My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.02 PURPOSE <br />The purpose of this manual is to satisfy the directive in Eugene Code 7.085 by providing design <br />standards for construction, reconstruction or repair of public improvements to be <br />constructed within areas under the City's jurisdiction. This manual includes information for <br />the design, plan preparation, and related construction requirements for both publicly- and <br />privately -initiated work. To further facilitate consistency, the bulk of this manual is its <br />appendices, which consist of related resources and regulations. Naturally, these standards <br />neither address all situations nor absolve professional competency. As provided in Section <br />1.03, the City may approve systems not included in this manual for special conditions and/or <br />environmental constraints. <br />1.03 PROFESSIONAL ENGINEER LISCENSE REQUIRED - VERIFICATION <br />An Oregon Registered Professional Engineer shall place their seal on all documents in <br />accordance with ORS 672.020, OAR 820-010-0620, and OAR 820-010-0621. Licensed <br />professionals in other disciplines may apply their seal to documents in accordance with OAR <br />820-010-0623 provided the work is within their education, training, expertise and licensure <br />as defined by Oregon law. The seal of another professional in no way absolves the Project <br />Engineer's responsibility to manage the project in its entirety. <br />In January of each year, the Computer Aided Drafting (CAD) leads for the City's project <br />teams will check the Oregon State Board of Examiners for Engineering and Land Surveying <br />(OSBEELS) database to determine if the professional engineering licenses for the engineers <br />on their teams are active prior to the first time the engineer's stamps are used. For those <br />licenses scheduled to expire in June, the CAD leads will check the OSBEELS database again <br />at the end of July to determine whether those mid -year licenses have been renewed and <br />continue to be active. If licenses are found to be inactive, the CAD leads will immediately <br />notify the engineers whose license are inactive and the principal engineers. Expiration <br />dates for the stamps will not be updated in CAD until the OSBEELS database has been <br />checked tq confirm the licenses are active. At no time will expired stamps be placed on <br />review plans, final plans or as -built sheets. <br />The City's PEPI Manager or designee shall check OSBEELS database to determine if the <br />professional engineering licensees for engineers on PEPI projects are active prior to PEPI <br />plan.approval. PEPI plans must be approved with the seal of an active Professional <br />Engineer. <br />1.04 DESIGN EXCEPTIONS AND DEVIATIONS <br />These standards are not intended to limit innovation or creativity, particularly when such <br />efforts result in higher quality and/or lower costs. Departure from the required standards <br />Public Improvement Design Standards Manual, 2016 Page 1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.