Loading...
HomeMy WebLinkAboutItem 3: Ordinance Levying Assessments for Debrick Road ECC UGENE ITY OUNCIL AIS GENDA TEM UMMARY Action: Approval of Findings and Recommendations from the Hearings Official and Adoption of an Ordinance Levying Assessments for Improvements Consisting of Paving, Curbs and Gutters, Sidewalks, and Storm Water Drainage System on Debrick Road from Clinton Drive to Valley Butte Drive, and Butte Lane from Clinton Drive to 700 feet south; and Providing an Immediate Effective Date (Contract 2006-05) (Job #4111) Meeting Date: May 8, 2006 Agenda Item Number: 3 Department: Public Works-Engineering Staff Contact: Paul Klope www.eugene-or.gov Contact Telephone Number: 682-5246 ISSUE STATEMENT City Council is being asked to approve the Hearing Official’s Findings and Recommendations dated April 24, 2006, and adopt an ordinance levying assessments for improvements consisting of paving, curbs and gutters, sidewalks, and storm water drainage system on Debrick Road from Clinton Drive to Valley Butte Drive, and Butte Lane from Clinton Drive to 700 feet south. Please note: This item has an immediate effective date. An immediate effective date requires a 2/3 majority or six affirmative votes from the council to enact. Ordinances without an immediate effective date do not take effect for 30 days. Without an immediate effective date, an additional 30 days of interest expense will accrue. BACKGROUND The project design and bidding was initiated as a result of a Poll Petition by the City in November 2003. The petition requesting the local improvement district was signed by property owners who represent 71% of the assessable frontage within the boundaries of the proposed Local Improvement District (LID). The City Engineer initiated the preparation of plans and specifications, pursuant to Section 7.160(8) of the Eugene Code, 1971 on February 20, 2004. The project has brought Debrick Road up to full City standards and meets the current and future pedestrian, bicycle and vehicular needs. Bids were opened on June 21, 2005, with Babb Construction Co. dba Delta Construction Co. as the low bidder. Property owners were notified of a public hearing regarding formation of the proposed LID and the public hearing was held on June 23, 2005. The City Council passed a resolution forming the Local Improvement District (LID) on July 18, 2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. Based on the low bid received, the costs listed below were the estimated assessment costs calculated at the time of the formation of the LID. L:\CMO\2006 Council Agendas\M060508\S0605083.doc Sidewalk (per front foot) TotTotal Assessable Cost Paving 28-foot (per front foot) $ 90.82 Paving 21-foot (per front foot) $ 74.44 Sidewalk (per front foot) $ 26.70 Total Estimated Assessable Cost $ 234,894 (current and delayed) Total Estimated City Cost $ 114,333 Total Estimated Project Cost $ 349,227 The estimated City cost shown above has been revised to correct an error in the amount of estimated non-assessable costs shown at the time of LID formation. After completion of construction, property owners were notified of the final assessment hearing ten (10) days prior to the hearing as required by Eugene Code. The final assessment hearing was scheduled for April 12, 2006, to review the final project costs, consider comments on the proposed final assessments, and to provide opportunity for property owners to submit evidence to be included in the ordinance levying the assessments by the City Council. There were no requests from property owners to speak at the hearing, so the hearing was cancelled. Final assessment costs were distributed per Eugene Code 7.175, and as outlined in the council-adopted Hearings Official findings and recommendations, and the resolution forming the LID. Below are the final unit assessable costs: Paving 28-foot (per front foot) $ 97.91 Paving 21-foot (per front foot) $ 82.61 Sidewalk (per front foot) $ 24.06 Total Final Assessable Cost $ 223,801.57 (current and delayed) Total Final City Cost $ 171,346.85 Total Final Project Cost $ 395,148.12 Per Eugene Code, property owners on local streets pay for the full width of the street, and the City pays for intersection costs and non-assessable storm drainage and wastewater costs. The non-assessable