My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. All persons conducting construction activities coveredbyR-6.645-C,1.'shall employ, <br />to the maximum extent practicable, erosion prevention and construction site management practices <br />which will achieve during both the construction period and wet weather season the following <br />outcomes: <br />1.1 Adjacent properties, water features, and Related Natural Resource Areas are <br />kept free ofdeposits or discharges of soil, sediment or construction-related material from the <br />site except those that would occur through natural processes from an undisturbed site; <br />1.2 Vegetation inwater features,RelatedNatural Resource Areas, and, associated <br />bank and/or riparian areas adjacent to construction sites ;are-preserved or'protected from <br />impacts that exceed those that occur through natural processes on an undisturbed site; <br />1.3 Public rights of way, the City's stormwater system and Related Natural <br />Resource Areas, private streets and private stormwater drainage systems that discharge to <br />the City's stormwater system are kept free of mud, soil, sediment, concrete washout, trash, <br />or other similar construction-related material exceeding one-half cubic foot in volume for <br />every 1,000 square feet of disturbed area Direct deposit, dropping, dumping, erosion, <br />tracking, or other discharge by construction vehicles ofrraterials'shall not occur in excess of <br />those that occur throughnaturalprocesses from anundisturbed site. Any such discharges that <br />occur shall be prevented from entering water features or the City's stormwater system and <br />removed not later than the end of the day in which the discharge occurred, or as directed by <br />the City. During the wet weather season corrective action shall betaken immediately for such <br />discharges. <br />1.4 Soils" and stockpile areas shall not be exposed to precipitation or stormwater <br />runoff without the provision of secondary containment, perimeter controls, and other <br />approved B1VIP's. <br />1.5 Earth slides, mudflows, earth sloughing; or other earth movement which may <br />leave the property, shall not occur in excess of those that occur through natural processes on <br />an undisturbed site; <br />L 6 No discharge into the City's stormwater, system or Related Natural Resource <br />Areas of construction related contaminants resulting from activities such as, but not limited <br />to, cleaning or washing of equipment, tools, or vehicles, shall occur: <br />L7 No hazardous substances, such as paints, thinners, fuels and other chemicals <br />shall be released onto the site, onto adjacent properties, or into water features, the. City's <br />stormwater system, or Related Natural Resource Areas. <br />1:8 A supply of materials necessary to meet the above outcon-ies and implement <br />the construction site management plan and maintain approved best management erosion <br />Administrative Rule - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.