HomeMy WebLinkAboutItem A: MUPTE Program
ECC
UGENE ITY OUNCIL
AIS
GENDA TEM UMMARY
Work Session: Multi-Unit Property Tax Exemption (MUPTE) Program
Meeting Date: June 24, 2013 Agenda Item Number: A
Department: Planning & Development Staff Contacts: Mike Sullivan
www.eugene-or.gov 541-682-5448
ISSUE STATEMENT
On February 27, 2013, council approved an ordinance suspending the Multi-Unit Property Tax
Exemption (MUPTE) program to provide the time needed for council to conduct a detailed
evaluation of the program and determine if modifications should be made. This work session is
a continuation of the discussion related to potential modifications to the MUPTE program.
BACKGROUND
At the May 13work session, staff received feedback from council on potential modifications to the
MUPTE program. On May 22, a council workshop was conducted to receive input from key
stakeholders. On May 29, council approved an ordinance extending the suspension of the MUPTE
program to July 31, 2013. At this work session, staff will be presenting recommendations on MUPTE
program modifications for council consideration. A public hearing on the ordinance required to
adopt MUPTE program modifications has been tentatively scheduled for July 15. Action on the
ordinance adopting MUPTE program modifications is tentatively scheduled for July 22.
RELATED CITY POLICIES
Utilization of the MUPTE program to stimulate new multi-unit housing development addresses
many goals for Eugene and downtown, including:
Eugene Downtown Plan
Stimulate multi-unit housing in the downtown core and on the edges of downtown for a
variety of income levels and ownership opportunities.
Downtown development shall support the urban qualities of density, vitality, livability and
diversity to create a downtown, urban environment.
Actively pursue public/private development opportunities to achieve the vision for an
active, vital, growing downtown.
Use downtown development tools and incentives to encourage development that provides
character and density downtown.
Facilitate dense development in the courthouse area and other sites between the core of
the downtown and the river.
S:\CMO\2013 Council Agendas\M130624\S130624A.docx
Envision Eugene Pillars
Promote compact urban development and efficient transportation options.
- Integrate new development and redevelopment in the downtown, in key transit
corridors and in core commercial areas.
- Meet the 20-year multi-family housing need within the existing Urban Growth
Boundary.
- Make compact urban development easier in the downtown, on key transit corridors,
and in core commercial areas.
Provide housing affordable to all income levels.
Regional Prosperity Economic Development Plan
Strategy 5: Identify as a Place to Thrive - Priority Next Step - Urban Vitality
- As we foster a creative economy, dynamic urban centers are an important asset.
Eugene, Springfield and many of the smaller communities in the region recognize the
importance of supporting and enhancing vitality in their city centers. Building
downtowns as places to live, work and play will support the retention and expansion of
the existing business community and be a significant asset to attract new investment.
The Cities of Eugene and Springfield will continue to enhance their efforts to promote
downtown vitality through development and redevelopment.
City Council Goal of Sustainable Development
Increased downtown development
COUNCIL OPTIONS
1.Direct the City Manager to prepare and schedule a public hearing on an ordinance modifying
the MUPTE program consistent with the criteria included in Attachment A.
2.Amend the criteria included in Attachment A, and direct the City Manager to prepare and
schedule a public hearing on an ordinance modifying the MUPTE program as amended.
3.Take no action and extend the suspension of the MUPTE program to allow for additional
discussion on MUPTE program modifications.
4.Take no action and continue the discussion on MUPTE program modifications.
CITY MANAGER’S RECOMMENDATION
The City Manager recommends preparing and scheduling of a public hearing on an ordinance
modifying the MUPTE program consistent with the criteria included in Attachment A.
SUGGESTED MOTION
Move to direct the City Manager to prepare and schedule a public hearing on an ordinance
modifying the MUPTE program consistent with the criteria included in Attachment A.