City share for this project is funded from Road Fund, in the amount of $75,120.82, Wastewater Utility Fund, in the amount of $15,835.96, and Stormwater SDC Funds, in the amount of $66,487.93. Transportation SDC funds may only be used on arterial and collector street projects. The cost increases in the final project costs were due to additional excavation and base rock necessary to stabilize the base of the roadway due to soft road bed, design modifications during construction requested by property owners to accommodate safety and maintenance issues, modifications to the existing wastewater lines to bring them up to current City standard, additional storm drainage improvements to accommodate springs within the project that surfaced during heavy rains this winter prior to final completion of the project, additional utility relocation costs and delays and additional coordination work due to delays in completion of work by the utility companies to relocate their facilities. L:\CMO\2006 Council Agendas\M060508\S0605083.doc Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by Eugene Code, Chapter 7. Of the 10 properties in the LID, three property owners qualify for a subsidy under the low-to-moderate income subsidy program. Two property owners qualify for the moderate subsidy level and one owner for very low subsidy. This City-funded program applies only to owner-occupied residential properties in the LID. The total cost for the low-income subsidies is $13,902.17, and is funded from the Street Subsidy Fund. RELATED CITY POLICIES The assessment costs will be distributed as outlined in the council-adopted Hearing Official’s Findings and Recommendations and Resolution forming the LID. COUNCIL OPTIONS Special assessment provisions adopted as part of an LID resolution cannot be modified during the final assessment process if they result in increased costs to the property owners. The purpose of the final assessment hearing is to review the calculations to ensure conformance with the requirements stated in the LID resolution and the Eugene Code. Per Section 7.187, the City Council can take the following actions: 1. Approve the Findings and Recommendations of the Hearings Official of April 24, 2006 and adopt the ordinance levying assessments; 2. After review of the proposed assessment, and a determination that the assessments should be modified, direct staff to publish a new notice and hold another public hearing. New findings would then be prepared for City Council adoption. CITY MANAGER’S RECOMMENDATION The City Manager recommends approval of the Findings and Recommendations of the Hearings Official and adoption of the ordinance levying assessments. SUGGESTED MOTIONS Move to approve the Findings and Recommendations of the Hearings Official of April 24, 2006. Move to adopt an ordinance levying assessments for improvements consisting of paving, curb and gutters, sidewalks, and storm water drainage system on Debrick Road from Clinton Drive to Valley Butte Drive, and Butte Lane from Clinton Drive to 700 feet south; and providing an immediate effective date. ATTACHMENTS A. Ordinance, including Hearings Official’s Findings and Recommendations FOR MORE INFORMATION Staff Contact: Paul Klope Telephone: 682-5246 Staff E-Mail: paul.w.klope@ci.eugene.or.us L:\CMO\2006 Council Agendas\M060508\S0605083.doc ATTACHMENT A ORDINANCE NO. AN ORDINANCE LEVYING ASSESSMENTS FOR IMPROVEMENTS CONSISTING OF PAVING, CURBS, GUTTERS, SIDEWALKS, AND STORM WATER DRAINAGE SYSTEM ON DEBRICK ROAD FROM CLINTON DRIVE TO VALLEY BUTTE DRIVE, AND BUTTE LANE FROM CLINTON DRIVE TO 700 FEET SOUTH; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE. (CONTRACT 2006-05) (JOB #4111) The City Council of the City of Eugene finds that: A. On the 20th day ofF ebruary, 2004, based on the findings issued by the City Engineer, pursuant to Section 7.160(8) of the Eugene Code, 1971, the City Engineer initiated the proposed local improvements consisting of paving, curbs, gutters, sidewalks, and storm water drainage system on Debrick Road from Clinton Drive to Valley Butte Drive, and Butte Lane from Clinton Drive to 700 feet south. B. After due notice and a public hearing before the hearing official on June 23, 2005, the City Council formed the Local Improvement District and authorized