Laserfiche WebLink
Eugene City Hall R32.19.04 Rev. B. September 9, 2003 <br /> <br /> o Main Level. This is where the four Office Wings and the City Council chambers <br /> are located. The Main Level is located atop the parking level. Figure 2-2 shows <br /> the existing layout, along with locations for proposed seismic mitigation. <br /> <br /> o Basement Level. There is a partial basement located in the northwest comer of the <br /> building, under the parking level. The basement houses mechanical equipment <br /> and some police files. <br /> <br /> .L~.~[.N~ PROPOSED NEW <br /> _P.A_R._KE~'~ LEVEL PLAN ~,=,,==CONCR[TE SHEAR <br /> ~e 1" = 50' OR. STOL B~CED <br /> <br /> Figure 2-1. Parking Level Plan, Showing <br /> Existing Layout and Proposed New Walls <br /> <br /> G&E Engineering Systems Inc. Page 4 <br /> <br /> <br />