 3,227 3,227 3,575 3,749 234
2 City M anag er 27 35 39 43 45 2.0% 7,812 8,492 9,216 9,600 9,792 218
3 Central Services
4 City Prosecutor 11 12 13 13 13 0.7% 2,584 2,772 2,963 2,977 2,984 230
5 Finance 32 32 32 32 32 0.0% 7,332 7,352 7,373 7,413 7,433 232
6 Human Resources and Risk Services 32 36 37 40 42 0.9% 8,644 9,124 9,365 9,835 10,070 240
7 Information Services
8 Technical & Application Services 53 56 62 66 68 0.9% 13,242 13,590 14,286 14,750 14,982 220
9 Document and Distribution Services 9 10 10 10 10 0.4% 5,217 5,466 5,466 5,466 5,466 547
10 Municipal Court
11 Court Administration 32 39 41 41 41 1.0% 5,350 6,051 6,233 6,258 6,270 153
12 Courtroom and Support 10,012 12,355 12,355 12,355 12,355
13 Fire and EM S 4 6 6 7 8 2.4% 520 538 538 538 538 67
14 Library, Recreation & Cultural Services 12 15 15 18 20 1.7% 2,637 3,009 3,009 3,380 3,565 178
15 Planning and D evelopm ent
16 Administration 3 3 3 3 3 0.0% 1,858 1,858 1,858 1,875 1,884 628
17 Building & Permit Services / PIC 69 69 70 77 81 0.5% 16,020 16,354 16,816 17,715 18,165 224
18 Community Development 14 15 16 18 19 1.1% 3,737 3,853 3,969 4,259 4,404 232
19 Planning 23 23 23 23 23 0.0% 5,269 5,269 5,269 5,269 5,269 229
20 Parking Services 13 14 15 17 18 1.1% 1,950 2,066 2,127 2,304 2,392 133
21 Public Works
22 Administration 18 21 23 24 25 1.2% 3,805 4,164 4,390 4,483 4,530 181
23 Engineering 87 94 104 122 131 1.4% 20,617 21,700 23,460 26,371 27,826 212
24 Total 452 493 522 569 595 1.0% 121,836 129,249 133,933 140,447 143,704 242
25 Common / Shared Support 2 2 2 2 19,829 23,569 23,569 23,569 23,569
26 Records Achive 4,400 5,500 5,500 5,500 5,500
27 Total Staff aud Net Square Feet. City Hall 452 495 524 571 597 1.0% 146,065 158,318 163,001 169,515 172,772 289
28 Building Gross Square Feet (Net-to-Gross = 80%) 182,581 197,897 203,752 211,894 215,965
Police Department
29 Office of the Chief 9 15 15 16 17 2.4% 4,380 4,400 4,679 4,819 283
30 Operations Support 9 9 12 14 15 1.9% 2,156 2,726 3,026 3,176 212
31 Technical Services 31 34 38 49 55 1.9% 6,563 6,988 7,695 8,049 146
32 Investigations Division 33 43 48 60 66 2.5% 10,961 11,461 12,396 12,864 195
33 Patrol Division 135 184 202 252 277 2.6% 12,705 12,898 13,953 14,481 52
34 Common / Shared Support 22,640 23,087 24,810 25,672
35 Total Staff and Net Square Feet - Police 217 285 315 391 430 2.5% 59,405 61,560 66,559 69,059 161
36 Building Gross Square Feet (Net-to-Gross = 78%) 76,168 78,819 84,968 88,043
37 Total Staff aud Net Square Feet
38 Building Gross Square Feet
The SGS Group
1
Eugene City Hall Complex Master Plan
Attachment C - Space Needs Study
Comparative Benchmarking
To aid in evaluating the appropriateness of the City Hall space needs program, a comparative
analysis of other government agency space programs completed in recent years by the con-
sultant team is summarized on the following table.
Net Sq/Ft. per Private Office
Project Square Staff
Feet Person Percentage
Culver City, CA 69,335 251 276 21%
Sacramento County Permit Center, CA 87,354 362 241 15%
Merced County/City of Los Banos, CA ~~,~~~ 324 297 20%
Oakland, CA - Broadway Building 112,720 327 345 9%
Los Angeles County - Fire 138,637 515 269 15%
San Joaquin County, CA 145,265 553 262 24%
Surprise, AZ 1aa Ann : 7A 222 18%
. '~
Oakland, CA - Dalziel Building 166,865 644 259 10%
Sacramento County Public Works, CA 216,395 1,038 208 16%
Clark County, NV 299,741 1 ,435 209 12%
Denver, CO 545,065 2,475 220 17%
Average 185,812 788 255 16%
Eugene City Hall 143,704 595 242 28%
The overall net square feet per person for the City Hall space needs is 242. This is consistent
with the other jurisdictions surveyed and close to the average of the eleven other cities and
counties.
Recent programming projects completed by the consultant team assigned private offices to be-
tween 10% and 24% of the total staff, with an average of 16%. The jurisdictions surveyed gen-
erally allocated private offices to division heads and above, with supervisors and professional
staff generally in open workstations with the availability of small conference and meeting rooms
for those instances where privacy and/or confidentiality were required.
Preliminary requests for private offices total 28% of the total staff. This is higher than average,
but normal as part of the Space Needs process. Generally for City of Eugene staff, private
offices were requested for supervisor and higher positions, plus a significant number of profes-
sional positions. To reduce the number of private offices, Executive Managers adopted a policy
of providing private offices for Division Managers and above, with an approval process to man-
age exceptions through the Executive Managers. It is anticipated that through this policy, the
number of private offices will be reduced to an appropriate percentage (anticipated at between
15-20%) that will serve the operational and flexibility needs of the organization.
The net effect of reducing private offices on the overall area is nominal because the sizes of
workstations and private offices for supervisors and professional staff are very similar.
2