Loading...
HomeMy WebLinkAboutResolution No. 5092COUNCIL RESOLUTION NO. 5092 A RESOLUTION ADOPTING INFLATIONARY ADJUSTMENTS TO SYSTEMS DEVELOPMENT CHARGES FOR PARKS SYSTEM, LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND TRANSPORTATION SYSTEM. PASSED: 8:0 REJECTED: OPPOSED: ABSENT: CONSIDERED: June 24, 2013 RESOLUTION ADOPTING O ° ADJUSTMENTS t,'; SYSTEMS DEVELOPMENT • LOCAL WASTEWATER SYSTEM, STORMWATER SYSTEM, AND :: The City Council of the City of Eugene finds as follows: A. The System Development Charge (SDC) Methodologies were adopted by Resolution No. 4900 effective May 7, 2007. B. The SDC Methodologies adopted by Resolution No. 4900 have subsequently been amended by Resolution Nos. 4929, 4977 and 4991. C. Inflationary adjustments to Local Wastewater System, Stormwater System, and Transportation System SDCs have most recently been adopted by Administrative Order No. 58- 11 -01 -F. Inflationary adjustments to Parks System SDCs have most recently been adopted by Resolution No. 5031. D. Based on: (1) the park development /renovation cost adjustment using the Engineering News - Record 20 -City national average Construction Cost Index and, (2) the park land acquisition cost adjustment using the Lane County Assessment & Taxation office's published 2011 and 2012 Sales Ratio Reports, it is necessary to adjust the Parks System SDCs by implementing an average 2.4% increase in the Parks System SDC for residential development, and an average 2.0% increase in the Parks System SDC for nonresidential development. E. Based on the Engineering News- Record 20 -City national average Construction Cost Index, it is necessary to amend the Local Wastewater System, Stormwater System and Transportation System SDCs by implementing a 5.1% increase for those SDCs. F. Section 2.4 of the SDC Methodologies requires that revisions to fees by more than five percent shall be established by resolution of the City Council. G. These inflationary adjustments to the SDCs are in conformity with applicable state law, authorized by EC 7.710(5) and Sections 2.1 and 2.4 of the Methodologies, and should be implemented effective July 1, 2013. BE IT RESOLVED 6 O : OF O. EUGENE, a Municipal Corporation of the State of Oregon, as follows: Section 1 . The Systems Development Charges for the Parks System are amended by implementing an average 2.4% increase in the Parks System SDC for residential development, Resolution — Page 1 of 2 and an average 2.0% increase in the Parks System SDC for nonresidential development, as set forth in Exhibit A attached to this Resolution. Section 2. The Systems Development Charges for the Local Wastewater System, Stormwater System, and Transportation System are amended by implementing a 5. % increase, as set forth in Exhibit A attached to this Resolution. Section 3. This Resolution shall become effective on July 1, 2013. The foregoing Resolution adopted the 24 day of June, 2013. 6w, - . 1ki'Alt City Recorder Resolution — Page 2 of 2 ®rlm-vrrl-�� 11 - M� 1! -mzmm livillm (See Appendix C -2 for information regarding the Regional Wastewater SDC) Transportation Wastewater Local (City) Stormwater Parks Cost per Trip = $1,774.51 7 4.51 Cost per new residential units Total stormwater unit cost per Net Residential cost per Dwelling (e.g., single - family, mobile home sq.ft. of impervious surface Area = Unit: parks, duplexes, apartments) = a $0.192. Charges are based on Single Family = $3,757.00; base rate of $387.72 plus $0.0940 use. 1 -2 Family development Duplex/TH /MH /ADU = per square foot of living area. under 3,000 sq.ft. have tiered Multifamily = Residential additions will be rates based on est. imp. surface Nonresidential: charged $0 -8940 per square foot areas. 1 -2 Family over 3,000 Class A = $1 -0G per room; of increased living area. sq.ft.. and Multi - Family & Class B = $1, 000.00 per TGSF; Nonresidential uses = $2.9373 per Nonresidential are based on Class C = $613.00 per TGSF; gallon of daily flow /discharge. actual imp. surface area. Charges Class D = $364 -00 per TGSF; for Mfg. Home Parks are based on Class E = $447-.GG per TGSF. est. imp. surface area per space plus actual impervious surface area of additional common area. Estimated costs of Estimated non - assessable cost of Estimated non - assessable cost of Unit costs for various components. arterial /collector Street system existing system using costs from system -wide capacity from future (non assessable cost per lane- "Gravity Sewer Lines System capacity - enhancing projects as N mile, costs of intersections, traffic Valuation Model" developed by contained in the Stormwater SDC M signals, street lights, structures) CH2M Hill. Charges are net of all Project List and available existing ; and off street bicycle paths. federal grants and outstanding stormwater system capacity. e.' debt. Existing levels of service for Design flow standards currently Design standards currently used Planned levels of service for various components as used by the city for various land by the City to handle a Five -year various components, as a established by current City use types. PFUs equivalents are storm. established in the adopted Eugene w transportation design standards. determined per Oregon adopted Parks, Recreation, & Open Space us Plumbing Code. Comprehensive Plan's Project & v Priorities List. m y = Street Component: Reimbursement fee - I Reimbursement fee Reimbursement fee °_ m - 1► 40% Impr. Fee 1� 84% 1p- 47% 23% ® 60% Reim. Fee N � Bike Component: Improvement fee Improvement fee Improvement fee @ ® `U Im- 100% Impr. Fee ► 16% h 53% Do- 77% Charges for new or expanding New or expanding residential uses Charges for new (all) or expanding Charges for new or expanding development are based on the are charged based on a per (Multi - family, Nonresidential) development are based on a cost per trip times the trip rate dwelling unit cost plus a rate per development are based on a tiered flat rate per dwelling unit for assigned for a specific square foot of living area. Non- estimated or actual impervious residential development types and development type times the residential uses are charged surface areas and the total a tiered flat rate per room or per 2 number of units of measurement based on the number of PFUs at a stormwater unit cost per square thousand gross square feet of proposed. rate for the specific development foot. Stormwater impact not building area for nonresidential m type. Credit for past trunk sewer attributable to impervious surface development types- E levy payments will be applied to area will be charged based on g. the local charge. equivalent surface area and the E total stormwater unit cost per square foot. Note: Administration costs are not included in the figures above see section 2.3.1 for more information. T®AhIC®n0TATInAI QvCTFM DEVEL CHARGE ANALYSIS .... a. ..._.._._ °— ° °-- °--- •- - - ---- -------------__ - REIMBURSEMENT Fee IMPROVEMENT Fee Level of Service Analysis Costs - EXISTING System Level of Service Analysis Costs - FUTURE System TRANSPORTATION COST COMPONENTS ajor Minor Major Neighborhoo System Major Minor Major Neig or hood System Arterials Arterials Collectors Collectors Average Arterials Arterials Collectors Collectors Average NON - ASSESSABLE STREET SECTION COSTS To4a1 street section cost per linear mile 83:316:945 3P.205 =634 51,258 °347 $4- 35$'706 $4-44$ -426 Average street section cost per linear mile $2.045.684 * * * $2:592:518 -�4$3- 24§;445 *.11) + r c �.'.m 2AAAV *.551 + ."4,204,532 *.18) +f$a -.289: 347 *AS)) -2(54: 340. 785 * .71) + $2 99 "x: +$ 1,232,350 +( $a - 448,42 § Average assessable section cost per linear mile X52943:684 -* .7011 ".452) Average non-assessable section cost er linear mile ' ($2,046,884 * .299) -4$2- 582 -515 Avea a assessable section cost er lane mile * 25 / 2.62 lanes per mile) * 1.25 enq costs) - fS4, '- / 2.62 lanes per mile) 1.25 ena costs) Avera enon- assessable section cost at lane mile * / 2 621anes er mile * 1.25 en costs 26 2 anes er mi e i 1 25 en costs INTERSECTION COSTS Total intersection cost per linear mile $344 212 Average intersection cost per linear mile .1 ) + .55) + .18) + ($18,347 .16) 828 0 ; 778 $220;464 $462'888 o Average intersection cost per lane mile 12. 2 anes per mi e) 7.2 eng costs) $13 &,856 2.62 anes per ml a 1.25 eng costs v — TRAFFIC SIGNAL COSTS $284677 o Average signal cost per intersection $204 V 41 m Average signal cost per lane mile $956 + 4't0 x$284;67 -7 "0. 276 unadjuste signalize intersections per lane mile) " 0. 479 a juste signs rze mtersechons per ane mi e STREET LIGHT COSTS C Total street light cost per linear mile Average street Iigh4 cost per linear mile $280 -,773 $280`773 �cn�o * .16) Average street light cost per lane mile - {($280 = 773 / 2.62 lanes per mile) * 1.25 eng costs) 8133;867 - (($280,7 -73 / 2.621anes per mi e) * 1.25 eng costs) $433'867_ $176,30 Average street light cost per trip 8178'!8 BRIDGE 8 OTHER STRUCTURE COSTS Past projects, Replacement Cost New (RCN) RCN bn ge inventory - 12,663,248 oca streets) 890;327 -,567 G ridge inventory- (oca stree s) 1 2 short span Past Ferry Street Bridge 8 related overpass costs (FSB cost estimated to be 20% of ODOT RCN) 814,006-,903 (FSB cost estimated to be 20% of ODOT RCN) 844 -103 Total costs for past projects * 1.25 eng costs] 8442.903.338 * 1.25 eng costs) - 880;823,000 Average brid 8 other structure cost per lane mile ka 33U8 363. 9 iota Aneria Co actor inear mi es) 8302;740 4$88823,600 / 363. 9 iota Arlene o ector inear mi es) 8222'190 OFF - STREET BICYCLE PATH COSTS Average path lighting cost per mile 8937;823 Average path section cost per mile No bike path reimbursement component proposed. 8443'048 $17 Cost per pe rson, path lighting =33 (((0.1005 / 1,000) *$127 ° 7.25 eng costs) Cost per person, path section $ ,� I otal o t- street bicycle pain cost per trip Improvement "a lluu / allocation Tor mxe pain component) - i14s*v+ SUMMARY OF ALL TRANSPORTATION SYSTEM SDC COMPONENTS Nonassessable street section cost per lane mile 8281"822 8677&94 8152,502 Intersection cost per lane mile $133,956 Traffic signal cost per lane mile '8486'410 $131;044 Street light cost per lane mile $4331957 8133,067 Bridge 8 other structure cost per lane mile 38 s2a19 282 2:1.. Total nonassessable street system cost per lane mile $47487,864 $9,343;713 Total non-assessable street system cost per trip 87- +468:77 $1'736'40 [(ave. one -way trip length on street system / number of vehicles per hour) x (capacity per lane mile x total cost per lane mile of street system) + ave. street light cost per trip)] Total allocated cost per trip Reimbursement Fee (40% allocation for street component)" $683,61 0.$0 Improvement Fee (60% allocation for street component)* 84,e41:$a Total off - street bicycle path cost per trip Total Cost per Trip per Street System Fee Component 858351" 81:101,0® *overall transportation SDC revenue sptf is 67% (improvement) a 33% (Reimbursement). TOTAL TRANSPORTATION COST PER TRIP (REIMBURSEMENT FEE + IMPROVEMENT FEE) ?i i • y n Ailmr4w :1 �11111 1lj ii j il 11111111 W EMMMIN Total Cost -inch to 48-inch otal Assessable Cost L Capacity Information rotal City System Capacity in mgd Eugene Local Cost per PFU Wastewater Description Averacie Dailv Flow per (Flow per PFU x Code* - Use 1 F Single-Family / Duplex Housing $387-.72 + (Sq Ft Living Area x $G7G9404 ix Mixed Use with Residential $387-72- (Sq Ft Living Area x $0-.G940) 11 Multi-Family Housing $387-.7-2 + (Sq Ft Living Area x 12 A, B, & C Elderly Housing Attach, Detach, & Group/Retirement Home $387-.7-2- + (Sq Ft Living Area x $0-.0940) 13 Residential Hotel $387-.7-2 + (Sq Ft Living Area x $G�� 14 Mobile Home Park $a87-.72 + (Sq Ft Li ing Area x 0.0940) 15 Hotels, Motels, Lodging 1905 $&5-96 21 Beverage/Food Mfg 39.87 $44744 24 Wood Products 47.93 $440-7-8 2X Light Mfg./Printing 56.62 $46&.