Laserfiche WebLink
Control points (V -NODE -CTL) <br />Pole Points (V -NODE -POLE) <br />Pole Symbols (V -NODE -POLES -SYMBOLS) <br />Sanitary Lines (V -LINE -WASTEWATER) <br />Sanitary Points (V -NODE -WASTEWATER) <br />Storm Lines (V -LINE -STORM) <br />Storm Points (V -NODE -STORM) <br />Building Lines (V -LINE -BUILDING) <br />Curb Lines (V -LINE -CURB) <br />5.02 REVISIONS. <br />All plan data shall be verified for accuracy. Revisions to the approved design drawings, <br />reflecting what was actually constructed, must be mapped accordingly. In some instances, <br />changes will require additional engineering analysis. More detailed instructions specific to <br />infrastructure type are provided below, but general expectations are as follows: <br />A. Strikethrough Requirement <br />Cross out original language or design (with a single line so it is still readable) and write in <br />new language. DO NOT ERASE THE OLD/CHANGED INFORMATION. <br />B. Record Requirements <br />Record and date all revisions on appropriate sheet(s). List revisions and change orders in <br />the title block, beginning at the bottom line and continue with subsequent entries <br />progressing toward the top line (not from top to bottom.) Letter the revision number in <br />a triangle. <br />If right-of-way and/or public easement dimensions/locations changed, then verify that <br />the dedication document was revised/replaced accordingly (i.e., new deed, legal <br />description, property owner signature, and recording at Lane County). <br />5.03 TITLE BLOCK ADDITIONS <br />Add the following information to the title block: <br />A. Inspector <br />Date stamp "INSPECTED BY" followed by the project City Inspector's first initial and last <br />name (e.g., INSPECTED BY M. CAIRO). <br />Public Improvement Design Standards Manual, 2016 5 - 2 <br />