My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/22/06 Meeting
>
Item 2C: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:34:09 PM
Creation date
5/18/2006 8:48:28 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Metropolitan Wastewater Management Commission <br /> <br />Capital Improvements Program <br /> <br />REGIONAL WASTEWATER PROGRAM <br />CAPITAL PROGRAMS <br /> <br />The FY 06-07 CIP budget is included in the administration (Springfield) portion of the R WP <br />budget. The five-year CIP begins on page 52. Until recently, CIP projects have come primarily <br />from the 1997 Master Plan, the 1997 Biosolids Management Plan, and the 2001 WWFMP. In <br />Early 2004, MWMC, the three Governing Bodies and the Oregon Department of Environmental <br />Quality approved the 2004 Facilities Plan and twenty-year project list, which address anticipated <br />increased regulatory requirements and wet weather flow and user capacity needs through 2025. All <br />of the projects from previous plans and studies have been incorporated into the 2004 Facilities <br />Plan, which now provides a complete basis for the one and five-year CIPs reflected below. <br /> <br />The FY 06-07 CIP budget is composed of projects carried over from previous years and projects <br />planned in the 2004 Facilities Plan for design and/or construction in FY 06-07. CIP project <br />summaries are provided below and on the following pages. The FY 06-07 CIP is funded using a <br />combination of Capital Reserves and SDCs. <br /> <br />Other capital programs, including Equipment Replacement, Major Capital Outlay, and Major <br />Rehabilitation are included in the operations (Eugene) portion of the RWP budget. The basis for <br />planning in these capital programs involves an annual evaluation by operations staff of major <br />assets, where they are in their projected life cycles, performance/maintenance records, etc. FY 06- <br />07 funding for these programs will come from the Equipment Replacement Reserve and Capital <br />Reserve. Itemized lists of, and budgets for, Equipment Replacement purchases and Major <br />Infrastructure Rehabilitation projects are included on page 37. There are no Major Capital Outlay <br />purchases scheduled for FY 06-07. <br /> <br />CAPITAL IMPROVEMENT PROJECTS <br /> <br />Carryover Proiects: <br />These projects represent a continuation of previously budgeted activities. <br /> <br />Biocycle Farm Phase 2 Improvements <br />FY 06-07 Capital Budget = $299,000 <br />Expected Cash Flow: "" FY 06-07= $299,000 <br /> <br />Phase 2 of Biocycle Farm involves soil preparation and planting of an additional 130 acres to <br />increase biosolids removal from the existing lagoons. Consistent with the MWMC Biosolids <br />Management Plan, this Biocycle Farm expansion provides MWMC with more flexibility and <br />control of the overall biosolids management program. It also will enable MWMC to meet the <br />revised DEQ-approved time-line for draining and relining the facultative sludge lagoons. <br /> <br />Soil preparation work at the site is scheduled for the summer/fall of 2006 with planting to occur <br />in spring 2007. <br /> <br />Page 27 <br /> <br />PROPOSED FY 06-07 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.