Laserfiche WebLink
<br />Metropolitan Wastewater Management Commission <br /> <br />Capital Improvements Program <br /> <br />Biocycle Farm Hose Reels <br />FY 06-07 Capital Budget = $405,000 <br />Expected Cash Flow: * FY 06-07 = $405,000 <br /> <br />Additional hose reels need to be purchased to increase liquid biosolids application to the MWMC <br />Biocycle Farm. Changes in pumping capacity resulting from pump station modifications require <br />the addition of six new hose reels rather than the four originally proposed. <br /> <br />$225,000 in EP A grant funds have been secured to pay for a portion of the project cost. Bid <br />solicitation has been scheduled for spring 2006. <br /> <br />Biosolids Management Facility (BMF) - Lagoon Lining Phase 1 & Dredge Movement System <br />Improvements <br />FY 06-07 Capital Budget = $2,800,000 <br />Expected Cash Flow: * FY 06-07 = $1.500,000 FY 07-08 = $1,300,000 <br /> <br />On-site field testing indicates that the lagoons at the BMF may be leaking. MWMC has committed <br />to reline all four lagoons over the next several years. This project will include upgrades to the <br />existing dredge movement system for safety and operational efficiency. <br /> <br />A request for proposals (RFP) for engineering services is being developed and selection of a <br />design consultant is scheduled for spring 2006. <br /> <br />River Avenue Street Improvements <br />FY 06-07 Capital Budget = $500,000 <br />Expected Cash Flow: * FY 06-07 = $250,000 FY 07-08 = $250,000 <br /> <br />The City of Eugene is planning River Avenue street improvements along the WPCF frontage. A <br />portion of the street improvement costs will be assessed to abutting property owners, including <br />MWMC. <br /> <br />Eugene has developed and approved a design concept for the street improvements. Eugene staff <br />expects construction to occur this summer and have provided a new cost estimate of $500,000 for <br />the project. We will continue to fmance the street improvements within the capital budget and are <br />proposing an increase in next year's budget to cover the additional costs. <br /> <br />Wet Weather Flow Management Plan Update <br />FY 06-07 Capital Budget = $432,000 <br />Expected Cash Flow: * FY 06-07 = $432,000 <br /> <br />The WWFMP, approved in 2001, identified local and regional wastewater improvements <br />necessary to manage wet weather flows relating to infiltration/inflow issues. Updates to the <br />WWFMP study are needed to monitor the performance of the Eugene/Springfield collection <br />system improvements and confirm the recommended solution (i.e. - collection system <br /> <br />Page 28 <br /> <br />PROPOSED FY 06-07 BUDGET AND eIP <br />