My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Admin Order 58-16-01
COE
>
City of Eugene
>
Administrative Orders
>
2016
>
Admin Order 58-16-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2016 3:04:50 PM
Creation date
3/4/2016 10:51:32 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Admin Orders
Document_Date
3/2/2016
CMO_Effective_Date
3/2/2016
Author
CRO
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Railroad Permit <br />Any work crossing (above or below ground) or adjacent to railroad property requires a <br />permit from the affected railroad company. <br />E. Fill Permit <br />A PEPI permit does not authorize grading/fill activity on private property. It is the <br />applicant's responsibility to verify and obtain all necessary grading/fill permits through <br />Building and Permit Services at the Permit Information Center before starting any <br />construction outside of the public -rights of -way and easements. <br />F. Tree Removal Permit <br />A Tree Removal Permit may be required for work near street trees or removal of a tree <br />on private property. Removal of more than 30 percent of the critical root zone of a street <br />tree constitutes a felling and requires a permit. Authorization for planned, unavoidable <br />streettree removal is typically approved through the PEPI permit. Unanticipated technical <br />fellings or removals requires a separate street tree removal permit and/or may be subject <br />to penalties as violations of Chapter 6.300. Replacement of a street tree or payment of its <br />appraised value is required under the PEPI, as determined by the Urban Forester. See <br />Appendix D for applicable regulations. Trees shall be delineated on the CSMP; refer to <br />Section 3 for plan requirements. <br />G. Electric Permit <br />An Electrical Permit is required from Building Permit Services at the Permit and <br />Information Center for all traffic signal and street illumination work. The electrical <br />Contractor is responsible for obtaining the permit after the construction plans are <br />approved. <br />4.12 CONTRACTOR AND CONSTRUCTION SCHEDULE <br />Contractor: The applicant (Owner/Developer) shall submit a copy of their contract with a <br />qualified Contractor. If the Contractor is not known by the City Engineer pre -qualification <br />screening may be required: <br />Construction Schedule in accordance with the Standard Specifications shall be submitted <br />before the construction permit is issued. <br />Public Improvement Design Standards Manual, 2016 Page 4-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.