-34 3X Manufacturing 58.65 $Iq-2-� 4X Transportation & Utilities 18.22 $53.52 41 Fire Station 7.75 $22--76 51 Wholesale Trade 21.37 $62-.7-7 54 Retail Trade / Grocery 55.46 $4-62�, 55 Retail Trade Automotive 7.83 $2-3-.00 59 Retail Trade Other 39.91 $447-.2-3 5A Restaurant - Fast Food 25.44 $74-.7-2 5B Restaurant - Low to Med Turnover 62.47 $4B-3-49 5C Restaurant - Higher Turnover 22.45 $6&.94 5D Drinkinq Establishments 54.98 $161.49 5E Take/Bake & Pick Up/Delivery Establishments 26.49 $74-84 5X Retail Trade / Clothing & Dry Goods 12.35 $36-28 61 Financial Offices / Banks 16.99 $49-99 62 Other Services 28.51 $93-74 63 Services 6.49 $19.06 64 - Rental/Storage Automotive & Other Repair Services 16.17 $47--50 65 Medical Services 28.75 $84A-5 66 Construction Trade Services 13.69 $40,24 67 Government Services, Off ice/Business Parks Based on specific se of development 68 / Cultural 15.66 $46-.GO 69 - Education Chu rches/Clubs/Organizations 15.70 $4642 6A1 Laundry Services (Linen, Uniform) 538.96 $1,583.09 6A2 Laundry, Self-Service 299.64 $8" 6A3 Dry Cleaning Service (with or w/out laundry services) 36.30 $406-6-2 6B Car Wash 264.54 $747-03 6X Professional/Real Estate/insurance 67.76 $499-G3 7X Entertainment, Recreation & Sports 88.42 $269-7-2 82 Veterinarian Service 24.79 $72-K *The unit cost of capacity for the local wastewater system is $2.93n per gallon per day. The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use. Land use type that do not fit into the above categories will receive a default flow assignment based on the sample average. 8rate per PFU may be assigned by the City Engineer should a proposed use not be represented by one of t published SDC use codes and for which a default flow assignment is not representative of the proposed flow. |n the case uf those proposed developments that are determined to have a potential for exceptional water usage, the City Engineer may require that the Owner(s) enter into enagreement with the City to review water usage or wastewater discharge at such time the development is in full use or production as the final basis of the local wastewater GDC. A complete list uf wastewater GDC/MUDBPR use codes io provided in Table 8. MOI W 71I= I PIL11111 I I I I I I I I I I I I I I I I I I III III III III III III III III IIII I 1110I ilii�grw" 7 '11flywym�!�lg 1 12. Future Stormwater System SDC-Eligible Project Costs (improvement Fee)i I Total Est. Cost, Future System (SDC-Eligible Projects) (From Table 9) MvvMM- *See Appendix F for complete rate schedule. TABLE 9 City u e Stormwater li i le Project List Table 13 Reimbursement Fee Cost Basis Existing Inventory Units Needed For Growth Unit Costs ($ /Unit) Facilities m v m 2 CU m o- U) °- - m E m o Total Acres Developed Development Acquisition Facilities Trails Development Acquisition Facility Trails Growth Cost 0 m F F c Acres (Acres) (Acres) (Number) (miles) (Cost Basis) a co N m LL ii N o t c U U Park Type a Neighborhood Parks na 210.631 95.821 18.211 40.02 V $4 9a9 1 1 V,'� 97 48%148% Urban Plazas Subtotal 1.101 1.101 0.231 0.001 0.34 $9 $01 $s $01 01 11 0.001 0.00 0% 0% Community Parks na 1 219.171 1 0.001 0.00 Metropolitan Parks Subtotal 654.451 191.401 19.551 134.931 1.41 1.78 $83{ 63 j $ $4 - v , , " "� 31 41 30% Natural Area Parks Subtotal 1,487 17 3.49 0-001 0.61 $2 $7 - ,784 Q "'� x,&97 1 $8644 1 1 3 38 38% Linear Parks / Greenways Subtotal 201.13 7.40 0.00 31.49 2.30 $&3394 $ 62 - ,SW $2,"� ° 90 0 0 8.80 3.60 25 ° l0 Special Use Facilities Bloomberg 20.80 4.32 $8, -992 $12 8% Campbell Center 1.43 1.43 0.16 $5;289 $848 1 8% Cuthbert Amphitheater 0.16 $40$176 $16351 1 8 °l0 Hilyard Community Center 0.16 $5 59 $848 1 8% Lamb Cottage 0.21 $33 $6356 8% Morse Ranch House 0.21 $52,688 $40 8 Owen Rose Garden 8.30 5.20 0.41 0.26 0.05 $626 $37321 Q "� �7,'�^ $4?64 1 8 °l° Prefontaine Memorial 1.28 0.27 0.21 0 -. $�03a8 $1-2464 8% 18 0% Shelton McMurphey Johnson 1.12 1.12 0.23 0.23 $526 $37,§21- $8354 8% South Eugene High School I -$G Subtotal 130.71 80.53 0.64 5.08 1.16 $8-7 11 31 0.00 0.00 TOT4L 2,903.96 393.05 42.12 211.52 2.90 4.69 Q "'°, °� ', 8 16.80 8.96 ree uosr oasis Other Other Other Acquisition Fundin Net Pro ect Growth Cost Park Acquisition Development 9" 1 Units Quantity Development Renovation Funding -- Funding-_ Growth Share Type ° Cost Cost Totals City Partner Partner Costs (Co Basis} a` (Ownership) Parks and Open Space • neighborhood park site to serve this area (83) • neighborhood park site to serve this area (B4) NP NP • neighborhood park site to serve this area (65) NP neighborhood park to serve this area (S6) NP a neighborhood park site (RI) NP neighborhood park site (R2) NP a neighborhood park site (R3 and R4) NP > Ferndale Park Site NP Rosetta Place as neighborhood park NP land for combined neighborhood park and Ridgeline NP land for combined neighborhood park and Ridgeline land for neighborhood park (WCS) Hawkins Heights as a neighborhood park (WC4) NP NP NP o neighborhood park (WC5) NP o Videm Park to serve WC-6 NP land for neighborhood park (W11) NP p Willakenzie school site as neighborhood park, vdth play d ballfields NP a neighborhood park site to north, adjacent to Golden s B1 NP p Royal /Danebo NP p neighborhood park site (63) NP p neighborhood park site (B4) NP p neighborhood park site (B5) NP p neighborhood park site (61) NP p neighborhood park site (S6) NP p Terra Linda Park as neighborhood park NP p Lone Oak park site as neighborhood park with athletic fields NP p Wendover Park site as neighborhood park NP p recreational amenities along Amazon Greenway to serve �rhood park needs C2 NP p Creekside Park as neighborhood park a neighborhood park (W4) NP NP p Chase Commons as neighborhood park NP p neighborhood park site (R1) NP p neighborhood park site (R2) NP p neighborhood park site (R3 and R4) NP P Ridgeline "Gateway" park (WC1) as both trailhead and r recreation area with icnic la area, basketball, etc. NP P Ridgeline "Gateway" park (WC3) as both tailhead and NP site ota acres acres 4 4 $ 1,024,250 $ 1,024,250 $0 $ 1,024,250 $ 1,024,250 acres 4 $ 1,024,250 $0 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $1,024,250 $ 1,024,250 acres 4 $ 1,024,250 $ - 148,@gI $ 1,024,250 acres 4 $ 1,024,250 49% $ 1,024,250 $0 $1,024,250 4 $501,883 $-- 634,656 $-- X31 acres 1 19% $ 784 $ tea'7,,'764 acres 4 $ 1,024,250 49% $ 1,024,250 acres acres 4 4 $ 1,024,250 $ 1,024,250 $0 $ 768,820 $ 1,024,250 $ 1,024,250 acres 3 49% $501,883 $ 473,292 acres 2 $0 F, 631,056 49% $ 315, acres 2 $ 308,217 $-- 346,528 $ M5 acres 4 $ 1,024,250 1 % � $ 1,024,250 acres 5 $0 $ 678'a86 19% $--- 78$820 $-- �� 19% acres 4 $ 1,024,250 $� $ 1,024,250 acres 2 $0 $ 690,112 $ 262,940 $ w95, acres 4 $501,883 -- 63i,6a6 $--- 624,056 acres 4 49% ice- 637;666 $--- 631 acres 4 $0 $- 631 631-A66 acres 2.3 $ 362,857 $ 362,857 acres 4 49 $--- 63-"P066 $ - -- 631,056 acres 4.3 $0 $- 23 -986 $ -- 676,385 $ 678 acres 3.9 $ 616,- 280 $- 645.289 acres 1 $ - .D.T6 acres 4 631 $- 631856 $- acres acres 3.17 4 $ 1,024,250 600. 500M2 $ -1-12 $ $ 1,024,250 acres 4 $- 63i.n acres 4 $- 634, 056 acres 0. 63156 F - 634- acres 4 $-- 6a4 $- 621 096 acres 5 788,820 5 788 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $ 604,056 19% $ - 148,@gI $0 $ - 157,764 19% $ 2° $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $1,024,250 49% $501,883 $0 $ - 473 19% $ 8&926 $0 $ 345 -,526 49% $- 454,609 $0 $ 215 49% $-- 154,609 $0 $1,024,250 49% $501,883 $0 $ 768,820 19% $ 149 $0 $1,024,250 49% $501,883 $0 $ 262 49% $ - 12984: $0 F, 631,056 49% $gym $0 $ - 6' ^Ow 49% $ 308,217 $0 $ 631 - 49% $ 309 $0 $ 362,867 49% 1 % � $0 $•-- --6349.x`6 49% $ 309, =17 $0 $ 678'a86 19% $0 $ R45,290 19% $-- 116 $0 $ 137 19% $� $0 4-----644 49% $0 $ 690,112 19% $ w95, $0 $1,024,250 49% $501,883 $0 $ 6311966 19% 1499&1 $0 $--- 634,056 49% $• 30 & -1'F $0 F�631 X 056 49% $- S09z'F7 $0 49% $- X09 $0 $ X88,920 49 $0 $- 23 -986 431 Other Park - Acquisition Development Acquisition Development Renovation Other Funding -- Other Funding -- Funding g' Net Project 1 Growth Share Growth Cost Type a Units Quantity Cost Cost Partner Costs (Cost Basis) Totals City Partner (Ownership) Acquire 100+ acres surrounding Golden Gardens ponds for CP 2 acres 100 $ 4,097,000 $ 4,097,000 $0 $0 $0 $0 $4,097,000 49% $2,006,448 community park Acquire Amazon Park inholdings along Hilyard for community park CP 1 acres 1.5 $ 2,048,499 $ 2,048,499 $0 $0 $0 $0 $2,048,499 49% $1,003,224 use Acquire community park site to serve Santa Clara CP 1 acres 40 $ 10,242,500 $ 10,242,500 $0 $0 $0 $0 $10,242,500 49% $5,016,121 Develop Santa Clara Community Park, including lighted ballfields CP 2 acres 40 $ 4 $0 $0 $0 $0 $-- .7R2 52% $ 2,449,287 Develop Golden Gardens and acquired property as community park 3 acres 40 $- ,732,920 $ 4,732,920 $0 $0 $0 $0 $ 4,,732,,eA20 52% $ - , 2,"- .4A,2 -7 with significant natural area component and trails Acquire portion of Union Pacific area for neighborhood and 5,121,250 $0 $0 $0 $0 $5,121,250 49% $2,508,060 community park, including improved connections, recreation and CP 4 acres 20 $ 5,121,250 $ o ens ace Community Park Total 241.5 09,249 $9,465840 $-- 30 $0 $o $0 $0 �-- 34 501 $- 15432,4 8 Acquire land to provide urban open space wthin Courthouse UP 4 acres 0.75 2,281 $ 1,152,281 $0 $0 $288,070 $0 $864,211 35% $305,967 neighborhood Acquire land for urban plaza to be developed in partnership with transit UP 4 acres 0.5 0,613 r$2 $ 870,613 $0 $217,653 $435,306 $0 $217,653 35% $77,058 Acquire land to expand park blocks UP 4 acres 0.5 0,613 $ 870,613 $0 $0 $217,653 $0 $652,959 35% $231,175 Acquire land for an urban plaza in Santa Clara UP 4 acres 0.5 0,613 870,613 $0 $0 $217,653 $0 $652,959 35 °!0 $231,175 Urban Plaza Total 2.25 64,119 $ $ 3,764,119 $0 $217,653 $1,158,683 $0 $2,387,783 35% $845,377 Acquire land for Amazon Creek Gmenway (WC2) LP 2 acres 4 $ 1,024,250 $ 1,024,250 $0 $256,063 $256,063 $0 $512,125 100% $512,125 Implement plan for Jefferson Area Greenmy and linear park LP 3 acres 4 $--- - -631 -0036 $ - -x.31 -056 $0 $ 157,764 � -'528 $0 $ 157-764 40% $- `�3,2 =3 Develop millrace linear park LP 5 acres $0 $0 $0 $0 $0 40% $0 Implement greenway /linear park plan forAmazon Creek from LP 4 acres 3.97 $ -4 -700 $------4,444- $0 $ 657-,350 $057-,360 $0 $0 40% $0 Headwaters to Fair rounds in partnershi with ACOE Implement Rasor Park Master Plan LP 2 acres 2 $&15 $ 215, $0 $0 $0 $0 $ alii 40% $- 126,4.27 Acquire linear park along Roosevelt drainage channel LP 4 acres 10 $ 409,700 $ 409,700 $0 $204,850 $0 $0 $204,850 100% $204,850 Linear Park Total 1 23.97 $ 1 ,433,950 $ -2 1 6 ,2" $-- X885234 $0 $--, $0 $ -1,190, 76% $ 4o6 -15 Acquire land on priority storm-ter condors that link with developed arks include trails NA 1 acres 30 $ 1,229,100 $ 1,229,100 $0 $614,550 $614,550 $0 $0 36% $0 Acquire additional river frontage, including property to the north NA 1 acres 60 $ 5,530,950 $ 5,530,950 $0 $2,765,475 $1,382,738 $0 $1,382,738 36% $496,635 Acquire land for natural areas within Willamette/McKenzie River NA 4 acres 100 $ 2,048,500 $ 2,048,500 $0 $1,024,250 $1,024,250 $0 $0 36% $0 confluence Acquire land for natural areas and access to Gillespie Butte NA 1 acres 1.7 $ 435,306 $ 435,306 $0 $0 $0 $0 $435,306 36% $156,348 Acquire natural areas to connect Ridgeline system east to Pisgah NA 3 acres 55 $ 1,126,675 $ 1,126,675 $0 $0 $281,669 $563,338 $281,669 36% and Willamette Rivers