Laserfiche WebLink
<br /> Joanne Rodin, 33506 Bloomberg, wondered if Troutman Investments was the <br />e same as the Emporium. She said no information had been given about why <br /> Troutman Investments needs to take residential property for expansion. <br /> She felt everyone1s needs could be met if the process could be slowed down <br /> so that options could be considered. Consistency is needed in land use plans <br /> so that land owners can rely on them. The Emporium received C-2 zoning in <br /> 1974 by indicating offices, not warehouse space, would be built. Th at zoni ng <br /> was not correct, she said, because warehouse space was built and warehousing <br /> should be zoned Light Industrial. Changing the designation to Rural Industrial <br /> woul d not sol ve the probl em bec ause the rural industrial designation is <br /> appropriate for egg farms, quarries, or industries that are hazardous. <br /> Discussing available services, Ms. Rodin said services outside the urban <br /> growth boundary are not adequate for the intensity of the proposed development. <br /> She gave details about the Emporium septic system and said the growth of the <br /> Emporium had produced a significant off-site impact. Many of the residents <br /> living below the Emporium have had to replace their septic systems or their <br /> we 11 s. Ms. Rodin said the police service in the neighborhood is not adequate <br /> for an industrial development. If the warehouse expands into the residential <br /> area and a fire occurs, she does not think the rural fire department will <br /> be adequate. Three years ago there was a fire on the Emporium property. <br /> The fire fighters went through a neighbor1s back yard. <br /> Ms. Rodin advocated following standard land use goals which indicate property <br /> should be used to its full potential. She said the existing commercial <br /> property could accommodate the expansion. It has a private sewer line. She <br /> discussed two other options. Urban services could be brought to the Emporium <br />- property by expansion of the urban growth boundary or the corporate head- <br /> quarters could be moved, perhaps to the Bancroft default property in Spring- <br /> fi e 1 d. She said approval of the proposed amendments would set a precedent. <br /> Jim Hale, 4064 Meredith Court, is chair of MAPAC. He thought MAPAC had <br /> not recommended approval of the amendments because a majority of the members <br /> felt the inadequate findings would cause serious problems. Concerns expressed <br /> in the MAPAC motion which passed were the the lack of findings related to the <br /> statewide planning goals, the lack of findings addreSSing the criteria for a <br /> Rural Industrial District, and the lack of assurance to the neighbors that <br /> the site review suffix would be attached to the zoning.. MAPAC members also <br /> felt legislative action, such as approval of the amendments, should apply <br /> to more than one property. <br /> There being no further testimony, Councilor Wooten closed the public hearing. <br /> Jim Farah of the Planning staff said there is a need for detailed findings <br /> for the proposed amendments that each jurisdiction can adopt. The Pl anning <br /> staff is consulting the LCDC staff about how to address the administrative <br /> rule cited by Ms. Brown. Concerning expansion of the urban growth boundary, <br /> Mr. Farah said the Emporium is within the Lane Community College Drainage <br /> Basin and the expansion issue involves the whole basin. It was discussed <br /> during adoption of the Metro General Plan. The urban growth boundary is <br /> almost a mile to the north of the Emporium on that side of the Willamette <br /> River and across the river on the other side. It would be difficult to <br />e <br /> MINUTES--Eugene City Council October 8, 1984 Page 5 <br />