Loading...
HomeMy WebLinkAboutItem 4: Ordinance Levying Assessments for 3rd/4th Connector ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Action: Approval of Minutes, Findings and Recommendations from the Hearings Official and Adoption of an Ordinance Levying Assessments for Improvements Consisting of Paving, Curbs and Gutters, Sidewalks, Landscape Medians, Street Lights, rdth Street Trees, Wastewater, and Storm Water Drainage on 3 and 4 Avenues between Pearl Street and Lincoln Street, North of Southern Pacific Railroad and South of Skinner Butte Park; and Providing an Immediate Effective Date (Contract 2006-04) (Job #3827) Meeting Date: May 8, 2006 Agenda Item Number: 4 Department: Public Works-Engineering Staff Contact: Paul Klope www.eugene-or.gov Contact Telephone Number: 682-5246 ISSUE STATEMENT City Council is being asked to approve the Hearing Official’s Minutes, Findings and Recommendations dated April 19, 2006, and adopt an ordinance levying assessments for improvements consisting of paving, curbs and gutters, sidewalks, landscape medians, street lights, street trees, wastewater and storm rdth water drainage on 3 and 4 avenues between Pearl Street and Lincoln Street, north of the Southern Pacific Railroad and south of Skinner Butte park. Please note: This item has an immediate effective date. An immediate effective date requires a 2/3 majority or six affirmative votes from the council to enact. Ordinances without an immediate effective date do not take effect for 30 days. Without an immediate effective date, an additional 30 days of interest expense will accrue. BACKGROUND This project was identified in the FY04-FY09 Capital Improvement Program (CIP) adopted by the council on February 24, 2003, and pursuant to Section 7.160(5) of the Eugene, Code, 1971, a Local Improvement District (LID) was initiated. The North End Scoping Study was used as a guide for design and connections between the train station and Skinners Butte and the Shelton-McMurphey- Johnson House. Bids were opened on June 16, 2005, with Babb Construction Co. dba Delta Construction Co. as the low bidder. Property owners were notified of the public hearing regarding formation of the proposed LID and the public hearing was held on June 20, 2005. The City Council passed a resolution forming the LID on July 18, 2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated Based on the low bid received, the costs listed below are the estimated assessment costs calculated at the time of the formation of the LID. L:\CMO\2006 Council Agendas\M060508\S0605084.doc Paving 7-foot (per front foot) $ 65.00 Paving 10-foot (per front foot) $ 90.00 Sidewalk (per square foot) $ 6.00 Wastewater (per square foot) $ .35 Wastewater service (per each) $3,000.00 Total Estimated Assessable Cost $ 427,851 Total Estimated City Cost $1,258,433 Total Estimated Project Cost $1,686,284 Property owners were notified of the final assessment hearing ten (10) days prior to the hearing as required by Eugene Code. The final assessment hearing was held on April 12, 2006, to review the final project cost, consider comments on the proposed final assessments, and to provide evidence to be included in the ordinance levying the assessments by the City Council (see Hearing Official Minutes). Costs were distributed per Eugene Code 7.175, and as outlined in the council-adopted Hearings Official findings and recommendations, and the resolution forming the LID. Below are the final unit assessable costs: Paving 7-foot (per front foot) $ 67.23 Paving 10-foot (per front foot) $ 96.05 Sidewalk (per square foot) $ 6.06 Wastewater (per square foot) $ .48 Wastewater service (per each) $3,488.00 Total Final Assessable Cost $ 476,988.30 Total Final City Cost $1,367,531.10 Total Final Project Cost $1,844,519.40 The non-assessable City share for this project is funded from Transportation SDCs and Stormwater SDCs. The Transportation SDC portion is $1,160,160.00 and the Stormwater SDC portion is $203,145.00. The Metropolitan Wastewater Management Commission (MWMC) will reimburse the City $4,225 for adjustment work to their facilities. The nonassessable costs that the City pays for include additional width of paving, intersections, medians, bike lanes, street lights, street trees, and non- assessable storm drainage system costs. Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by Eugene Code, Chapter 7. The final project costs were higher than estimated. This was due to additional street excavation costs to stabilize the soft subgrade prior to paving, extra right-of-way costs for additional right-of-way needed at the west end of the project for realignment of the intersection to address safety concerns, additional storm drainage work due to underground springs, and higher utility relocation costs than estimated. L:\CMO\2006 Council Agendas\M060508\S0605084.doc RELATED CITY POLICIES The assessment costs will be distributed as outline the council-adopted Hearing Official’s Findings and Recommendations and Resolution forming the LID. COUNCIL OPTIONS Special assessment provisions adopted as part of an LID resolution cannot be modified during the final assessment process if they result in increased costs to the property owners. The final assessment hearing was to review the calculations to ensure conformance with the requirements stated in the LID resolution and the Eugene Code. Per Section 7.187, the City Council can take the following actions: 1. Approve the Findings and Recommendations of the Hearings Official of April 19, 2006 and adopt the ordinance levying assessments. 2. If, after review of the proposed assessment a determination is made that the assessments should be modified, staff would be directed to publish a new notice and a public hearing must be conducted. New findings would then be prepared for City Council adoption. CITY MANAGER’S RECOMMENDATION The City Manager recommends approval of the Findings and Recommendations of the Hearings Official and adoption of the ordinance levying assessments. SUGGESTED MOTIONS Move to approve the Minutes, Findings and Recommendations of the Hearings Official of April 19, 2006. Move to adopt an ordinance levying assessments for improvements consisting of paving, curb and gutters, sidewalks, landscape medians, street lights, street trees, wastewater, and storm water drainage rdth on 3 and 4 Avenues between Pearl Street and Lincoln Street, north of the southern Pacific Railroad and south Skinner Butte Park; and providing an immediate effective date. ATTACHMENTS A. Ordinance, including Hearings Official’s Minutes, Findings and Recommendations FOR MORE INFORMATION Staff Contact: Paul Klope Telephone: 682-5246 Staff E-Mail: paul.w.klope@ci.eugene.or.us L:\CMO\2006 Council Agendas\M060508\S0605084.doc ATTACHMENT A ORDINANCE NO. AN ORDINANCE LEVYING ASSESSMENTS FOR IMPROVEMENTS CONSISTING OF PAVING, CURBS, GUTTERS, SIDEWALKS, LANDSCAPE MEDIANS, STREET LIGHTS, STREET TREES, WASTEWATER, AND STORM WATER DRAINAGE ON 3RD AND 4TH AVENUES BETWEEN PEARL STREET AND LINCOLN STREET, NORTH OF THE SOUTHERN PACIFIC RAILROAD AND SOUTH OF SKINNER BUTTE PARK; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE. (CONTRACT 2006-04) (JOB #3827) The City Council of the City of Eugene finds that: A. On the 24th day of February, 2003, the City Council, by motion duly passed, initiated the proposed local improvements consisting of paving, curbs, gutters, sidewalks, landscape medians, street lights, street trees, wastewater, and storm water drainage on 3rd and 4th Avenues between Pearl Street and Lincoln Street, north of the Southern Pacific Railroad and south of Skinner Butte Park. B. After due notice and a public hearing before the hearing official on June 20, 2005, the City Council formed the Local Improvement District and authorized construction of the local improvements on the 18th day of July, 2005. C. The actual cost ofthe local improvements is ascertained to be $1,844,519.43, and the amounts to be assessed to, and borne by, the specially benefitted property, and to be borne by the City or others, have been determined in accordance with applicable provisions ofthe Eugene Code, 1971 (UE.C."), as set forth in Exhibit A attached hereto and incorporated herein by reference. D. The City Council has established the method of calculating local improvement assessments in E.C. 7.170 and 7.175. E. A public hearing on the ordinance, as required by Section 28(2) ofthe Eugene Charter of2002, was scheduled before the hearing official as authorized by E.C. 2.007(4), on April 12, 2006. At least ten days prior to the scheduled