My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Control points (V -NODE -CTL) <br />Pole Points (V -NODE -POLE) <br />Pole Symbols (V -NODE -POLES -SYMBOLS) <br />Sanitary Lines (V -LINE -WASTEWATER) <br />Sanitary Points (V -NODE -WASTEWATER) <br />Storm Lines (V -LINE -STORM) <br />Storm Points (V -NODE -STORM) <br />Building Lines (V -LINE -BUILDING) <br />Curb Lines (V -LINE -CURB) <br />5.02 REVISIONS. <br />All plan data shall be verified for accuracy. Revisions to the approved design drawings, <br />reflecting what was actually constructed, must be mapped accordingly. In some instances, <br />changes will require additional engineering analysis. More detailed instructions specific to <br />infrastructure type are provided below, but general expectations are as follows: <br />A. Strikethrough Requirement <br />Cross out original language or design (with a single line so it is still readable) and write in <br />new language. DO NOT ERASE THE OLD/CHANGED INFORMATION. <br />B. Record Requirements <br />Record and date all revisions on appropriate sheet(s). List revisions and change orders in <br />the title block, beginning at the bottom line and continue with subsequent entries <br />progressing toward the top line (not from top to bottom.) Letter the revision number in <br />a triangle. <br />If right-of-way and/or public easement dimensions/locations changed, then verify that <br />the dedication document was revised/replaced accordingly (i.e., new deed, legal <br />description, property owner signature, and recording at Lane County). <br />5.03 TITLE BLOCK ADDITIONS <br />Add the following information to the title block: <br />A. Inspector <br />Date stamp "INSPECTED BY" followed by the project City Inspector's first initial and last <br />name (e.g., INSPECTED BY M. CAIRO). <br />Public Improvement Design Standards Manual, 2016 5 - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.