Laserfiche WebLink
. .211 CELL TOWF. RS CI/LL TOWf/RS 212 <br /> <br /> recent U.S.G.S .Quadrangle map, at a scale of and Longimde. <br /> 1:25,000, and .showing the area within at least two m. Mounting locations on Tower or sUucture, <br /> miles from the proposed Facility Site. Indicate the including height above ground. <br /> location of the proposed Personal Wireless Service iv. Antenna type(s), manu~s), model <br /> FacilitY, .or of.the Facility undergoing Major number(s). <br /> Modification, and the exact Latitude and Longitude v. For each Antenna, the Antenna gain and <br /> (degrees, minutes and seconds).' Antenna radiation pattern. <br /> b. Proposed Facility Plan: A recent sUrVey, of thc vi. Number of channels per Antenna, projected <br /> Facility Site at a scale, no smaller than 1" = 40' and maximum. <br /> (1:480 or metric equivalent 1:500) showing: vii. Power input to the Antenna(s). <br /> i. Horizontal and radial, distances of Antenna(s) to viii.Power output, in normal us~ and at maximum <br /> nearest point on property line. output for each Antenna and all Antennas aa <br /> ii. Horizontal and radial distances of Antenna(s) an <br /> to nearest dwelling unit. ix. Output frequency of the Transmitter(s). <br /> iii: Proposed utilities, including 'distance from <br /> .source of power, sizes of service available and This information is critical as it gives your <br /> required,, locations of any propo~xl utility or independent consultant the information needed to <br /> communication lines, and whether assess the coverage and to generate a 2?adial Plot <br /> underground or above ground, to determine whether the information being <br /> iv. Any changes to be made to the existing provided by the' carrier is accurate and complete. <br /> Facility's landscaping, screening, fencing, Do not be tempted to jettison the engineering detail <br /> lighting, drainage, wetlands, grading, just because it is technical,..or becau~ you do not <br /> driveways or roadways, parkin___g, or other understtmd the meaning of the terms. It is not <br /> infrastructure aa a result of.this proposed necessary for lay?ople to understandsuchdetail. If <br /> MOdification of the Facility. this detail is not required in the applicatior~ the <br /> -c. .Proposed Communications Equipment Shelter: indosay does not have to provide it Your engine, er <br /> i. Floor Plans, elevations and cross' sections at a will then.be working with incomplete information. <br /> scale of no smaller that 1/4" = I' (1:48) of any ' <br /> proposed appurtenant structure. · VIII § 171 - 127. General Requirements: <br /> ii. Representative elevation view~, indicating the A. New Towers shall be set back at least one (1) time th~ height of <br /> root~ facades, doors and other exterior the Tower, plus 50', from all boundaries of tho'Site on which <br /> appearance and materials, the Tower is located. <br /> d. Propo,~d Equipment Plan: B. <br /> i. Plans, elevations, sections and details at' buffer strip of undisturbed tree~ shall bo retained for at'leant 50 <br /> appropriate scales but no smaller than 1" = feet in width around the entire perimeter ~a:apt whom the <br /> 10'. · acc,~s drive is located. Applicant ~ obtain a financial an~ty <br /> · ii. Number of Antennas and Repeaters, as well as to cover the cost of the renmiiation of any damage to 'tho <br />· the exact locations, of Antenna(s) and of all lan&capowhichoccun du6agthc cl~uiagofth~ Sit~. <br />,. Repeaters (if any) located on a map aa well aa C. Fencing and $igm: The area around tho To3~r and <br /> , ~ by degrees, minutes, and seconds of Latitude .... ~ Com___m_unication Equipment Shelter(s) shnll bo c ~letely <br /> <br /> <br />