public hearing before the hearing official, a notice containing the information required by E.C. 7.185 was posted on a public bulletin board at City Hall and given by certified mail to the owners of the parcels of real property subject to the assessment. At the time and place specified therein, the hearings official considered the assessment report of the City Engineer and Finance Officer and the testimony and evidence presented at the hearing. F. At least ten working days prior to the Council meeting, notice of the Council's consideration ofthis Ordinance was published in the Register Guard, and the Ordinance was posted on the City's web site on the same date, as required by Section 28(1) ofthe Eugene Charter of2002. Ordinance - 1 Q:\PROJECTS\PROJ-7\3827\ASSESS\ORDlNANCE FOR COUNCIL.doc G The Council has reviewed and considered the assessment report of the City Engineer and Finance Officer and the hearings official's findings and summary, and based thereon, THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The hearings official's summary is hereby made a part of the Council's record in these proceedings, and the hearings official's findings, including those regarding compliance with E.C. 7.160 to 7.190, attached hereto as Exhibit B and incorporated herein by reference, are hereby adopted. Section 2. The actual assessable cost ofthe local improvements consisting of paving, curbs, gutters, sidewalks, landscape medians, street lights, street trees, wastewater, and storm water drainage on 3rd and 4th Avenues between Pearl Street and Lincoln Street, north of the Southern Pacific Railroad and south of Skinner Butte Park is $476,988.28 which is hereby assessed against the parcels of property hereinafter described in the amounts set opposite, respectively. Section 3. The City Council does hereby determine and assess each lot and part oflot within the described local improvement district as set forth on the assessment roll attached as Exhibit C hereto and incorporated herein by reference. Section 4. The City Council does hereby determine that each parcel of land or lot hereinabove described is specially benefitted to the extent of the assessment set forth. The Finance Officer shall give notice of the assessments to the owners ofthe assessed parcels advising them the assessment may be paid in full, without interest, within ten days of the effective date of this ordinance. Assessments that remain unpaid after the ten day period are declared to be liens upon the respective lots, parts oflots or parcels ofland against which said several amounts are assessed, and may be paid, with interest on the unpaid principal amount commencing ten days after the effective date of this ordinance: 4.1 In up to twenty semi-annual installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024. 4.2 If the property owner so elects, in 120 monthly installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024 plus a service charge determined by the City Manager as provided in E.C. 2.020. Section 5. The City Recorder is directed to enter in the docket of City Liens a statement in connection with each unpaid assessment containing the following: 5.1 A description of each lot, part of lot or acreage specially benefitted by the local improvements; 5.2 The name of the owner or reputed owner thereof, or that the name of the owner is unknown; and 5.3 The sum assessed upon said property, the amount and date from which interest Ordinance - 2 Q:\PROJECTS\PROJ-7\3827\ASSESS\ORDINANCE FOR COUNCIL.doc accrues, and the date of entering the same in the docket of City Liens. Section 6. Upon enactment of this ordinance, the City Finance Officer shall send notice of the assessments by first class mail to the owners of the assessed parcels containing the information required by E. C. 7.190 and enclose therewith an application for paying the assessment in installments according to the terms set forth in Section 4 of this ordinance. Section 7. Any assessment remaining unpaid and for which no application for installment payments has been received may be foreclosed as provided by law. The proceeds from the payment or foreclosure of assessments levied by this ordinance shall be deposited to the city funds which advanced the cost of construction, engineering and related expenses