stem Acquire natural areas to complete Moon Mountain to Spencer Butte se ment NA 1/2 acres 325 $ 6,657,625 $ 6,657,625 $0 $0 $0 $0 $6,657,625 36% 12'�207 Acquire additional ridgeline to complete Fern Ridge to West Eugene NA 2/3 acres 500 $ 10,242,500 $ 10,242,500 $0 $0 $5,121,250 $2,560,625 $2,560,625 36% Acquire additional ddgeline to complete Willow Creek to Bailey Hill R, NA 112 acres 300 $ 6,145,500 $ 6,145,500 $0 $0 $0 $0 $6,145,500 36% Other Park �. - Acquisition Development Acquisition Development Renovation Other Funding -- Other Funding -- Funding -- Net Project Growth Share Growth Cost Type . Units Quantity Cost cost Partner Costs (Cost Basis) o` Totals City Partner (Ownership) Acquire additional ridgeline to complete Bailey Hill Road to Blanton NA 1/2 acres 300 $ 6,145,500 $ 6,145,500 $0 $0 $0 $0 $6,145,500 36% $2,207,268 Hai hts Acquire natural area within Royal Mixed Use area NA 3 acres 50 $ 1,024,250 $ 1,024,250 $0 $512,125 $0 $0 $512,125 36% $183,939 Acquire land for natural areas along McKenzie River (Rivers to NA 3 acres 80 $ 1,638,800 $ 1,638,800 $0 $819,400 $819,400 $819,400 $0 36% $0 Rid es Acquire additional Amazon Headwaters property NA 1 acres 50 $ 1,024,250 $ 1,024,250 $0 $256,063 $256,063 $0 $512,125 36% $183,939 Expand Ridgeline Trail natural area park to include Spencer Creek NA 314 acres 500 $ 10,242,500 $ 10,242,500 $0 $0 $5,121,250 $2,560,625 $2,560,625 36% $919,695 area Acquire land for natural areas to complete Rivers to Ridges farmland connections NA 5 $ - $0 $0 $0 $0 $0 $0 Develop and implement restoration plan for Green Island with NA 5 $ - $0 $0 $0 $0 $0 $0 artnera encies Natural Area Total 2351.7 $53,491,456 $ - $ 53,491,456 $0 $5,991,863 $14,621,169 $ 6,503,988 $27,193,838 36% $9,767,161 Acquire land to provide significant riverfront open space within MP 1 acres 1.76 $ 3,072,750 $ 3,072,750 $0 $460,913 $768,188 $0 $1,843,650 100% $1,843,650 courthouse /cannery neighborhood $0 $0 $0 $0 0% $0 Develop Prefontaine Memorial Park as a metropolitan park MP 5 $0 Metropolitan Park Total 1.76 $ 3,072,750 $ - $ 3,072,750 $0 $460,913 $768,188 $0 $1,843,650 100! $1,843,650 Acquire land in front of SMJ House SF 1 acres 0.3 $ 350,294 $ 350,294 $0 $0 $0 $0 $350,294 21% $72,781 Acquire land at 4J Admin site to expand River House and Rose SF 5 $0 $0 $0 $0 $0 0% $0 Garden for special event site Acquire land for park voth agricultural character, possible living SF 5 $0 $0 $0 $0 $0 0 ° {0 $0 histo fans S ecial Facility Total 0.3 $ 350,294 $ - $ 350,294 $0 $0 $0 $0 $350,294 21% $72,781 New Parks and Open Space Total 2748.2 $96,937,068 1 3 91 2 4 2 $0 $6,503,988 45% New Recreation Facilities Develop spray parks at Washington and or Monroe Parks NP 1 ea 2 $- X87 $ 1 97,2 09 $0 $0 $0 $197,205 54% $196544 Develop soccer fields at Bethel Community Park CP 3 ea 2 $-- 57.,4668 $-- �A78•,465 $0 $0 $0 $57868 ,4 42% $240 Develop a running trail to serve the Bethel area CP 2 If 2600 X 58 ; 149 88 $0 $0 $0 $68139 100% $58 Develop soccer field at N. Westmoreland CP 4 ea 1 $ 2 ° -,234 $ 2 °° 4 $0 $0 $0 $288 42% $120 Develop Stinker Fields as community park vrith significant athletic CP 3 acres 40 $-- 6,573 -,500- 6;573w`00 $0 $0 $0 $6 42% $2 fields lighting, vothin sports com lex model Provide major community center on west side of Beltline to serve Bethel SF 5 $0 Provide synthetic surface field to serve Bethel/Da nebo in partnership 1 ea 4 $-- 5 $-- �.`,2`e8 -,806 $0 $0 $0 $`x,268,800 42% �� with school district Provide additional dog off -leash facilities north of beltline (WK) CP 4 ea 1 $- i 7,,205 $ 397,° -20=5 $0 $0 $0 $347,285 83% $163 Develop an off leash dog area in Bethel /Danebo CP 5 $0 Develop pedestrian trails within Golden Gardens CP 3 $- x05,176 $ 105.,17x` $0 $0 $0 $395 76 28% $2 &64-1 Develop tennis courts at Bethel Community Park (4) CP 5 $0 Develop an off leash dog area in City Central CP 5 $0 Develop an off leash dog area in River Road /Santa Clara CP 5 $0 Develop a disc golf facility to serve Santa Clara and River Road $0 - Develop off -leash dog area to serve Willow Creek $0 Develop spray park at Ascot IPpppii $0 Develop multi -use path to Fem Ridge $0 1t nrnv®monf Fca r riozf Ancic Park Type - a` Units Quantity Acquisition Cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding 9 -- Partner (Ownership) Net Pro ect J Costs Growth Share Growth Cost (Gust Basis) Develop pedestrian trails along Greenhill Tributary LP 5 $ Develop trails within West Eugene Wetland sites NA 3 If 10000 $ 240 $0 $o $i &5376 $485 28% $29,6411 Develop primary Ridgeline trails NA 3/4 miles 15 $ 1- 774, 845 $x,734 $0 $0 $443,,719 $1,331,134 28% $375 Provide trailheads and interpretive facilities within existing WEW sites NA 4 ea 3 $ 236,646 2 36,646 $0 $0 $119,322 $318 35% $41 -686 Develop trails, trailheads, and interpretive facilities throughout Rid eline NA 3 mile 8 $- X46,584 $— X46,584 $0 $0 $296446 $709,938 28% $200,078 Develop mountain biking trails and freending designated areas NA 5 $0 Develop trails, trailheads, and interpretive facilities in WEW NA 4 ea 1 $ 7 -8 $ 78,882 $0 $0 $39 $39-041" 28% $11X1 -15 Develop trail facilities throughout the Ridgeline system NA 4 miles 5 $- 2944,615 $ -291 -615 $0 $0 $0 $593435 28% Provide covered centrally located skate park with bicycle facilities MP 1 ea 1 $ 263949 $ 262,949 $0 $0 $0 $262 73% Provide interpretive facilities and trails at Skinner Butte Park, enhance accessibili MP 3 ea 1 $-- 722 $ 723 $0 $0 $0 $723985 28% $203 Provide children's play area in downtown area MP 2 ea 1 $ i'e"4 $ 178,1141 $0 $0 $0 $178 54% $92,873 Develop regional play area in Alton Baker Park MP 3 ea i $- 4,314 $ 1,334,790 $0 $0 $9 $4,344,700 54 $744,433 Develop multi - cultural community centedaquabc center in Whiteaker /Skinner Butte area SF 4 ea 1 $ 13,147,000 X000 $0 $0 $0 $13 52% $6,828 Develop major indoor /outdoor aquatic facility and community center SF 2 as 1 $ 18,4055,804 4-- 4849& -W0 $0 $0 $0 $38,405 52% $9 -590 Develop Environmental Education Center SF 1 ea 1 $0 $0 $0 $2 21% $4- 78 Develop environmental education site behind River House SF 4 ea 1 $ 262-049 $ 262,949 $0 $0 $0 $262 21% $54 Acquire Civic Stadium for renovation and expanded community use SF 5 $0 Develop a major community/aquatic center to serve Santa Clara SF 5 $ Develop visual arts center SF 5 $ Provide full service South Eugene community center by upgrading Amazon Community Center SF 5 $ Develop a Vellodrome SF 5 $0 Develop a second Willamette River boat launch New Recreation Facilities Total Improving Existing Facilities X 4 ea 1 $ 532,', E33 $ 542,, -722 $0 $o $0 $512,733 21 °!o $366,-524 $54497,456 $-- 54,197;456 $0 $0 $942 -297 $�`3 +264M168 46% $24 Upgrade State Street Park NP 1 ea i $- 262 - $ 262 $262 $0 $0 $0 0% $0 Upgrade Monroe Park NP 5 $ Upgrade Charnel Mulligan NP 1 acres 1.2 $- 387285 $ 1,97 $187 $0 $0 $0 0% $0 Upgrade Tugman Park NP 4 ea 1 $-- 363,643 $ 261,643 $36 642 $0 $0 $0 0% $0 Enhance Crest Heights prairie habitat NP 4 acres 3 $ 98 $ 88 $98 $0 $0 $0 0% $0 Upgrade Acorn Park NP 5 $ $ $ $0 Upgrade Bond Lane park NP 1 ea 1 $ 262 949 $ 262,940 $237 $0 $0 $25,000 54% $13,419 Upgrade Brewer Park NP 5 $0 Upgrade Sladden Park NP 4 acres 1.2 $0 $0 $0 0% $0 Upgrade Lafferty Park NP 2 ea 1 $ 133479 $ 133,479 $186479 $0 $0 $25,000 54% $13,419 Implement Frank Kinney Park plan NP 5 $0 Upgrade Fairmount Park NP 5 $ Upgrade Washburne Park NP 5 $0 Implement Friendly Park plan NP 1 ea 1 X121 $1 &1,470 $333 $0 $0 $ 0 % $0 ; 470 1- nVammnf P ®a ('.ncf Racic •r• Park Type 0" Units Quantity Acquisition Cast Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding - Partner (Ownership) Net Project Costs Growth Share Growth Cost (Cost Basis) Upgrade Kincaid Park NP F a 1 $ 121,47a $ 134,470 $81 $0 $0 $50,000 54% $27,170 Upgrade University Park NP 4 ea 1 $ 197,205 $ 487,205 $1-07 - $0 $0 $0 0% $0 Enhance natural area at Bramblewood NP 4 acres 4 $-121 - $ 121,479 $131 ,478 $0 $0 $0 0% $0 Complete Arrowhead Park NP 5 $0 Complete Awbrey Park NP 5 $0 Upgrade Berkeley Park NP 4 ea 0.53 $ 431,: =0 $ 191,470 $- X8 $0 $0 $32 49% $42;185 Complete Skyview Park NP 5 $0 Complete Irwin Park NP 5 $0 Complete development of Candlelight Park NP 5 $0 Upgrade Scobert Gardens NP 5 $0 Complete Milton Park NP 5 $0 Provide play area at Shadow Wood park NP 5 $0 Complete Oakmont Park NP 5 $0 Complete Gilham Park NP 5 $0 Complete Petersen Barn Park, including parking revisions CP 2 as 2 $ 525,880 $ 525 $ 304 $0 $0 $139 52 $68,036 Develop play area at Ascot CP 2 ea 1 $- -98,603 $ 08 $- X8 $0 $0 $50,000 54% $27,170 Renovate Sheldon Community Center and pool SF 3 ea 1 $- 7625,250 $ 7,62` '.`-- x25,968 $0 $0 $0 0% $0 Improve Echo Hollow Pool SF 4 ea 1 - 5 $ 6- ,81F,180 $- .`,,916,1 50 $0 $0 $0 0% $0 Implement Amazon Park master plan CP 3 ea 1.5 $- 3 $- 3,614 $ 3,214,110 $0 $0 $400,000 66% $264,523 Implement Westmoreland Park master plan CP 4 ea 14.43 $ -- 657- ; 350 $- 6x 250 $--- 493,013 $0 $0 $464 52% $85 Enhance Spencer Butte Trail system NA 1 ea 1 $ 657,350 $-- 1 657360 $ 493,943 $0 $184 $0 0% $0 Implement Wild Iris Ridge Habitat Enhancement Plan NA 3 acres 123 $- 809,541 $- 808 $ 1- $0 $404;N9 $88,939 36% $51,944 Restore Willow Creek between 11th & 18th NA 4 acres 60 �-- 394,418 $-- 394,440 $0 $ 497,205 $197,205 $0 0% Implement Ridgelme master Plan NA 4 ea 1 $- 657,350 $- X57 $ 657,25a $0 $164,338 $0 0% Enhance and develop Sorrel Ponds site NA 5 Implement Skinner Butte Park Master Plan MP 3/4 acres 22.52 $ 7,522,712 $ 3385224 $0 $0 $4137 92 100% rl Provide accessible traits within Hendricks Park Forest MP 4 If 3500 $- 200A63 $- 200 $- "`3 $0 $0 $0 0% Implement Hendricks Park Forest Management Plan Replace aging infrastructure at Alton Baker Park Renovate Alton Baker Canoe Canal for kayaking, recreation, and natural resource benefits MP MP MP 3 2 2 acres acres 2 2 $ 0 -025 299 $ -26' 940 $_ -6-`73 -609 929 X98 $ - 2r"�"^ $ - �-�00 $ 720 2624 x^ 3,286,759 $0 $0 $0 $230,073 $0 $3,286,750 $0 $0 $0 64% 0% 0% $0 $-- Complete Alton Baker Park, update WABP Development Plan and Park, EABP Master Plan MP 3/4 acres 30 $- 4 $-- $0 $0 28% $0 $-- 4,81 - 7;061 ,667,064 Implement Morse Ranch master plan MP 4 acres 3 $-- 788,820 $ 788,820 $- -631,x6 $0 $0 $157,784 100% $157,764 Expand Petersen Barn Community Center SF 5 $0 Upgrade Campbell Center with fitness center SF 3 ea 1 m --,-«" $ 3,418 $-- 410,186 $0 $0 $3,008,034 0% $0 Develop parking and access to Laurelwood'Back 9" and Ribbon Trail south end SF 2 acres 2 $ 525,889 $ 628,880 $ 269 $0 $0 $262 -940 21% $54F31 Enclose portion of Amazon Pool for year round use SF 5 $0 Replace Maintenance Buildings at Laurelwood SF 2 ea 1 $ 1,241,077 $ 1- 244,073 $0 $0 $0 0% $0 Improve Tennis Courts at WHS in partnership with Bethel School District 52 SF 4 ea 1 - $ 131,470 $ 131,470 $ 131,478 $0 $65 $0 0% $0 frv, of Goo (`ncf Rncic Park yp Type �. ° o, Units Quantity Acquisition Cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding g "' Partner (Ownership) Net Pro ect ) Costs Growth Share Growth Cost (Cost Basis) Complete second phase of River House Master Plan SF 4 ea 1 A $0 $0 $788 21% $463 $- Implement SMJ House plan, including parking and access across railroad tracks Improve Cuthbert Amphitheater SF SF 5 5 $0 $0 Provide for replacement of synthetic surface fields in partnership with SF 1,3,4 ea 10 $ 3,286 $ 3 $-- ,26f,750 $0 $1,643 $0 $ Implement Rose Garden master plan Replace irrigation at Laurelwood SF SF 5 5 $0 $0 Restore Bloomberg NA 5 $0 Renovate park restrooms x 1 ea 7 $- 1 ,404,348 $ 1, 104,348 $0 $0 $0 0% $0 Develop children's play area renovation program x 1 ea 1 $ 262 $ 2 "�,^" -• $ 262 $0 $0 $0 0% $0 Decommission wading pools x 2 ea 1 $-- 657360 $- 657,350 $6572x`0 $0 $0 $0 0% $0 Renovate park irrigation systems x 2 ea 1 $- X314:700 $- X314,700 $34400 $0 $0 $0 0% $0 Renovate park lighting systems x 1 ea 1 $- 6`.7 $ --697aa8 $- 657,3`e0 $0 $0 $0 0% $0 Renovate tennis courts, including resurfacing x 1 ea 1 $- 1,334:790 $314,700 $0 $0 $328,675 81% Redevelop W. W. University Implement habitat management plans x 1 2 ea 1 78,882 $ 7882 $ 78 �- 11¢700 $0 $ $�2 ®,675 6sa�23 $0 $0 04&4-, 39 0% 0% 55%, $0 $0 $ �- 4,314,709 $14:700 46 �1e Imigroving Existing Facilities Total g6 7 §t A�� � '&q Ian $ Access improvements Improve access to Friendly & Lafferty Parks (See S2 on Map 3) NP 4 ea 1 $ 487,205 $ 1°�', -'� $0 $48;304 4 49 % Improve access to Kincaid and Milton (See S4 on Map 3) NP 4 ea 1 $ 387,' -�9 =` $= .