ATTACHMENTS
A. Recommendation - MUPTE Program Criteria
B. Alternative MUPTE Criteria
C. Example MUPTE Project Scorecard
S:\CMO\2013 Council Agendas\M130624\S130624A.docx
FOR MORE INFORMATION
Staff Contact: Mike Sullivan
Telephone: 541-682-5448
Staff E-Mail: mike.c.sullivan@ci.eugene.or.us
S:\CMO\2013 Council Agendas\M130624\S130624A.docx
ATTACHMENT A
Multi-Unit Property Tax Exemption (MUPTE) Program
MINIMUM THRESHOLD CRITERIA
To be considered for MUPTE approval, projects must meet the following minimum threshold
requirements. Terms and conditions not fully defined herein will be further defined by an
updated administrative rule:
Eligible Boundary
Projects must be located within the boundary illustrated on the map
attached as Exhibit A.
Density
For mixed-use projects (housing above commercial), the structure must have
five or more dwelling units. For housing-only projects, the project must meet a density
threshold that is greater than the minimum allowed in the Eugene code.
Project Need
Analysis of the project pro forma must establish that the project would
not be built but for the benefit of the tax exemption. The applicant must submit
documentation, including a pro forma and an analysis of the projected rate of return for
the proposed project demonstrating that the anticipated overall rate of return for the
project (with MUPTE) for the maximum period of exemption (10 years) will not exceed
10 percent. The pro forma and assumptions will be reviewed and adjusted by a MUPTE
review panel.
If the projected overall rate of return for the maximum exemption period is below
R
10 percent, and the Minimum Threshold Criteria is met, the project is eligible to
receive the maximum 10-year exemption.
If the projected overall rate of return for the maximum exemption period is above
R
10 percent:
- The term of the exemption will be decreased by the number of years
necessary to bring the rate of return down to 10 percent, or
- The applicant can add project elements included in the Additional Public
Benefit Criteria to increase the term of the exemption up to10 years
Green Building
The project must be built to meet a minimum green building standard
of LEED Silver or an equivalent standard acceptable to City.
Neighborhood Contact
Although neighborhood association support is not required for
MUPTE approval, the application must include evidence that the applicant made an effort
to contact the appropriate neighborhood association to share project information and seek
input. Such effort shall be evidenced by providing a copy of the comments received from
comments.
Affordable Housing
For rental projects, one of the following must be met:
During the period of exemption, a minimum of 20% of the number of dwelling
R
units must be affordable to households earning between 80% and 100% of the
area median family income upon initial occupancy of the unit by that household.
Applicant must pay an affordable housing fee equal to 10% of the projected first
R
year tax exemption.
Local Hiring and MWESB Goals
Applicants must provide a plan to meet the local
hiring goals included in the Additional Public Benefit Criteria.
Financial Reporting
annual accountant-prepared financial information sufficient to evaluate a to-date rate of
return for the project. The financial information will be used by the City Manager to
analyze the overall effectiveness of the MUPTE program, and may be used in the
aggregate to prepare an annual MUPTE report.
ADDITIONAL PUBLIC BENEFIT CRITERIA
The following Public Benefit Criteria (to be further defined in an updated administrative rule)
shall be used to determine the extent of eligibility for extending the tax exemption for up to, but
no longer than 10 years:
Local Hiring
The extent to which the project meets the following local hiring goals:
Greater than __ percent of the dollar volume of the combined professional
R
services and construction contracts include local firms (based in Oregon).
Greater than __ percent of the on-site construction jobs performed by local
R
residents (reside in Oregon). Exceptions for specialty work not available in
the local market will be review on a case by case basis.
Project demonstrates that it has made a good faith effort to solicit bids for
R
professional services and construction contracts from qualified women and
minority business enterprises.
Location
Projects located within the Downtown Plan Area, within a HUD Low-Mod
Income Areea , on a brownfield site, or includes the redevelopment of a valuable historic
resource.