or which are used to retire any indebtedness incurred by the City for these improvements. Section 8. An immediate effective date of this Ordinance is necessary to allow the City to begin immediate collection of the assessments that will be used to pay the obligations the City has incurred for this project. Enabling the City to begin collecting assessments will avoid increased interest costs and conserve limited City resources. Therefore, this Ordinance shall become effective immediately upon its passage by the City Council and approval by the Mayor, retention by the Mayor for more than ten days, or readoption over a Mayoral veto by two-thirds of all members of the City Council. Passed by the City Council this Approved by the Mayor this _ day of , 2006. day of , 2006. City Recorder Mayor Ordinance - 3 Q:\PROJECTS\PROJ-7\3827\ASSESS\ORDlNANCE FOR COUNCIL.doc PROJECT LEGAL: CONTRACT NUMBER: JOB NUMBER: ASSESSABLE: ASSESSABLE TOTALS: CITY SHARE: CITY SHARE TOTALS: EXHIBIT A CITY OF EUGENE (PROD) SPECIAL ASSESSMENT SYSTEM PAGE: 1 93003827 - 3RO/4TH AVENUE CONNECTOR-PEARL TO LINCOLN PAVING, CURBS AND GUTTERS, SIDEWALKS, LANDSCAPE MEDIANS, STREET LIGHTS, STREET TREES, WASTEWATER, AND STORM WATER DRAINGE ON 3RD AND 4TH AVENUE BETWEEN PEARL STREET AND LINCOLN STREET, NORTH OF THE SOUTHERN PACIFIC RAILROAD AND SOUTH OF SKINNER BUTTE 2006-00004 93003827 11 PEND ING 3 ON HOLD o LIEN DEFERRED 14 $350,079.20 $126,909.08 $0.00 $476,988.28 CITY PAVING CITY STORM PAID BY OTHER AGENCY $1,158,820.65 $203,145.02 $5,565.48 $1,367,531.15 TOTAL COST OF PROJECT: $1,844,519.43 EXHIBIT B FINDINGS AND RECOMMENDATIONS SUBJECT: PROPOSED FINAL ASSESSMENT FOR IMPROVEMENTS CONSISTING OF PAVING, CURBS AND GUTTERS, SIDEWALKS, LANDSCAPE MEDIANS, STREET LIGHTS, STREET TREES, W ASTEW A TER, AND STORM WATER DRAINAGE ON 3RD AND 4TH A VENUE BETWEEN PEARL STREET AND LINCOLN STREET, NORTH OF THE SOUTHERN PACIFIC RAILROAD AND SOUTH OF SKINNER BUTTE PARK (CONTRACT 2006-04) (JOB #3827) BACKGROUND Third and 4th Avenue runs diagonally between Pearl Street on the east and Lincoln Street on the west. The street had deteriorated badly. The pavement before the improvements were made was a 20 foot wide oil mat in very poor condition with poor drainage. The street provides the only connection between Pearl and Lincoln that is north of the railroad tracks and south of Skinner Butte. For a long time the street was little used, but in recent years there has been considerable development along the street. The improvements were identified in the FY 04-FY 09 Capital Improvement Program adopted by the Council on February 24,2003. The project was designed using the standards of Section 7.160(5) of the Eugene Code, and the North End Scoping Study. Bids were opened on June 16,2005. Property owners were notified of the public hearing regarding formation of the proposed LID. A public hearing was held. The City formed the Local Improvement District (LID) on July 18, 2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. PROJECT The improvements consist of a 32-foot wide road with two travel lanes, landscaped medians, bicycle lanes, curb and gutter, sidewalks, street lights, street trees, traffic calming and wastewater and storm water drainage systems. The improvements to 3rd and 4th Avenue address the deteriorating surface, and create safer traveling conditions for bicycles, pedestrians and vehicles. The intersections at both Pearl and Lincoln were realigned to improve the safety of these intersections. ASSESSMENTS The final costs were used to calculate assessments according to the procedures directed by Eugene Code 7.175. Residential properties are assessed based on the proportional cost of seven feet of paving, commercial properties are assessed the proportional cost of ten feet of paving. The final assessable costs are: PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON 3rd AND 4th AVENUE FINAL ASSESSMENTS Page 1 Paving 7-foot (per front foot) Paving lO-foot (per front foot) Sidewalk (per square foot) Wastewater (per square foot) Wastewater service (per each) $ 67.23 $ 96.05 $ 6.06 $ .48 $3,488.00 Total Final Assessable Cost Total Final City Cost $ 476,988.30 $1,367,531.10 Total Final Project Cost $1,844,519.40 The non-assessable City share for the project is funded from Transportation