My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/02/1987 Meeting
COE
>
City of Eugene
>
Council Minutes
>
Historic Minutes
>
1987
>
06/02/1987 Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2007 5:14:18 PM
Creation date
11/2/2006 4:24:02 PM
Metadata
Fields
Template:
City Council Minutes
Meeting_Type
Meeting
CMO_Meeting_Date
6/2/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />- <br /> <br />Answering questions from Mayor Obie and Ms. Bascom, Mr. Wong said the working <br />capital in the sewer fund finances the reserve for capital projects. <br />Mr. Gleason said the reserve fund for sewer capital projects has never been <br />separate from the working capital in the sewer fund. Mr. Wong said the <br />working capital was deliberately spent for projects in the Capital Improvement <br />Program (CIP) and the capital budget. He said $102,744 is too low for the <br />fund. He said an adequate working capital will be accumulated in two years if <br />the council approves the proposed increase in sewer rates. <br /> <br />Mr. Wong reviewed four proposals for monthly sewer rates for single-family <br />homes. The rates were $6.35, $6.13, $5.85, and the existing $5.65. He said <br />the $6.35 rate would correct the flow estimates, transfer portions of four <br />positions that deal with the sewer fund from the General Fund to the sewer <br />fund, provide a pipe sealing program, and provide for inflation in 1988 and <br />1989. The level of service would remain the same as now. <br /> <br />Answering questions from Ms. Wooten, Ms. Andersen said one of the positions to <br />be transferred is a person in the Public Works Department who has been <br />spending half-time working on public information about sewers. The other <br />positions to be transferred are half-time of a financial coordinator, half- <br />time of a person who works at the counter in the Engineering Division, and <br />half-time of a person maintaining the local pump stations. <br /> <br />e <br /> <br />Ms. Wooten said she asked for information about ,the flow correction. <br />Ms. Andersen said it is difficult to pinpoint the errors that led to an <br />underestimation of the flow; however, current projections are based on actual <br />pata since conversion to flow-based rates. Mr. Gleason said the council <br />instructed the staff to do the best it could when flow-based rates were <br />initiated. George Jessie of the Public Works Department said about 35~ of the <br />proposed rate increase is for flow correction. <br /> <br />Mr. Wong said the $6.13 rate would correct the flow estimates, transfer the <br />four half-time positions from the General Fund to the sewer fund, and provide <br />for inflation in 1989. He said services would be reduced about 3 percent and <br />capital projects costing about $20Q,000 would be eliminated. The $5.85 rate <br />would correct the flow estimate and provide for inflation in 1989. He <br />discussed various ways of reducing the expenditures between $200,000 and <br />$330,000 if the council approves that rate. He said the $5.65 rate would <br />result in eliminating some capital projects and reducing services $100,000 to <br />$330,000. <br /> <br />Mr. Wong said the staff recommends the $6.35 rate. He reviewed an analysis of <br />that rate for the next two years. The analysis was on page 7 of the packet he <br />had distributed. <br /> <br />Answering questions from Ms. Ehrman, Mr. Wong discussed the sewer projects in <br />the CIP for FY88 and FY89. He said the CIP contains $580,000 for sewer <br />projects in FY89 and a sewer rehabilitation project might be eliminated if the <br />council adopts the lower sewer rates in FY88. <br /> <br />Replying to questions from Ms. Wooten, Mr. Wong said the projected revenue in <br />the analysis of the $6.35 rate includes revenue from commercial and industrial <br /> <br />e <br /> <br />MINUTES--Eugene City Council Dinner/Work Session <br /> <br />June 2, 1987 <br /> <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.