Project Features
The extent to which the project incorporates the following public
benefit features:
Exceeds the affordable housing minimum threshold criteria (greater number
R
of units or income threshold between 60%-80% median household income
met), or increased affordable housing fee
Exceed the energy efficiency standards in the Oregon Energy Code
R
Number of ADA accessible dwelling units
R
Dwelling units available for home ownership
R
For projects in areas where student occupancy is expected, dwelling units
R
designed as traditional apartment units available to a broad cross section of the
community
Inclusion of open space/community gardens or gathering space that is
R
accessible to the community
Inclusion of ground floor commercial/retail which addresses a neighborhood
R
need
Design excellence and neighborhood compatibility
R
Embedded or structured parking
R
Transportation options, including bus passes, car share, bike share, bus
R
shelter, and minimum parking where appropriate
OTHER PROGRAM FEATURES
MUPTE Review Panel
- A newly formed MUPTE review panel appointed by the City
Manager will provide a third-party review of the MUPTE program, including:
Review of MUPTE project applications, with emphasis on analyzing the projects
R
financial projections.
R
Additional Public Benefit Criteria, and make recommendations regarding the
granting of the tax exemption.
Assist the City Manager in preparing an Annual Report on the MUPTE program.
R
Program Volume
The MUPTE program has set a goal of assisting in the creation of
1,600 new multi-family housing dwelling units. At such time that the MUPTE-assisted
number of dwelling units constructed reaches this goal, the program shall undergo a
comprehensive council review to determine if continuation of the program is desired.
Application Fee
The City Manager shall establish an updated application fee to be
established by the City Manager by Administrative Rule.
Exhibit A Boundary
ATTACHMENT B
Alternative MUPTE Criteria
were mentioned in
previous council discussions. They are listed for reference as alternative criteria which could be
substituted are added to the recommendation.
MINIMUM THRESHOLD CRITERIA
Eligible Boundary
Downtown Plan Area only
R
Limited, targeted area expansion (Examples: Trainsong, S. Willamette, Walnut
R
Station)
Eliminate Downtown Plan Area and focus MUPTE in economically
R
disadvantaged areas
Project Need
Cap the rate of return for the project exceed at 9 percent
R
Claw-back at the end of the tax exemption in the event that the overall rate of
R
return exceeds the cap, and dedicate claw-back funds to affordable housing
Use third-party professional (instead of panel) to review financial pro forma
R
Green Building
Do not include as Minimum Threshold Criteria, but include in Additional Public
R
Benefit Criteria
Affordable Housing
During the period of exemption, a minimum of 20% of the number of dwelling
R
units must be affordable to households earning 60% of the area median family
income upon initial occupancy of the unit by that household.
Increase the affordable housing fee to ___% (substitute percentage)
R
Local Hiring and MWESB Goals
Require that a specific percentage of local hiring be met to be eligible for the tax
R
exemption
Financial Reporting
The financial information will be used to calculate a claw-back payment at the
R
end of the tax exemption.
Minimum Threshold Criteria: Tax Exemption Benefit
Applicants meeting the Minimum Threshold Criteria will be eligible for
R
consideration of a 5 year property tax exemption on the eligible portion of the
project. Applicants may qualify for an extension of the tax exemption for of up to
ten years based on the Additional Public Benefit Criteria.
ADDITIONAL PUBLIC BENEFIT CRITERIA
Local Hiring
Increase the percentage for dollar volume of the combined professional services
R
and construction
Increase the percentage of the on-site construction jobs performed by local
R
residents
Location
Do not give extra consideration for projects located within Downtown Plan Area
R
Project Features
Public safety (lighting, design elements)
R
No tax exemption on commercial space that competes with neighboring
R
businesses
OTHER PROGRAM FEATURES
MUPTE Review Panel
Do not include a MUPTE review panel
Program Volume
Cap the annual dollar amount of tax exemptions approved (Example:
R
$500,000/year)
Rolling Cap (suspend the program when a specific dollar amount of tax
R
exemptions is reached, then reopen when project come onto the tax rolls)
Application Period
Limit the application period to create competitive process