My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. Curb Elevations <br />If curb elevations differ from design by more than 0.10 foot, cross out old and write in <br />new design data on drawings. <br />5.05 WASTEWATER VERIFICATIONS <br />Correct or add data from the inspection notes. Verify the following wastewater information <br />on the as -construct drawings: <br />A. Structure Numbers <br />All manholes and "phantoms" (a change in the angle of the pipe) on the plans and in the <br />profiles must be numbered, except for pipes less than eight inches in diameter or 25 feet <br />in length. When a manhole is added on an existing line (segment), two new segments are <br />created. Each segment needs a FROM and TO number. New numbers are provided by the <br />City's as -construct monitor. Obtain existing numbers from the City's wastewater index <br />maps. Add or cross out manholes and phantom numbers on the plans per the inspection <br />and final measurements. <br />B. Main Lines <br />Show the final measurements of all wastewater lines (from manhole to manhole). When <br />a segment continues from one drawing to the next, show the total length on both <br />drawings. Check against the inspection notes and video report and identify the video <br />report number. If there is more than a five-foot discrepancy, document the reason. <br />Check and correct the flow lines of all fixtures and ends of pipe in the profile. Cross out <br />old and write in new lines from final measurements. If the flow line from the final <br />measurement differs from the design by more than 0.10 foot or if the pipe size changed, <br />then obtain new wastewater design data from the Design Engineer and cross out old and <br />write in new design data on the drawings. <br />If pipe size, slope, or type changes, obtain new design data, cross out the old data and <br />write in the new. Show the top of the fixture elevation in the profile. <br />Revise any pipe hydraulic data as appropriate. <br />C. Service Lines <br />Show the tee location per the Inspector's notes and video report. If they differ by more <br />than 3 feet, document why there is such a discrepancy. If there is no service line to a lot, <br />indicate why on the drawing. Specifically note if the depth of the service line is either <br />shallower than 4 feet or deeper than 6 feet. <br />Dimension service lines and tees using straight-line progression arrows from the nearest <br />Public Improvement Design Standards Manual, 2016 5 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.