SDCs ($1,160,160) and Storm Water SDCs ($203,145). MWMC will reimburse the City $4,225 for adjustment work that was done to their facilities. The City costs include the additional width of paving (beyond the seven or ten foot width assessable to properties), intersections, medians, bike lanes, street lights, street trees, and non-assessable storm drainage system costs. Assessment financing, a lO-year payment plan through the City, is available to all property owners within the improvement district as required by Eugene Code, Chapter 7. The estimated assessments, made at the time the district was formed were lower than the final assessments. The original estimates were: Paving 7-foot (per front foot) Paving lO-foot (per front foot) Sidewalk (per square foot) Wastewater (per square foot) Wastewater service (per each) $ 65.00 $ 90.00 $ 6.00 $ .35 $2,850.00 Total Estimated Assessable Cost Total Estimated City Cost $ 427,851 $1,258,433 Total Estimated Project Cost $1,686,284 The higher than estimated final costs were due to additional street excavation costs to stabilize the soft sub grade prior to paving, extra right-of-way costs for additional right of way needed at the west end of the project for realignment of the intersection, additional storm drainage work due to underground springs, and higher utility relocation costs. PUBLIC INVOLVEMENT The City of Eugene Public Works Department sent notice of the proposed assessments to property owners more than ten days in advance of the hearing date. A hearing on the proposed PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON 3rd AND 4th AVENUE FINAL ASSESSMENTS Page 2 LID was held on April 12, 2006. One property owner attended. A summary of the hearing is attached, labeled as Exhibit A. The only objection expressed that related to the proposed final assessments related to the increase in the cost of the project. The attending property owner was especially affected because previous estimates had been based on a record showing the property smaller than it actually was. This was not an error that warranted reconsideration of the proposed assessments. FINDINGS AND RECOMMENDATION Notice of the public hearing was provided and all the property owners were given an opportunity to participate in the hearings. Appropriate notice was given of the public hearing and pending Council action, as required by the Eugene Charter and Code. Letters informing property owners of the hearing and notification to property owners of the intent of the City to characterize the assessment as an assessment, not a tax, as required by ORS 305.583(5) were mailed to the property owners. The Hearings Officer finds that the project is one for which the assessments are for local improvements as set forth in ORS 310.410 because 1. The assessments do not exceed actual costs; 2. The assessments are imposed for a capital construction project that provides a specific benefit for a specific property or rectifies a problem caused by a specific property 3. The assessments are imposed in a single assessment upon completion of the project; and 4. The assessments allow the property owners to elect to pay the assessment with interest over at least ten (10) years. The Hearings Official also finds that the proposed final assessment, calculated and recommended by the City Engineer is reasonable and consistent with the Eugene Code. The Hearings Official recommends that the Council act in accord with the City Engineer's recommendations, adopting the ordinance prepared for the public hearing, levying the assessment as set forth by the City Engineer. ;r/~~ed' ~~ham Hearings Official April 19, 2006 PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON 3rd AND 4th AVENUE FINAL ASSESSMENTS Page 3 Exhibit A MINUTES Local Improvement District Assessments Paving, Constructing Curbs, Gutters, Sidewalks, Landscape Medians, Street Lights, Street Trees, Wastewater and Storm Water Drainage on 3rd and 4th A venues Between Pearl Street and Lincoln Street, North of the Southern Pacific Railroad and South of Skinner Butte Park. April 12, 2006 Public Hearing Hearings Official Milo Mecham convened the hearing at 6:00 p.m. Present at the hearing representing the City of Eugene were Principal Engineer Paul Klope and Project Engineer Steve Gallup. There