My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
practices under all weather conditions shall be kept at all times on the construction site. <br />2. When designing and implementing management BMP's to meet the above outcomes, <br />the applicant shall consider the seasonal variation of rainfall; temperature, and other climatic factors <br />relative to the timing of land disturbance activities. All construction activity that will result in soil <br />disturbance during the wet weather season shall, at a minimum, implement and maintain the following <br />Best Management Practices (BMP) on site: <br />2.1 Construction site entrances shall be graveled with crushed rock. of sufficient <br />size and: grading as necessary to prevent any off-site tracking. <br />2.2 All stormwater facilities, water features, and RelatedNaturalResource Areas' <br />shall be protected. <br />2.3 All exposed soil and stockpile are -as not protected by perimeter control <br />consistent with an approved CSIVIP shall be covered <br />2.4 Sediment, soil, or construction related material shall be removed immediately <br />from the right-of-way, adjacent property, and the city's stormwater system, including water <br />features and Related Natural Resource Areas. <br />3. No permit or other approval issued pursuant to these rules shall be deemed to <br />authorizze any violation of the above outcomes or wet -weather requirements. <br />R 6.64rE Designation of Sensitive Areas. <br />1. Criteria for Sensitive Area Designation. For the purposes of administering these <br />Rules, any construction site that meets one or more of the following criteria shall be considered a <br />sensitive area for which an erosion prevention permit will be required_ <br />1.1 The slope of the parcel in the area of disturbance is greater than 10%; <br />1.2 The site contains` highly erodible soils, or <br />1.3 The parcel or tax lot of record has the potential to directly drain into a water <br />feature or its designated b4fler area: <br />2. Determination of Sensitive Area. To : assist with the administration of these <br />provisions, the City has prepared a map indicating sites that appear to meet the above criteria. The <br />Public Work's Director, or designee, shall use this map to make a preliminary determination of a <br />site's sensitive area status. The map is on file at the Citys Public Works Engineering Department <br /><Administrative Rule - 11 <br />�t1'1'�:MYW3N aysvnF'rov-2su.w�fti <br />
The URL can be used to link to this page
Your browser does not support the video tag.