<br />Metropolitan Wastewater Management Commission <br /> <br />Capital Improvements Program <br /> <br />Digester Mixing Improvements (Design and Construction) <br />FY 06-07 Capital Budget = $2,472,596 <br />Expected Cash Flow: * FY 06-07 = $1,272,596 FY 07-08 = $1,200,000 <br /> <br />The MWMC Facility Plan identifies the need to provide additional solids stabilization volume. <br />This project includes design and construction of digester mixing improvements that will increase <br />the active volume of the existing three digesters, thus allowing for additional solids stabilization <br />volume. This will be accomplished by replacing the existing gas mixing system with a pump <br />mixing system. This project will also defer the need to construct an additional digester. <br /> <br />The current schedule calls for soliciting bids in February 2006, starting construction in May 2006, <br />and completing construction by January 2008. <br /> <br />Waste Activated Sludge Thickening (Gravity Belt Thickener Building/Equipment <br />Expansion) <br />FY 06-07 Capital Budget = $2,637,000 <br />Expected Cash Flow: * FY 06-07 = $137,000 FY 07-08 = $2,500,000 <br /> <br />The MWMC Facilities Plan includes a third gravity belt thickener by expanding the existing <br />building. This is intended to provide additional capacity for waste activated sludge thickening and <br />is anticipated to help delay construction of an additional digester. <br /> <br />This project is being reviewed to determine the proper schedule for design and construction. <br />Design work and bidding of the project should occur in FY 06-07. Ultimately, the timing for this <br />project will be determined based on performance testing of the upgraded clarifiers. <br /> <br />Clarifier Improvements <br />FY 06-07 Capital Budget = $14,350,000 <br />Expected Cash Flow: * FY 06-07 = $6,950,000 FY 07-08 = $7,250,000 <br />FY 08-09 = $150,000 <br /> <br />The Clarifier Improvements Project combines three separate clarifier projects identified in the <br />MWMC Facilities Plan. These projects were combined because they have similar design and <br />construction specifications and also because their timelines are in close proximity of each other. <br />The bundled projects are: <br /> <br />1. Primary Clarifier Enhancements. The Primary Clarifier Enhancements project <br />includes design and construction of baffling in the primary clarifiers and removal of <br />hydraulic restrictions. Enhancing the existing clarifiers will increase primary treatment <br />capacity, increase capacity to treat base and peak flows, and improve effluent quality _ <br />and reliability so that a blended primary and secondary effluent can meet the currentBNPDES total suspended solids limits. <br /> <br />Page 30 <br /> <br />PROPOSED FY 06-07 BUDGET AND eIP <br />