My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 3 - PH/Ord. on Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-11/22/04Mtg
>
Item 3 - PH/Ord. on Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:42:10 PM
Creation date
11/17/2004 12:20:16 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
11/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
203 CELL TOWERS CELL TOWER$ 2O4 <br /> <br /> Capacity to tho Town of Great Barrington. The <br /> docmncntafion 'shall include, for each. Facility Site The purpose of this section is to require the cringers <br /> examined, the exact location (in longitude and latitude, to to show what they can already provide and to <br /> degrees, minutes and seconds)~ ground elevation, height demonstrate conclusively that they need the new <br /> of Tower or structure, type of Antennas proposed, facility they are applying for. It may be that they <br /> proposed Antenna gain, height of proposed Antennas on want the new facility (because it may produce <br /> Tower or structure, proposed output fi'equency, proposed income for them as they rent out space on the new <br /> number of channels, proposed power input and proposed tower to other competitors), intt they may be .able to <br /> maximum power output per channel. Radial Plots from Provide completely adeqUate coverage from an <br /> each of'these Facility Sites, as proposed, shall be existing tower (on which they wouM be paying <br /> .... provided as part of the Application.. .rent). In this circumstance, the town is not rextuired <br /> .3. Applicant shall demonstrate with written documentation to allow a new tower, but couM insist tt~t the <br /> that they have analyzed the feasibility of Repeaters in carrier co-locate on the existing tower. <br /> conjunction with all Facility Sites listed in. compliance <br /> with VJI,B,I&2 (above) to provide Adequate Coverage C. Required Documentation: <br /> and/or Adequate Capacity to the Town of Great 1. Copies of all submittals and showings perteini~ to: FCC. <br /> .Barriagton. Radial Plots of all Repeaters considered for licensing; Environmental Impact ,Statemei~ <br /> use ia conjunction with these Facility Sites shall be of Construction or Alteration; Aeronautical Studies; and, <br /> provided as part of the Application. all data, asaunptions and calodations relating.to service <br /> 4. .Notwithstandin$ anything else in this §t71-126.B coverage and power levels regardless of whether <br /> (entitled "Adequate Coverage, Adequate Capacity, and categorical exemption from Routine Environmental <br /> Justification of Need"), Applicant may request that the Evaluation uader the FCC roles is claimed. <br /> requirement to provide written documentation as to any <br /> existing Facility Site (as specified in §171-126.B. 1 and It is very important to obtaitt all the data <br /> §171-126.B.2) be waived or modified as to any such : you need from the carricrl The following <br /> existing Facility Site outside the Town of Great sections spell this out in detail. <br /> Batriagton .which is located more than four miles from <br /> any boundary of the Town of Great Barrington. Such a 2. Copies of all information submitted in compliance with <br /> request shall be submitted by the Applicant..in writing and requirements of Massachusetts Depamn0nt of Public <br /> shall be supported by a statement of reasons and Health, 1'05 CMR 122 Fixed Facilities .Which Generate <br /> supporting material.. The SPGA may waive or modify ELF, CTROMAONETIC: FIELDS IN THE FREQUENCY RANOE OF <br /> said requirement only if it finds that consideration of the 300 KHz TO 100 GHz AND MICROWAVE OVENS, or any <br /> docmnentation regarding any such existing Facility Site revisions thereof as the Department of Public Health may, <br /> as to Which the Applicant seeks a waiver is not necessary by written notice, create. <br /> because the intended technology is clearly not technically <br /> feasible for use at said site. The SPGA's finding as to the This is a ~tts regulation, but there may <br /> waiver request shall be based on ali the evidence, which- ' be something sitnilar inyour state. Chec~ with your <br /> may include but is not !!re_ired to: then-cun'ent industry State's Health Department to see. <br /> standard~..goV°mment regulatory .sl~andard~ or material~, <br /> <br />· ,,"~xnd input from the SPGA's Independent Consultant. ~ 3. The exact legal name,, address or principal p~ · of <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.