�+ -�5 $0 $48,404 4 49 % Develop access improvements to meet neighborhood park needs See B2 on Ma 3 NP 4 ea 1 - X $--33,470 4 $ 31 479 $0 $22,86$ 8 7M --- 3 48% ; 315 Develop access improvements to serve this neighborhood (See B6 NP 4 ea 1 $ a2,°`8 $ -- 32 ,866 $0 $ 217 1 49 � Improve access to Frank Kinney, Edgewood and S6 (See S7 on map 3) Improve access to Fairmount and Laurel Hill Park (See S1 on Map 3) NP NP 4 4 ea ea 1 1 $-- 205 $ = ^_ $ 107,205 $ . °7,��� $0 $0 $49301- $ 4 4 49/ 49% $72,473 $724n Improve access to Amazon Park (See S3 on Map 3) NP 4 ea 1 $ 19+4,' -95 $- ^197,2M $0 $4&301 $0 $147,994 49% $72-073 Improve access to Tugman Park (See S5 on Map 3) NP 4 sa 1 $--- 197,295 $ 19?205 $0 $49301 $0 $147,994 49% $72,470 Improve access to existing parks (See R5 on Map 3) NP 4 ea 451,470 $ lil,iln $0 $32,866 $0 $98 49% ;fiAB ;5 Improve access to existing parks (See R6 on Map 3) NP 4 ea 1 $ 1a4,47a $ 131,-1, $0 $22 $0 $9669a 49% $482135 Enhance access to Striker Fields (See W3 on Map 3) NP 4 ea 1 $- 131,470 $-134,4'a $0 $32,868 $0 $98 49% $48,315 Enhance access to Brewer & Bond Lane parks (See W5 on Map 3) NP 4 ea 1 $ 131,470 $- - $0 $32 $0 $98,693 49% $4$315 Improve connectivity to Sheldon (See W6 on Map 3) NP 4 ea 1 $- 131 $ 133. =* $0 $32 $0 $98,692 49 % Enhance access to Crescent Park (See W7 on Map 3) NP 4 ea 1 $-- 65,,735 $ - 65,725 $0 $46,434 $0 $48,x03 49% $24,158 Improve access and parking at Cal Young Sports Park (See W2 on Ma 3 NP 4 ea 1 $ 131 $- 131,470 $--- 98,683 $ 32,868 $0 $0 49% $0 Enhance access to Willakenzie school and Ascot Park (See W9 and W10 on Ma 3) Enhance access to Churchill Sports Park (See WC2 on Map 3) NP NP 4 5 ea 2 $-- 131,476 $-----434-,47-G $0 $ 82,868 $0 $ 98 49% $ 48,315 $0 Enhance access to Oakmont Park (See W8 on Map 3) NP 5 $0 Replace pedestrian bridges at Amazon Park, add new bridges where needed CP 2 as 1 X493,@13 $'- 1FT4238 $0 $0 0 % $0 $- X67350 $657,359 Iw, n4 � ('n ct taacic Other Park .. c Acquisition Devel opment Acquisition Other Other Funding g -- Net Pro ect 1 Growth Share Growth Cost ° units Quantity Cost C ost Development Renovation Funding -- Funding -- Partner Costs (Cost Basis) Type L Totals City Partner (Ownership) Enhance access to Amazon Creek Greenway and Fern Ridge Bike ath h, the Willow Creek area LP 5 $0 Develop access improvements between parks, schools and X 3 If 2000 $ 42- ,^0,7n $ 42,07g $0 $-- -�eSM1@ $0 - :1,553 21% $ neighborhoods to WEW s stem and bike s stem Develop connections from bikepath to ddgeline and pacific crest trail X 5 $0 system and proposed Willamalane riverfront system Develop pedestrian improvements to link downtovm wth Skinner $- 4,, @49 $ 92f3 - 21% $ 181,210 Butte Park, SMJ house, and riverfront system (excluding pedestrian X 213 ea 1 4--4490,"0 $0 $- 920 $0 bridge at train station) $0 $0 0% $0 Improve access north /south of Beltline X 2 ea 1 - 394 804 $0 $--- Provide underpass via Delta Ponds to riverfront bike system X omplet ea $0 Complete comprehensive POS Signage System X 1 ea 1 $-- 394 $ —� $0 $0 $0 $- 394:419 21 % $ �1-9^- Complete ADA improvements X 1 ea 1 $ ---262 4 90 $ 2 €2,049 $0 $0 $0 $ 2R2,940 21 Improve Royal Avenue to enhance park/school connectivity X 4 ea 1 $ 134,470 $ 734 479 $0 — w,7'�` $0 X $- 5 21% Improve access to existing natural resource areas X 5 $0 Develop pedestrian and bike access improvements betmen River X 5 $0 Road /Santa Clara and Bethel Danebo and Fern Ridge Reservoir Provide access to Golden Gardens X 1 ea 1 $ 197 $ %07r<9v $0 $0 $0 $ 21 % $ 49,974 Acquire land to provide connectivity north and east to Santa Clara X 5 $0 area Access Improvements Total $ -6,254 028 $-- 6,254,028 ;�- 591 - + 91-6 $---2438 $0 S-- 3,522 5 34% $ 56 GRAND TOTAL 654 $96,937,068 9 $26,499,300 $6,503,988 $155,413 46% $78;962 -89 $146 -46 U42 - 904 &13 System-Wide Unit Costs; Residential & Nonresidential veveicipment per uomponenr Residential Unit Nonresidential Unit Residential Cost Nonresidential Cost Cost Basis Share ($/New Person) Share ($/New Equiv. Pop.) New Parks and Open Space Improvement Fee Neighborhood Parks $208 Community Parks $15,432,428 $294 _$Z $294 Urban Plaza _$4-2� $4-6 SQ8,642 $46 Linear Parks - . . ..... . W X1448,6 $17 Natural Area Parks 16 4 _$7_57-,M $486 $4-,6G1-,844 $4W Metropolitan Parks _$&,46&,44-7 $4-,S44-,2-94 $35 $3G2-,W9 $35 Special Use Facilities $72-,784- $68- $4 $_1-1-,9-36 $1- Sub -total $39,748,974 $33430-,4Q $73" $6�-� $M New Recreation Facilities $24,690,346 $2G-,644-,4-29 $474 $4-,044,7247 $474 Improving Existing Facilities $& $4-,4-54-,895 $M $873,339 $4-G Access Improvements $1,198,256 $47004-,742 $a $Vra-,544 U4 Subtotal IMPROVEMENT $70,962,809 $59,324,908 $1,354 $44-,637-,904 $1,354 l Existinq Parks and FacilitieE Reimbursement Fee Community Parks Urban Plaza Linear Parks Natural Area Parks Metropolitan Parks Special Use Facilities Subtotal REIMBURSEME Ent Cost per Unit Table 17 SDC Schedule Persons or EP I Gross SDC Net SDC per Credit per Unit E��9O I per Unit per Unit Unit lResidential per DU I a Nonresidential per Room A 1.93 $3 $1,924 $_1 per TGSF - B 1.29 $2_, $1,286 $1 C 0.79 $1,400 $7-H D 0.47 $M $469 $364 1 0.191 $3371 $-149 S447 iEP - Equivalent Population; TGSF = Thousand Gross Square Feet, DU = Dwelling Unit 0 17 =$� • PIP , n TIM, 1.0 Formula and Calculation Details 1.1 General Rate Setting, Cost • Service Formul SDC Eligible Costs SDC per Unit of Service Impact Measurement 1.2 Transportation System Cost of Service consists of non-assessable arterial and collector street system cost of service plus off bicycle cost of service. Non-Assessable Cost per Lane Mile X Lane Miles per trip ® Cost per Trip GUY Miles of Bicycle Paths per Person X Cost per Miles = Cost per Person Cost per Person - Cost per Trip # of Trips per Person [WMETAL0.11 Path Lighting + Path Section Wq-31-3) + ($44&.49) = $133.61 (per Person) Total Off - Street Bicycle Allocated Cost per Trip = $133 -5 - = $449-47 (per Trip) 0.895 3� ffl� � JZJ t _ 0] r I I Total Transportation Cost per Trip = Total Street Allocated Cost per Trip + Total Off -Street Bicycle Allocated Cost per Trip Total Transportation Cost per Trip = $1,625.34 + $4444-7 = $1,774.51 1 Graphical compari of water consumption per month to square foot of living area results ino slope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 gallons per month. 8000 7000 6000 5000 Gallmm per Mnth 4000 3000 2000 1000 O O 816 1585 2382 3280 Total Area Living Space [ � Pngeoted Sampled Actual Data The implementation of this rate structure results in each new single fnnnik/ dwe being charged a local wastewater SDC that is comprised of a base rate of $387.72 plus an additional charge of $0.0940 applied to the total proposed living space area of the dwelling. TIM, 29M Non-Assessable System Valuation (Value of Existing + Value of Planned) = Cost per Unit of Capacity Build-out Capacity (mgd) Per Unit of Capacity X Flow per PFU for Development Type X Number of PFUs for Development = SDC for Development $444,009M + $12,915M $2.9373 per Gallon per Day 49.0 mgd $2.937-3 X Gallon per PFU (varies by development type) X Number of PFUs = SDC for Development 3•�� SDC eligible costs Total additional impervious surface area within UGB (sq. ft) Unit cost per square foot of impervious surface area Reimbursement: $0.0919 per sq. ft. impervious surface area 1mr.1MUMM $0.1012 per sq. ft. 155,770,560 sq. ft. impervious surface area Total Unit Cost per Sq. Ft. Impervious Surface Area = (Reimbursement + Improvement) = $0.0919 + $0.1012 $0.192 Cost per person X Persons per Dwelling Unit Type = Cost per DU Nonresidential — costs and equivalent population densities p development category type vary I Cost per Person X Persons per TGSF = Cost per TGSF M Cost per Person X Persons per Room = Cost per Room TGSF = Thousand Gross Square Feet of floor area 2.0 Adopted SDC Fee Schedule: Current Rates 2.1 Transportation System: Cost per trip $1,774.51 2.2 Local Wastewater System: Residential dwelling unit base fee Residential dwelling unit total living area multiplication factor $0.0940 Non-Residential rate per gal/day per land use type per PFU Varies 2.4 Stormwater System: Small Residential (building footprint < 1,000 sq. ft.) $34&. 60 Medium Residential (building footprint > 1,000 sq.ft. and < 3,000 sq. ft.) $556.80 Small Duplex (unit building footprints < 1,000 sq. ft.) $691.20 Medium Duplex (unit building footprints >1,000 sq. ft. and < 3,000 sq. ft.) $4-_443-60 Manufactured Home Park Per space (assumes 1,684 sq. ft. per space) $323.33 R!—Us Per sq. ft. actual impervious surface area, addt'l common areas $9.192 All Other Development Per sq.ft. actual impervious surface area and/or equivalent $9.192 2.5 Parks System: Residential (per Dwelling Unit) Single Family Duplex/Town Home/Mobile Home/Accessory DU Multifamily $2,376.00 Nonresidential (unit varies – see Table 19 for Class description) Class A (per Room) ­90 Class B (per thousand gross square feet or TGSF) $44-90-00 Class C (per TGSF) W3.00 Class D (per TGSF) $364-.00 Class E (per TGSF) City of Eugene SDC Methodologies Fee Schedule & Formulas, Page F-6 F47. 11 rpu W-11 W907 a I =0 om UP III I it l; SUMMARY OF LOCAL SYSTEMS E LOP °T CHARGES (See Appendix C -2 for information regarding the Regional Wastewater SDC) Transportation Wastewater Local (City) Stormwater Parks Cost per Trip =$1,865.01 Cost per new residential units Total stormwater unit cost per Net Residential cost per Dwelling (e.g., single- family, mobile home sq.ft. of impervious surface Area = Unit: parks, duplexes, apartments) = a $0.202. Charges are based on Single Family = $3,845; base rate of $407.49 plus $0.0987 use. 1 -2 Family development Duplex/TH /MH /ADU = $3,117.00 per square foot of living area. under 3,000 sq.ft. have tiered Multifamily = $2,432.00 Residential additions will be rates based on est. imp. surface Nonresidential: v charged $0.0987 per square foot areas. 