was one member of the public present, Mr. Zeph Van Allen of 150 W. 4th Street. Mr. Van Allen was familiar with the process, having attended the formation hearing and having held several discussions with Eugene staff, including Mr. Gallup. Perhaps because of his familiarity with the process and the issues, Mr. Van Allen demonstrated that he did not need introductory remarks by the hearings official or by Mr. Gallup by immediately beginning with a statement of his questions and concerns. Mr. Van Allen began by stating his dissatisfaction with the increase in the price of the proposed assessments. He indicated that his notice of final proposed assessment was more than twenty-five percent higher than the estimated assessments provided when the district was formed. Mr. Van Allen also indicated that he was dissatisfied with the proposed change of street name, especially because it came so quickly after the last request for an address change. Mr. Van Allen suggested that the City should bear the cost of the address change. Mr. Van Allen also indicated that, while the street improvements were necessary, he felt that the street had been over built, and that he was concerned that this was the cause of some of the excess costs that he was being asked to pay. An additional problem that Mr. Van Allen suggested arose from the street design was an increase in through traffic. Mr. Van Allen argued that the improvements encouraged more traffic from the Fifth Street area. Because of this, Mr. Van Allen suggested that the end of the improvements, at 3rd and Lincoln should have a four way stop installed, to slow traffic and prevent accidents. After Mr. Van Allen finished his statements, Project Engineer Steve Gallup checked the detailed numbers of proposed assessments to develop an explanation of the change in price. Mr. Gallup explained that it appeared that Mr. Van Allen's proposed assessments had increased more than the other assessments because of a correction that was made when the actual size ofMr. Van Allen's property was used to calculate the proposed final assessment. Earlier, when the estimated assessments were shared with property owners, an estimated property size was used. While drawn from the property records, this estimate turned out to be smaller than the actual property size. When this correction was combined with the cost increases that the project did experience, the result was the apparent large increase that Mr. Van Allen experienced. The earlier estimates were estimates, both of the property size and of the cost. In Mr. Van Allen's case correcting both these estimates magnified the effect of the change in cost. With regard to the question of the scope of the improvements, and whether the street was overbuilt, Mr. Gallup explained that the road was identified as a collector street and was designed according to the established standards for the street. In some places the design had been modified to limit some standard features because of the position of the street. Mr. Gallup and Mr. Klope responded to questions from the hearings official regarding the limited assessment of the costs of collector streets. Mr. Gallup and Mr. Klope explained that the increased size and capacity of a collector street, when compared with a local street, are not usually paid by the assessed property owners. Most property owners pay the same set of costs regardless of the street classification or added design features. In this case Mr. Van Allen was not being assessed for the street width or street features put in because the street was a collector street. Mr. Gallup explained to Mr. Van Allen that he was aware that the City had already begun consideration of the question of a four way stop at 3rd and Lincoln. Mr. Gallup provided Mr. Van Allen with contact information for Tom Larson of the City's Traffic Engineering section, to allow Mr. Van Allen to participate in further discussion on the issue. In response to the hearings officer's questions, Mr. Van Allen and Mr. Gallup explained the issues with regard to street name changes. Coincident with the completion of the improvement project the City is considering a street name change for 3rd and 4th A venue. After this explanation, the hearings officer explained to Mr. Van Allen that that issue was