My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 6 - PH/Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-12/06/04Mtg
>
Item 6 - PH/Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:55 PM
Creation date
12/1/2004 2:43:15 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: ..... .~ . allowed a~ follows: ' <br /> ) .(a) g. fxmiimi_u . '. ... <br /> 1. Such construction or modification shall be considered an outfight <br /> ... permitted use in the C4, I-.1, I-2 and !-3 zone. <br /> 2.. Modification to. increase the height of an eyasting' ' transnnss~on' ' <br /> tower shall be considered an outright permitted use in all other <br /> · ZOnes if the city approved an increase in tower height, as part of a <br /> prior land use process authorizing the transmission tower. The <br /> increase in height allowed under this paragraph shall be. limited to <br /> · the specific height authorized in the prior land use process. <br /> (b) ~. Such construction shall require site review approval in the <br /> '~ PL; C-2, and C-3 zones. <br /> (¢) Conditional Use Permit.. Such construction shall require a conditional use <br /> permit in the R-l, C-l, S and GO zofies. <br /> (d) Prohibited Zones and Locations. No new'trans~ssion tower shall be <br /> permitted in any zones not included in subparagraphs (a) to (c) above, <br /> ~ including the AG,.R-2, R-3, R-4, H, NR, and PRO zones; or in the. <br /> - Willamette Oreenway, on Oillespie Butte above the elevation of 450 feet, <br /> on the ridgeline as defined in the South Hills Study or on Sudkins Point. <br /> (6) .Application Requirements. <br /> · (a) Collocation of Antenn~. In addition.to standard required application <br /> material, an applicant for collocation of antennas shall submit the · <br />~'ii~ '"'\ following information; additional application material is required, as <br />::' .specified in paragraph (c) below, for applications'requiring a site review or <br /> conditional use process. ~ <br /> <br /> .. ...... 1. A description of the proposed antennas location, design and' height. <br /> 2. Documentation demonstrating'compliance with non-i0ni~ing <br /> . .electromagnetic radiation (NiER) emissions standards as ~et forth - <br /> by the Federal Communications Commission (FCC) particularly <br /> with respect to any habitable areas within the structure on'which <br /> the antennas are co-locating on or in structures directly across <br /> · from or adjacent to the antennas. <br /> · 3. A statement documenting that placement of the antenna is designed <br /> to allow future collocation of additional antennas if technologically <br /> possible. <br /> 4. Documentation that the ancillary facilities will not produce sound <br /> lev. els in excess of those standards specified in subsection (7)(0 of <br /> this section, or designs showing how the sound is to be effectively <br /> muffled and reduced pursuant to those standards. <br /> 5. P1ans showing the connection to utilities/right-of-way cuts <br /> required, ownership of utilities and easements required. <br /> 6. DoCUments demonstrating that necessary easements have been <br /> obtained. <br /> 7. Plans showing how vehicle access will be provided.. <br /> . ! 8. Signature of the property owner(s) on the application form or. a <br /> <br /> Eugene City Council Agenda page29 IV-38 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.