construction of the local improvements on the 18th day of July, 2005. C. The actual cost ofthe local improvements is ascertained to be $395,148.12, and the amounts to be assessed to, and borne by, the specially benefitted property, and to be borne by the City or others, have been determined in accordance with applicable provisions ofthe Eugene Code, 1971 ("E.C."), as set forth in Exhibit A attached hereto and incorporated herein by reference. D. The City Council has established the method of calculating local improvement assessments in E.C. 7.170 and 7.175. E. A public hearing on the ordinance, as required by Section 28(2) ofthe Eugene Charter of2002, was scheduled before the hearing official as authorized by E.C. 2.007(4), on April 12, 2006. At least ten days prior to the scheduled public hearing before the hearing official, a notice containing the information required by E.C. 7.185 was posted on a public bulletin board at City Hall and given by certified mail to the owners ofthe parcels of real property subject to the assessment. At the time and place specified therein, the hearings official considered the assessment report of the City Engineer and Finance Officer and the testimony and evidence presented at the hearing. F. At least ten working days prior to the Council meeting, notice of the Council's consideration ofthis Ordinance was published in the Register Guard, and the Ordinance was posted on the City's web site on the same date, as required by Section 28(1) ofthe Eugene Charter of2002. Ordinance - 1 Q:\PROJECTS\PROJ-l \4111\Assessment\Correspondence\ORDINANCE FOR COUNCIL.doc G The Council has reviewed and considered the assessment report ofthe City Engineer and Finance Officer and the hearings official's findings and summary, and based thereon, THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS: Section 1. The hearings official's summary is hereby made a part of the Council's record in these proceedings, and the hearings official's findings, including those regarding compliance with E.C. 7.160 to 7.190, attached hereto as Exhibit B and incorporated herein by reference, are hereby adopted. Section 2. The actual assessable cost ofthe local improvements consisting of paving, curbs, gutters, sidewalks, and storm water drainage system on Debrick Road from Clinton Drive to Valley Butte Drive, and Butte Lane Clinton Drive to 700 feet south is $223,801.27 which is hereby assessed against the parcels of property hereinafter described in the amounts set opposite, respectively. Section 3. The City Council does hereby determine and assess each lot and part oflot within the described local improvement district as set forth on the assessment roll attached as Exhibit C hereto and incorporated herein by reference, which includes those properties whose owners qualified for the Street Subsidy Program. Section 4. The City Council does hereby determine that each parcel of land or lot hereinabove described is specially benefitted to the extent ofthe assessment set forth. The Finance Officer shall give notice of the assessments to the owners of the assessed parcels advising them the assessment may be paid in full, without interest, within ten days of the effective date of this ordinance. Assessments that remain unpaid after the ten day period are declared to be liens upon the respective lots, parts oflots or parcels ofland against which said s~veral amounts are assessed, and may be paid, with interest on the unpaid principal amount commencing ten days after the effective date of this ordinance: 4.1 In up to twenty semi-annual installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024. 4.2 If the property owner so elects, in 120 monthly installments, including principal and interest at the rate set by the City Manager as provided in E.C. 2.022 through 2.024 plus a service charge determined by the City Manager as provided in E.C. 2.020. Section 5. The City Recorder is directed to enter in the docket of City Liens a statement in connection with each unpaid assessment containing the following: 5.1 A description of each lot, part of lot or acreage specially benefitted by the local improvements; 5.2 The name of the owner or reputed owner thereof, or that the name of the owner is unknown; and 5.3 The sum assessed upon said property, the