outside the scope of the local improvement district assessment hearing. Mr. Gallup informed Mr. Van Allen that the question was scheduled to be before the Council at the same Council meeting that would consider of this assessment matter. Mr. Van Allen concluded by saying that he had no real complaints about the improvement. He felt that the City had created a nice road that did help address the problems that had existed before. Mr. Van Allen felt that it might create some new problems, but that was only to be expected. There being no further inquiries or statements to be made, the hearing closed at 6:20. MEMORANDUM DATE: April 12, 2006 FROM: Mark Schoening, City Engineer TO: Hearings Official SUBJECT: PROPOSED FINAL ASSESSMENT FOR IMPROVEMENTS CONSISTING OF PAVING, CURBS AND GUTTERS, SIDEWALKS, LANDSCAPE MEDIANS, STREET LIGHTS, STREET TREES, WASTEWATER, AND STORM WATER DRAINAGE ON 3RD AND 4TH AVENUE BETWEEN PEARL STREET AND LINCOLN STREET, NORTH OF THE SOUTHERN PACIFIC RAILROAD AND SOUTH OF SKINNER BUTTE PARK (CONTRACT 2006-04) (JOB #3827) BACKGROUND This project was identified in the FY04-FY09 Capital Improvement Program (CIP) adopted by the Council on February 24,2003 and pursuant to Section 7.160(5) of the Eugene, Code, 1971, a local improvement district was initiated, and the North End Scoping Study was used as a guide for design and connections between the train station and Skinners Butte and the Shelton-McMurphy House. Bids were opened on June 16,2005, with Babb Construction Co. dba Delta Construction Co. as the low bidder. Property owners were notified of the public hearing regarding formation of the proposed LID and the public hearing was held on June 20, 2005. The City formed the Local Improvement District (LID) on July 18,2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. The property owners were notified of the proposed assessments and the pending assessment hearing ten (10) days prior to the hearing as required by Eugene Code. The intent of the final assessment hearing scheduled for April 12, 2006, is to review the final project costs, consider comments on the proposed assessments, and to provide evidence to be included in the ordinance levying the assessments by the City Council. CORRESPONDENCE Since the mailing of the Notice of Proposed Assessments, City staffhas received 2 phone calls and no written correspondence from property owners. One property owner has indicated they will be attending the hearing as of noon, April 11 , 2006. PROJECT The original roadway was a 20- foot wide oil mat in very poor condition with poor drainage. The new improvements consist of a 32-foot wide street with two travel lanes, landscaped medians, bicycle lanes, curb and gutter, sidewalks, street lights, street trees, traffic calming and wastewater and storm water drainage systems. The improvements to 3rd and 4th Avenue address the deteriorating surface, and created safer traveling condition for bicycles, pedestrians and vehicles. In addition, at each end of the project, realignment of the intersections were designed to address safety issues. Attached is a map showing the limits of the project and the properties to be assessed (see Attachment A). ASSESSMENTS Costs were distributed per Eugene Code 7.175, and as outlined in the Council adopted Hearings Official findings and recommendations, and the resolution forming the LID. Below are the final unit assessable costs: Paving 7-foot (per front foot) Paving 10-foot (per front foot) Sidewalk (per square foot) Wastewater (per square foot) Wastewater service (per each) $ 67.23 $ 96.05 $ 6.06 $ .48 $3,488.00 Total Final Assessable Cost Total Final City Cost $ 476,988.30 $1,367,531.10 Total Final Project Cost $1,844,519.40 The non-assessable City share for this project is funded from Transportation SDC's and Storm Water SDC's. The Transportation SDC portion is $1,160,160.00 and the Storm SDC portion is $203,145.00. MWMC will reimburse the City $4,225 for adjustment work that was done to their facilities. The nonassessable costs that the City pays for include additional width of paving, intersections, medians, bike lanes, street lights, street trees, and non-assessable storm drainage system costs. Assessment financing, a 1 O-year payment plan through the City, is available to all property