Laserfiche WebLink
~ Eugene Code <br /> (b) Site Review. A telecommunication facility which, pursuant to ~"~ <br /> subsections (3)through (5) of this section, is subject to sit® review*shall <br /> be processed in accordance with the site review procedures .of this land <br /> use code. The criteria contained in this section, as well as the criteria <br /> contained in EC 9.8440 Site Review Approval Cdteria - General, shall <br /> = govern aPproval or denial of the site review application. In the event of <br /> a conflict in criteria, the criteria contained in this section shall.govern. <br /> No development, permit shall be issued' prior to completion of the site <br /> review process, including any lOcal appeal. <br /> (c) Conditional Use Permit. A telecdmmunication facilitY which, pursuant to <br /> subsections (4) or (5) of this section, requires a conditional use permit <br /> shall be. processed in accordance with the conditional use permit <br /> procedures of this land use code, except that the variance provisions <br /> shall not apply. The criteria contained in EC 9.8090 Conditional Use <br /> Permit Approval Criteria - General and Subsections (6) and (7) of this <br /> section shall govern approval or denial of the Conditional use permit <br /> -application. In the event of a conflict in criteria, the criteria contained in <br /> subsections (6) and (7) of this sectiOn shall govem. No development <br /> permit shall be issued prior to completion of the conditional use permit <br /> process, including any local appeal. <br />(3) '. Collocation of Additional Antennas on Existing Transmission Tow. er. <br /> (a) Permitted Use. Collocation of an additional antenna on an existing <br /> transmission tower shall be considered an outright permitted use if <br /> property.is zoned GO, PL, S, C-2, C-3, C-4, 1,1,. I-2,' or I-3 or if the · ~,.. <br /> transmission tower is in any other Zone and the city specifically <br /> approved, as part of a prior land use process authorizing the <br /> transmission tower, collocation of additional antennas. <br /> (b) Site Review. Collocation of an additional antenna on an existing <br /> transmission tower shall be subject to site review approval if property is <br /> zoned AG, R-l, C-1 or PRO and approval for collocation was not <br /> granted through a prior land 'use process. <br />(4) Collocation of Antennas on Existing Buildings, Light or Utility Poles, and <br /> Water Towers. In addition to collocation on a transmission tower, an <br /> antenna may be collocated on existing buildings, light or utility poles, and <br /> water towers. <br /> (a) Permitted Use. Such collocation on a building, light or utility pole, or <br /> water tower, shall be considered an outdght permitted use provided that <br /> the antennas and ancillary facilities COmPly with the standards contained <br /> in EC 9.5750 Telecommunications Devices-Siting Requirements and <br /> Procedures, the color of the antennas blends 'in with the existing <br /> structure and surroUndings, and one of the following is met: <br /> 1. The property'is zoned PL, C-2, C-3, C-4, R-4, I-1, I-2, or I-3 and <br /> the antennas do not exceed the height limitation of the zone'; or <br /> The property is zoned AG, R-l, R-2, R-3, C-1, GO, S, H, or PRO, <br /> and the antennas extend no more than 18 feetabove, and project <br /> no more than 2 feet horizontally away from the existing structure. <br /> (b) Site Review. Such collocation on a building, light or utility pole, or water <br /> tower shall be subject to site review approval provided that the antennas <br /> and ancillary facilities comply with the standards contained in EC 9.5750 <br /> Telecommunications Devices-Sitin,q Requirements and Procedures, the <br /> <br /> 9-232 01/02/2004 <br /> <br /> IV-lO <br /> <br /> <br />