amount and date from which interest accrues, and the date of entering the same in the docket of City Liens. Ordinance - 2 Q:\PROJECTS\PROJ-J \4111 \Assessment\Correspondence\ORDlNANCE FOR COUNCIL.doc Section 6. Upon enactment ofthis ordinance, the City Finance Officer shall send notice of the assessments by first class mail to the owners ofthe assessed parcels containing the information required by E. C. 7.190 and enclose therewith an application for paying the assessment in installments according to the terms set forth in Section 4 of this ordinance. Section 7. Any assessment remaining unpaid and for which no application for installment payments has been received may be foreclosed as provided by law. The proceeds from the payment or foreclosure of assessments levied by this ordinance shall be deposited to the city funds which advanced the cost of construction, engineering and related expenses or which are used to retire any indebtedness incurred by the City for these improvements. Section 8. An immediate effective date of this Ordinance is necessary to allow the City to begin immediate collection of the assessments that will be used to pay the obligations the City has incurred for this project. Enabling the City to begin collecting assessments will avoid increased interest costs and conserve limited City resources. Therefore, this Ordinance shall become effective immediately upon its passage by the City Council and approval by the Mayor, retention by the Mayor for more than ten days, or readoption over a Mayoral veto by two-thirds of all members of the City Council. Passed by the City Council this Approved by the Mayor this _ day of , 2006. day of , 2006. City Recorder Mayor Ordinance - 3 Q:\PROJECTS\PROJ-I \411 J \Assessment\Correspondence\ORDINANCE FOR COUNCIL.doc PROJECT LEGAL: CONTRACT NUMBER: JOB NUMBER: ASSESSABLE: ASSESSABLE TOTALS: CITY SHARE: CITY SHARE TOTALS: TOTAL COST OF PROJECT: . . CITY OF EUGENE (PROD) SPECIAL ASSESSMENT SYSTEM PAGE: 1 EXHIBIT A 93004111 - DEBRICK RD & BUTTE LANE STREET IMPROVEMENTS PAVING, CURB, GUTTERS, SIDEWALKS AND STORM SYSTEM ON DEBRICK ROAD FROM CLINTON DRIVE TO VALLEY BUTTE DRIVE, AND BUTTE LANE FROM CLINTON DRIVE TO 700 FEET SOUTH 2006-00005 93004111 19 PENDING 3 ON HOLD o LIEN DEFERRED 22 $154,832.81 $68,968.46 $0.00 $223,801.27 CITY PAVING CITY SANITARY CITY STORM LOW INCOME SUBSIDY $75,120.82 $15,835.95 $66,487.91 $13,902.17 $171,346.85 $395,148.12 EXHIBIT B FINDINGS AND RECOMMENDATIONS SUBJECT: PROPOSED LOCAL IMPROVEMENT DISTRICT FORMATION FOR PAVING, CONSTRUCTING CURBS, GUTTERS, SIDEWALKS, AND STORM WATER DRAINAGE SYSTEM ON DEBRICK ROAD FROM CLINTON DRIVE TO VALLEY BUTTE DRIVE, AND BUTTE LANE FROM CLINTON DRIVE TO 700 FEET SOUTH (CONTRACT 2006-05) (JOB #4111) BACKGROUND Debrick Road is a street in the Cal Young - Willagillespie area, located near the bottom of a small hill. Usage along Debrick and Butte Lane has increased, but this has meant a deterioration of portions of the street. The portion of Debrick improved had been a gravel street, badly potholed with poor drainage. In 2003 the property owners in the area requested the City to initiate a project to improve the street. The City held a public information meeting in January 2004 to discuss design issues and to formulate an initial design for the project. Property owners were notified of a public hearing regarding formation of the proposed LID and the public hearing was held on June 23,2005. The City Council passed a resolution forming the Local Improvement District (LID) on July 18, 2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. The property owners were notified of the proposed assessments and the pending assessment hearing ten (10) days prior to the hearing as required by Eugene Code. PROJECT . The improvements consist of a 21- foot wide road on Butte Drive from Clinton to Debrick with a raised crosswalk, and 28 foot paving on the remainder of Butte Drive and all of Deb rick. The City also installed sidewalks and a storm drainage system. The project brought Debrick Road up to full City Standards to meet the current and future pedestrian, bicycle and vehicular needs of the area. ASSESSMENT Costs were distributed in accordance with Eugene Code 7.175, and as outlined in the Council adopted Hearings Official findings and