|
101 CELL TOWERS
<br /> CELL TOWERS 202
<br /> each be qualified professionals with a record of service to Details of the aPPlication process are specific to
<br /> municipalities in one of' the. followin8 fields: a) Great Barrington, andwould need to be adaptedto
<br /> · tele~o~~ona engineering, b) structural engin~-rin~ c) fit your local and state requirements. We require
<br /> monitoring of electromagnetic fields, and, if determined
<br /> ~ by the SP(}~ d)other consultants, two different Oq~es of permits because the .first
<br /> carrier, who may build a tower will need to get both
<br /> B. The SP(3A shall select the Independent Consultant(s) after
<br /> consultation with the Planning Board, the Board of Health, and a Tower permit and a Facility permit, but
<br /> subsequent carriers, co-locating on that Tower,
<br /> the Conservation Commission, which may propose a list of need only get a Facility permit. However, note that.
<br /> qualified candidates.
<br /> Major Modifications also require new permits.
<br /> Bec, m~_se applications for these facilities (when they : B. Adequate Coverage, Adequate Capacity, and Justificati n
<br /> inchtde eveo~ng they should) are voluminous a,d ~ of Need:
<br /> tectmiaal, you need to be able to hire independent 1. Applicant shall 'provide 'written documentation of any
<br /> con~tant(s). The Applicant shouM pay for
<br /> ~ts, not the Town. This language allows ~. Facility Sites in Great Barring, ton, in abutting towns and
<br /> that to happen. Again, note the'reference to in Mount Washington, MA, in which it has a legal, or
<br /> equitable interest, whether by ownership, leasehold or
<br /> M~ law and change as necessary, otherwise. From each such Facility Site, it shall
<br /> VI § 171 - 12~ Prohibition of TeleP°rts: demonstrate with written documentation that these
<br /> FaCility Sites are not already providing, or do not have
<br /> There shall be no Teleport(s) within the Town of Great Barrington. the potential by adjusting the Site, to provide Adequate.
<br /> COverage and/or Adequate Capacity to the Town of Great
<br /> Te~ create a lot of radiation, are not protected Barrington. The documentation shall include, for each
<br /> in the Telecommunications Act, arut you don't want
<br /> them anywhere near residential areas. Facility Site listed, the exact location (in longitude and
<br /> latitude, to degrees, ·minutes and seconds), ground
<br /> ~11 § 171- 126. Al~iieation Reqnirements: elevation, height of Tower or structtire, type of Antennas,.
<br /> A. No Tower or Personal Wireless Service Facility shall be Antenna gain, height of Antennas on Tower or structure,
<br /> output frequency, number of channels, power input and
<br /> ~ constructed, or installed without first obtaining a maximum power output per channel. Potential
<br /> Special Permit from the SPGA. One or both of two kinds of
<br /> Special Permits are required; a) for new Tower construction (or adjustments to these existing Facility 'Sites, including
<br /> Major Modification Of An Exi~ng Tower); b) for Personal changes in Antenna type, orientation, gain, height or
<br /> Wireless Service Facilities (or Major Modification Of An power output shall be specified. Radial Plots from 'each of
<br /> these Facility Sites, as they exist, and with adjustments as
<br /> F_zdsting t~acility), to be mounted on an existing, or newly above, shall be provided as part of the Appiicatio~
<br /> permitted, Tower or structure. If Applicant is applying for both 2. Applicant shall demonstrate with written documentation
<br /> Permits, they shall be submitted and examined concurrently.
<br /> Appli~ shall .be submitted using the Long Form that they have examined all Facility Sites located in Great
<br /> Barrington, in abutting towns and in Mount Washington,
<br /> Application (SP-2), in accordance with. the requirements of
<br /> ~ Atl~e X of the Bylaw. The following additional information MA, in which Applicant has no legal or equitabl interest,
<br /> ,o whether by ownerzhip, leasehold or. otherwise to
<br /> to must also be submitted: determine whether those.existing Facility Sites can be
<br /> used to provide Adequate Coverage and/or
<br />
<br />
<br />
|