Laserfiche WebLink
any lOcal appeal; ::' ' ' . · <br /> <br /> · (3) 'Coll6cation of Aflditlonal Antennas- · · · ' : . · - <br /> .. on Ex~stiag Tnmsm~si0n'Tower. <br /> (a) P..~llill~l_u~. Collocation of an additional, antenna on an.~xisting <br /> transmission tower shall be considered an outright permitted use if <br /> property is zoned GO, PL, S, C,2, C-3, C-4, I-L I-2, or I-3 or if the <br /> .transmission tower is in any other zone and the city specifically approved, <br /> as part ora prior land use process authorizing the transmission tower, <br />· collocation of additional antennas. · <br /> (b) Site Review. Collocation of an additiohal antenna on an existing <br /> transmission tower shall be Subject to site revie, w approval if property is <br /> · zoned AG, R,1, C-1 or PRO and. ap. proval for collocation was not granted <br /> through a Prior land'use process, <br /> ' :'(4) Collocation of Antennas on Existing Buildings, Light or Utility Poles, and <br /> Wster Towers.' In addition to collocation on a tr0nsmission tower, an antenna <br /> maybe collocated on existing buildings, light or utility poles, and :Water towers. <br /> (a) Permitted Use. Suc~h COllocatiOn on a building, light or utility pole, or <br /> water tower, shall be Considered an outright permitted use provided that <br /> the antennas and ancillary facilities.comply, with the standards contained. <br /> - in EC 9.5750 Telecommunications Devices. Sftln~ Requirements and <br /> .... procedUres, the coler of the antennas blends in with the existing structure <br /> and surroundings, and one of the following, is met: <br /> · 1. The property is zoned PL, C-2, C-3; C-4, R-4, I-l, I~2, or I-3 and <br /> --. the antennas do not exceed, the height limitation of the zone; or <br /> 2. The property is zoned AG, R,1, R-2, R-3, C-l, GO, S, H, or PRO, <br /> and the antennas extend no more .than 18 feet above, and'project no <br /> · more than 2 feet horizontally away from the existing structure. <br /> (b) .Site Review. Such collocation on a building, light or utility pole, or water <br /> tower shall be subjectto site review approval provided ti~t the antennas <br /> 'and ancillary facilities comply with the standards contained in EC 9.5750' <br /> Telecommunications Devices-Sifin~_ Requireme~1s and ProcedUres, the <br /> color of the antennas blend in with the existing structure and surroundings, <br /> and: <br /> 1. .The property is zoned AG,-R-1, R-2, R-3, C-l, GO, S, H, or PRO, <br /> and the' antennas extend more than 18 feet above, or project more <br /> than 2 feet horizontally away from the existing structure. <br /> (¢) · Conditional Use Permit In all cases other than those listed in <br /> subparagraphs(a) and (b), such collocation shall require a conditional use <br /> <br /> · permit. No exceptions to the standards contained in EC ~.5750 <br /> Tele~mmunications Devices-Sifin? Requirements and Pr0ce~es Shall <br /> 'be permitted except as authorized by subsection (9) of this section. In no <br /> event shall a conditional use permit authorize a t0wer or antennas to <br /> exceed the height limitation for a zone as established by Chapter 9. except <br /> as provided for in this section. <br /> · (5) '. Construction of Transmission To~,er. Construction of a transmission tower, or <br /> a modification of an existing transmission tower to increase, its height, shall be <br /> <br /> Eugene City Council Agenda page28 IV-3 7 <br /> <br /> <br />