recommendations, and the resolution forming the LID. The final unit assessable costs: Paving 28-foot (per front foot) Paving 21-foot (per front foot) Sidewalk (per front foot) $ 97.91 $ 82.61 $ 24.06 PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON DEBRICK ROAD AND BUTTE LANE FINAL ASSESSMENT Page 1 Total Final Assessable Cost Total Final City Cost $ 223,801.57 (current and delayed) $ 171,346.85 Total Final Project Cost $ 395,148.12 As specified in the Eugene Code, property owners on local streets pay for the full width of the street, and the City pays for intersection costs and non-assessable storm drainage costs. The non- assessable City share for this project is funded from Road Fund, in the amount of$75,120.82, Wastewater Utility Fund, in the amount of$15,835.96, and Storm Water SDC Funds, in the amount of$66,487.93. Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district in accord with Eugene Code, Chapter 7. The estimates developed before the improvement were slightly lower than the final cost. (The estimated City cost shown here has been revised to correct an error in the amount of estimated nonassessable costs shown at the time of LID formation.) Paving 28-foot (per front foot) $ 90.82 Paving 21-foot (per front foot) $ 74.44 Sidewalk (per square foot) $ 26.70 Total Estimated Assessable Cost $ 234,894 Total Estimated City Cost $ 114,333 Total Estimated Project Cost $ 349,227 The final project costs were higher than estimated. The cost increases were due to additional excavation and base rock necessary to stabilize the base of the roadway due to soft road bed, design modifications during construction requested by property owners to accommodate safety and maintenance issues, modifications to the existing wastewater lines to bring them up to current City standard, additional storm drainage improvements to accommodate springs within the project that surfaced during heavy rains this winter prior to final completion of the project, additional utility relocation costs and delays and additional coordination work due to delays in completion of work by the utility companies to relocate their facilities. PUBLIC INVOLVEMENT The project was initiated by a petition signed by seventy-one percent of the property owners. Prior to the public hearing on the final assessment, notice of the pending hearing was sent to all property owners. No property owners chose to attend the hearing. PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON DEBRICK ROAD AND BUTTE LANE FINAL ASSESSMENT Page 2 FINDINGS AND RECOMMENDATION Notice of the public hearing was provided and all the property owners were given an opportunity to participate in the hearings. Appropriate notice was given of the public hearing and pending Council action, as required by the Eugene Charter and Code. Letters informing property owners of the hearing and notification to property owners of the intent of the City to characterize the assessment as an assessment, not a tax, as required by ORS 305.583(5) were mailed to the property owners. The Hearings Officer finds that the project is one for which the assessments are for local improvements as set forth in ORS 310.410 because 1. The assessments do not exceed actual costs; 2. The assessments are imposed for a capital construction project that provides a specific benefit for a specific property or rectifies a problem caused by a specific property 3. The assessments are imposed in a single assessment upon completion of the project; and 4. The assessments allow the property owners to elect to pay the assessment with interest over at least ten (10) years. The Hearings Official also finds that the proposed final assessment, calculated and recommended by the City Engineer is reasonable and consistent with the Eugene Code. The Hearings Official recommends that the Council act in accord with the City Engineer's recommendations, adopting the ordinance prepared for the public hearing, levying the assessment as set forth by the City Engineer. April 24, 2006 PAVING, CURBS AND GUTTERS, SIDEWALKS, AND RELATED IMPROVEMENTS ON DEB RICK ROAD AND BUTTE LANE FINAL ASSESSMENT Page 3 MEMORANDUM DATE: April 12, 2006 FROM: Mark Schoening, City Engineer TO: Hearings Official SUBJECT: PROPOSED FINAL ASSESSMENT FOR IMPROVEMENTS CONSISTING OF