Laserfiche WebLink
20~ CELL TOWERS CELL TOWEP, S 210 <br /> proposed height of tower above average grade beginning at True North-and continuing clock- <br /> at Tower Base. Show all .proposed antennas, wise at forty-five degree intervals. <br /> including their location on the Tower. ii. A plan map of a circle of two (2) miles ntdius <br /> iii. Details of proposed Tower foundation, of the Facility Site on which, any visibility of <br /> including cross sections and details. Show all the proposed Tower from a public way shall <br /> ground attachments, specifications for anchor be indicated. <br /> bolts and other anchoring hardware, iii. Applicant shall utilize - the U.S.G.S. <br /> iv. Detail proposed'exterior finish of the Tower. Quadrangle map, at a scale of 1:25,000, and <br /> v. Indicate relative height of the Tower to the submit profile drawings on a horizontal scale <br /> tops. of surrounding trees as they presently of 1"= 400', with a vertical scale of 1"= 40'. <br /> exist, and the height to which they are Trees shall be shown at existing heights and at <br /> expected to grow in ten years, projected heights in ten years. <br /> vi. Hlustration of the modular structure of the h. Balloon Test: <br /> proposed Tower indicating the heights of Within 35 days of submitting an Application, <br /> sections which could be removed or added in Applicant shall arrange to .fly, or raise upon a <br /> the future to adapt to changing'corn- temporary mast, a three-foot diameter .brightly <br /> munications conditions or demands. . colored balloon at the maximum height and at the <br /> vii. ~A StmcmralProfessionalEngineer's written ~ location Of the proposed Tower. The dates, <br /> description of the proposed Tower structure (including a second date, in case of poor visibility <br /> . and its capacity to support additional on the initial date), times, and location of this <br /> Antennas or other communications facilities at balloon test Shall be advertised, by the Applicant, at <br /> different heights and the ability of the Tower 7 and 14 'days in advance of the first test dm in a <br /> to be shortened if future communications newspaper with a general circulation in the Town of <br /> facilities no longer require the original height. Great Barrington. The Applicant shall inform the <br /> viii. A description of Available Space on the SPGA and the Planning Board, in writing, of the <br /> tower, providing iHust,-afions and examples of dates and times of the test, at least 14 days in <br /> the type and number of Personal Wireless advance. The balloon shall be flown for at least four <br /> Service Facilities which could be mounted on consecutive hours sometime between 9:00 am and <br /> the structure. 5:00 pm of the dates chosen. <br /> f. Imposed Commnnications Equipment Shelter:. <br /> L Floor Plans, elevations and cross sections at a Ba//ool~ Tests are a~t effective way to visualize the <br /> scale of no smaller that 1/4" -- 1' (1:48) of any Tower's/~eig/~t catd impact. But the test must beru~ <br /> proposed appurtenant structure. ~,he~ people are aware of/t a~td whe~ l/~e bal/oo~zs <br /> ii. Representative elevation views, indicating the cca~ be seelt/ ' <br /> .root~, facades~ doors and other exterior <br /> ap .pearanceand materials. E. For new Personal Wireless Service Facility, or Major <br /> ~ g. Sight Lines: Modification of An Existing Facility, a Pets nai Wireless .' <br /> ~ i. A'minimum of eight' (g) view lines in a zero (0) to Service l~'neility Special Permit is required. <br /> o, tWO (2) mile radius from the site, shown 1.The following Plans.and maps:. - <br /> ,-4 ~-' a. Location Map: Copy of a portion of tb.~. most ' <br /> <br /> <br />