1 -2 Family over 3,000 Class A = $1,526.00 per room; of increased living area. sq.ft.. and Multi - Family & Class B = $1,020.00 per TGSF; Nonresidential uses = $3.0871 per Nonresidential are based on Class C = $625.00 per TGSF; gallon of daily flow /discharge. actual imp. surface area. Charges Class D = $372.00 per TGSF; for Mfg. Home Parks are based on Class E = $150.00 per TGSF. est. imp. surface area per space plus actual impervious surface area of additional common area. Estimated costs of Estimated non - assessable cost of Estimated non - assessable cost of Unit costs for various components. arterial /collector Street system existing system using costs from system -wide capacity from future (non assessable cost per lane- "Gravity Sewer Lines System capacity- enhancing projects as mile, costs of intersections, traffic Valuation Model" developed by contained in the Stormwater SDC m signals, street lights, structures) CH2M Hill. Charges are net of all Project List and available existing and off street bicycle paths. federal grants and outstanding stormwater system capacity. ° v debt. Existing levels of service for Design flow standards currently Design standards currently used Planned levels of service for N a various components as used by the city for various land by the City to handle a Five -year various components, as M established by current City use types. PFUs equivalents are storm. established in the adopted Eugene transportation design standards. determined per Oregon adopted Parks, Recreation, & Open Space N Plumbing Code. Comprehensive Plan's Project & m v Priorities List. v c Street Component: Reimbursement feed Reimbursement fee Reimbursement fee a 1► 40% Impr. Fee ► 84% ► 47% ► 23% (; ► 60% Reim. Fee :y v Bike Component: Improvement fee Improvement fee Improvement fee ro o ► 100% Impr. Fee ► 16% Po- 53% ► 77% L) Charges for new or expanding New or expanding residential uses Charges for new (all) or expanding Charges for new or expanding development are based on the are charged based on a per (Multi - family, Nonresidential) development are based on a cost per trip times the trip rate dwelling unit cost plus a rate per development are based on a tiered flat rate per dwelling unit for assigned for a specific square foot of living area. Non- estimated or actual impervious residential development types and development type times the residential uses are charged surface areas and the total a tiered flat rate per room or per 2 number of units of measurement based on the number of PFUs at a stormwater unit cost per square thousand gross square feet of r proposed. rate for the specific development foot. Stormwater impact not building area for nonresidential type. Credit for past trunk sewer attributable to impervious surface development types- E levy payments will be applied to area will be charged based on a the local charge. equivalent surface area and the E total stormwater unit cost per square foot. Note: Administration costs are not included in the figures above see section 2.3.1 for more information. • e i • • e t i! C R ._ r "r i h: REIMBURSEMENT Fee IMPROVEMENT Fee Level of Service Analysis Costs - EXISTING System Level of Service Analysis Costs - FUTURE System TRANSPORTATION COST COMPONENTS alor Major Neigh o ood System ajor Major Neighborhood System Arterials Arterials Co Collectors Average Arterials Arter als Collectors Collectors Average NON - ASSESSABLE STREET SECTION COSTS Total street section cost per linear mile $3.485 268 $2,412.708 $1 265 963 1 323 574 $4582.051 $3,136.521 $1.400,300 $1,622,296 Average street section cost per linear mile $2.150,014 2 724.734 (($3,485,268 *.17) +($2.472. 708 *.55) +($1 .265.963 *.18) +($1,323,574 *.16)) (($4.562A51 *.11) +$3,136,527 *.55) +$1.400,300 *.78) +($1.522,296 *.76U Average assessable section cost per linear mile $1.507.160 $1.231 580 ($2.150,014 * .701) ($2,72d.734 * .452) Average non-assessable section cost per linear mile $642.854 $1.493.154 ($2,150.014 *.299) ($2,724.734 *.548) Avera a assessable section cost per lane mile $719,065 $587586 (($1.507.160 12.62 lanes per mile) * 1.25 enq costs) (($1.231.580 / 2.62 lanes per mile) ` 1.25 enq costs) Average nonassessable section Cost per lane mile $306.70 S 383 (($719 065 /2.62 lanes Der mile * 1.25 en costs) $1.493.15412.62 lanes per mile) * 1.25 enq costs) INTERSECTION COSTS Total intersection cost per linear mile 515.106 $316.122 $195 401 183.687 $709,018 $327189 $246,596 $216.443 Average intersection cost per linear mile $295,091 $336,804 + ($183,687° .i6) .18) + ($215,443 * .16) o Average intersection cost per lane mile $140,788 $160,689 {($295,091 / 2.621anes per mile) " 1.25 eng costs) (($336,804! 2.62 lanes per mile) ` 1.25 eng Costs) TRAFFIC SIGNAL COSTS g Average signalcost per intersection $309,600 $309 600 U 1 Average signal cost per lane mile $163,345 $138,670 m ($309,600 * 0.5276 unadjusted signalized intersections per lane mile) ($309,600 * 0.4479 adjusted signalized intersections per lane mile) STREET LIGHT COSTS ,v G Total street light cost per linear mile $556.161 $278.081 $278.081 1111221 $556.161 $278,081 $278,081 $193.221 Average street light cost per linear mile $295,092 $235,092 ($556,161 *.11) + $278,081 *.55) + ($278,081 *.18) + ($193,221 *.16) ($556,161' .11) + $ 278,081 * .55) + ($278,081 * .18) + ($193,221 * .16) Average street light cost per lane mile $140,788 $140,788 (($295,092 / 2.621anes per mile} * 1.25 eng costs) (($295,09212.62 lanes per mile) * 1.25 eng costs) Average street light cost per trip $185.38 $185.38 - ((0.8888 * / 675) "$140,788) , ((0.88881675)' $140 788) BRIDGE & OTHER STRUCTURE COSTS Past projects, Replacement Cost New (RCN) $104,393,273 $52,196,638 (($117,702,347 RCN bridge inventory - $13,309,074 local streets) (($117,701,347 RCN bridge inventory - $13,309,074 (local streets) * 112 short span) Past Ferry Street Bridge & related overpass costs (FSB cost estimated to be 20% of ODOT RCN) $15,759,853 (FSB cost estimated to be 20 % of ODOT RCN) $15.759.853 Total costs for past projects $150,191,408 $84,945,614 (($104,393,273+ $15,759,853) * 1.25 eng Costs) (($52,196,638 + $15,759,853) * 1.25 eng costs) Average bridge &other structure cost per lane mile $412,738 $233,438 ($150,191,408 / 363.89 total Arterial /Collector linear miles) ($84,945,614 / 363.89 total Arterial /Collector linear miles) OFF -STREET BICYCLE PATH COSTS - Average path lighting cost per mile $144,968 Average path section cost per mile $465,612 Cost per person, path lighting No bike path reimbursement component proposed. $18.21 (((0.100511,000) * $144,968) * 1.25 eng costs) Cost per person, path section $122.11 0.2098 1,000 ' ,612 1 1.2 eng costs Total off - street bicycle path cost per trip Improvement Fee (100% allocation for bike path component)* $156.78 (($18.2 + $122.11) 17.89 tnp pper person) SUMMARY OF ALL TRANSPORTATION SYSTEM SDC COMPONENTS Nonassessable street section cost per lane mile $306,705 $712.383 Intersection cost per lane mile $140,788 $160,689 Traffic signal cost per lane mile $163,345 $138,670 Street light cost per lane mile $140,788 $140,788 Bridge & other structure cost per lane mile 41$ 2,738 23 $ 3. 488 Total nonassessable street system cost per lane mile $1,164,365 $1,385,968 Total non-assessable street system cost per trip $1,533.17 $1,824.96 ((0.8888 / 675) * $1,164,365) ((0.8888 / 675) * $1,385,968) [(ave. one -way trip length on street system ! number of vehicles per hour) x (capacity per lane mile x total cost per lane mile of street system) + ave. street light cost per trip)] Total allocated cost per trip Reimbursement Fee (40% allocation for street component)* $613.27 0.00 Improvement Fee (60% allocation for street component)* $1,094.96 Total off -street bicycle path cost per trip $156.78 Total Cost per Trip per Street System Fee Component $613.27 $1,251.74 *0-11 transportation SDC revenue split is 67% (Improvement) s 33% (Reimbursement). TOTAL TRANSPORTATION COST PER TRIP (REIMBURSEMENT FEE + IMPROVEMENT FEE) = $613.27 + $1,251.74 = S 1865.01 i! C R ._ r "r i h: 12. Analvsis of Assessable Amount Size Total Cost 6-inch $12,902,621 8 to 48-inch $429,347,705 Total Assessable Cost $442,250,327 '!3. Capacity Information k -- — Total City System Capacity in mgd i I 15. Calculation of Reimbursement Percentage 1 —1 City System Capacity (EDUs) in mgd 49.0 100.00% Existing Use in mgd 21.4 43.7% Percent Available for New Development in mgd 27.6 56.3% Total Value of Reserve Capacity (value of system) $84,962,122 100.00% Value of Increased Capacity (cost of future projects UGB- Master Plan) $13,570,639 15.98% Value of Reimbursable Capacity (previously paid value-existing users) $71,387,795 84.02% AI- r�cr,. �xa�ur- r4a��iri���. a��i . :r1-+; Eugene Local Wastewater SDC U se Code* Description Average Daily Flow per PFU Cost per PFU (Flow per PFU x $2.9373) 1 F Single - Family / Duplex Housing $407.49 + (Sq Ft Living Area x $0.0987) 1X Mixed Use with Residential $407.49 + (Sq Ft Living Area x $0.0987) 11 Multi - Family Housing $407.49 + (Sq Ft Living Area x $0.0987) 12 A, B, & C Elderly Housing Attach, Detach, & Group /Retirement Home $407.49 + (Sq Ft Living Area x $0.0987) 13 Residential Hotel $407.49 + (Sq Ft Living Area x $0.0987) 14 Mobile Home Park $407.49 + (Sq Ft Living Area x $0.0987) 15 Hotels, Motels, Lodging 19.05 $58.81 21 Beverage /Food Mfg 39.87 $123.08 24 Wood Products 47.93 $147.96 2X Light Mfg. /Printing 56.62 $174.79 3X Manufacturing 58.65 $181.06 4X Transportation & Utilities 18.22 $56.25 41 Fire Station 7.75 $23.93 51 Wholesale Trade 21.37 $65.97 54 Retail Trade / Grocery 55.46 $171.21 55 Retail Trade Automotive 7.83 $24.17 59 Retail Trade Other 39.91 $123.21 5A Restaurant - Fast Food 25.44 $78.54 5B Restaurant - Low to Med Turnover 62.47 $192.85 5C Restaurant - Higher Turnover 22.45 $69.31 5D Drinking Establishments 54.98 $169.73 5E Take /Bake & Pick Up /Delivery Establishments 26.49 $81.78 5X Retail Trade / Clothing & Dry Goods 12.35 $38.13 61 Financial Offices / Banks 16.99 $52.45 62 Other Services 28.51 $88.01 63 Rental /Storage Services 6.49 $20.04 64 Automotive & Other Repair Services 16.17 $49.92 65 Medical Services 28.75 $88.75 66 Construction Trade Services 13.69 $42.26 67 Government Services, Office /Business Parks Based on specific use of development 68 Education / Cultural 15.66 $48.34 69 Churches /Clubs /Organizations 15.70 $48.47 6A1 Laundry Services (Linen, Uniform) 538.96 $1,663.82 6A2 Laundry, Self- Service 299.64 $925.02 6A3 Dry Cleaning Service (with or w /out laundry services) 36.30 $112.06 6B Car Wash 264.54 $816.66 6X Professional /Real Estate /Insurance 67.76 $209.18 7X Entertainment, Recreation & Sports 88.42 $272.96 82 Veterinarian Service 24.79 $76.53 *The unit cost of capacity for the local wastewater system is $3.0871 per gallon per day. The flow per Plumbing Fixture Unit (PFU) is stated as gallons per day based on the size of development and type of land use. Land use types that do not fit into the above categories will receive a default flow assignment based on the sample average. The default flow is 47.93 gal /day x $3.0871 = a cost per PFU of $147.96. A rate per PFU may be assigned by the City Engineer should a proposed use not be represented by one of the published SDC use codes and for which a default flow assignment is not representative of the proposed flow. In the case of those proposed developments that are determined to have a potential for exceptional water usage, the City Engineer may require that the Owner(s) enter into an agreement with the City to review water usage or wastewater discharge at such time the development is in full use or production as the final basis of the local wastewater SDC. A complete list of wastewater SDC /HUD BPR use codes is provided in Table 8. 