PAVING, CURBS AND GUTTERS, SIDEWALKS, AND STORM WATER DRAINAGE SYSTEM ON DEBRICK ROAD FROM CLINTON DRIVE TO VALLEY BUTTE DRIVE, AND BUTTE LANE FROM CLINTON DRIVE TO 700 FEET SOUTH (CONTRACT 2006-05) (JOB #4111) BACKGROUND The project design and bidding was initiated as a result of a Poll Petition by the City, in November, 2003. The petition requesting the local improvement district was signed by property owners who represent 71 % of the assessable frontage within the boundaries of the proposed Local Improvement District (LID). The City Engineer initiated the preparation of plans and specifications, pursuant to Section 7.160(8) of the Eugene Code, 1971 on February 20,2004. The project has brought Debrick Road up to full City Standards and meets the current and future pedestrian, bicycle and vehicular needs. Bids were opened on June 21, 2005, with Babb Construction Co. dba Delta Construction Co. as the low bidder. Property owners were notified of a public hearing regarding formation of the proposed LID and the public hearing was held on June 23, 2005. The City Council passed a resolution forming the Local Improvement District (LID) on July 18,2005. Construction of the project has been completed, final actual costs have been tabulated, and final assessment costs have been calculated. The property owners were notified of the proposed assessments and the pending assessment hearing ten (10) days prior to the hearing as required by Eugene Code. The intent of the final assessment hearing scheduled for April 12, 2006, is to review the final project cost, consider comments on the proposed assessments, and to provide evidence to be included in the ordinance levying the assessments by the City Council. CORRESPONDENCE Since the mailing of the Notice of Proposed Assessments, City staff has received 2 phone calls and no written correspondence from property owners. None of the property owners requested to attend the public hearing and the hearing was cancelled. PROJECT The project included 21 feet of paving, sidewalk and drainage improvements on Butte Drive from Clinton to Debrick with raised crosswalk for traffic calming, and 28 feet of paving, sidewalk and drainage improvements on the remainder of Butte Drive and Debrick Road. A cul-de-sac was constructed for the terminus of Butte Drive. Attached is a map showing the limits of the project and the properties to be assessed (see Attachment A). ASSESSMENTS Costs were distributed per Eugene Code 7.175, and as outlined in the Council adopted Hearings Official findings and recommendations, and the resolution forming the LID. Below are the final unit assessable costs: Paving 28-foot (per front foot) Paving 21-foot (per front foot) Sidewalk (per front foot) $ 97.91 $ 82.61 $ 24.06 Total Final Assessable Cost Total Final City Cost $ 223,801.57 (current and delayed) $ 171,346.85 Total Final Project Cost $ 395,148.12 Per Eugene Code, property owners on local streets pay for the full width of the street, and the City pays for intersection costs and non-assessable storm drainage costs. The non-assessable City share for this project is funded from Road Fund, in the amount of $75,120.82, Wastewater Utility Fund, in the amount of$15,835.96, and Storm Water SDC Funds, in the amount of$66,487.93. Transportation SDC funds may only be used on arterial and collector street projects. Assessment financing, a 10-year payment plan through the City, is available to all property owners within the improvement district as identified by Eugene Code, Chapter 7. The estimated city cost shown here has been revised to correct an error in the amount of estimated nonassessable cost shown at the time of LID formation. Paving 28-foot (per front foot) Paving 21-foot (per front foot) Sidewalk (per front foot) $ 90.82 $ 74.44 $ 26.70 Total Estimated Assessable Cost Total Estimated City Cost $ 234,894 (current and delayed) $ 105,716 Total Estimated Project Cost $ 353,765 The final project costs were higher than estimated. The cost increases were due to additional excavation and base rock necessary to stabilize the base of the roadway due to soft road bed, design modifications during construction requested by property owners to accommodate safety and maintenance issues, modifications to the existing wastewater lines to bring them up to