My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 2C: Ratification of MWMC Budget
COE
>
City of Eugene
>
Council Agendas 2006
>
CC Agenda - 05/22/06 Meeting
>
Item 2C: Ratification of MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:34:09 PM
Creation date
5/18/2006 8:48:28 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/22/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Metropolitan Wastewater Management Commission <br /> <br />Capital Improvements Program <br /> <br />2. Secondary Clarifier Enhancements. This project includes design and construction of <br />baffling, inlet energy dissipation, changing out of the flocculation well, construction of <br />an outboard launder, and retrofitting of the suction header for the existing eight <br />clarifiers. It also includes secondary gates. Enhancing the existing clarifiers will <br />alleviate current operational problems and increase secondary treatment capacity for <br />base and peak flows. Effluent quality and performance reliability will also be <br />improved. <br /> <br />3. 9th and 10th Secondary Clarifiers. These two new secondary clarifiers (9th and 10th) <br />will provide additional secondary treatment and peak flow management. The wet <br />weather secondary capacity is proposed to increase from approximately 100 mgd to 160 <br />mgd. <br /> <br />In addition to these projects, the Clarifier Improvements Project includes related equipment <br />replacement of clarifier rake arms, gates, and operating systems, and some major rehabilitation <br />work on the clarifier floors and existing rake mechanisms. The project also includes construction <br />ofthe contractor's courtyard, which will be used to support all projects at the plant, and the <br />construction of a tie-in to the Tertiary Filters (a portion of a future project which will be more <br />efficiently constructed with this project). Budget transfers needed to bundle these work items <br />under one project package were discussed at the Commission's October 20,2005 meeting and <br />approved by the Commission at their December 15; 2005 meeting. <br /> <br />Construction is expected to begin in spring 2006 and be completed by spring 2008. <br /> <br />Aeration Basin Phase 1 Improvements Design and Construction (formerly South Aeration <br />Basin Improvements) <br />FY 06-07 Capital Budget = $9,779,680 <br />Expected Cash Flow: * FY 06-07 = $579,680 FY 07-08 = $6,200,000 <br />FY 08-09 = $3,000,000 <br /> <br />The MWMC NPDES wastewater discharge permit, issued by the DEQ in 2002, now places a limit <br />on the allowable dry weather (May 1 st through October 31 st) discharge of ammonia. In order to <br />meet this limit, the 2004 MWMC Facilities Plan identifies projects to increase the dry weather <br />aeration basin treatment capacity to 65 mgd with respect to ammonia (i.e., with nitrification) and <br />increase the sustained (i.e., on a weekly basis) wet weather treatment capacity to 130 mgd. The <br />first phase of this project includes design and construction to add step feed processing, anoxic <br />selectors, and fine bubble diffusers, and to remove hydraulic restrictions in a portion of both the <br />south and north basins. It also includes primary effluent flow control gates for both north and <br />south basins. Staff will be coordinating funding of system improvements that relate to equipment <br />replacement. <br /> <br />During alternative selection and predesign, West Yost Consultants and staff identified a modified <br />Phase 1 project which was different from the Facilities Plan concept, but which had several <br />advantages over the original concept. Instead of modifying four cells of the South Aeration Basin, <br />the new concept entails modifying two cells in the North Aeration Basin and two cells in the South <br />Aeration Basin. This concept allows for greater flexibility with respect to operations and also in <br />timing future enhancements to the remaining basins. Design work is ongoing and expected to be <br /> <br />Page 31 <br /> <br />PROPOSED FY 06-07 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.