2. Future Stormwater System SDC-Eligible Project Costs (Improvement Fee) Total Est. Cost, Future System (SDC-Eligible Projects) (From Table 9) Unit Cost per Square Foot, Improvement Fee [$16,567,626 / 155,770,5601 *See Appendix F for complete rate schedule. Unit Cost per Square Foot, Improvement Fee [$16,567,626 / 155,770,5601 $0.1064 Unit Cost per Square Foot, Reimbursement Fee [$15,045,983 / 155,770,5601 $0.0966 Total Unit Cost per Square Foot [improvement + Reimbursement] $0.202 Small Residential SDC (building footprint < 1,000 sq. ft.) [1,800 sq. ft. x $0.202] $363.60 Medium Residential SDC (building footprint >1,000 sq. ft. and < 3,000 sq.ft.) [2,900 sq.ft x $0.202] $585.80 Small Duplex SDC (unit building footprints < 1,000 sq. ft.) [$363.60 x 2] $727 Medium Duplex SDC (unit building footprints >1,000 sq. ft. and < 3,000 sq,ft.) [$585.80 x 2]1 $1,171 M Mfg. Home Park SDC per Space (portion of total charge) [1,684 sq. ft. x $0.202]1 $340 ' *See Appendix F for complete rate schedule. City of Eugene Project Name Estimated Project Cost I Total SDC-Eligible Cost Martin Drive Pipe Improvements (02-07 CIP) $132,661 $132,661 Mt. Cavalry Pipe Improvements $1,088,682 $264,814 Frederick Court Pipe Daylight $168,752 $77,626 43rd Avenue Pipe Improvements $3,074,755 $983,922 Morse Park Ranch Park Pipe Improvements $1,504,213 $165,463 Laurelwood Flood Control Fac/Pipe Imps $2,864,920 $429,738 Jackson Street Pipe Improvements $110,408 $27,602 Windsor Circle Pipe Improvements $1,310,926 $842,738 West Hawkins Lane Water Quality Facility $891,971 $722,072 Bell Avenue (Increase Pipe Sizes Along) $1,133,472 $521,397 Empire Park Pond Retrofit $549,190 $109,838 Royal Node Stormwater Infrastructure $1,997,057 $1,997,057 Greenhill Tributary Storm Improvements Ph 2 $533,499 $181,875 Greenhill Tributary Water Quality Facility $1,068,141 $320,442 Roosevelt Channel - Culvert Improvement $193,857 $61,218 A-1 Main Channel Culvert & Open Waterway Improvements $734,346 $117,495 Lynnbrook Drive Open Waterway & Culvery Improvements $688,129 $206,439 Spring Creek Bridge Construction & Waterway Improvements $198,708 $45,703 Sanders Street Water Quality Facility $1,066,000 $53,300 Spring Creek Drive Water Quality Facility $337,502 $67,500 Kirsten Street Pipe Improvements $546,337 $158,438 Hunsacker - Open Channel Improvements (02-07 CIP) $567,733 $340,925 Lenox/Salty - Culvert Replacement (02-07 CIP) $245,353 $146,926 Hunsacker Culvert Replacement (02-07 CIP) $37,090 $22,824 Division Avenue Tip-Up Pipe Replacement $15,536 $3,573 Irvington Drive Water Quality Facility $932,626 $130,568 St. Peter School Culvert Replacement $79,077 $23,723 River Point Pond Outlet Channel $532,501 $218,325 Gilham Road System Culvert Replacement $38,515 $38,515 Gilham Road System Water Quality Facility $932,769 $93,277 Ascot Park Open Waterway Modification $102,992 $67,975 3rd-4th Connector Stormwater Improvements (02-07 CIP) $171,176 $171,176 Beaver St & Hunsaker Ln Stormwater Improvements $71,324 $71,324 Greenhill Rd Stormwater Improvements $142,649 $142,649 Irvington Drive - Stormwater (02-07 CIP) $142,649 $142,649 Kinney Park Flow Diversion & Restoration $884,412 $654,465 River Road - Stormwater (02-07 CIP) $71,324 $71,324 oya ve., Terry to Greenhill $142,649 $142,649 Services for New Development ($1 00,000/year) $4,849,995 $4,849,995 Streambank Stabilization ($ varies/year) $6,989,7001 $1,747,425] ITotals $37,143,593 1 $16,567,6261 Table 13 Reimbursement Fee Cost Basis Existing Inventory Units Needed For Growth Unit Costs ($ /Unit) Facilities Park Type Total Acres Developed Acres Development (Acres) Acquisition (Acres) Facilities (Number) Trails (miles) Development Acquisition Facility I Trails I Growth Cost (Cost Basis) C (D m v m I I U � ) v c m a N E E2 r Q N E F N `? L; U v N d ° c LL U Neighborhood Parks na 1 210.631 95.821 18.211 40,021 1 1 $79,5461 $122,9101 1 1 $6,367,013 48% 48°10 Urban Plazas Subtotal 1.101 1.101 0.231 0.001 0.34 $0 $01 $0 I 1 $01 01 11 0.001 0.00 0% 0% Community Parks nal 219.171 1 0.001 0.00 $0 Metropolitan Parks Subtotal 654.451 191.401 19.551 134.93 1.4' 87,8821 $76,8191 $878,818 1 $85,846 1 $13,471,5451 31 41 5.001 5.36142 30% Natural Area Parks Subtotal 1,487 17 1 3.491 0.001 1 0.611 $2,6241 $7,7841 1 $131,195 1 $89,4111 1 1 3 1 138%138% Linear Parks / Greenways Subtotal 1 201.131 7,401 0.001 31.491 1 2.301 1 $63,5041 $65,736 1 $2,151,1601 01 0 8.80 3.60 25% Special Use Facilities Bloomberg 20.80 4.32 $3,002 $12,972 8% Campbell Center 1.43 1.43 0.16 $5,524 $890 1 8% Cuthbert Amphitheater 0.16 $110,480 $17,806 1 8% Hilyard Community Center 0.16 $5,524 $890 1 8% Lamb Cottage 0.21 $33,144 $6,886 8% Morse Ranch House 0.21 $55,240 $11,477 8% Owen Rose Garden 8.30 5.20 0.41 0.26 0.05 $552 $37,521 $165,720 $18,024 1 8% 8 °!° Prefontaine Memorial 1.28 0.27 0.21 $37,521 $11,048 $12,274 8% 8% Shelton McMurphey Johnson 1.12 1.12 0.23 0.23 $552 $37,521 $8,860 8% 8 South Eugene High School $ Subtotal 130.71 80.53 0.641 5.081 1.161 i 1 $90,081 1 3 0.00 0.00 TOTAL 2,903.96 393.05 42.12 211.52 2.90 4.69 1 $22,169,210 4 8 16.80 8.96 WMI t-ee uosr rsasis Park Othe r Acquisition Other Other Fundin Net Pro ect Growth Cost -- 1 Units Quantity Acquisition Development Development Renovation Funding -- Funding- Growth Share Type a Cost Cost Totals City Partner Partner Costs (Cost Basis) (Ownership) Parks and Open Space • neighborhood park site to serve this area (63) NP • neighborhood park site to serve this area (134) NP • neighborhood park site to serve this area (135) NP neighborhood park to serve this area (S6) NP a neighborhood park site (R1) NP neighborhood park site (R2) NP a neighborhood park site (R3 and R4) NP > Ferndale Park Site NP Rosetta Place as neighborhood park NP land for combined neighborhood park and Ridgeline s" C1 NP land for combined neighborhood park and Ridgeline NP land for neighborhood park (WC5) NP a Hawkins Heights as a neighborhood park (WC4) NP 3 neighborhood park (WC5) > Videra Park to serve WC-6 NP NP land for neighborhood park (W11) NP Willakenzie school site as neighborhood park, vdth play d ballfelds NP a neighborhood park site to north, adjacent to Golden NP acres 4 $ 1,024,250 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $0 $ 1,024,250 acres 4 $ 1,024,250 $0 $0 $ 1,024,250 acres 4 $ 1,024,250 49% $ 1,024,250 acres 4 $ 1,024,250 $0 $276,200 $ 1,024,250 $0 $662,880 $0 $662,880 4 $0 $662,880 $ 662,880 $ 662,880 acres 1 49% $ 165,720 $ 165,720 acres 4 $ 1,024,250 19% $ 1,024,250 acres 4 $ 1,024,250 $0 $1,024,250 $ 1,024,250 acres 4 $ 1,024,250 49% $ 1,024,250 acres 3 60 $ 497,160 acres acres 2 2 $ 331,440 $ 331,440 $ 331,440 $ 331,440 acres 4 $ 1,024,250 $ 1,024,250 acres 5 $ 828,600 $ 828,600 acres 4 $ 1,024,250 $ 1,024,250 acres 2 $ 276,200 $ 276,200 acres acres 4 4 $ 662,880 $ 662,880 $ 662,880 $ 662,880 acres 4 $ 662,880 $ 662,880 acres 2.3 $ 381,156 $ 381,156 acres 4 $ 662,880 $ 662,880 acres 4.3 $ 712,596 $ 712,596 acres 3.9 $ 646,308 $ 646,308 acres 1 $ 165,720 $ 165,720 acres 4 $ 662,880 $ 662,880 acres 3.17 $ 525,332 $ 525,332 acres 4 $ 1,024,250 $ 1,024,250 acres 4 $ 662,880 $ 662,880 acres 4 $ 662,880 $ 662,880 acres acres 4 4 $ 662,880 $ 662,880 $ 662,880 $ 662,880 acres 5 $ 828,600 $ 828,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,024,250 49% $0 $1,024,250 49% $0 $1,024,250 49 %. $0 $1,024,250 49% $0 $1,024,250 49% $0 $1,024,250 49% $0 $1,024,250 49% $0 $662,880 $0 $165,720 19% 19% $0 $1,024,250 49% $0 $1,024,250 49% $0 $1,024,250 49% $0 $497,160 19% $0 $331,440 $0 $331,440 49% 49% $0 $1,024,250 49% $0 $828,600 19 1 /6 $0 $1,024,250 49% $0 $276,200 49 $0 $662,880 $0 $662,880 49 49% $0 $662,880 49% $0 $381,156 49 9 /6 $0 $662,880 49% $0 $712,596 19% $0 $646,308 19% $0 $165,720 19% $0 $562,880 49% $0 $525,332 19% $0 $1,024,250 49% $0 $662,880 19% $0 $662,880 49% $0 $662,880 $0 $662,880 49% 49% $501 $501 $501 $501 $501 $501 $12` $31 $501 neighborhood park site (B3) neighborhood park site (84) NP NP neighborhood park site (85) NP neighborhood park site (81) NP neighborhood park site (S6) NP Terra Linda Park as neighborhood park NP Lone Oak park site as neighborhood park Wth athletic fields NP Wendover Park site as neighborhood park NP recreational amenities along Amazon Greenway to serve rhood ark needs C2 NP Creekside Park as neighborhood park NP a neighborhood park (W4) NP Chase Commons as neighborhood park NP neighborhood park site (R1) NP neighborhood park site (R2) neighborhood park site (R3 and R4) NP NP Ridgeline "Gateway" park (WC1) as both trailhead and recreation area with picnic pla area basketball etc. NP Ridgeline "Gateway" park (WC3) as both traithead and NP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 l $828,600 49% $135,338 $324,811 $324,811 $324,811 $186,766 $324,811 $135,393 $122,799 $31,487 $324,811 $99,813 $501,883 $125,947 $324,811 $324,817 $324,811 Imn -Mmonf I:Mm ('net pneic Other Park a - Units Quantity Acquisition Developmen4 Acquisition Development Renovation Other Funding -- Other Funding -- Funding -- Net Project Growth Share Growth Cost Type • °- Cost Cost Partner Costs (Cost Basis) a` Totals City Partner (Ownership) Acquire 100+ acres surrounding Golden Gardens ponds for CP 2 acres 100 $ 4,097,000 $ 4,097,000 $0 $0 $0 $0 $4,097,000 49% $2,006,448 community park Acquire Amazon Park inholdings along Hilyard for community park use CP 1 acres 1.5 $ 2,048,499 $ 2,048,499 $0 $0 $0 $0 $2,048,499 49% $1,003,224 Acquire community park site to serve Santa Clara CP 1 acres 40 $ 10,242,500 $ 10,242,500 $0 $0 $0 $0 $10,242,500 49 $5,016,121 Develop Santa Clara Community Park, including lighted ballfields CP 2 acres 40 $ 4,971,600 $ 4,971,600 $0 $0 $0 $0 $4,971,600 52 9 /6 $2,572,804 Develop Golden Gardens and acquired property as community park 3 acres 40 $ 4,971,600 $ 4,971,600 $0 $0 $0 $0 $4,971,600 52% $2,572,804 with significant natural area component and trails Acquire portion of Union Pacific area for neighborhood and 5,121,250 $0 $0 $0 $0 $5,121,250 49% $2,508,060 community park, including improved connections, recreation and CP 4 acres 20 $ 5,121,250 $ open s ace Communit y Park Total 241.5 $21,509,249 $ 9,943,200 $ 31,452,449 $0 $0 $0 $0 $31,452,449 50% $15,679,462 Acquire land to provide urban open space within Courthouse neighborhood UP 4 acres 0.75 $ 1,152,281 $ 1,152,281 $0 $0 $288670 $0 $864,211 35% $305,967 Acquire land for urban plaza to be developed in partnership with UP 4 acres 0.5 $ 870,613 $ 870,613 $0 $217,653 $435,306 $0 $217,653 35% $77,058 transit Acquire land to expand park blocks UP 4 acres 0.5 $ 870,613 $ 870,613 $0 $0 $217,653 $0 $652,959 35% $231,175 Acquire land for an urban plaza in Santa Clara UP 4 acres 0.5 $ 870,613 $ 870,613 $0 $0 $217,653 $0 $652,959 35% $231,175 Urban Plaza Total 2.25 $ 3,764,119 $ $ 3,764,119 $0 $217,653 $1,158,683 $0 $2,387,783 35% $845,377 Acquire land for Amazon Creek Greenway (WC2) LP 2 acres 4 $ 1,024,250 $ 1,024,250 $0 $256,063 $256,063 $0 $512,125 100% $512,125 Implement plan for Jefferson Area Greenway and linear park LP 3 acres 4 $ 662,880 $ 662,880 $0 $165,720 $331,440 $0 $165,720 40% $66,401 Develop millrace linear park LP 5 acres $0 $0 $0 $0 $0 40% $0 Implement greenway/ linear park plan for Amazon Creek from Headwaters to Fair rounds in artnershi with ACOE L P 4 acres 3.97 $ 1,381,000 $ 1,381,000 $0 $690,500 $690,500 $0 $0 40% $0 Implement Rasor Park Master Plan LP 2 acres 2 $ 331,440 $ 331,440 $0 $0 $0 $0 $331,440 40% $132,803 Acquire linear park along Roosevelt drainage channel LP 4 acres 10 $ 409,700 $ 409,700 1 $0 $204,850 $0 $0 $204,850 100% $204,850 Linear Park Total 23.97 $ 1,433,9501 $ 2,375,320 $ 3,809,270 $0 $1,317,133 $1,278,003 $0 $1,214,135 75% $916,179 Acquire land on priority stormwater corridors that link with developed NA 1 acres 30 $ 1,229,100 $ 1,229,100 $0 $614,550 $0 $0 36% $0 arks, include trails Acquire additional river frontage, including property to the north NA 1 acres 60 $ 5,530,950 $ 5,530,950 $0 $2,765,475 $0 $1,382,738 36% $496,635 Acquire land for natural areas within Willamette/McKenzie River confluence NA 4 acres 100 $ 2,048,500 $ 2,048,500 $0 $1,024,250 1 $0 $0 $0 36% $0 Acquire land for natural areas and access to Gillespie Butte NA 1 acres 1.7 $ 435,306 $ 435,306 $0 $0 $0 $435,306 36% $156,348 Acquire natural areas to connect Ridgeline system east to Pisgah and Willamette Rivers stem NA 3 acres 55 $ 1,126,675 $ 1,126,675 $0 $0 $563,338 $281,669 36% $101,166 Acquire natural areas to complete Moon Mountain to Spencer Butte segment NA 1/2 acres 325 $ 6,657,625 $ 6,657,625 $0 $0 $0 $6,657,625 36% $2,391,207 Acquire additional ridgeline to complete Fern Ridge to West Eugene Wetlands NA 2/3 acres 500 $ 10,242,500 $ 10,242,500 $0 $0 $5,121,250 $2,560,625 $2,560,625 36% $919,695 Acquire additional ridgeline to complete Willow Creek to Bailey HiII Rr NA 1/2 acres 300 $ 6,145,500 $ 6,145,500 $0 $0 $0 $0 $6,145,500 36% $2,207,268 1rnnrn1 /'=M'nnf Paa (:net Raeie Park Type • ° - a` Units Quantity Acquisition Cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding 9 -- Partner (Ownership) Net Project 1 Costs Growth Share Growth Cost (COSY Basis) Acquire additional ridgeline to complete Bailey Hill Road to Blanton Heights NA 1/2 acres 300 $ 6,145,500 $ 6,145,500 $0 $0 $0 $0 $6,145,500 36 $2,207,268 Acquire natural area within Royal Mixed Use area NA 3 acres 50 $ 1,024,250 $ 1,024,250 $0 $512,125 $0 $0 $512,125 36% $183,939 Acquire land for natural areas along McKenzie River (Rivers to Ridges NA 3 acres 80 $ 1,638,800 $ 1,638,800 $0 $819,400 $819,400 $819,400 $0 36% $0 Acquire additional Amazon Headwaters property NA 1 acres 50 $ 1,024,250 $ 1,024,250 $0 $256,063 $256,063 $0 $512,125 36% $183,939 Expand Ridgeline Trail natural area park to include Spencer Creek area NA 3/4 acres 500 $ 10,242,500 $ 10,242,500 $0 $0 $5,121,250 $2,560,625 $2,560,625 36% $919,695 Acquire land for natural areas to complete Rivers to Ridges farmland connections NA 5 $ - $0 $0 $0 $0 $0 $0 Develop and implement restoration plan for Green Island with artnera encies NA 5 $ - $0 $0 $0 $0 $0 $0 Natural Area Total 2351.7 $53,491,456 $ - $0 $5,991,863 $14,621,169 $ 6,503,988 $27,193,838 36% $9,767,161 Acquire land to provide significant riverfront open space within courthouse /canne nei hborhood MP 1 acres 1.76 $ 3,072,750 $0 $460,913 $768188 $0 $1,843650 100 1 % $1843,650 Develop Prefontaine Memorial Park as a metropolitan park MP 5 P53,491,456 $0 $0 $0 $0 0 % $0 Metro olitan Park Total 1.76 $ 3,072,750 $ $0 $460,913 $768,188 $0 $1,843,650 100% $1,843,650 Acquire land in front of SMJ House SF 1 acres 0.3 $ 350,294 $0 $0 $0 $0 $350,294 21% $72,781 Acquire land at 4J Admin site to expand River House and Rose Garden fors ecial event site SF 5 $0 $0 $0 $0 $0 0% $0 Acquire land for park with agricultural character, possible living histow farm SF 5 $0 $0 $0 $0 $0 0% $0 Special Facility Total 0.3 $ 350,294 $ - $ 350,294 $0 $0 $0 $0 $350,294 21% $72,781 New Parks and Open Space Total 2748.2 1 $96,937,0681 $ 24,637,592 $121,574,660 $0 $7,987,561 $17,826,042 $6,503,988 $90,076,471 45% $40,225,268 New Recreation Facilities Develop spray parks at Washington and or Monroe Parks NP 1 ea 2 $ 207,150 $ 207,150 $0 $0 $0 $207,150 54% $111,904 Develop soccer fields at Bethel Community Park CP 3 ea 2 $ 607,640 $ 607,640 $0 $0 $0 $607,640 42% $252,500 Develop a running trail to serve the Bethel area CP 2 If 2600 $ 61,040 $ 61,040 $0 $0 $0 $61,040 100% $61,040 Develop soccer field at N. Westmoreland CP 4 ea 1 $ 303,820 $ 303,820 $0 $0 $0 $303,820 42% $126,250 Develop Striker Fields as community park with significant athletic fields, li Ming, within s orts complex model CP 3 acres 40 $ 6,905,000 $ 6,905,000 $0 $0 $0 $6,905,000 42% $2,869,324 Provide major community center on west side of Beftline to serve Bethel SF 5 $0 Provide synthetic surface field to serve Bethel /Danebo in partnership with school district 1 ea 4 $ 5,524,000 $ 5,524,000 $0 $0 $0 $5,524,000 42% $2,295,459 Provide additional dog off -leash facilities north of beftline (WK) CP 4 ea 1 $ 207,150 $ 207,150 $0 $0 $0 $207,150 83% $172,159 Develop an off leash dog area in Bethel /Danebo CP 5 _ $0 Develop pedestrian trails within Golden Gardens CP 3 $ 110,480 $ 110,480 $0 $0 $0 $110,480 28% $31,136 Develop tennis courts at Bethel Community Park (4) CP 5 $0 Develop an off leash dog area in City Central CP 5 $0 Develop an off leash dog area in River Road /Santa Clara CP 5 $0 Develop a disc golf facility to serve Santa Clara and River Road CP 5 $0 Develop off -leash dog area to serve Willow Creek CP 5 $0 Develop spray park at Ascot CP 5 $0 Develop mutti -use path to Fern Ridge LP 5 $0 lmnrnvamant FPP Cnst Basis Park Type - e. Units Quantity Acquisition Cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding g -- Partner (Ownership) Net Project 1 Costs Growth Share Growth Cost (Cost Basis) Develop pedestrian trails along Greenhill Tributary LP 5 $ Develop trails within West Eugene Wetland sites NA 3 If 10000 $ 220,960 $ 220,960 $0 $0 $110,480 $110,480 28% $31,136 Develop primary Ridgeline trails NA 3/4 miles 15 $ 1,864,350 $ 1,864,350 $0 $0 $466,088 $1,398,263 28% $394.067 Provide trailheads and interpretive facilities vdthin existing WEW sites NA 4 ea 3 $ 248,580 $ 248,580 $0 $0 $124,290 $124,290 35% $43,788 Develop trails, trailheads, and interpretve facilities throughout Ridgeline NA 3 mile 8 $ 994,320 $ 994,320 $0 $0 $248,580 $745,740 28% $210,169 Develop mountain biking trails and freending designated areas NA 5 $0 Develop trails, trailheads, and interpretive facilities in WEW NA 4 ea 1 $ 82,860 $ 82,860 $0 $0 $41,430 $41,430 28% $11,676 Develop trail facilities throughout the Ridgeline system NA 4 miles 5 $ 621,450 $ 621,450 $0 $0 $0 $621,450 28% $175,141 Provide covered centrally located skate park with bicycle facilities MP 1 $ 276,200 $ 276,200 $0 $0 $0 $276,200 73% $200,853 Provide interpretive facilities and trails at Skinner Butte Park, enhance accessibili MP 1 $ 759,550 $ 759,550 $0 $0 $0 $759,550 28% $213,511 Provide children's play area in downtown area MP J2e_ 1 $ 179,530 $ 179,530 $0 $0 $0 $179,530 54% $97,557 Develop regional play area in Alton Baker Park MP 1 $ 1,381,000 $ 1,381,000 $0 $0 $0 $1,381,000 54% $750,439 Develop multi - cultural community center / aquatic center in Whiteaker /Skinner Butte area SF 1 $ 13,810,000 $ 13,810,000 $0 $0 $0 $13,810,000 52% $7,173,310 Develop major indoor /outdoor aquatic facility and community center SF 1 $ 19,334,000 $ 19,334,000 $0 $0 $0 $19,334,000 52 $10,042,633 Develop Environmental Education Center SF 1 ea 1 $ 2,416,750 $ 2,416,750 $0 $0 $0 $2,416,750 21 $502,132 Develop environmental education site behind River House - SF 4 ea 1 $ 276,200 $ 276,200 $0 $0 $0 $276,200 21% $57,386 Acquire Civic Stadium for renovation and expanded community use SF 5 $0 Develop a major community/aquatic center to serve Santa Clara SF 5 $0 Develop visual arts center SF 5 $0 Provide full service South Eugene community center by upgrading Amazon Community Center SF 5 $ Develop a Vellodrome SF 5 $0 Develop a second Willamette River boat launch New Recreation Facilities Total Improving Existing Facilities X 4 ea 1 $ 538,590 $ 538,590 $0 $0 $0 $56,930,620 $ 56,930,620 $0 $0 $990,868 $538,590 21% $111,904 $55,939,753 46% $25,935,474 Upgrade State Street Park 1 ea 1 $ 276,200 $ 276,200 $276,200 $0 $0 $0 0% $0 Upgrade Monroe Park 5 $0 Upgrade Charnel Mulligan FNP 1 acres 1.2 $ 207,150 $ 207,150 $207,150 $0 $0 $0 0% $0 Upgrade Tugman Park 4 ea 1 $ 379,775 $ 379,775 $379,775 $0 $0 $0 0% $0 Enhance Crest Heights praise habitat 4 acres 3 $ 103,575 $ 103,575 $103,575 $0 $0 $0 0% $0 Upgrade Acorn Park S $0 $0 $0 $0 Upgrade Bond Lane park NP 1 ea 1 $ 276,200 $ 276,200 $251,200 $0 $0 $25,000 54% $13,419 Upgrade Brewer Park NP 5 $0 Upgrade Sladden Park NP 4 acres 1.2 $ 207,150 $ 207,150 $207,150 $0 $0 $0 0% $0 Upgrade Lafferty Park NP 2 ea 1 $ 138,100 $ 138,100 $113,100 $0 $0 $25,000 54% $13,419 Implement Frank Kinney Park plan NP 5 $0 Upgrade Fairmount Park NP 5 $ Upgrade Washburne Park NP 5 $ Implement Friendly Park plan NP 1 ea 1 $ 138,100 $ 138,100 $138,100 $0 $0 $0 - 0% $0 lmnrniramant Faa ('nct Ra -c:bz Park Type y a Units Quantity Acquisition Cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding 9 -- Partner (Ownership) et Project J Casts Growth Share Growth Cost (Cost Basis) Upgrade Kincaid Park NP 4 ea 1 $ 138,100 $ 138,100 $88,100 $0 $0 $50,000 54% $27,170 Upgrade University Park NP 4 ea 1 $ 207,150 $ 207,150 $207,150 $0 $0 $0 0% $0 Enhance natural area at Bramblewood NP 4 acres 4 $ 138,100 $ 138,100 $138,100 $0 $0 $0 0% $0 Complete Arrowhead Park NP 5 $0 Complete Awbrey Park NP 5 $0 Upgrade Berkeley Park NP 4 ea 0.53 $ 138,100 $ 138,100 $103,575 $0 $0 $34,525 49% $76,917 Complete Skyview Park NP 5 _ _ $0 Complete Irwin Park NP 5 $0 Complete development of Candlelight Park NP 5 $0 Upgrade Scoben Gardens NP 5 $0 Complete Milton Park NP 5 $0 Provide play area at Shadow Wood park NP 5 $0 Complete Oakmont Park NP 5 $0 Complete Gilham Park NP 5 $0 Complete Petersen Barn Park, including parking revisions CP 2 ea 2 $ 552,400 $ 552,400 $414,300 $0 $0 $138,700 52% $71,467 Develop play area at Ascot CP 2 ea $ 103,575 $ 103,575 $53,575 $0 $0 $50,000 54% $27,170 Renovate Sheldon Community Center and pool SF 3 ea $ 8,009,800 $ 8,009,800 $8,009,800 $0 $0 $0 0% $0 Improve Echo Hollow Pool SF 4 ea $ 6,214,500 $ 6,214,500 $6,214,500 $0 $0 $0 0% $0 Implement Amazon Park master plan CP 3 ea 1.5 $ 3,796,369 $ 3,796,369 $3,396,369 $0 $0 $400,000 66% $264,523 Implement Westmoreland Park master plan CP 4 ea 14.43 $ 690,500 $ 690,500 $517,875 $0 $0 $172,625 52% $89,333 Enhance Spencer Butte Trail system NA 1 ea 1 $ 690,500 $ 690,500 $517,875 $0 $172,625 $0 0% $0 Implement Wild Iris Ridge Habitat Enhancement Plan NA 3 acres 123 $ 849,315 $ 849,315 $331,233 $0 $424,658 $93,425 36% $33,555 Restore Willow Creek between 11th & 18th NA 4 acres 60 $ 414,300 $ 414,300 $0 $207,150 $207,150 $0 0% $0 Implement Ridgeline master Plan NA 4 ea 1 $ 690,500 $ 690,500 $690,500 $0 $172,625 $0 0% $0 Enhance and develop Sorrel Ponds site NA 5 $0 Implement Skinner Butte Park Master Plan MP 3/4 acres 22.52 $ 7,902,082 $ 7,902,082 $3,555,937 $0 $0 $4,346,145 100% $4,346,145 Provide accessible trails within Hendricks Park Forest MP 4 If 3500 $ 210,257 $ 210,257 $210,257 $0 $0 $0 0% $0 Implement Hendricks Park Forest Management Plan MP 3 acres 2 $ 966,700 $ 966,700 $766,700 $0 $241,675 $0 64% $0 Replace aging infrastructure at Alton Baker Park MP 2 acres 2 $ 276,200 $ 276,200 $276,200 $0 $0 $0 0% $0 Renovate Alton Baker Canoe Canal for kayaking, recreation, and natural resource benefits MP 2 $ 6,905,000 $ 6,905,000 $3,452,500 $0 $3,452,500 $0 0% $0 Complete Alton Baker Park, update WABP Development Plan and EABP Master Plan MP 3/4 acres 30 $ 5,059,984 $ 5,059,984 $4,909,984 $0 $1,264,996 $0 28% $0 Implement Morse Ranch master plan MP 4 acres 3 $ 828,600 $ 828,600 $662,880 $0 $0 $165,720 100% $165,720 Expand Petersen Barn Community Center SF 5 $ Upgrade Campbell Center with fitness center SF 3 ea 1 $ 3,590,600 $ 3,590,600 $430,872 $0 $0 $3,159,728 0% $0 Develop parking and access to Laurelwood'Back 9" and Ribbon Trail south end SF 2 acres 2 $ 552,400 $ 552,400 $276,200 $0 $0 $276,200 21% $57,386 Enclose portion of Amazon Pool for year round use SF 5 $0 Replace Maintenance Buildings at Laurelwood SF 2 ea 1 $ 1,303,664 $ 1,303,664 $1,303,664 $0 $0 $0 0% $0 Improve Tennis Courts at WHS in partnership with Bethel School District 52 SF 4 ea 1 $ 138,100 $ 138,100 $138,100 $0 $69,050 $0 0% $0 Imnrrniamant Faa rust Ra.cic Park Type a - a Units Quantity Acquisition cost Development Cost Acquisition Development Totals Renovation Other Funding -- City Other Funding -- Partner Other Funding -- Partner (Ownership) Net Project Costs Growth Share Growth Cost (Cost Basis) Complete second phase of River House Master Plan SF 4 ea 1 $ 1,657,200 $ 1,657,200 $828,600 $0 $0 $828,600 21% $172,159 Implement SMJ House plan, including parking and access across railroad tracks SF 5 $ Improve