manhole and show distances. Check and correct the length and/or alignment of service <br />lines on the drawing. Cross out old footage and write in new from inspection notes. <br />5.06 STORMWATER VERIFICATIONS <br />Correct or add data from the inspection notes. Verify the following stormwater information <br />on the as -construct drawings: <br />A. Structure Numbers <br />All manholes, catch basins, taps, end of pipe segments, and phantoms on the plans and <br />in the profiles must be numbered, except for pipes less than 10 inches in diameter or 25 <br />feet in length. New numbers are provided by the City's as -construct monitor. Obtain <br />existing numbers from the City's stormwater index maps. <br />Add or cross out manholes, catch basins, taps, end of pipe segments, and phantom <br />numbers on the plans per the inspection and final measurements. When a manhole is <br />added on an existing line (segment), two new segments are created. Each segment needs <br />a FROM and TO number. Use the line break symbol if necessary. <br />B. Main Lines <br />Show the final measurements of all stormwater lines (e.g., from manhole to manhole, <br />manhole to catch basin, and catch basin/manhole to end of pipe). When a segment <br />continues from one drawing to the next, show the total length on both drawings. Check <br />against the inspection notes and video report and identify the video report number. If <br />there is more than a five-foot discrepancy, document the reason. <br />Check and correct flow lines of all fixtures and ends of pipe in the profile. Cross out old <br />and write in new from final measurements. If the flow line from final measurement differs <br />from the design by more than 0.10 foot or if the pipe size changed, then obtain new <br />stormwater design data from the engineer and cross out old and write in new design data <br />on the drawings. <br />Show the elevation of both the top and the bottom of all stormwater structures in the <br />profile. Check and correct catch basin type (cross .out old construction note and write in <br />new, and change drafting symbol). Revise any pipe hydraulic data as appropriate. <br />5.07 STREET LIGHTS <br />Correct or add data from the inspection notes. Verify the following street light information <br />on the as -construct drawings: <br />A. Pole Numbers <br />All street light poles need to be numbered on the street light plans. Numbers can be <br />Public Improvement Design Standards Manual, 2016 5 - 5 <br />