Laserfiche WebLink
Glenwood Interchange/Son Blaze Village and Surrounding <br /> Developments <br /> Required Roadway Improvements <br /> <br />Stage 1 Roadway Improvements <br /> <br />Stage I work is related to Son Blaze Phase I in Table 3 of the Traffic Impact Analysis ! <br />(included as Page 5 of Exhibit A). Reference Drawing I for illustration of required <br />impwvements. <br /> <br />Stage I is initial work required prior to completion of the final subdivision plats for Son <br />Blaze residential phases 1, 2, 3, and 8: <br /> <br />· The City will apply for a public road appwach permit fxom ODOT pursuant to OAR <br /> 734-051-0010 et seq. for a road approach permit for Moon Mountain Drive.. <br /> <br />· Realign and reconstruct Moon Mountain Drive to address safety concerns and <br /> provide for the future realignment of Glenwood Drive and extension of Glenwood <br /> Blvd. (Brackenfem). <br /> <br />· Con~xuct a right-turn lane for the westbound approach at the intersection of <br /> Glenwood Drive and Glenwood Boulevard. The length of the right-turnlane will be <br /> determined by ODOT. The design and construction specifications will be approved <br /> by ODOT. -- <br /> <br />· Improve Laurel Hill Drive to City Standards from Moon Mountain to the SOuthern <br /> terminus. This work will also include the Improvement of tho Moon Mountain and <br /> Laurel Hill intea'~ection to conform to City Fire Marshall standaxxts. <br /> <br /> The contractor shall bo allowed to stockpile material on-site for the future <br /> realignment of Glenwood Drive as identified in Phase 2 mitigation. Thc contractor <br /> . shall obtain a miscellaneous permit from. ODOT to perform this work. Access to the <br /> stockpile site shall bo determined by ODOT. The contractor shall be rea]x)nsible for <br /> ~g and implementing a traffic control plan. The ~raffic control plan will be <br /> approved by ODOT. <br /> <br /> l Dra# Traffic Impact.4nalFsis for Son Blaze Village and Other Surrounding <br /> De~opments dated April 9, 2001, and amendments dated June 5, 2001, prepared by <br /> JRH Transportation Engineering. <br /> II-B-98 <br /> <br /> F. XHIBIT A PAGE 2 <br /> <br /> <br />