Cuthbert Amphitheater SF 5 $0 Provide for replacement of synthetic surface fields in partnership with SF 1,3,4 ea 10 $ 3,452,500 $ 3,452,500 $3,452,500 $0 $1,726,250 $0 $0 Implement Rose Garden master plan SF 5 $0 Replace irrigation at Laurelwood SF 5 $ Restore Bloomberg NA 5 $0 Renovate park restrooms X 1 ea 7 $ 1,160,040 $ 1,160,040 $1,160,040 $0 $0 $0 0% $0 Develop children's play area renovation program X 1 ea 1 $ 276,200 $ 276,200 $276,200 $0 $0 $0 0% $0 Decommission wading pools X 2 ea 1 $ 690,500 $ 690,500 $690,500 $0 $0 $0 0% $0 Renovate park irrigation systems X 2 as 1 $ 1,381,000 $ 1,381,000 $1,381,000 $0 $0 $0 0% $0 Renovate park lighting systems X 1 ea 1 $ 690,500 $ 690,500 $690,500 $0 $0 $0 0% $0 Renovate tennis courts, including resurfacing X 1 ea 1 $ 1,381,000 $ 1,381,000 $1,035,750 $0 $0 $345,250 81% $277,966 Redevelop W. University 1 $ 82,860 $ 82,860 $82,860 $0 0% $0 Implement habitat management plans X 2 1 $ 1,381,000 $ 1,381000 $1,381,000 $0 $345,250 $0 0% $0 Im rovin Existing Facilities Total $64,245,846 $ 64,245,846 $49,321,446 $207,150 $8,076,779 $10,110,318 55 °fo $5,576,350 Access Improvements Improve access to Friendly & Lafferty Parks (See S2 on Map 3) NP 4 ea 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49% $76,128 Improve access to Kincaid and Milton (See S4 on Map 3) NP 4 ea 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49 °!0 $76,128 Develop access improvements to meet neighborhood park needs See B2 on Ma 3 NP 4 ea 1 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Develop access improvements to serve this neighborhood (See B6 on Map 3 NP 4 ea 1 $ 34,525 $ 34,525 $0 $8,631 $0 $25,894 49% $12,688 Improve access to Frank Kinney, Edgewood and S6 (See S7 on map 3 NP 4 as 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49% $76,128 Improve access to Fairmount and Laurel Hill Park (See S1 on Map 3) NP 4 ea 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49 $76,128 Improve access to Amazon Park (See S3 on Map 3) NP 4 ea 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49% $76,128 Improve access to Tugman Park (See 55 on Map 3) NP 4 ea 1 $ 207,150 $ 207,150 $0 $51,788 $0 $155,363 49% $76,128 Improve access to existing parks (See R5 on Map 3) NP 4 ea 1 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Improve access to existing parks (See R6 on Map 3) NP 4 ea 1 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Enhance access to Striker Fields (See W3 on Map 3) NP 4 ea 1 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Enhance access to Brewer & Bond Lane parks (See W5 on Map 3) NP 4 ea 1 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Improve connectivity to Sheldon (See W6 on Map 3) NP 4 as 1 $ 138,100 $ 138,100 $0 $34,525 $0 - $103,575 49% $50,752 Enhance access to Crescent Park (See W7 on Map 3) NP 4 ea i $ 69,050 $ 69,050 $0 $17,263 $0 $51,788 49% $25,376 Improve access and parking at Cal Young Sports Park (See W2 on Map3 NP 4 ea 1 $ 138,100 $ 138,100 $103,575 $34,525 $0 $0 49% $0 Enhance access to Willakenzie school and Ascot Park (See W9 and W10 on Map 3 NP 4 ea 2 $ 138,100 $ 138,100 $0 $34,525 $0 $103,575 49% $50,752 Enhance access to Churchill Sports Park (See WC2 on Map 3) NP 5 $0 Enhance access to Oakmont Park (See W8 on Map 3) NP 5 $0 Replace pedestrian bridges at Amazon Park, add new bridges where needed CP 2 ea 1 $ 690,500 $ 690,500 $517,875 $172,625 Imnrnvnmant Fan (nct Ra -ci-c Other Park >. - Acquisition Develo pment Acquisition Other Other Funding -- Net Project Growth Cost Type n. Units Quantity Cost Cost Development Renovation Funding -- Funding -- Partner Costs Growth Share (Cost Basis) Totals City Partner (Ownership) Enhance access to Amazon Creek Greenway and Fern Ridge Bike ath in the Willow Creek area LP 5 $0 Develop access improvements between parks, schools and X 3 If 2000 $ 44,192 $ 44,192 $0 $11,048 $0 $33,144 21% $6,886 neighborhoods to WEW system and bike s stem Develop connections from bikepath to ridgeline and pacific crest trail X 5 $0 s stem and pro osed Willamalane rivertront system Develop pedestrian improvements to link downtown with Skinner Butte Park, SMJ house, and riverfront system (excluding pedestrian X 2/3 ea 1 $ 1,933,400 $ 1,933,400 $0 $966,700 $0 $966,700 21% $200,853 bridge at train station) Improve access north /south of Beltline X 2 ea 1 $ 414,300 $ 414,300 $0 $414,300 $0 $0 0% $0 Provide underpass via Delta Ponds to riverfmnt bike system X ompleb ea $0 Complete comprehensive POS Signage System X 1 ea 1 $ 414,300 $ 414,300 $0 $0 $0 $414,3001 21% $86,080 Complete ADA improvements X 1 ea 1 $ 276,200 $ 276,200 $0 $0 $0 $276,200 21% $57,386 Improve Royal Avenue to enhance park/school connectivity X 4 ea 1 $ 138,100 $ 138,100 $0 $69,050 $0 $69,050 21% $14,347 Improve access to existing natural resource areas X 5 $0 Develop pedestrian and bike access improvements between River X 5 $0 Road /Santa Clara and Bethel Danebo and Fern Ridge Reservoir Provide access to Golden Gardens X 1 ea 1 $ 207,150 $ 207,150 $0 $0 $0 $207,150 21% $43,040 Acquire land to provide connectivity north and east to Santa Clara area X 5 $0 Access Im rovements Total $ 6,569,417 $ 6,569,417 $621,450 $2,246,542 $0 1 $3,70,425 34% $1,258,684 € T 654 $96,937,068 $152,383,476 $249,320,544 $49,942,896 $10,441,252 E$�� 6 ,893,688 $6,503,988 $159,827,966 46 °!0 $72,995,776 OM . System-Wide Unit Costs; Residential & Nonresidential Development per Component Table 17 SDC Schedule Category Cost Basis 83.6% Residential Share 43,819 Kesidential Unit Cost ($/New Person) 16,4% Nonreside Share 8,596 Nonresidentiai Unit Cost ($/New Equiv. Pop.) New Parks and Open Space Improvement Fee Neighborhood Parks $11,100,659 $9,280,151 $212 $1,820,508 $212 Community Parks $1 5,679,462 $13,108,030 $299 $2,571,432 mg Urban Plaza 2.641 $706,735 $16 $138,642 $16 Linear Parks _ ___$9116,179 $765,925 $17 $150,253 $W Natural Area Parks $9,767,161 $8,165,347 $186 $1,601,814 $186 Metropolitan Parks $1,843,650 $1,541,291 $35 $302,359 $35 Special Use Facilities $72,781 $60,845 $1 $11,936 $1 Sub-total $40,225,268 $33,628,324 $767 $6,596,944 $767 New Recreation Facilities $25,935,474 $21,682,056 $495 $4,253,418 $495 Improving Existing Facilities $5,576,350 $4,661,828 $106 $914,521 $106 Access Improvements $1,258,684 $ 1,052,259 $24 $206,424 $24 Subtotal IMPROVEMENT $72,995,7761 $61,024,468 $1,3931 $11,971,3071 $1,393 Existing Parks and FacilitieE Reimbursement Fee Neighborhood Parks $6,367,013 $5,322,823 $121 $1,044,190 $121 Community Parks $0 $0 $0 $0 $0 Urban Plaza $0 $0 $0 $0 $0 Linear Parks __$2,151,1160 $1,798,370 $41 $352,790 $41 Natural Area Parks $89,411 $74,748 $2 $14,663 $2 Metropolitan Parks $13,471,545 $11,262,211 $257 $2,209,333 $257 Special Use Facilities 1 $90,081 $75,308 $2 $14,773 $2 Subtotal REIMBURSEMENT $22,169,210 $18,533,459 $423 $3,635,750 $423 Total SYSTEM $95,164,985 $79,557,928 $1,816 $15,607,058 $1,816 Less Credit $359 $1,025 . Net Cost per Unit $1,456 $791 Table 17 SDC Schedule Category Persons or EP I Gross SDC Credit per Unit Net SDC per per Unit per Unit Unit Residential per DU $1,978 $1,526 per TGSF Sin le - 2.641 $4,7931 $948 1 $3,849 n­1­fT­n 1-11-AMIhil. 1.29 9 1AI `91 AR-X;l $768 1 $3.117 Nonresidential per Room A 1.93 $3,504 $1,978 $1,526 per TGSF B 1.29 $2,342 $1,322 - $1,020 C 0.79 $1,434 $810 $625 D 0.47 $853 $482 $372 E 0.191 $345 195 $150 EP - Equivalent Population, TGSF = Thousand Gross Square Feet, DU = Dwelling Unit 0 $7 = P.M; " • jW1 = MPT"O", PT4 In SIDC Eligible Costs SDC per Unit of Service Impact Measurement 1.2 Transportation System Cost of Service consists of non-assessable arterial and collector street system cost of service plus off -street bicycle cost of service. Non-Assessable Cost per Lane Mile X Lane Miles per trip = Cost per Trip Street System Cost per Trip Reimbursement: $1,164,365 X (0.8888 / 675) = $1,533.17 = Cost per Trip Improvement: $1,385,968 X (0.8888 / 675) = $1,824.96 = Cost per Trip Total Street Allocated Cost per Trip = $1,533.17 (0.4) + $1,824.96 (0.6) = $1,708.23 1.2.2 Off-Street Bicycle path Cost of Service (improvement Fee Only) General Formulas Miles of Bicycle Paths per Person X Cost per Miles Cost per Person Cost per Person ® Cost per Trip # of Trips per Person NoRnpi Path Lighting + Path Section ($18.21) + ($122.11) $140.32 (per Person) Total Off -Street Bicycle Allocated Cost per Trip = $ 140.32 - = $156.78 (per Trip) 0.895 0 0 1 . Total Transportation Cost per Trip = Total Street Allocated Cost per Trip + Total Off-Street Bicycle Allocated Cost per Trip im. gn F.T Total Transportation Cost per Trip = $1,708.23 + $156.78 = $1,865.01 MWEM= Graphical comparison of water consumption per month to square foot of living area results in a slope of 0.951 gallons per month per square foot and a base flow per dwelling unit of 3,946 gallons per month. 8000 7000 6000 5000 Gallons perfvbnth 4000 3000 2000 1000 0 Base Flow Intercept, 3,946 Gal. / Month Gal. l Day (GPD) 132 --30 day month- - Cost per Gal /Day $3.0871 Base Charge = $407.49 GPD x Cost per GaL_ 0 v 816 1585 2382 3280 Total Area Living Space Projected Sampled Actual Data The implementation of this rate structure results in each new single family dwelling being charged a local wastewater SDC that is comprised of a base rate of $407.49 plus an additional charge of $0.0987 applied to the total proposed living space area of the dwelling. Non-Assessable System Valuation (Value of Existing + Value of Planned) = Cost per Unit of Capacity Build-out Capacity (mgd) Per Unit of Capacity X Flow per PFU for Development Type X Number of PFUs for Development ® SDC for Development $137.690M + $13.573M $3.0871 per Gallon per Day 49.0 mgd $3.0871 X Gallon per PFU (varies by development type) X Number of PFUs = SDC for Development • • SDC eligible costs Total additional impervious surface area within UGB (sq. ft) Unit cost per square foot of impervious surface area Reimbursement: $15,045,983 155,770,560 sq. ft. $0.0966 per sq. ft. impervious surface area Improv $10,567,020 = $O.1O04 per sq. ft. 155 aq. ft. impervious surface area Total Unit Cost perGq. FL Impervious Surface Area = � (Reimbursement + Improvement) = $0.0900+$0.1064 $0.202 Cost per person X Persons per Dwelling Unit Type = Cost per DU development category type vary CooparPerson X Persons per TG8F Cost per TG8F OR Cost per Person X Persons per Room Cost per Room T8SF= Thousand Gross Square Feet of floor area Calculations: Vary; see Table 17 2.1 Transportation System: Cost per trip $1,865.01 2.2 Local Wastewater System: Residential dwelling unit base fee $407.49 Residential dwelling unit total living area multiplication factor $0.0987 Non-Residential rate per gal/day per land use type per PFU Varies Small Residential (building footprint < 1,000 sq. ft.) $363.80 Medium Residential (building footprint > 1,000 sq.ft. and < 3,000 sq. ft.) $585.60 Small Duplex (unit building footprints < 1,000 sq. ft.) $727.20 Medium Duplex (unit building footprints >1,000 sq. ft. and < 3,000 sq. ft.) $1,171.60 Manufactured Home Park Per space (assumes 1,684 sq. ft. per space) $340.17 PLU I Per sq. ft. actual impervious surface area, addt'l common areas $0.202 All Other Development Per sq.ft. actual impervious surface area and/or equivalent $0.202 2.6 Parks System: Residential (per Dwelling Unit) Single Family $3,845.00 Duplex/Town Home/Mobile Home/Accessory DU $3,117.00 Multifamily $2,432.00 Nonresidential (unit varies — see Table 19 for Class description) Class A (per Room) $1,526.00 Class B (per thousand gross square feet or TGSF) $1,020.00 Class C (per TGSF) $625.00 Class D (per TGSF) $372.00 Class E (per TGSF) $150.00 PETTIT,,