Laserfiche WebLink
21~ CELL TOWERS CELL TOWE1LS 220 <br /> <br /> XI § 171- 130. Monit ring andEvaluation fCompliance: of non-compliance. Failure to accomplish this reduction of <br /> A. Pre-testing: After the granting of a Special Permit and before emission within 15 business days of initial notification of non- <br /> Applicant's Personal Wireless Service ~Facilities begin compliaacx shall be a violation of tho Stm:ial Permit and <br /> transmission, the applicant shall pay for an Independent subject to penalties and fines as specified in Article Xll, §171- <br /> Consultant, hired by the Town, to Monitor the background' 65 of tho Bylaw. Such fines shall be payable by tho owner(O of <br /> levels of EMF radiation, around the proposed 'Facility Site ,, the Facilities with Antennas on the Facility Site, until <br /> and/or any Repeater locations to be utilized for Applicant's compliance is achieved.. <br /> Personal Wireless Service Facilities. The Independent D. Structural. Inspection: Tower Owner(s) shall pay for an <br /> · Consultant shall use the Monitoring Protocol. A report of the Ia. dependent Consultant (a licensed profe~onal structural <br /> Monitoring results shall be prepared by the Independent engineer), hired by the Town, to conduct inspections of the <br /> · Consultant and submitted to the Board' of Selectmen, the Tower's structural integrity and safety. Guyed towers shall be <br /> Planning Board, the Board of Health, the Town Engineer, the inspected every three years. Monopoles and non-guyed latti~ <br /> · Building Inspector and the Town Clerk. towers shall bo inspected every five years. A report of the <br /> B. Poet-testing: ARea'transmission begins, the owner(s)of any inspection results shall, be prepared by the Independent <br /> Personal Wire, less Service Facility(s) located on any Facility ConSUltant and submitted to the Board of 8zl~n, the <br /> Site sha/I pay for aa Independent ~ Consultant, hired by the Planning Board, tho Board of Health, the TOwn Engineer, the <br /> Town, to conduct testing and Monitoring of EMF radiation Building InSl~gor, and th~ Town Clerk. Any Major <br /> emitted from said Site, and to report results of said Monitoring Modification of Existing Facility which inolude~ chang~ to <br /> as follows: Tower dimensions' or antenna numbers or ~ shall require <br /> 1. There shall be routine annual Monitoring of emissions by n~w'stmctural inspectiom <br /> the Independent Consultant' using actual tield E. Unsafe Structure: Should the inspection of any Tower reveal <br /> measurement of radiation, utilizing the Monitoring any stmcmrsl defect(s) which, in the opinion of tho <br /> Protocol; This Monitoring shall measure levels of ElVlF Independent Consultant render(s) that Tower unsafe,, the <br /> radiation from the Facility Site's primary Antennas as following actions' must be taken. Within 10 business days of <br /> well as from Repeatea~ (if any). A report of the notification of unsafe structure, the owner(s) oftho Tower shall <br /> Monitoring results shall bo prepared by the Independent submit a plan to re, mediate the structural defoe(s). This plan <br /> Consultant and submitted to the Board of Selectmen, shall bo initiated wit~_hin 10 days of tho submission of the <br /> tho Planning Board, the Board of Health, the Town remodiation plan, and completed as soon as reasonably <br /> Engineer, the Building Inspector, and the Town Clerk~ possible. Failure to accomplish this remediation of structural <br /> 2. Any Major Modification of Existing Facility, or tho defect(s) within 10 business days ofinit~ notification shall be <br /> activation of any additional permitted~Channels, shall a violation of tho Special Permit and subject to penalties and <br /> require new Monitoring. fines as specified in Article XH, §171-65 of the Bylaw. Such <br /> C. F.,xee~ive Emis~iens: Should the Monitoring cfa Facility Site fines shall be payable by the owner(s) of 'the Tower, until <br /> reveal that the Site exceeds thc FCC 96-326 standard, then the complianc~ is achieved. <br /> owner(s) of all Facilitie~ utilizing that Site shall be so notified. <br /> Tho owner(s)shall, submit to the SPGA and tho Building Xll .~§ 171- 1~;1. Removal Requirements: <br /> lnspe~or a plan for the reduction of emissions t°a level that Any Personal Wireless Service Facility which ceases to operate for <br /> · complies with the FCC 96-326 standard within 10. business a period of eno ye, ar shall be removed. Ce, as~ to citrate i~ defined <br />· .days of notification of noncompliance. That plan shall miu~' as not porfo _rro__i_ng the normal functions associated with tho <br /> <br /> · ~,-~missions to the standard within 15 days of initial notification .9 Personal Wiroless Service Facility and its cquipme~-~On a <br /> <br /> <br />