HomeMy WebLinkAbout09/26/13 - City Council Newsletter
City of Eugene
125 East 8 Avenue, 2 Floor
thnd
Eugene, Oregon 97401
(541) 682-5010
(541) 682-5414 (FAX)
www.eugene-or.gov
EUGENE CITY COUNCIL NEWSLETTER
September 26, 2013
IN THIS EDITION
CHILDREN’S RIGHT TO PLAY OUTSIDE GUARANTEED
SECOND MEETING SCHEDULED ON 30 AVENUE CROSSING SAFETY
TH
ODOT TO BUILD A WIDER, SAFER SIDEWALK/SHARED-USE PATH ON FRANKLIN BOULEVARD
AROUND THE CITY
Children’s Right to Play Outside Guaranteed
Friday, Sept. 27, is Oregon Children’s Outdoor Bill of Rights Day. “OCOBOR” is combatting a disturbing trend in Oregon and
the United States: today’s youth are spending less time outdoors and are less connected to the natural world. Children who
are indoors all the time are more likely to engage only in sedentary activities and be
less fit. That can lead to obesity, diabetes, heart disease, and other direct negative
consequences to their health.
The Recreation Division has long recognized what research has now confirmed: just
being outside has a remarkable rejuvenating and calming effect that can reduce
hyperactivity in children. In response to the recent trend away from outside play,
Recreation developed the Full Moon Rising Program that uses outdoor activities to
teach science, technology, engineering, and mathematics curriculum in local schools
and then, depending on the season, takes the children tree climbing, rock climbing,
boating, or sledding.
It was at the urging of the Recreation Division that the Oregon Recreation & Park
Association launched the OCOBOR initiative. It guarantees the right of every Oregon child to follow a trail, go boating, camp
out under the stars, learn to swim, walk barefoot on the beach, climb a tree, observe animals in their habitat, catch a fish,
play in a nearby park, and explore Oregon’s culture and history.
For more information, contact Recreation Division Manager Craig Smith at 541-682-5334.
Second Meeting Scheduled on 30 Avenue Crossing Safety
th
A meeting to continue discussing safety concerns about pedestrians crossing 30 Avenue east of Hilyard Street has been
th
scheduled for Thursday, Oct. 3, beginning at 6 p.m., in the cafeteria of Camas Ridge Elementary School, 1150 East 29
th
Avenue. The purpose of the meeting will be to discuss community input, describe evaluation studies, and present the City’s
recommended improvement option.
Many pedestrians, bicyclists, transit users, and neighborhood residents have expressed a desire for a safer street crossing
that is easy to use. Many of the concerns have been submitted on behalf of students who attend Camas Ridge Elementary
School. While there is a pedestrian bridge across from the school near University Street, it has steep stairwells and doesn’t
work for people with mobility challenges or families with strollers, large bicycles or tag-along trailers. Another group of
concerned users are transit riders who board at 30 Avenue and University, which is five blocks from the only marked
th
crosswalk on 30 Avenue east of Hilyard.
th
An initial meeting was held on May 23 to identify safety challenges and begin the discussion of potential options. Staff is
still developing a recommended improvement option for the Oct. 3 meeting. More information, including notes from the
May 23 meeting and the results of speed studies and traffic counts, is available at www.eugene-or.gov/30thcrossing, or by
contacting Reed Dunbar, transportation planner, at 541-682-5727.
EUGENE CITY COUNCIL NEWSLETTER PAGE 1
September 26, 2013
ODOT to Build a Wider, Safer Sidewalk/Shared-Use Path on Franklin Boulevard
Wildish Construction will start construction of a shared-use path on the south side of Franklin Boulevard between Walnut
Street and Judkins Point, Friday, Sept. 27. City of Eugene staff worked with Oregon Department of Transportation (ODOT)
to develop a design that will improve the safety of pedestrians and bicyclists as well as improve the quality of their
experience on this popular transportation corridor.
Currently at this location, a narrow, two-directional, five-foot-wide sidewalk handles a heavy volume of bicycle and
pedestrian use. This sidewalk is the primary pedestrian and biking facility in and out of the Laurel Hill Valley
neighborhood and serves the University of Oregon campus and the Lane Transit District’s Walnut EmX Station. The new
sidewalk will be constructed to a 12-foot width with a five-foot planting strip from Walnut Street to the east end of the
project. An improved drainage system will be included in the new design to keep rainwater from flowing across the
sidewalk and freezing in winter. The City of Eugene is providing the landscape plans, and although some trees will be
removed, numerous trees will be planted. The low-bid contract of $252, 664 was provided through ODOT’S Bicycle and
Pedestrian Program and awarded to Wildish Construction, Inc. Completion is expected by the end of December.
During construction, there will be one eastbound lane open to vehicle traffic and a four-foot-wide temporary
bike/pedestrian path sharing the roadway. The bike/pedestrian path will be delineated by pedestrian channelization
devices and tubular markers. During the weekends, there will be two lanes of eastbound traffic open to vehicle traffic with
a four-foot-wide temporary bike/pedestrian adjacent to traffic. Westbound traffic will not be affected.
Visit the ODOT project web site for more information, or contact Eugene Bicycle and Pedestrian Coordinator Lee
Shoemaker at lee.shoemaker@ci.eugene or 541-682-5471.
EUGENE CITY COUNCIL NEWSLETTER PAGE 2
September 26, 2013