Laserfiche WebLink
Transportation Funding Secured <br />Upgrades and Capacity Enhancement <br />Amazon Active Transportation Corridor <br />Project Description: This project is to implement walking, running, and bicycling improvements to East/West <br />Amazon Drives and to extend Amazon Path south to Tugman Park. Widen the sidewalk from E 33rd Avenue to the <br />south end of Tugman Park. Install three prefabricated 10' wide steel pedestrian bridges (45' long) over Amazon <br />Creek to increase mobility and transit access. Develop a two-way separated bicycle facility on East or West <br />Amazon Drive from Hilyard Street to Snell Street. Improve the intersection at either 33rd Avenue or 34th Avenue <br />for access to the Amazon Path, to the Rexius Trail and two-way separated bicycle facility. Repair and replace the <br />Rexius Running Trail (approximately from Hilyard Street to Snell Street). <br />This project meets priority measure 2 of TransPlan Financial Policy #6. This project improves the efficiency and <br />capacity of existing pedestrian and bicycle facilities and is included in the CIP because it includes funding sources - <br />transportation SDCs and federal Transportation Alternatives funds - that are not available for projects that meet <br />the first priority measure of "Protect the existing system". <br />Project Status: Not Started This project was included in the FY14-19 CIP. Public Works Department will be <br />applying for funding as part of the 2015-2018 Oregon Statewide Transportation Improvement Program (STIP). <br />Specific Plans/Policies Related to this Project: <br />City of Eugene Transportation System Plan (formerly Transplan) <br />Eugene Pedestrian and Bicycle Master Plan <br />Capital Costs ($ in thousands) <br />Fund <br />2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />Total <br />Federal Funds <br />$224 <br />$27 <br />$1,290 <br />$0 <br />$0 <br />$0 <br />$1,541 <br />Transportation SDC <br />$23 <br />$3 <br />$133 <br />$0 <br />$0 <br />$0 <br />$159 <br />Total <br />$247 <br />$30 <br />$1,423 <br />$0 <br />$0 <br />$0 <br />$1,700 <br />Neighborhood: Southeast <br />Ward: Ward 2 <br />Amazon Active Transportation Corridor <br />City of Eugene 2016 - 2021 Capital Improvement Program Page 173 <br />