Laserfiche WebLink
statement 1}om th~ property owner(s) granting authorization tO <br /> proceed with. develOpment permit and land use .processes. <br />· :" .9. If ancillary facilities will be located on the ground, a landscape <br /> plan drawn to scale showing proposed and existing landscaping, <br /> including type, spacing, size and irrigation methods. <br /> 10. Documents demOnstratingthat the FAA has reviewed and <br /> approved the proposal, and the Oregon Aeronautics Division has <br /> reviewed the Proposal. Alternatively, when a site'review or <br /> .- conditional use process is required, submit a statement <br /> documenting that notice of file proposal has been submitted to the <br /> FAA and oregon Aeronautics Division.' The site review or <br /> conditional use process'may proceed and approval may be.granted <br /> · :.:' ' for the proposal as submitted,'subject to FAA approval. If FAA <br /> approval.requires any changes to the proposal as initiallY apProved, <br /> then that initial approval shall be void. A new application will <br /> need to be submitted, reviewed and approved through an additional <br /> · site review or conditional use process: lqo development permit ~ . <br /> application' shall be submitted without documents demonstrating <br /> FAA review and approval and Oregon AeronautiCs Division <br /> review. <br /> Co) .Construction. of Transmission Tower. In addition to' standard required <br /> application material, an applicant for a transmission tower shall submit the <br /> following information;-additional'application'material is required, as <br /> · spec'tried in paragraph (c) below, for applications requiring a site review or <br /> - conditional use process: <br /> 1." A description of the p.roP6sed tower location, designand height. - <br /> .2. The general capacity of the tower in terms of the number and type <br /> of antennas it is designed to' accommodate. <br /> 3. Documentation demonstrating compliance with non-ionizing <br /> electromagnetic radiation (NIER) emissions standards as set forth <br /> by the Federal Communications Commission (FCC). <br /> 4. A signed agreement, as supplied by the city, stating that the <br /> applicant will allow collocation with other users, provided all <br />-- Safety, structural, and technological requirements are met. This <br /> ageement shall also state that any fiaum owners or operators will <br /> allow collocation on the tower. <br /> 5. Documentation that the ancillary.facilities will not produce sound <br /> levels in excess of those standards specified in Subsection (7) of <br /> this section, or designs showing how the sound is to be effectively <br /> muffled and reduced pursuant to. those standards. <br /> 6. A landscape plan drawn to scale showing proposed and existing <br /> landscaping, including type, spacing, size and irrigation methods. <br /> 7. Plans showing the connection to utih'ties/right-of-way cuts <br /> required, ownership of utilities and easements required. <br /> 8. Documents demonstrating that necessary easements have been <br /> <br /> IV-39 <br /> Eugene City Council Agenda page30 <br /> <br /> <br />