Laserfiche WebLink
(b)Where the base zone is C-1, C-2, C-3, or GO, the /TD standards in EC <br />9.4530 shall apply, except that the minimum floor area ratio (FAR) shall <br />be 1.0 FAR (1.0 square feet of floor area to 1 square foot of the <br />development site). <br />(c)Where the base zone is E-1, E-2, I-2, or I-3, the /TD standards in EC <br />9.4530shall apply, except that the minimum floor area ratio (FAR) shall <br />be .40 FAR (.40 square feet of floor area to 1 square foot of the <br />development site). <br />Section 38. <br />Subsection (1) of Section 9.4640of the Eugene Code, 1971, isamended to <br />provide as follows: <br />9.4640Annexation and/or Annexation Agreements. <br />(1) <br />Annexation of the entire development site, or execution of a consent to <br />annexation agreement is required prior to any of the following actions: <br />(a)Any zone change or planned unit development approval if the <br />development potential of the existing lot(s) would increase, or the <br />proposed or allowable uses will generate, singly or in the aggregate, a <br />direct additional need for key urban facilities and services. <br />(b)Approval of any new dwelling unit(s), commercial or employment and <br />industrial development. <br />(c)Approval of an expansion of an existing commercial or employment and <br />industrial development if the proposed use will generate, singly or in the <br />aggregate, a direct additional need for key urban facilities and services <br />provided by the city. <br />Section 39. <br />Subsections(3)(a), (4)(a)1., (5)(a)1., (6)(c)2., (7)(b), (7)(d), and (7)(e)of <br />Section 9.5750of the Eugene Code,1971, areamended to provide as follows: <br />9.5750Telecommunication Devices-Siting Requirements and Procedures. <br />(3)Collocation of Additional Antennas on Existing Transmission Tower. <br />(a)Permitted Use. Collocation of an additional antenna on an existing <br />transmission tower shall be considered an outright permitted use if <br />property is zoned GO, PL, S, C-2, C-3, E-1, E-2,I-2, or I-3 or if the <br />transmission tower is in any other zone and the city specifically <br />approved, as part of a prior land use process authorizing the <br />transmission tower, collocation of additional antennas. <br />(4)Collocation of Antennas on Existing Buildings, Light or Utility Poles, and <br />Water Towers. <br /> In addition to collocation on a transmission tower, an <br />antenna may be collocated on existing buildings, light or utility poles, and <br />water towers. <br />(a)Permitted Use. Such collocation on a building, light or utility pole, or <br />water tower, shall be considered an outright permitted use provided that <br />the antennas and ancillary facilities comply with the standards contained <br />in EC 9.5750 Telecommunications Devices-Siting Requirements and <br />Procedures, the color of the antennas blends in with the existing <br />structure and surroundings, and one of the following is met: <br />Ordinance -Page 31of 48 <br />