current City standard, additional storm drainage improvements to accommodate springs within the project that surfaced during heavy rains this winter prior to final completion of the project, additional utility relocation costs and delays and additional coordination work due to delays in completion of work by the utility companies to relocate their facilities. LOW INCOME SUBSIDY Of the 10 properties in the LID, 3 owners qualify for a subsidy under the low-to-moderate income subsidy program. Two property owners qualify for the moderate subsidy level and one owner for very low subsidy. This City funded program only applies to owner-occupied residential properties in the LID. The total cost for the low income subsidies is $13,902.17, and is funded from the Street Subsidy Fund. RECOMMENDATION The final total assessable costs are higher than those quoted at the time of the formation of the LID. Assessment costs are in accordance with Eugene Code. Staff recommends approval of the final assessments as calculated, and that the Council levy the final assessments. I "~tig . ~~~~ @... ~ 51~.:v 0 ~ ~~~~ ~ b~r i ~~ti~ ;BX_UO;;(J@ ~r1~~ i: ~ ~~~~ ~ob?:~ @ o o ~ ~: ::; Q z~ ;;;::;! s: ~ -U DEBRICK RD I BUTTE LN ASSESSMENT MAP DATE SCALE DESIGNED BY DRAWN BY CHECKED BY PROJECT NO ?/2'b/04 "'Af'H~ PM KM To 4111 REV DATE CITY OF EUGENE, OREGON DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION (') r- Z -I o Z o ;:0 <: m 'p o )>m en OJ en2Q mO cn^ cn;u S::o m-- ZOJ -iC s::-i )>-i -om r Z z _ DES~-~ 11 11 o o BY CITY OF EUGENE SPECIAL ASSESSMENT SYSTEM ASSESSMENT REGISTER (CITY COUNCIL) 93004111 - DEBRICK RD & BUTTE LANE STREET IMPROVEMENTS PROJECT LEGAL DESCRIPTION MASTER PROJECT #: 2006-00005 TAXLOT 17031930-02411 000 PROPBRTY DBSCRIPTION 17031943-00500 000 PROPBRTY DBSCRIPTION 17031943-00601 000 PROPBRTY DBSCRIPTION 17031943-00700 000 / PROPBRTY DBSCRIPTION 17031943-00701 000 PROPBRTY DBSCRIPTION 17031943-00800 000 PROPBRTY DBSCRIPTION 17031943-00901 000 PROPBRTY DBSCRIPTION 17031943-00902 000 PROPBRTY DBSCRIPTION 17031943-00903 000 PROPBRTY DBSCRIPTION 17031943-01000 000 PROPBRTY DBSCRIPTION 17031943-01001 000 PROPBRTY DESCRIPTION 17031943-01002 000 PROPERTY DBSCRIPTION 17031943-01100 000 PROPBRTY DBSCRIPTION 17031943-01200 000 PROPERTY DESCRIPTION 17031943-01401 000 PROPERTY DESCRIPTION 17031943-01402 000 PROPBRTY DESCRIPTION CONTRACT #: 2006 00005 PAVING, CURB, GUTTERS, SIDEWALKS AND CLINTON DRIVE TO VALLEY BUTTE DRIVE, 700 FEET SOUTH TOTAL IMPROVBMBNT AMOUNT $10,719.46 R2479/9886928 $12,250.17 R1321/8442364 $10,045.13 2003-077070 $1,712.32 2005-018479 $2,082.53 2003-007436 $12,250.17 2001-037434 $9,647.51 2005-071617 $4,596.26 2005-062166 $6,431.68 2005-066265 $8,575.12 R1608/8958102 $8,575.12 R11564/8912360 $9,555.13 R1994/9467032 $11,025.15 2003-122581 $18,762.89 2001-034580 $6,125.09 R2582/99072563 $6,125.09 2302/9503838 PAGE: 1 EXHIBIT C JOB #: 93004111 STORM SYSTEM ON DEBRICK ROAD FROM AND BUTTE LANE FROM CLINTON DRIVE TO OWNER INFORMATION YARBROUGH DAVID H 1120 BUTTE LN EUGENE OR 97401 HARRIS NORMAN R PO BOX 3978 PALMER AK 99645 DUIKER PAUL GERALD & LISA A 1235 BUTTE LN EUGENE OR 97401 CARTER VANESSA L 1185 DEBRICK RD EUGENE OR 97401 ROSALES JAMES 1205 BUTTE LN EUGENE OR 97401 HANSON MICHAEL W 1180 CLINTON DR EUGENE OR 97401 ROBIN MICHAEL R 1140 BUTTE LN EUGENE OR 97401 TUSEK MICHAEL R 1140 DEBRICK RD EUGENE OR 97401 TICER VIVIAN L 1132 BUTTE LN EUGENE OR 97401 THOMING BARRY L 1150 DEBRICK RD EUGENE OR 97401 MCCOLL SCOTT R 1160 DEBRI CK RD EUGENE OR 97401 JOINER PAUL B 11 7 0 DEBRI CK RD EUGENE OR 97401 RADIX INTERNATIONAL INC 1230 BUTTE LN EUGENE OR 97401 CLEVELAND STEPHANIE J 1230 BUTTE LN EUGENE OR 97401-7674 BRYANT DANIEL E H 1280 BUTTE LN EUGENE OR 97401 MONTE DONALD W 1260 BUTTE LN EUGENE OR 97401 TAX_LQT 17031943-01403 000 PROPERTY DESCRIPTION 17031943-01502 000 PROPERTY DESCRIPTION 17031943-01503 000 PROPERTY DESCRIPTION CITY OF EUGENE SPECIAL ASSESSMENT SYSTEM ASSESSMENT REGISTER (CITY COUNCIL) 93004111 - DEBRICK RD & BUTTE LANE STREET IMPROVEMENTS PAGE: 2 TQTh_I.__!~PROVEMENT AMOJm'l' OWNER ~}!FORKA'1'IOlf $6,125.09 R1799/9250772 MONTE DONALD W 1260 BUTTE LN EUGENE OR 97401 $6,125.09 R2529/99025427 ARLIE HOMES INC 722 COUNTRY CLUB RD EUGENE OR 97401 $4,103.81 R1084/8035439 PAULSEN TERRY G 13 00 BUTTE LN EUGENE OR 97401