My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other information should be obtained directly from utility owners (see Appendix L for <br />contact information). The applicant will be required to resolve any conflicts directly with <br />the utility owner; additionally, written concurrence from each utility will be required prior <br />to City approval of the PEPI plans, in accordance with Section 4.08 Concurrences. <br />4.02 APPLICATION REQUIREMENTS <br />The following information is required for the City to process the PEPI permit. <br />A. Engineering and Construction Agreement <br />The Owner/Developer shall submit a signed "Engineering and Construction Agreement" <br />(see Appendix Q. This agreement defines the scope of work and confirms that the public <br />improvements will be privately engineered, constructed and financed. This agreement <br />obligates the Owner/Developer to reimburse the City for costs incurred to complete the <br />project. See Section 4.05 City Engineering Services and Section 4.10 Financial <br />Responsibilities for more information. <br />B. Supporting Analyses <br />1. Geotechnical Analysis is required of all PEPI projects; refer to Appendix C for <br />report requirements. <br />2. Stormwater Analysis is required to demonstrate compliance with the <br />standards in Appendix J as noted in Section 2.04 of this manual. <br />3. Wastewater Analysis is required as noted in Section 2.08 of this manual. <br />4. Pavement Design Calculations are required for all new streets as noted in <br />Section 2.05. <br />5. Street Light Analysis is required for all new streets as noted in Section 2.05, <br />6. Traffic Signal Warrant Analysis is required, when applicable, as noted in <br />Section 2.07. <br />7. Pipe -Load Calculations are required as noted in Section 2.08. <br />8. Critical Root Zone Impact analysis is required with tree preservation. See <br />Section 3 regarding natural resource area mapping required on Construction <br />Site Management Plans. For, additional information on applicable tree <br />regulations, refer to Appendix D. <br />Public Improvement Design Standards Manual, 2016 Page 4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.