owners within the improvement district as identified by Eugene Code, Chapter 7. Based on the low bid received, the costs listed below are the estimated assessment costs plus contingency calculated at the time of the formation of the LID. Paving 7-foot (per front foot) Paving 10-foot (per front foot) Sidewalk (per square foot) Wastewater (per square foot) Wastewater service (per each) $ 65.00 $ 90.00 $ 6.00 $ .35 $3,000.00 Total Estimated Assessable Cost Total Estimated City Cost $ 427,851 $1,258,433 Total Estimated Project Cost $1,686,284 The final project costs were higher than estimated. This was due to additional street excavation costs to stabilize the soft subgrade prior to paving, extra right-of-way costs for additional right of way needed at the west end of the project for realignment of the intersection to address safety concerns, additional storm drainage work due to underground springs, and higher utility relocation costs than estimated. LOW INCOME SUBSIDY Information regarding the subsidy program was not sent out because there are no single family properties in the proposed LID. RECOMMENDATION Assessment costs are in accordance with Eugene Code. Staff recommends approval of the final assessments as calculated, and that the Council levy the final assessments. :: I -; @ @ r 0 w @l 0 0 0 '" 0 -;~;u C/) s: '" r" - ;>; '" ~ 88 "ll .<0 Z :>> ~ o ~ ~ Z ~ I m w 0 ;U i ;U '" I <: c m =I < m I m "ll Z ~: i -; (g '" c .cs ;U "ll i m m 0 C/) ~ ~ i m C/) I 8 -;~@ r" - 1 I o co ~w g~ 0 ... - < 0 Q " m z~ c ~~ G) m ;:: Z m )> "1J .... S ~ m ~ U> ~ U> n1 ~ n1 '" c ~ -< m C H P ~ I I RIR @ ?~5 :::j~~ ~~I wC/) 6 m I o r o Z G) C/) ~ -<~ r~ ~~ i~ Irt ,~ 1)> 1< I Cb I @ r m G) m z o Ii t .1 !/ t -r fJ Ii t ! , t ;11 I i ~ I I I i 1 t t I i I Lincoln 5t ~~ 8~ " ;:1 @ ~ 0 ~ o " m c G) m Z m W ;0 o I .J::=.. -I I )> < m o -00 ;oZ OZ c....m mO 0-1 -10 ~;o W"Tl ex:> - f\.)Z ""'-I)> r )> en en m en en s: m Z -I :z: _ CITY OF 3rd-4th Connector DATE 02 27 06 SCALE GRAPHIC 11 EUGENE, OREGON Assessment DESIGNED BY s. GALLUP 11 DEPARTMENT OF PUBUC WORKS from Pearl Street DRAWN BY G. FEE 0 CHECKED BY S. GALLUP ENGINEERING DIVISION to Lincoln Street PROJECT NO. 3827 REV DATE DESCRIPTION BY '-l [iJ :::j ~ 8 m w ;u t ~ m -; m o Z -; c :>> Z r - " 0 ;u Z o ;u Z m -; -; l'i ;;; m ~ " m '" Z o -; '" :>> tv C/) " C/) 21 0 o 'i> -; o Z @ ;>;m ~s;: -; - '" IZ w ~~ ~ "'c ;u'" c;U OC -;0 m C/) -; m r s: " m ~ Z '" b .0) ;u ... ",-< '" ~ 'C i8 ~ CITY OF EUGENE SPECIAL ASSESSMENT SYSTEM ASSESSMENT REGISTER (CITY COUNCIL) 93003827 - 3RO/4TH AVENUE CONNECTOR-PEARL TO LINCOLN EXHIBIT C PAGE: 1 PROJECT LEGAL DESCRIPTION MASTER PROJECT #: 2006-00004 'l;M!<Q'!' 17033043-00100 000 PROPBRTY DBSCRIPTION 17033043-00200 000 PROPBRTY DBSCRIPTION 17033043-00300 000 PROPBRTY DBSCRIPTION 17033043-00400 000 PROPBRTY DBSCRIPTION 17033043-00601 000 PROPBRTY DB SCRIPTION 17033043-01701 000 PROPBRTY DBSCRIPTION 17033043-01702 000 PROPBRTY DBSCRIPTION 17033043-01704 000 PROPBRTY DBSCRIPTION 17033043-01705 000 PROPBRTY DBSCRIPTION 17033044-04700 000 PROPBRTY DBSCRIPTION 17033044-05600 000 PROPBRTY DBSCRIPTION CONTRACT #: 2006 00004 JOB #: 93003827 PAVING, CURBS AND GUTTERS, SIDEWALKS, LANDSCAPE MEDIANS, STREET LIGHTS, STREET TREES, WASTEWATER, AND STORM WATER DRAINGE ON 3RD AND 4TH AVENUE BETWEEN PEARL STREET AND LINCOLN STREET, NORTH OF THE SOUTHERN PACIFIC RAILROAD AND SOUTH OF SKINNER BUTTE ,!,-Q,!,~~MPROVBMBNT AMOUNT OWNBjL INFORMATION $10,258.84 CITY OF EUGENE - PW PARKS & OPEN $10,114.17 R1651-9041752 BRIDGET DRIVE VENTURES 1601 SIXTEENTH ST SANTA ROSA CA 95404 $699.89 2004-009834 SKINNER BUTTE PROPERTIES LLC PO BOX 10667 EUGENE OR 97440 $31,157.86 2003-123406 SKINNER BUTTE PROPERTIES LLC PO BOX 10667 EUGENE OR 97440 $74,003.90 2003 -11 7143 CITY OF EUGENE - FACILITIES MGT 210 CHESHIRE AVE EUGENE OR 97401 $44,036.16 R2169-9628600 GUBRUD ELAINE TE 355 LINCOLN ST EUGENE OR 97401 $55,647.42 2004-9474627 VANALLEN ZEPH PO BOX 1419 EUGENE OR 97440 $85,215.43 2004-044184 NORTHSIDE HOLDINGS LLC PO BOX 10638 EUGENE OR 97440 $14,254.57 PARTITION PLAT 99-PI269, PARCEL 2 JENOVA LAND COMPANY PO BOX 10638 EUGENE OR 97440 $10,011.41 EVERGREEN UNION R287-47560 & 47564, R297-65417, R791- 350 PEARL ST 18704 EUGENE OR 97401 $14,679.55 R1715 - 9142168 GARFIELD ASSOCIATES PO BOX 529 EUGENE OR 97440