Laserfiche WebLink
Eugene·Code .. " <br /> <br /> · ' i.i color of the antennas blend in with the· existing structure and <br /> surroundings, and: <br /> 1. The property is zOned AGi R-l, R-2, R-3, C-1, GO, S, H, *or PRO, <br /> - and the antennas extend.more than 18 feet above, or project more <br /> than 2 feet horizontally away from the existing structure. · <br /> (c) .Conditional use Permit In all cases other than those listed in <br /> ~ . subparagraphs (a) and (b), such collocation shall require a conditional <br /> <br /> · · use permit. No exCeptions to the Standards contained in EC 9.5750 <br /> Telecommunications Devicesi-Sitin.q Requirements and prOcedures shall <br /> be permitted ·except as authorized by subsection (9) of this section. In. <br /> no event shall· a conditional use permit authorize a tower or antennas to <br /> exceed the height limitation fOr a zone as established by Chapter 9 <br /> except as provided for in this section. <br /> (5) Construction of Transmission TOwer. Construction of a transmission <br /> tower, or a modification of an existing transmission tower to increase its <br /> height, shall be allowed as follows: <br /> (a) Permitted Use. <br /> · .-- 1. Such construction or modification shall ~be considered an outright <br /> permitted use in the C-4, 1,1, I-2 and I-3 zone.~ <br /> 2. Modification to inc[ease the height of an existing transmission <br /> tower shall be considered an outright permitted use in all other <br /> · .zones if the city approved an increase in tower height, as part of a <br /> prior land use process authorizing the transmission tower. The <br />~'"~ increase in height allowed under this paragraph shall be 'limited to <br /> ~ i! - the specific height authorized in the prior land use process. <br /> (b) Site Review. Such construction shall'require site review approval, in the <br /> PL, C-2, and C-3 zones. ' <br /> (c) Conditional USe Permit Such construction shall require a conditional <br /> GO zones. <br /> No new transmission tower shall be <br /> permitted in any zones in subparagraphs (a) to (c) above, <br /> .including the AG, R-2, R~3, R-4, .H, NR, and PRO zones; or in the <br /> Willamette Greenway, on.Gillespie Butte above the elevation of 450 <br /> feet, on the ridgeline'as defined in the South Hills Study or on Judkins <br /> Point. ' <br /> · (6) Application Requirements. <br /> (a) ..Collocation of Antennas. In addition to standard required application <br /> material, an applicant for cOllocation of antennas shall submit the <br /> following information; additional application material is 'required, as <br /> specified in paragraph (c)below, for applications r6quiring a site review <br /> or conditional use process. <br /> 1. A description of the proposed antennas Io.cation,.design and <br /> height. <br /> 2. Documentation demonstrating compliance with non-ionizing <br /> electromagnetic, radiation (NIER) emissions standards as set forth <br /> by the. Federal Communications Commission (FCC) particularly <br /> with respect to any habitable areas within the structure on which <br /> the antennas are co-locating.on or in structures directly across <br /> ! frOm or adjacent to the antennas <br /> - . 3. A statement documenting that placement of the antenna is <br /> <br /> · . 9-233 01/02/2004 <br /> <br /> I¥~11 <br /> <br /> <br />