My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 6 - PH/Cell Towers
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-12/06/04Mtg
>
Item 6 - PH/Cell Towers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:55 PM
Creation date
12/1/2004 2:43:15 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
12/6/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
...... '.obtained; <br />· "' "~ 9~ Plans showing how vehieJe access, will be provided; ' <br />' i ) 10~ Signature of the property Owner(s) on the application form or a <br /> " statement from the property owner(s) granting authorization to <br /> . proceed with~development permit and land use processes; <br /> 11. Documents demonstrating that the FAA has reviewed and <br /> approved the proposal, and Oregon Aeronautics Division has <br /> reviewed the proposal. Alternatively, when a site review or <br /> conditional use process is required, submit a statement <br /> documenting that notice of the proposal has been submitted to the <br /> FAA and Oregon Aeronautics DiVision. The site review or <br /> conditional use proCess may proceed and approval may be granted <br /> for. the proposal as submitted, subject to FAA approval. If FAA <br /> approval requires, any changes to the proposal as initially approved, <br /> then that initial approval shall be void. 'A new application will <br /> need to be submitted, reviewed and approved through an additional <br /> site review or conditional use process. No development permit <br /> application shall be submitted without documents demonstrating <br /> FAA review and approval and Oregon Aeronautics Division <br /> review. <br /> <br /> .... (c) ,Site Review and Conditional USe permit Applicotionc. In addition to the <br />.... application requirements specified in paragraph (b) above, applications for <br />.... '~ site review orconditional use permits also shall include the following <br />'~? information: <br /> 1. A visual study containing, at a minimum, a graphic simulation <br /> showing theappearance of the proposed tower, antennas, and <br /> ancillary facilities from at least $ points within a 3 mile radius. <br /> Such points 'shall be chosen by the provider with review and <br /> approval by the planning director to ensure that various potential <br /> .views are represented. <br /> 2. Documentation that alternative sites within a radius of at least 2000 <br /> feet have been considered and have been determined to be <br /> technologically unfeasible or unavailable. For site reviews, <br /> alternative sites zoned C-4, I-l, I-2, and I-3 must be.considered. <br /> 'For conditional use permits alternative sites zoned PL, C-2 and C- <br /> 3, C-4, I-l, I-2, and I-3 must be considered. <br /> ,3. Evidence demonstrating collocation is impractical, on existing tall <br /> buildings, light or utility poles, water towers, existing transmission <br /> towers, and existing tower facility sites for reasons of structural <br /> support capabilities, safety, available spaCe, or falling to meet <br /> service coverage area needs. . <br /> 4. A current overall system plan for the city, showing facilities <br /> presently constructed or approved and future expansion plans. <br /> ~ 5. A statement providing the reasons for the location, design and <br /> ~ . height of the proposed tower or antennas. <br /> <br /> Eugene City Council Agenda page31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.