My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5 - PH on Laurel Hill Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-11/08/04Mtg
>
Item 5 - PH on Laurel Hill Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:47:57 PM
Creation date
11/4/2004 8:59:35 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/8/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Glenwood Interchange/Son Blaze Village and Surrounding <br /> Developments <br /> Required Roadway Improvements <br /> <br />Stage 1 Roadway Improvements <br /> <br />Stage I work is related to Son Blaze Phase I in Table 3 of the Traffic Impact Analysis ! <br />(included as Page 5 of Exhibit A). Reference Drawing I for illustration of required <br />impwvements. <br /> <br />Stage I is initial work required prior to completion of the final subdivision plats for Son <br />Blaze residential phases 1, 2, 3, and 8: <br /> <br />· The City will apply for a public road appwach permit fxom ODOT pursuant to OAR <br /> 734-051-0010 et seq. for a road approach permit for Moon Mountain Drive.. <br /> <br />· Realign and reconstruct Moon Mountain Drive to address safety concerns and <br /> provide for the future realignment of Glenwood Drive and extension of Glenwood <br /> Blvd. (Brackenfem). <br /> <br />· Con~xuct a right-turn lane for the westbound approach at the intersection of <br /> Glenwood Drive and Glenwood Boulevard. The length of the right-turnlane will be <br /> determined by ODOT. The design and construction specifications will be approved <br /> by ODOT. -- <br /> <br />· Improve Laurel Hill Drive to City Standards from Moon Mountain to the SOuthern <br /> terminus. This work will also include the Improvement of tho Moon Mountain and <br /> Laurel Hill intea'~ection to conform to City Fire Marshall standaxxts. <br /> <br /> The contractor shall bo allowed to stockpile material on-site for the future <br /> realignment of Glenwood Drive as identified in Phase 2 mitigation. Thc contractor <br /> . shall obtain a miscellaneous permit from. ODOT to perform this work. Access to the <br /> stockpile site shall bo determined by ODOT. The contractor shall be rea]x)nsible for <br /> ~g and implementing a traffic control plan. The ~raffic control plan will be <br /> approved by ODOT. <br /> <br /> l Dra# Traffic Impact.4nalFsis for Son Blaze Village and Other Surrounding <br /> De~opments dated April 9, 2001, and amendments dated June 5, 2001, prepared by <br /> JRH Transportation Engineering. <br /> II-B-98 <br /> <br /> F. XHIBIT A PAGE 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.